Unit 1
process planning
• Activities involved to convert design into the
product.
Types of process planning
• Manual process planning
– Traditional approach
– Workbook approach
• Computer aided process planning
– Retrieval process planning (variant)
– Generative process planning
Traditional approach
• Manual
• Based on process planner experience and
intuition it will vary.
• Stages
Stage 1 process planner interpret product
drawing
Stage 2 refer manual
Stage 3  documenting routing sheet
Workbook approach
• Modified version of the traditional approach
• Referring workbook
• Workbook which contains predetermined
sequence of operation (standard procedures).
Advantages of manual process
planning
• Suitable for small scale industries.
• Highly flexible.
• Low investment costs.
Disadvantages of Manual process
planning
• Time consuming process.
• Need a skilled process planner.
• Possibilities for human error.
• Inconsistent process plan.
Computer aided process planning
(CAPP)
why we need to go for CAPP?
• Overcome the drawbacks of Manual process
planning.
• Reduce the routine work of manufacturing
engineer.
• Act as an interface between CAD and CAM.
Benefits of CAPP (2 mark)
• Productivity improvement.
• Production cost reduction
• Elimination of human error.
• Product standardization.
Approaches of CAPP
• Retrieval CAPP system (variant approach)
• Generative CAPP system
Retrieval CAPP system
• Concept similar parts will have similar
process plan.
• Process plan for a new product is created by
recalling, identifying or retrieving the existing
plan for similar product.
Retrieval CAPP system (procedure)
Advantages of retrieval CAPP
• Once a standard plan is produced, similar
plans can be produced using existing plan.
• Simple programming (when compared to
Generative type).
• Easy to learn and use.
• Commercially available retrieval CAPP systems
are  MultiCapp and MIPLAN
Generative Process plan
• In generative approach, the process plan were
generate process plan automatically without
any reference to prior plan.
• Concept the concept is based on decision
logics and pre-coded algorithms.
Components of Generative process
plan
Part description
Sub system (define
machining parameters)
Subsystem (define
sequence of operation )
database
Report generator
Advantages of generative CAPP
• Generate consistent process plan.
• New components can planned easily
• Integrating with an automated manufacturing
facility.
• Example APPAS,CMPP,EXCAP,XPLAN
Drawing interpretation
• First step
• Getting information from the drawing.
• Prepared by design department.
• Details required
– Material of the component, its designation
– Number of parts to be produced
– Weight of the component
– Dimensions of the part
– Dimensional and geometric tolerances
– Size and accuracy of the parts
Engineering drawing
• Universal language
• Projection
– Orthographic
– Pictorial
• Types of drawing
– Detailed drawing
– Assembly drawing
– Combined drawing
Detailed drawing
• Detailed drawing
– Single part drawing
– Collective single part drawing
Single part detailed drawing
Collective part detailed drawing
Assembly drawing
• Assembly drawing
– Single part assembly drawing
– Collective assembly drawing
Single part assembly drawing
Collective assembly drawing
Combined drawing
Information on the drawing sheet
required
• Geometric and dimensions (complete dimensions)
• Material specifications (material code , example SS310)
• Notes of special material treatments (like heat treatment)
• Dimensional tolerances (upper limit and lower limit eg:
10±0.2)
• Geometric tolerances (straightness, flatness, roundness)
• Surface finish specifications (roughness and waviness)
• Tool references
• Gauge references
• Quantity to be produced
• Part lists
Material Evaluation
• Second activity of process planning.
• Material selection (done by design engineer)
– Choose the material
• Material evaluation (done by process planning
engineer)
– Check the chosen material for further process
Material properties
Classification of materials
Metals and their classification
Metals
• Based on iron content
– Ferrous(iron more)
– Non ferrous (iron content less)
Ferrous
• Ferrous
– Steels (carbon percentage less than 2%)
– Cast iron (carbon percentage more than 2%)
Steels
• Steels
– low alloy steel (percentage of alloying element is less
than 5 %)
• Low carbon steel (mild steel) (carbon percentage less than
0.25%)
• Medium carbon steel (0.25 % to 0.6 % )
• High carbon steel (more than 0.6 %)
– High alloy steel (percentage of alloying element is
more than 5 %)
• Tool steel
• Stainless steel (chromium content is more than 12 %)
Cast Iron
• Cast iron (carbon percentage more than 2 %)
– Grey most widely used
– White hard and brittle
– Malleable  highly malleability
– Spheroidal Graphite cast iron (SG cast iron) high
ductility.
Non ferrous materials
• Non Ferrous materials (iron content low)
Example Aluminium, Copper, Lead, Tin, Zinc,
Nickel, Titanium, Magnesium
• Properties
– Light in Weight.
– High electrical and thermal conductivity.
– Better resistance to corrosion.
– Ease of fabrication.
– Colour.
Polymer
• Polymers a substance which has a
molecular structure built up chiefly or
completely from a large number of similar
units bonded together.
Polymers Classification
Ceramics
• Ceramics A ceramic is any of the various
hard, brittle, heat-resistant and corrosion-
resistant materials made by shaping and then
firing a nonmetallic mineral, such as clay, at a
high temperature.
Ceramics Properties
• Ceramics are strong, hard and brittle.
• Can be used at high temperature.
• They are good thermal and electrical
insulators.
Ceramic Example
• Alumina
• Silicon Carbide
• Silicon nitride
• Sialons
composites
• Composites composites are the
combination of two or more materials having
superior properties than the original
materials.
Composites Classification
Material selection process (procedure)
Material evaluation method
• Steps
– Shape and geometry considerations
• Dimension
• Size
• Surface finish
– Material property requirements
• Mechanical
• Physical
• service
– Manufacturing considerations
• Interchangeability
• Quality assurance
• Ease of manufacturing and assembly
Steps in process selection
• Process method of shaping, joining and
finishing
• We need to choose right process.
Manufacturing Process
Classification of process
Factors in process selection
• Material form
• Component shape and size
• Economic consideration
• Dimensional and geometric accuracy
• Surface finish
• Batch size
• Production rate
Steps in Process Selection
• Drawing interpretation (process-shape matrix)
• Identification of critical processing factors
(process material matrix)
• Comparison of potential manufacturing process
(compare)
• Identification of suitable process (select)
Process shape matrix
Process material matrix
Production equipment and tooling
selection
• Selection of production equipment (machine)
• Selection of tooling (tool)
Factors consider Production
equipment selection (machine)
• Technical factors
– Physical size
– Machine accuracy
– Surface finish
– Cutting force
• Operational factors
– Batch size
– Capability
– availability
PROCESS PLANNING AND COST ESTIMATION
Tooling selection constraints
Stages in tooling selection
• Evaluation of Process and tooling selection
• Analysis of machining operations
• Analysis of workpiece characteristics
• Tooling analysis
• Selection of tooling
UNIT 2
Process Planning Activities
Process Planning Activities
• Process parameter calculation for various
production process
• Selection of jigs and fixtures
• Selection of quality assurance methods
• Set of documents for process planning
• Economics of process planning
• Case studies
Process Parameter calculation for
various production process
• Process Parameter
– Cutting Speed
– Feed and Feed rate
– Depth of Cut
Cutting Speed
• Cutting Speed Relative speed between tool
and workpiece
• Unit mpm
Cutting Speed
• Factors affecting cutting speed
– Nature of cut
– work material
– Cutting tool material
– Cutting fluid application
– Purpose of machining
– Kind of machining operation
– Capacity of machining tool
– Condition of the machine tool
Cutting speed
Cutting speed
Cutting speed (formula)
Turning problem
• Turning a rod of 60 mm diameter and the
maximum spindle speed is 500 rpm. calculate
the cutting speed in m/min.
Cutting speed (formula)
Shaping problem
Feed and Feed Rate
• Feed distance through which the tool
advances into the workpiece
• Feed rate rate at which cutting tool
advances the workpiece.
• Unit mm/rev or mm/min
Factors affecting feed rate
Feed rate for turning and boring
Feed rate for drilling
Feed rate for milling
Depth of Cut
• Depth of cut thickness of material removed
in one cut.
• Depth of cut is always perpendicular to feed
direction
• Unit mm
Speed, feed, and depth of cut
https://www.youtube.com/watch?v=NN3vOblJQ
Q8
Selection of Jigs and Fixture
• Work holding device to position and hold the
work piece in precise location while
manufacturing operation.
• General work holding devices
– Vices
– Chuck
– clamp
• Special work holding devices
– Jigs
– fixtures
PROCESS PLANNING AND COST ESTIMATION
Jigs and Fixture
• Jigs
– Which locate and hold the workpiece and guides
the tool
• Fixture
– Which locate and hold the workpiece and does
not guide the tool.
Jigs and Fixture animation
• https://www.youtube.com/watch?v=5m5HqE
y_Jqs
Functions of jigs and fixtures
• Chris Strikes Long Raining Sixes
• Clamping exert force to press the workpiece
• Supporting supporting machines
• Locating position the workpiece
• Resist forces
• Safety factors
Reason for using jigs
• Reduce the effort of setting workpiece
• Reduce production cycle time
• Semi skilled labour employed
• Reduce the cost of inspection
Factors considering during selection of
jigs and fixture
• Physical characteristics of tool and workpiece
• Type and capacity of machine
• Study of safety and ejecting devices
• Required level of accuracy
Types of jigs and Fixtures
• Types of Jigs
– Drill Jig
 drilling, tapping, chamfering, spot facing, reaming
countersinking
– Boring Jig
• Types of Fixture
– Turining, milling, grinding, broaching, boring,
taping, welding, assembly
Selection of quality assurance
methods
• Quality is fitness for use (Juran)
• Quality assurance maintenance of a desired level of
quality
• Selection of quality assurance methods for critical factors
• Critical factors
– Dimensional tolerance
– Geometry tolerances
– Surface finish
Steps involved in quality assurance
• Identification of inspection location
• Identification of most appropriate inspection
technique
• Determination of frequency of testing
• Evaluation of inspection and test data
• Identification of corrective data
Quality
• Quality Assurance Strategy
– Detection Strategy
– Prevention Strategy
Detection Strategy
Prevention Strategy
Statistical tools of Quality
Statistical tools of Quality
Statistical Quality Control
Statistical Quality Control
Statistical Quality Control
• Descriptive Statistics mean, median, mode
• Statistical process control using control
charts
• Acceptance sampling samples are taken to
decide quality
Control chart
Attribute Vs Variables
Inspection and measurement
• Maintain the product quality
• Stages
– Pre-production inspection
– Inspection during production
– Post production inspection
Inspection and measurement
• Types
– 100% inspection
– Sample inspection
Inspection and measurement
• Inspection of attributes (surface finish,
accuracy)
• Inspection of variables (with quantitative
numbers)
Measurement Instruments
Inspection of attributes
Inspection of variables
Inspection of variables
Factors to be considered while
Selecting measuring instruments
• Accuracy
• Linearity
• Magnification
• Repeatability
• Resolution
• Sensitivity
• stability
Set of documents required for process
planning
Set of documents required for process
planning
Set of documents required for process
planning
Economics of Process planning
• Process planner should have fundamental
knowledge on cost estimating, cost
accounting, various types of costs,
components of cost and calculation of cost of
the product manufacturing
Economics of Process planning
• Knowledge of costing will help process
planner and management for taking following
decisions
– Type of material to be used
– Type of manufacturing process
– Volume of product
– Make or buy decision
– Design of a product
Break even analysis
• It is graph plotted between sales and volume
Break even analysis
• Break even analysis it is a study of inter
relationships between sales, cost and
operating profit at various levels of output.
• Break even point no profit no loss
(revenue=cost)
Break even analysis
• To help in deciding profitable level of output
• To compute cost and revenue for all volumes
• To take decision regarding make or buy
• To take plant expansion decisions
Break even Point
• Algebraic method
• Graphical method
Algebraic method
Graphical method
Case Study
Process planning activities
• Step 1 Analyse (Drawing interpretation)
– Spindle have to be manufactured 60 mm dia and
130mm length
– Spindle consist of three concentric cylinder
– One internal thread and one external thread have
to be cut
Process planning activities
– material of the component is mild steel
– Dimensional tolerance is 0.05
– Number of parts to be made = 200
Process planning activities
• Step 2 Identification of operation involved
and sequence of operation
• First operation  turning from 60 mm
diameter to 50 mm diameter for 130 mm
length
Process planning activities
• Second operation  50 to 40 for 110 length
• Third operation 40 to 35 for 65 length
• Fourth operation  drilling 10 mm dia for 45 mm
length
• Fifth operation internal threading
• Sixth operation external threading
Process planning activities
Process planning activities
UNIT 3
INTRODUCTION TO COST
ESTIMATION
Syllabus
Topics to be covered
• Cost Estimation (Estimation) Vs Cost Accounting
(Costing)
• Importance of Cost Estimation
• Types of estimates
• Elements of cost estimation
• Estimating procedure
Topics to be covered
• Importance of Costing
• Methods of costing
• Elements of Costing
• Estimate of labor cost and material cost
• Allocation of overhead charges
• Calculation of depreciation cost
Cost Estimating (Estimation)
• Process of determining the probable cost of
the product before the start of manufacture.
Cost Accounting (Costing)
• Process of determining the Actual cost of the
product after the manufacturing.
Importance of cost estimation
• Important for all organizations.
• Important for deciding manufacturing and
selling policies.
• Problem
– Overestimating problem with competitive
prices
– Underestimating will lead to financial loss
Objective of cost estimation
• To establish selling price of product
• To verify the quotation by vendors
• To take make or buy decision
• To prepare production budget
Types of estimate
• Preliminary cost estimate
• Final Cost estimate
Preliminary cost estimate
• Based on incomplete data
• Less Accurate
• Suitable for new project
• Procedure
– With drawings
– Without drawings
Final Cost estimate
• Based on complete data
• Most Accurate
• Huge amount of money spent to make the
estimate
Classification of cost estimates based
on design level
• Conceptual phase (cost estimate accuracy
±30%)
• Preliminary design phase (cost estimate
accuracy ±20%)
• Detailed design phase (cost estimate accuracy
±10%)
Methods of Estimate
• Conference method
• Comparison method
• Detailed analysis method
Methods of Estimate
• Parametric Estimating
– Uses relationship between the historical data and
other variables
• Statistical Estimating
– Sampling or random sampling used in general
study for variable
Data Requirements for cost estimating
Data Sources for cost estimating
Data Sources for cost estimating
Data Sources for cost estimating
Possible Estimation
• Over Estimation
• Under Estimation
• Realistic Estimation
Elements of cost estimation
Design Cost
Drafting Cost
Cost of Research and Development
Materials Cost
Labour Cost
Inspection Cost
Maintenance Charges
Overhead Cost
Cost Estimating procedure
Cost Estimating procedure
Cost Estimating procedure
Cost Estimating procedure
Cost Estimation Form
Cost Accounting (Costing)
• Process of determining the Actual cost of the
product after the manufacturing.
Importance of Cost Accounting
• Determining , classifying and analyzing the
cost and income of business firm
• Determining prices to be quoted to customers
• Forming basis for managerial decision
– To make or buy decision
– To introduce new product or drop on existing one
Importance of Cost Accounting
• Cost control through the accumulation and
utilization of cost data.
• Establishing standard for measuring efficiency.
Estimating Vs Costing
Methods of Costing
1. Job costing
2. Batch Costing
3. Process costing
4. Department costing
5. Operating cost method
6. Unit cost method
7. Multiple cost method
Job costing
• Method is concerned with finding cost of the
individual job
• Suitable for job order industries (ship building,
machine manufacturing, fabrication, building
contracts)
Batch costing
• Method concerned with instead of costing of
separately, each batch of components is taken
together.
• Used to determine the cost of group of similar
products
Process Costing
• Method concerned with standard product
with number of distinct processes performed
in a definite sequence.
• Used in oil refining, chemical, paper making,
paint , cement manufacturing
Department costing
• Method is suitable for cost of output of each
department separately for the manufacture of
standard products
• Used in Steel industry and automobile
industry.
Operating cost method
• Method is suitable for company providing
utility services
• Example transport services, water works,
electric board,
• Cost is based on operating expenses (per Km)
Operating cost method
Unit cost method
• Method is suitable for companies with the
uniform product
• Example mines, quarries etc.
Multiple cost method
• Method is suitable for companies producing
variety of standardized products, with no
relation between cost, quality and process.
Classification of cost
Elements of cost
Material cost
• Direct Material material becomes the part
of product
– Mild steel used for spindle
– Wood used for table
• Indirect Material used to convert the direct
material into finished product
– Greese, lubricating oil, coolant
Labour cost
• Direct Labour labour directly work on the
produt
– Welder, casting technician etc
• Indirect Labournon productive staff to help
the productive labour
– Supervisor, inspector, store keeper, watchman
Expenses
• Direct Expenses charged directly to the
particular job
– Design
– manufacturing
• Indirect Expenses other than material, labor
and direct expenses.(Overhead charges)
Overhead charges
• Factory expenses
– Cost fuel, power and internal transport
– Repair and maintenance
• administrative expenses
– Charge of higher officials
– Office rent, legal charges, audit fees
• Selling expenses
– Cost of sales manager
– Cost of advertising
• Distribution expenses
– Packaging and delivery
– Store keeper
– unloading
Components of cost
• Prime cost
• Factory cost
• Production cost
• Total cost
• Selling Price
Ladder of Cost
Estimation of material cost
Procedure
Estimation of material cost
Estimation of material cost
Estimation of Labor Cost
• Cost spent on workers who directly involve in the
manufacturing operations.
• Formula
Labor cost= standard time * cost of labour per hour
• Estimator should have knowledge on
– Operations involved
– Tools used
– Machines used
Estimation of Labor Cost
Estimation of Standard time
problem
Estimation of Standard time (with allowances)
problem
Estimation of Standard time (with
allowances)
Calculation of Selling Price
Problem
PROCESS PLANNING AND COST ESTIMATION
Calculation of Selling Price
Problem
Allocation of Overhead
Depreciation
Causes of Depreciation
Methods of finding Depreciation fund
Straight line method
• Amount of depreciation distributed over the
equal period of installments.
• Merit simple method (little calculations)
• Demerit this method does not consider
maintenance and repair charges
Straight line method
Formula
Straight line method
Problem
Straight line method
Problem
Straight line method
Problem
Straight line method
Problem
Diminishing balance method
(Reducing balance method)
Reducing balance method
Formula
Reducing balance method
Problem
Reducing balance method
Problem
Reducing balance method
Problem
Sinking Fund Method
Sinking Fund Method
Formula
Sinking Fund Method
Problem
Annuity method
• In sinking fund interest amount earned invested
on outside agencies but in this method invested
within company.
Annuity method
Formula
Annuity method
Problem
Annuity method
Problem
Sum of years digit method
Sum of years digit method
Problem
Sum of years digit method
Problem
Sum of years digit method
Problem
Insurance Policy Method
Machine hour Method
Production Unit Method
Revaluation Method
Retirement Method
UNIT 4
PRODUCTION COST ESTIMATION
Syllabus
Topics to be covered
• Estimation of Forging Shop
• Estimation of welding
• Estimation of foundry shop
Forging
• ForgingForging is a manufacturing process
involving the shaping of metal using localized
compressive forces.
Types of Forging
• Hot Forging
– Forging done above the Recrystallization
temperature
• Cold Forging
– Forging done below the Recrystallization
temperature
Forging process
• Hand forging
• Drop forging
• Press forging
• Machine forging
Forging operations
• Upsetting
• Drawing down
• Setting down
• Bending
• Punching
• Drifting
• swaging
Estimation of material losses in forging
• Shear loss
• Tonghold loss
• Scale loss
• Flash loss
• Sprue loss
Estimation of forging cost
• Material cost
• Labour cost
• Overhead cost
Forging Problem
Forging Problem
Forging Problem
Forging Problem
Forging Problem
Forging Problem
Forging Problem
Forging Problem
Forging Problem
Estimation in welding shop
• Welding welding is the process of joining of
similar or dissimilar metal by application of
heat
Types of Welding
• Pressure Welding
• Non Pressure Welding
Estimation of welding cost
Estimation of welding cost
Estimation of welding cost
Estimation of welding cost
Estimation of foundry cost
Estimation of foundry cost
Estimation of foundry cost
Estimation of foundry cost
Estimation of foundry cost
UNIT 5
MACHINING TIME CALCULATION
Syllabus
Estimation of machining time
• Machining time is the time which machine
works on the component.
• Eg: from the time tool touches the work to
tool leaves the work
Terms used
• Length of Cut
• Cutting Speed
• Feed
• Depth of Cut
Length of Cut
• Approach Length
• Length of workpiece to be machined
• overtravel
Length of Cut
Cutting Speed
• Cutting Speed Relative speed between tool
and workpiece
Feed and Feed Rate
• Feed distance through which the tool
advances into the workpiece
• Unit mm/rev or mm/min
Depth of Cut
• Depth of cut thickness of material removed
in one cut.
• Depth of cut is always perpendicular to feed
direction
Importance of machining time
calculation
• Inorder to find out the machining cost
• Reduction of total manufacturing time, T
• Increase in MRR, i.e., productivity
• Reduction in machining cost without sacrificing
product quality
• Increase in profit or profit rate, i.e., profitability.
Calculation of machining time for
different lathe operation
• Turning
• Chamfering
• Facing
• Knurling
• Thread Cutting
Turning operation
External Relief Turning
Chamfering operation
Facing operation by lathe
• The process of reducing length of the material
is called facing
• This can be done by the single point cutting
tool
Facing (formula)
Facing operation
KNURLING
• KNURLING MEANS CREATING CROSS LINKED
PATTERN ON THE WORKPIECE BY LATHE
MACHINE.
knurling
Machining time calculation for Drilling
Drilling Problem
Machining time calculation for
Boring(formula)
Boring Problem
Milling
• Milling is the removal of material from
workpiece by rotary multipoint cutting tool.
• Operations
– Face milling
– Slot milling or slab milling
– Profile machining or forming
– Keyway cutting
– indexing
Milling operation
Machining time calculation for milling
formula
Machining time calculation for milling
Determination of added table travel
• Face milling
Determination of added table travel
• Slot milling or slab milling
Machining time calculation for milling
Machining time calculation for milling
Machining time calculation for milling
Machining time calculation for
Shaping
Machining time calculation for
Shaping
Machining time calculation for
Shaping
Machining time calculation for
Shaping (problem)
Machining time calculation for
planning
Machining time calculation for
Grinding
• Grinding is the process of metal removal by
abrasion.
• Methods of grinding
– Surface grinding
– Cylindrical grinding
Machining time calculation for
Grinding (Formula)
Machining time calculation for
Grinding (Formula)
Machining time calculation for
Grinding (Problem)
Machining time calculation for
Grinding (Problem)
Machining time calculation for
Grinding (Problem)
THANK YOU

More Related Content

PPTX
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPT
Process Planning & Cost Estimation
PDF
Ppce unit 2- PROCESS PLANNING ACTIVITIES
PPTX
INTRODUCTION TO PROCESS PLANNING
PPTX
tolerance stack up analysis
PPTX
Strength of Materials
PDF
Mechanical Testing : Testing Of Materials
PPT
Machining time and costs
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
Process Planning & Cost Estimation
Ppce unit 2- PROCESS PLANNING ACTIVITIES
INTRODUCTION TO PROCESS PLANNING
tolerance stack up analysis
Strength of Materials
Mechanical Testing : Testing Of Materials
Machining time and costs

What's hot (20)

PPT
introduction to process planning murugananthan
PPTX
Unit ii process planning activities
PPTX
PPCE Unit 4
PPTX
PPCE unit 2 (ME8793 – PROCESS PLANNING AND COST ESTIMATION )
PPTX
Electron beam machining (ebm)
PPTX
CNC part programming
PPTX
Theory of Metal Cutting
PPTX
PPTX
Group technology
PPTX
Tool changing mechanism in cnc machine
PPTX
Lecture 3 Computer - Aided Manufacturing (CAM)
PPT
Jigs and Fixture
PPTX
Computer Aided Process Planning (CAPP)
PPT
Adaptive control System
PPT
Rapid prototyping and tooling
PPTX
Automatically programmed tool (ATP)
PPT
Electrical discharge machining
PPTX
Numerical control machines tool
PDF
Unit 5-cad standards
PPT
Automatic lathes
introduction to process planning murugananthan
Unit ii process planning activities
PPCE Unit 4
PPCE unit 2 (ME8793 – PROCESS PLANNING AND COST ESTIMATION )
Electron beam machining (ebm)
CNC part programming
Theory of Metal Cutting
Group technology
Tool changing mechanism in cnc machine
Lecture 3 Computer - Aided Manufacturing (CAM)
Jigs and Fixture
Computer Aided Process Planning (CAPP)
Adaptive control System
Rapid prototyping and tooling
Automatically programmed tool (ATP)
Electrical discharge machining
Numerical control machines tool
Unit 5-cad standards
Automatic lathes
Ad

Similar to PROCESS PLANNING AND COST ESTIMATION (20)

PPTX
PPTX
PPT for course work.pptx fddddddhhhhhhhhddddd
PPTX
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
PPTX
UNIT-1-PPCE.pptx
PPTX
Unit 1
PPTX
PROCESS PLANNING AND COST ESTIMATION
PPTX
Cim presentation (1)
PPTX
PPCE Unit -1.pptx
PPTX
PPCE Unit -1.pptx
PPT
Process Planning
PPTX
Process planning activities
PPTX
Process planning and cost estimation
PDF
Cam 1 unit palanivendhan manufacturin systems
PPT
Process Selection & Facility Layout.ppt
PPTX
INTRODUCTION TO PROCESS PLANNING
PPTX
UNIT- 1.pptx
PPTX
TMA Module 2........................................................
PPT
computer aided process planning, approaches to capp, variant and generaive type
PPT
UNIT 1 PPCE.ppt
PPT
Process engineering
PPT for course work.pptx fddddddhhhhhhhhddddd
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
UNIT-1-PPCE.pptx
Unit 1
PROCESS PLANNING AND COST ESTIMATION
Cim presentation (1)
PPCE Unit -1.pptx
PPCE Unit -1.pptx
Process Planning
Process planning activities
Process planning and cost estimation
Cam 1 unit palanivendhan manufacturin systems
Process Selection & Facility Layout.ppt
INTRODUCTION TO PROCESS PLANNING
UNIT- 1.pptx
TMA Module 2........................................................
computer aided process planning, approaches to capp, variant and generaive type
UNIT 1 PPCE.ppt
Process engineering
Ad

More from KIT-Kalaignar Karunanidhi Institute of Technology (20)

PPTX
Unit 1 automotive engine auxiliary systems
PPTX
Unconventional machining processes
PDF
ME6403 - ENGINEERING MATERIALS AND METALLURGY BY Mr.ARIVUMANI RAVANAN /AP/MEC...
PDF
ME6302 MANUFACTURING TECHNOLOGY – I BY Mr.K.SIVAKUMAR /AP/MECH/KIT/CBE
PDF
ME2036- ENGINEERING THERMODYNAMICS BY Mr.P.SATHISH
PDF
ME2041 ADVANCED I.C. ENGINES BY Mr.P.BALAKRISHNAN/AP/MECH/KIT/CBE
PDF
ME6004 - UNCONVENTIONAL MACHINING PROCESS BY Mr.P.HARIPRASAD/AP/MECH/KIT/CBE
PDF
ME 2029 - DESIGN OF JIGS AND FIXTURES NOTES BY Mr.K.SATHISHKUMAR/AP/MECH/KIT/CBE
Unit 1 automotive engine auxiliary systems
Unconventional machining processes
ME6403 - ENGINEERING MATERIALS AND METALLURGY BY Mr.ARIVUMANI RAVANAN /AP/MEC...
ME6302 MANUFACTURING TECHNOLOGY – I BY Mr.K.SIVAKUMAR /AP/MECH/KIT/CBE
ME2036- ENGINEERING THERMODYNAMICS BY Mr.P.SATHISH
ME2041 ADVANCED I.C. ENGINES BY Mr.P.BALAKRISHNAN/AP/MECH/KIT/CBE
ME6004 - UNCONVENTIONAL MACHINING PROCESS BY Mr.P.HARIPRASAD/AP/MECH/KIT/CBE
ME 2029 - DESIGN OF JIGS AND FIXTURES NOTES BY Mr.K.SATHISHKUMAR/AP/MECH/KIT/CBE

Recently uploaded (20)

PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
Unit 4 Skeletal System.ppt.pptxopresentatiom
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
Cell Types and Its function , kingdom of life
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
IGGE1 Understanding the Self1234567891011
PDF
Trump Administration's workforce development strategy
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PPTX
Final Presentation General Medicine 03-08-2024.pptx
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
UNIT III MENTAL HEALTH NURSING ASSESSMENT
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
Unit 4 Skeletal System.ppt.pptxopresentatiom
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
History, Philosophy and sociology of education (1).pptx
Cell Types and Its function , kingdom of life
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
IGGE1 Understanding the Self1234567891011
Trump Administration's workforce development strategy
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
Weekly quiz Compilation Jan -July 25.pdf
Supply Chain Operations Speaking Notes -ICLT Program
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
Indian roads congress 037 - 2012 Flexible pavement
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
LDMMIA Reiki Yoga Finals Review Spring Summer
Final Presentation General Medicine 03-08-2024.pptx

PROCESS PLANNING AND COST ESTIMATION