R REZA SHAH ABADI
104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM
1/2
List of Noticeable Projects/ Maintenance Workshop Activities
i. List of High voltage substations EPC projects:
 Kerman Province Miduk copper complex
It was a project to provide around 150MW active power for Nicico expansion projects from
400KV nation power grid to 132KV Nicico’s network and 132KV regional power grid. It was
an AIS green field project with One and a half breaker in 2*400KV bays switchyard and H
type in 11*132KV feeders with 2*200MVA transformers. All utilities in Scada, Conventional
Control, Protection, communication, AC/DC, Diesel generator, civil and construction,
fencing, bus and cable work have been included in an EPC project.
 Azerbaijan Province Sungun copper complex
It was a project to provide around 30MW active power for Nicico expansion project from
230KV nation power grid to 20KV Nicico’s network. It was an AIS brown field project to add
a new 40 MVA transformer in a RING 230KV switchyard to provide a new 20KV feeder. All
utilities in Scada, DCS Control, Protection, communication, AC/DC, MV switchgear, bus
and cable work have been included in an EPC project.
 Sistan & Baluchistan Province Chehlkooreh copper complex
It was a project to provide around 9MW active power for Nicico new project from 63KV
regional power grid to 6.9KV Nicico’s new network. It was an AIS green field project with
two incomings 63KV and 2*15MVA transformers. All utilities in Scada, Conventional
Control, Protection, communication, AC/DC, civil and construction, fencing, bus and cable
work, duct banks, MV switchgear have been included in an EPC project.
 Kerman Province Sarcheshmeh Copper Complex:
In order to provide required power for expansion projects in this location, we have finalized
the required Basic/Detail design and finding best location for three new substations:
 230KV AIS Switching substations, One and a half breaker with 8 incoming and
outgoings
 230KV GIS Double-Busbar, 2*80MVA transformers
 132KV GIS H type, 2*80MVA transformers
ii. List of EPC ( Engineering, Procurement and Construction) Medium and Low voltage
projects and its code in Sarcheshmeh Copper complex:
 E3: Switchgear and MCC: Replacing ten old LV Power center switchgears by new metal
clad and well equipped ones and refurbishment the 20 air bus ducts and 130 ACBs.
Replacing old MCC by new safer, divided compartment and well equipped ones.
 E7: Protection Relay and Automation: Replacing all old protection relays by numerical
intelligent types, providing SAS for all substations (including remote mines and sites spread
in 70 Sq. Km), SCADA, FDS ( Fundamental Design Specifications SAS/SCADA), Power
Management System (PMS), Intelligent Load Shedding (ILS) for the factory’s power plant,
Network Protocols DNP 3 and IEC61850, Providing a media of fiber optic, Radio system
and Communication network, Human Machine Interface (HMI) software applications, LAN
technologies, field/backbone switches, IP list, Signal List, SAS Architecture Diagrams,
Hardware/Software Technical specification, Data Base configuration, Time Synchronization
R REZA SHAH ABADI
104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM
2/2
 E8: Switchgear GIS and Breakers: Replacing all different types minimum oil circuit
breakers and SF6 circuit breaker on trucks with Vacuum CB, replacing an MV Air Insulation
Switchgear by a metal clad semi GIS with a complete SAS/numerical relays/power quality
meters systems, Installation the tuned MV filter banks, Installation PASS systems, design
for installation of an IS-Limiter, replacement two in-box- Disconnector Switches with their
enclosures with new ones, replacing two air bus ducts with the fully insulated ones …..
 E9: Transformers and Ring Main Units: Replacing the 42 distribution Askarel (PCB) oil
immerse transformers by cast resin dry types and exporting the oil and contaminated
equipment to disposal plant in France. In this project we replaced 16 Oil Immersed LBSs by
metal enclosed GIS RMUs
Note: Energy Globe (An International Foundation in Austria) awarded National Award in
2013 for this project and the project was a candidate for Energy Globe International Award
in 2013 as well.
 E13: Partial Discharge: Installation online and offline partial discharge measurement and
monitoring system for MV machines (45 units including Generators 11 & 6.9KV and
Electromotors 6.9KV) based on North American method in the production lines.
Furthermore, providing a portable measurement PD system for switchgears, electromotors,
cables and terminators based on European method.
 E17: Skid Mounted Substations: Replacing 3 old and conventional mining substations
5MVA, 20/6.9KV and 12 mining 6.9KV switchboxes by new mobile and skid mounted ones.
They are equipped by numerical relay, Power Quality Meters and Broadband Power Line
carrier data systems on MV cables.
 E20: Transformers and Cable Duct Banks: Expanding electrical distribution network
(including 11 transformer substations, 12KV metal enclosed switchgear with 22 feeders,
encapsulated resin bus ducts, 20 Km triplex 20/12KV cables, 1200 meter duct bank, 16
manholes, 35 distribution industrial transformers 20/6.9KV & 20/0.4KV, 45 units metal clad
semi GIS, plug in terminators, etc.) for the new consumer to feed 40MW new plants.
iii. List of High voltage Transmission line PC projects:
 400, 132 KV in Kerman Province 70km
 63KV in Azerbaijan Province 15km
 230, 63 KV in Sistan & Baluchistan Province 120km
iv. Noticeable Workshop Maintenance Activities:
 Rewinding MV Electromotor Stator: Complete rewinding a Stator of 4500hp, 30poles,
200RMP, 6900 Volt, Synchronous Mill Electromotors GE Canada in workshop with all
required tests
 Overhauls of Stators Gas Turbine Generators and checking all parts of insulation
windings 11Kv, 25MW Alstom Frame 5
 Predict the insulation life lasting by doing all required tests on a Waste Heat Steam
Generator Stator 6900 Volts, 10MW GE to
 Rewinding Transformer: 2MVA, 20KV/6.9KV
 Inspection on rewinding/maintenance of a variety range of MV electromotors in off-site
workshop

More Related Content

PPTX
Ultra High Voltage AC Transmission UHVAC
PDF
gamal ghazy svc
PPTX
High Voltage Direct Current(Hvdc) transmission
PPTX
PDF
ACHIEVEMENTS
PDF
Group 8 hvdc
PPTX
Transmission and distribution system of nepal
PDF
Instruction manual
Ultra High Voltage AC Transmission UHVAC
gamal ghazy svc
High Voltage Direct Current(Hvdc) transmission
ACHIEVEMENTS
Group 8 hvdc
Transmission and distribution system of nepal
Instruction manual

What's hot (16)

DOC
Osama Fouad (Update)
PPT
HVDC vs HVAC ppt
PPT
Rourkela Steel Pant Power System
PDF
EPC Solutions - All About Substation
PPT
Catalog busbar ls 06. busduct presentation e series rev 2
PDF
Comparison of the performance of hvdc and hvac overhead transmission lines fo...
PDF
Comnet C2US Data Sheet
PDF
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
PDF
Single phase grid connected motor drive system with dc-link shunt compensator...
PDF
ABB Low Voltage LV Capacitors, ABB CLMD
PDF
Electric09
PDF
Prefabricated compact transformer
PDF
Bs bab 1
DOC
Mohd_Anwarulla
PDF
CWB Contactors
Osama Fouad (Update)
HVDC vs HVAC ppt
Rourkela Steel Pant Power System
EPC Solutions - All About Substation
Catalog busbar ls 06. busduct presentation e series rev 2
Comparison of the performance of hvdc and hvac overhead transmission lines fo...
Comnet C2US Data Sheet
HVDC Transmission lines Market, Technology and Geographical Trends 2016 Prese...
Single phase grid connected motor drive system with dc-link shunt compensator...
ABB Low Voltage LV Capacitors, ABB CLMD
Electric09
Prefabricated compact transformer
Bs bab 1
Mohd_Anwarulla
CWB Contactors
Ad

Similar to Project List 1.3-May21,16- Substation Electrical Enginner (20)

PDF
Juliet Joseph
PDF
wathiq alanbaki
DOCX
DOC
Wajid Ali Shah
PDF
Techno Quest - Profile
DOC
Resume -Abdul Alim Dewan -2017
DOCX
Krishna kumar cv
DOCX
Engineer Mr. AR.Mohamed Iqbal Resume
PDF
Resume 2016 june
DOC
Saif Ismail_CV
PDF
Compliance Contracting Brochure
PPTX
P S electricals
PPT
Basics of Electrical Engineering & Maintenance Practices
PPT
Electrical Systems maintenance-for-electrical
PPT
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
PDF
updated CV Yacoub
PDF
updated CV Yacoub
PDF
MAraziR-1 (1)
DOC
PDF
resume_2015_11_19_11_22_24_986
Juliet Joseph
wathiq alanbaki
Wajid Ali Shah
Techno Quest - Profile
Resume -Abdul Alim Dewan -2017
Krishna kumar cv
Engineer Mr. AR.Mohamed Iqbal Resume
Resume 2016 june
Saif Ismail_CV
Compliance Contracting Brochure
P S electricals
Basics of Electrical Engineering & Maintenance Practices
Electrical Systems maintenance-for-electrical
BASICS OF ELECTRICAL ENGINEERING AND MAINTENANCE PRACTICES.ppt
updated CV Yacoub
updated CV Yacoub
MAraziR-1 (1)
resume_2015_11_19_11_22_24_986
Ad

Project List 1.3-May21,16- Substation Electrical Enginner

  • 1. R REZA SHAH ABADI 104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM 1/2 List of Noticeable Projects/ Maintenance Workshop Activities i. List of High voltage substations EPC projects:  Kerman Province Miduk copper complex It was a project to provide around 150MW active power for Nicico expansion projects from 400KV nation power grid to 132KV Nicico’s network and 132KV regional power grid. It was an AIS green field project with One and a half breaker in 2*400KV bays switchyard and H type in 11*132KV feeders with 2*200MVA transformers. All utilities in Scada, Conventional Control, Protection, communication, AC/DC, Diesel generator, civil and construction, fencing, bus and cable work have been included in an EPC project.  Azerbaijan Province Sungun copper complex It was a project to provide around 30MW active power for Nicico expansion project from 230KV nation power grid to 20KV Nicico’s network. It was an AIS brown field project to add a new 40 MVA transformer in a RING 230KV switchyard to provide a new 20KV feeder. All utilities in Scada, DCS Control, Protection, communication, AC/DC, MV switchgear, bus and cable work have been included in an EPC project.  Sistan & Baluchistan Province Chehlkooreh copper complex It was a project to provide around 9MW active power for Nicico new project from 63KV regional power grid to 6.9KV Nicico’s new network. It was an AIS green field project with two incomings 63KV and 2*15MVA transformers. All utilities in Scada, Conventional Control, Protection, communication, AC/DC, civil and construction, fencing, bus and cable work, duct banks, MV switchgear have been included in an EPC project.  Kerman Province Sarcheshmeh Copper Complex: In order to provide required power for expansion projects in this location, we have finalized the required Basic/Detail design and finding best location for three new substations:  230KV AIS Switching substations, One and a half breaker with 8 incoming and outgoings  230KV GIS Double-Busbar, 2*80MVA transformers  132KV GIS H type, 2*80MVA transformers ii. List of EPC ( Engineering, Procurement and Construction) Medium and Low voltage projects and its code in Sarcheshmeh Copper complex:  E3: Switchgear and MCC: Replacing ten old LV Power center switchgears by new metal clad and well equipped ones and refurbishment the 20 air bus ducts and 130 ACBs. Replacing old MCC by new safer, divided compartment and well equipped ones.  E7: Protection Relay and Automation: Replacing all old protection relays by numerical intelligent types, providing SAS for all substations (including remote mines and sites spread in 70 Sq. Km), SCADA, FDS ( Fundamental Design Specifications SAS/SCADA), Power Management System (PMS), Intelligent Load Shedding (ILS) for the factory’s power plant, Network Protocols DNP 3 and IEC61850, Providing a media of fiber optic, Radio system and Communication network, Human Machine Interface (HMI) software applications, LAN technologies, field/backbone switches, IP list, Signal List, SAS Architecture Diagrams, Hardware/Software Technical specification, Data Base configuration, Time Synchronization
  • 2. R REZA SHAH ABADI 104 – 4723 DAWSON STREET – BURNABY – BC – V5C 0A7, CELL: (604)655-2132, REZA10SHAH @YAHOO.COM 2/2  E8: Switchgear GIS and Breakers: Replacing all different types minimum oil circuit breakers and SF6 circuit breaker on trucks with Vacuum CB, replacing an MV Air Insulation Switchgear by a metal clad semi GIS with a complete SAS/numerical relays/power quality meters systems, Installation the tuned MV filter banks, Installation PASS systems, design for installation of an IS-Limiter, replacement two in-box- Disconnector Switches with their enclosures with new ones, replacing two air bus ducts with the fully insulated ones …..  E9: Transformers and Ring Main Units: Replacing the 42 distribution Askarel (PCB) oil immerse transformers by cast resin dry types and exporting the oil and contaminated equipment to disposal plant in France. In this project we replaced 16 Oil Immersed LBSs by metal enclosed GIS RMUs Note: Energy Globe (An International Foundation in Austria) awarded National Award in 2013 for this project and the project was a candidate for Energy Globe International Award in 2013 as well.  E13: Partial Discharge: Installation online and offline partial discharge measurement and monitoring system for MV machines (45 units including Generators 11 & 6.9KV and Electromotors 6.9KV) based on North American method in the production lines. Furthermore, providing a portable measurement PD system for switchgears, electromotors, cables and terminators based on European method.  E17: Skid Mounted Substations: Replacing 3 old and conventional mining substations 5MVA, 20/6.9KV and 12 mining 6.9KV switchboxes by new mobile and skid mounted ones. They are equipped by numerical relay, Power Quality Meters and Broadband Power Line carrier data systems on MV cables.  E20: Transformers and Cable Duct Banks: Expanding electrical distribution network (including 11 transformer substations, 12KV metal enclosed switchgear with 22 feeders, encapsulated resin bus ducts, 20 Km triplex 20/12KV cables, 1200 meter duct bank, 16 manholes, 35 distribution industrial transformers 20/6.9KV & 20/0.4KV, 45 units metal clad semi GIS, plug in terminators, etc.) for the new consumer to feed 40MW new plants. iii. List of High voltage Transmission line PC projects:  400, 132 KV in Kerman Province 70km  63KV in Azerbaijan Province 15km  230, 63 KV in Sistan & Baluchistan Province 120km iv. Noticeable Workshop Maintenance Activities:  Rewinding MV Electromotor Stator: Complete rewinding a Stator of 4500hp, 30poles, 200RMP, 6900 Volt, Synchronous Mill Electromotors GE Canada in workshop with all required tests  Overhauls of Stators Gas Turbine Generators and checking all parts of insulation windings 11Kv, 25MW Alstom Frame 5  Predict the insulation life lasting by doing all required tests on a Waste Heat Steam Generator Stator 6900 Volts, 10MW GE to  Rewinding Transformer: 2MVA, 20KV/6.9KV  Inspection on rewinding/maintenance of a variety range of MV electromotors in off-site workshop