SlideShare a Scribd company logo
ANWARULLA KHAYOOM
#17, 1st floor ,2nd Main Road ,chinnanna layout, Kaval bysandra Bangalore - 560032
Tel - 9980334803 RT NAGAR POST OFFICE
Design & Development/ Consultancy Services with a progressive organization in the Field of
Electrical Design pertaining to - BUILDINGS/TOWNSHIPS/Substations /T&D
/MEP/EPC/POWER/ Illumination /Tendering and Estimation,Townships, Infrastructure /Industrial.
BRIEF OVERVIEW
Overall Experience : 22 YEARS
Domain experience :- 20 YEARS
Power Design of Buildings like Residential/commercials/Hospitals etc and Township design
projects includes Estimation and Tender doc preparation , MV Reticulation , and substations
and if necessary Switching stations.
1. Design of AIS Substations :
2. Transmission and Distribution.
3 Illumination Design
4 Industrial design and Automation.
5 MEP - Building services for High rise - External/internal illumination/grounding/BMS/
Switchgear and protection /Cable sizing/load calculations as per NEC standards.
BOQ , Estimation and Tender Documents preparation.
Softwares – MS Excel/Autocad/ Lisp programming/Mypower etc.
EDUCATION
BE - ELECTRICAL ENGINEERING BANGALORE INSTITUTE OF TECHNOLOGY - [B.I.T]
BANGALORE
YEAR OF GRADUATION : JULY 1991
PROJECT WORK : DESIGN OF LINEAR INDUCTION MOTOR AND ITS APPLICATION
IN LAVITATION.
STANDARDS USED FOR BUILDINGS , TOWNSHIPS AND SUBSTATION
NEC Standard
BUSBAR DESIGN – IEEE 605
EARTHING DESIGN – IEEE80/IS3043/IEC60364
LIGHTNING STROKE SHIELDING – IEEE998- 1996
BATTERY BANK SIZING –IEEE 485 1997
TRANSFORMERS - IEC60076
CABLES - IEC60287/IEC60502/BS5467/IS7098
1
POWER / ELECTRICAL DES IGN EXPERIENCE WITH THE FOLLOWING CONSULTANCY
ORGANISATIONS AND EPC CONTRACTORS.
JOB DETAILS :-
Load forecasting for a new project as applied to a Township design.
Detailed design from MRS/Substation to 66kv reticulation , then sizing the subdistribution system , and
coordinating the substations for envisaging power at breakdowns at any substation.
2. MV detailed design includes distribution transformer sizing and placing at load centres and RMU
design for 11kv feeders,till the invidual feeder pillars.
3. Electrical /power Design of buildings considering Nec standard
4. Illumination and HVAC.
5. Tender document preparations.
TYPES OF PROJECTS :-
AIS Substations/infrastructure/townships/technoparks /hospitals/Residential
buildings/Industrial Automation etc.
SUBSTATION DESIGN Calculations as below for each AIS substation:-
1. Site survey and Feasibility report preparation.
2. SLD preparation.
3. Layout and Sectional Elevation drawings considering the clearances.
4. Tempreture Rise calculations for Rigid/Strung conductor Busbar design – As per IEEE605
5. Short circuit calculations for Rigid conductor Busbar design – As per IEEE605/IEC 60865
6. Short circuit calculations for Strung conductor Busbar design – As per IEEE605/IEC 60865
7. Sag Tension calculation as per IS 5613 and IS 802
8. BIL coordination among lightning arrestors/tranfos/breakers and other equipment for any
impulses like lightning or switching impulses in case of 220kv and above.
9. Direct Lightning strike protection calculations (as per IEEE 998)
10. Detailed earth Mat design as per – IEEE 80
2
11. Tender doc and GTP for all the equipments of the substation.
Building design and Substation projects undertaken
1. 220kv/66kv AIS Substation at Ludhiana with 60 mva load capacity
3 x 22 mva power transformers.
Double Busbar and Transfer bus scheme , Rigid conductors
With Pentograph vertical break isolators.
Total no of bays = 10 nos
Feeder bays = 4
Transformer bays = 3
Bus-coupler bays =1
Bays for future expansion = 2
2. 110kv/33kv AIS Substation at Trivandrum with 40 mva load capacity
2 x 20 mva power transformers.
Double Busbar single Breaker scheme , Rigid conductors
With Pentograph vertical break isolators.
Total no of bays = 5 nos
Feeder bays = 2
Transformer bays = 2
Bus-coupler bays =1
WORK DETAILS :
AIS SUBSTATION DESIGN AND DRAFTING FOR ETHIOPIA.
220/66/ 33KV SUBSTATION – PRIMARY DESIGN
1. Feedback Infra PVT LTD AUG 2010 -
TRIVANDRUM , KERALA
Sr.Electrical Engineer
WORK DETAILS :
PROJECT 1 :- TECHNOPARK AT TRIVANDRUM OF 40 MVA
Detailed DESIGN AND TENDER DOCUMENT PREPARATION FOR THE FOLLOWING –
3
1. 110KV U/G TRANSMISSION
2. 33/11KV TOWN DISTRIBUTION PROJECTS
3. 110/33/11KV SUBSTATIONS / SWITCHING STATIONS .
4. DESIGN FOR BUILDING SERVICES related to IT OFFICES and Community Quarters.
PROJECT 2 :- INFOPARK AT COCHIN
1. 220/66/11KV SUBSTATION – PRIMARY DESIGN
2. MV/LT DESIGN FOR INFOPARK – 11KV CABLE DISTRIBUTION, DISTRIBUTION
TRANSFORMER SIZING AND PLACING AT THE LOAD CENTRES.
ROLE : DESIGN,ESTIMATION, TENDER DOC PREPARATION, CLIENT INTERACTION,
TEAM SIZE ; 2 ENGINEERS + 4 DRAFTSMEN
3. Parsons Brinckerhoff PVT LTD OCT 2009 TILL JULY 2010
RAISINA ROAD, LEE-MERIDIAN HOTEL, NEW-DELHI
Sr.Electrical Design Engineer
WORK DETAILS :
20MVA grid station with 10 x 2 mva 11kv DG sets for backup power, twin metering system for main and backup
power.
DESIGN AND TENDER DOCUMENT PREPARATION FOR
1. MULTIPLE HOUSING PROJECT OF 500ACRES.
2. TOWNSHIP DEVELOPMENT AND DESIGN FOR BUILDING SERVICES.
3. 20MVA ,220KV/66KV SUBSTATION.
4. Detailed engg wrt grid station and township.
5. Working in rules with Punjab Electricicity Board
4
Managing a Team size of 4 engineers and draftsmen.
Client : IREO , GURGAON NCR.
4. Secon PVT LTD NOV 2004 TILL DEC 2008
#147,WHITE FIELD, EPIP AREA, BANGALORE-560066
WORKED AS ELECTRICAL CONSULTANT
WORK DETAILS :
ELECTRICAL CONSULTANCY FOR VARIOUS TOWNSHIP/PHE PROJECTS AT LIBYA and
Substation primary design
TOWN DISTRIBUTION , ILLUMINATION AND PHE DESIGN PROJECT DONE FOR LIBYA
INCLUDES THE FOLLOWING:
ALL THE DESIGNS CONFIRMING TO IEC STANDARDS.
DETAILED HT/LT ELECTRICAL DESIGN RELATED TO TOWNSHIP PROJECTS WHICH INCLUDES LOAD
FORECASTING FOR 2025 AND ACCORDINGLY DESIGNING THE NO OF 11KV/0.4KV DISTRIBUTION
SUBSTATION, NO OF 220/66/11KV SUBSTATIONS, OR JUST 11KV SWITCHING STATIONS FOR SMALL
SETTLEMENTS LESS THAN 100 HECTARES .
DECIDING LOAD CENTRE FOR EACH 11KV/0.4KV DISTRIBUTION TRANSFORMER STATION.
PREPARATION OF 220/132KV/11KV SLD, DESIGN CALCULATIONS.
PROVIDING HT INTERLINK BETWEEN DIFFERENT 220/66/11KV SUBSTATIONS IN THE CASE OF ANY
EMERGENCY OPERATION INCURRED.
FOR HT/LT U/G DISTRIBUTION, CABLE SIZING DONE CONSIDERING ALL THE DERATING FACTORS,
MINIMUM VOLTAGE DROP AND SYSTEM FAULT LEVEL .
O/H DISTRIBUTION SYSTEM WITH ACSR CONDUCTORS OF REQUIRED SIZE FOR THE ENTIRE
SETTLEMENT WHEREVER U/G DISTRIBUTION IS NOT POSSIBLE.
PREPARATION OF HT/LT REGULATION CHART.
PREPERATION OF DETAILED HT/LT CABLE LAYOUT DRAWINGS IN CADD WITH TRENCHING DETAILS.
ALL THE HT FEEDERS CONNECTED IN RING MAIN, MAXIMUM LOADING ON ONE FEEDER 3.5 MVA AND
ON EACH RING AROUND 7 MVA.
CONSIDERING PROPER DIVERSITY FACTOR & DEMAND FACTOR FOR RESIDENTIAL AND
NONRESIDENTIAL LOADS.
DETAILED STREET LIGHTING DESIGN.
HIGHMAST LIGHTING DESIGN.
SHORT CIRCUIT ANALYSIS
PUBLIC HEALTH ENGG PROJECTS :
PUBLIC HEALTH ENGINEERING PROJECTS DONE FOR 40 SETTLEMENTS IN LIBYA AS PER GECOL
STANDARDS [CONFORMING TO IEC STANDARDS].
BASIC AND DETAILED DESIGN & ENGINEERING OF POWER DISTRIBUTION SYSTEM OF INDUSTRIAL
PLANTS, WATER TREATMENT PLANTS ,SEWAGE TREATMENT PLANTS,ELECTRICAL LAYOUTS ,
CONTROL SCHEMES.
 Responsible for electrical design - water supply, sanitation, sewerage and storm water drainage
system
 Played a pivotal role in designing projects and looking after preparation for general plan for
water supply, sanitation, sewerage and storm water drainage system and accompanying works in
Libya.
5
 Assisted SECON in their on going projects for the electrical design and management of water
supply, sanitation, sewerage and storm water drainage
 Managed assessment of Electrical Demand for the entire settlement for master plan area taking
into account all amenties viz street Lighting, public utilities, housing, private industries, schools ,
hospitals, etc
 Managed the following responsibilities with utmost conviction.
DESIGN CALCULATIONS INCLUDE THE FOLLOWING :
• HT AND LT REGULATION CALCULATION.
• ILLUMINATION DESIGN :
INTERIOR LIGHTING DESIGN
STREET LIGHTING DESIGN
HIGH MAST LIGHTING DESIGN
• DETAILED CABLE DESIGN CONSIDERING ALL THE DERATING FACTORS.
• SHORT CIRCUIT CALCULATIONS.
• LOAD FORECASTING AND TRANSFORMER SIZING.
• EVALUATION OF LOAD CENTERS.
• PLANT YARD AND PERIMETER LIGHTING DESIGN
• ELECTRICAL LOAD CALCULATIONS
• INSTALLATION LIGHTING
• CABLE AND CONDUIT LAYOUT
• EARTHING DESIGN
• AC AND VENTILATION
 Evaluated capacity of back up generators for all pumping stations and treatment plants.
 Demonstrated excellence in designing of electrical layout with regard to HT and LT supply for
the entire settlement.
ILLUMINATION DESIGN :
INTERNAL LIGHTING :
ILLUMINATION DESIGN DONE CONSIDERING ALL THE DERATING FACTORS LIKE MAINTENANCE
FACTOR ,UTILIZATION FACTOR , WASTE FACTOR etc FOR VARIOUS INSTALLATIONS AS MENTIONED
BELOW.
EXTERNAL LIGHTING :
EXTERNAL LIGHTING DESIGN DONE USING POINT CALCULATION METHOD FOR THE FOLLOWING
STANDARDS.
SUBSTATION PROJECTS FOR LIBIYA
Main Receiving station of 400KV/220KV
Each Main Receiving station feeding to 3 nos 220/66kv Main substations
Each Main substation feeding to 6 nos 66/11kv secondary substations.
So each major Zone having total 19 stations .
Main Receiving station of 400KV/220KV - Double busbar+ double breaker +transfer bus
scheme with rigid conductors, clearances were given as per 765 kv system.
BIL 1425KV
Main Substation of 220/66KV - Double busbar+ single breaker +transfer bus scheme with
rigid conductors, clearances were given as per 220kv system
BIL 900KV
6
Secondary Substation of 66/11KV - Double busbar+ single breaker scheme with rigid
conductors, clearances were given as per 66 kv system
BIL 350KV
5. MEKASTER JAN 1995 - SEP 2001
#401, ST MARKS ROAD, BANGALORE-560001
Asst Design Engineer
INDUSTRIAL DESIGN RELATED TO SMALL SCALE INDUSTRIES
LT AND HT DESIGN RELATED TO RESIDENTIAL BUILDINGS FOR HOUSING PROJECT..
LOW SCALE AUTOMATION DESIGN FOR SMALL SCALE INDUSTRIES.
DEVELOPING CONTROL CIRCUITS FOR VARIOUS APPLICATIONS.
SWITCH YARD DESIGN
SITE WORK AND CLIENT INTERACTION.
REPORTING TO SECTION HEAD.
OVERSEAS EXPERIENCE - OCT 1992- NOV 1994
WORKED AS AN ELECTRICAL CONSULTANT IN GULF FOR THE CLIENTS MENTIONED BELOW
6. Oman Concrete Products Inc.
Muscat, Sultanate of OMAN
PLANT MANAGER
 Responsible for production and maintenance in a concrete block plant.
 Incharge for ELECTRICAL(LT/HT) and ELECTRO-MECHANICAL DEVICES FOR A CONTINUOUS
PROCESS PLANT INDUSTRY.
 MANAGED operations of Plant consisting of BESSER machinery of USA, with a capacity to produce 1000 blocks
per hour.
FOLLOWING ARE THE COMPONENTS OF THE BLOCK PLANT :-
CONVEYOR SYSTEM : Actuated by cutler hammer limit switches and
proximity switches.
MIXTURE PLANT : Controlled mixing of ingredients for blocks
actuated by pnuematic cylinders with Ingersol
Rand air compressors.
VIBRATOR PLANT : From the cuber , mixture is compressed in the mold
for specific pressure and then fed to the steam chamber.
The vibrator works on cams.
CUBER PLANT : For packing steamed blocks .Operated by hydraulic
cylinders.
STEAM PLANT : Steam generated by a Low pressure Thermax boiler.
A water treatment plant for softening hard water.
7
7. AL MOSAWI ELECTRICAL DESIGNER AND CONTRACTORS
Manama, Bahrain
ELECTRICAL DESIGN ENGINEER
1. ELECTRICAL DESIGN FOR LT/HT INSTALLATIONS FOR HOSPITAL PROJECTS, SCHOOLS IN
VARIOUS TOWNS OF BAHRAIN. AND MINI TOWNSHIP PROJECTS.
2. AIS substation design
8. AL HANOUF HEALTH SERVICES
Riyadh, Saudi Arabia
ELECTRICAL ENGINEER
ELECTRICAL MAINTENANCE OF HOSPITAL PLANT IN AL QASSIM PROVINCE, SAUDIA
EXCEL TRADERS (ELECTRICAL CONTRACTORS) FEB 1989 - APR 1991
DICKENSON ROAD[OFF COMMERCIAL STREET],BANGALORE-1
Electrical Engineer
EXCEL TRADERS (ELECTRICAL CONTRACTORS) AUG 1991 - JULY 1992
DICKENSON ROAD[OFF COMMERCIAL STREET],BANGALORE-1
PROJECT Engineer
ELECTRICAL DESIGN OF LT/HT INSTALLATIONS
FOR INSTALLATIONS LIKE MULTISTORYED BUILDINGS, HOTELS, HOSPITALS etc.
TOWNSHIP DESIGNING.
PROJECTS EXECUTED IN BANGALORE :
GOLDEN ENCLAVE – SMALL TOWNSHIP AND COMMERCIAL COMPLEX , INFRASTRUCTURE
PROJECT ON OLD AIRPORT ROAD, BANGALORE
AL-AMEEN HOUSING BOARD , BANGALORE
WOCHARDT RESEARCH HOSPITAL , CUNNINGHAM ROAD, BANGALORE
PROFESSIONAL AND SOFTWARE ENHANCEMENTS
 Electrical and Electronic Controls from Foremen Training Institute, Bangalore.
 Digital and analog simulations
Low scale Automation
 IC simulations.
 AUTOCAD- RL 12 / 14 / 2000 / 2002 and AUTOLISP PROGRAMMING.
 Finite Element Analysis(Mechanical) from CADD Centre, Bangalore
8
DETAILS OF TOWN DISTRIBUTION PROJECTS EXECUTED IN INDIA
OTHER INFRASTRUCTURE PROJECTS DESIGNED IN
BANGALORE AUG 1991 - JULY 1992
1 GOLDEN ENCLAVE
2 AL-AMEEN HOUSING
TOWNSHIP PROJECTS DESIGNED IN LUDHIANA AUG 2009
ONWARDS.
3 LUDHIANA INTEGRATED
TOWNSHIP 128 ACRES 20 mva
ONGOING PROJECTS :
4 TECHNOCITY – 500ACRE IT CUM TOWNSHIP OF 100MVA IN TRIVANDRUM
5 INFOPARK – 150 ACRES IT-SEZ CUM TOWNSHIP PROJECT IN COCHIN OF 100MVA
9
DETAILS OF TOWN DISTRIBUTION PROJECTS EXECUTED IN INDIA
OTHER INFRASTRUCTURE PROJECTS DESIGNED IN
BANGALORE AUG 1991 - JULY 1992
1 GOLDEN ENCLAVE
2 AL-AMEEN HOUSING
TOWNSHIP PROJECTS DESIGNED IN LUDHIANA AUG 2009
ONWARDS.
3 LUDHIANA INTEGRATED
TOWNSHIP 128 ACRES 20 mva
ONGOING PROJECTS :
4 TECHNOCITY – 500ACRE IT CUM TOWNSHIP OF 100MVA IN TRIVANDRUM
5 INFOPARK – 150 ACRES IT-SEZ CUM TOWNSHIP PROJECT IN COCHIN OF 100MVA
9

More Related Content

PDF
EPC Solutions - All About Substation
PDF
20150209111021 tech spn dtd 29.jan 2015
DOC
Standards and protocols instrumentation ( typical)
PDF
Project List 1.3-May21,16- Substation Electrical Enginner
PDF
CWB Contactors
PPT
Electrical Engineering Basics - What Design Engineers Need to Know
PPT
Introduction on indian codes as applied in electrical design
DOCX
Mosfet based ups cum-eps
EPC Solutions - All About Substation
20150209111021 tech spn dtd 29.jan 2015
Standards and protocols instrumentation ( typical)
Project List 1.3-May21,16- Substation Electrical Enginner
CWB Contactors
Electrical Engineering Basics - What Design Engineers Need to Know
Introduction on indian codes as applied in electrical design
Mosfet based ups cum-eps

What's hot (20)

PDF
Iec 61439 for_low_voltage_switchgear_and
PDF
The Intellectual Automated Substation
PPTX
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
PPT
Power Electronics Basic by Engr.Rajesh Roy
DOCX
Design and Construction of 2KVA AC/DC Inverter
PPTX
Deepak kumar
PPTX
PDF
PJ HND KDUA POLY
PPTX
Critical Power: Integrating Renewable Power into Buildings
PPT
Mobile Grid Station Paper By Obaid Ur Rahman
PDF
Commission resume
PPTX
ESE Type Lightning Arretor NFC17-102(2011) Presentation by JMV LPS LTD
DOCX
Resume (Expanded) - Christopher C. Love
PDF
Characterization and Modeling of Power Electronics Device
DOCX
Power Supply Unit
PDF
Bs bab 1
PDF
AlpTransit_SCAE_Contribution
PDF
ENBLOM Company Profile
PDF
100 simple circuit diagram projects
PPTX
Power Electronics introduction
Iec 61439 for_low_voltage_switchgear_and
The Intellectual Automated Substation
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
Power Electronics Basic by Engr.Rajesh Roy
Design and Construction of 2KVA AC/DC Inverter
Deepak kumar
PJ HND KDUA POLY
Critical Power: Integrating Renewable Power into Buildings
Mobile Grid Station Paper By Obaid Ur Rahman
Commission resume
ESE Type Lightning Arretor NFC17-102(2011) Presentation by JMV LPS LTD
Resume (Expanded) - Christopher C. Love
Characterization and Modeling of Power Electronics Device
Power Supply Unit
Bs bab 1
AlpTransit_SCAE_Contribution
ENBLOM Company Profile
100 simple circuit diagram projects
Power Electronics introduction
Ad

Viewers also liked (18)

PDF
220 66 kv nrs sub report
PPTX
Workers’ Risk of Fatal Injuries Varies By Profession
PDF
Pillowfight Day Brazil
DOCX
DrYRR cv.vc c
PDF
Experiencias en la implementacion del BSC
PPT
Parent University Graduation
PDF
Golf Suites Esp
DOCX
A.pérez esclarín los retos de la educación
PDF
13 a amberhinds_finalportfolio2
PPTX
Martinovich - Wearing Seat Belts Saves Lives
PDF
Wichita Zoo
KEY
One Day Your CEO Will Tweet Too
PDF
Digital Marketing Certification in the Philippines: Why Get Certified
PPTX
PPt on 220 kV substation
PPTX
Relay and switchgear protection
PPTX
Substation protection devices
220 66 kv nrs sub report
Workers’ Risk of Fatal Injuries Varies By Profession
Pillowfight Day Brazil
DrYRR cv.vc c
Experiencias en la implementacion del BSC
Parent University Graduation
Golf Suites Esp
A.pérez esclarín los retos de la educación
13 a amberhinds_finalportfolio2
Martinovich - Wearing Seat Belts Saves Lives
Wichita Zoo
One Day Your CEO Will Tweet Too
Digital Marketing Certification in the Philippines: Why Get Certified
PPt on 220 kV substation
Relay and switchgear protection
Substation protection devices
Ad

Similar to Mohd_Anwarulla (20)

DOC
DOC
Ravi_ElectricalEngineer
DOC
CV_ Sayantan Ghosh_B.Tech_Electrical
DOC
CV_ Sayantan Ghosh_B.Tech_Electrical
DOC
Mr. jagadeesh electrical design engineer
DOCX
Kareem cv updated
DOCX
Kareem cv updated
DOCX
Kareem cv updated
DOCX
Sr.Electrical Engineer_13years of Experinece
PDF
CV-NITIN NIWARIYA _ Electrical _
DOC
Resume- Rahul Bhardwaj
DOCX
CV for Linkedin
PDF
Ahmed elsayed'cv
DOC
DOCX
Gopinath.S -Design Engineer - Copy
DOC
Copy of BhaskarSarkar_AECOM
DOC
Rajmohan_Sep_2015
DOC
Yahya Khan CV(1)
DOC
Resume electrical design and site engineer(mep) 9+ years of exp
DOC
Resume - Electrical Engineer (MEP) 9+ Years Exp
Ravi_ElectricalEngineer
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
Mr. jagadeesh electrical design engineer
Kareem cv updated
Kareem cv updated
Kareem cv updated
Sr.Electrical Engineer_13years of Experinece
CV-NITIN NIWARIYA _ Electrical _
Resume- Rahul Bhardwaj
CV for Linkedin
Ahmed elsayed'cv
Gopinath.S -Design Engineer - Copy
Copy of BhaskarSarkar_AECOM
Rajmohan_Sep_2015
Yahya Khan CV(1)
Resume electrical design and site engineer(mep) 9+ years of exp
Resume - Electrical Engineer (MEP) 9+ Years Exp

Mohd_Anwarulla

  • 1. ANWARULLA KHAYOOM #17, 1st floor ,2nd Main Road ,chinnanna layout, Kaval bysandra Bangalore - 560032 Tel - 9980334803 RT NAGAR POST OFFICE Design & Development/ Consultancy Services with a progressive organization in the Field of Electrical Design pertaining to - BUILDINGS/TOWNSHIPS/Substations /T&D /MEP/EPC/POWER/ Illumination /Tendering and Estimation,Townships, Infrastructure /Industrial. BRIEF OVERVIEW Overall Experience : 22 YEARS Domain experience :- 20 YEARS Power Design of Buildings like Residential/commercials/Hospitals etc and Township design projects includes Estimation and Tender doc preparation , MV Reticulation , and substations and if necessary Switching stations. 1. Design of AIS Substations : 2. Transmission and Distribution. 3 Illumination Design 4 Industrial design and Automation. 5 MEP - Building services for High rise - External/internal illumination/grounding/BMS/ Switchgear and protection /Cable sizing/load calculations as per NEC standards. BOQ , Estimation and Tender Documents preparation. Softwares – MS Excel/Autocad/ Lisp programming/Mypower etc. EDUCATION BE - ELECTRICAL ENGINEERING BANGALORE INSTITUTE OF TECHNOLOGY - [B.I.T] BANGALORE YEAR OF GRADUATION : JULY 1991 PROJECT WORK : DESIGN OF LINEAR INDUCTION MOTOR AND ITS APPLICATION IN LAVITATION. STANDARDS USED FOR BUILDINGS , TOWNSHIPS AND SUBSTATION NEC Standard BUSBAR DESIGN – IEEE 605 EARTHING DESIGN – IEEE80/IS3043/IEC60364 LIGHTNING STROKE SHIELDING – IEEE998- 1996 BATTERY BANK SIZING –IEEE 485 1997 TRANSFORMERS - IEC60076 CABLES - IEC60287/IEC60502/BS5467/IS7098 1
  • 2. POWER / ELECTRICAL DES IGN EXPERIENCE WITH THE FOLLOWING CONSULTANCY ORGANISATIONS AND EPC CONTRACTORS. JOB DETAILS :- Load forecasting for a new project as applied to a Township design. Detailed design from MRS/Substation to 66kv reticulation , then sizing the subdistribution system , and coordinating the substations for envisaging power at breakdowns at any substation. 2. MV detailed design includes distribution transformer sizing and placing at load centres and RMU design for 11kv feeders,till the invidual feeder pillars. 3. Electrical /power Design of buildings considering Nec standard 4. Illumination and HVAC. 5. Tender document preparations. TYPES OF PROJECTS :- AIS Substations/infrastructure/townships/technoparks /hospitals/Residential buildings/Industrial Automation etc. SUBSTATION DESIGN Calculations as below for each AIS substation:- 1. Site survey and Feasibility report preparation. 2. SLD preparation. 3. Layout and Sectional Elevation drawings considering the clearances. 4. Tempreture Rise calculations for Rigid/Strung conductor Busbar design – As per IEEE605 5. Short circuit calculations for Rigid conductor Busbar design – As per IEEE605/IEC 60865 6. Short circuit calculations for Strung conductor Busbar design – As per IEEE605/IEC 60865 7. Sag Tension calculation as per IS 5613 and IS 802 8. BIL coordination among lightning arrestors/tranfos/breakers and other equipment for any impulses like lightning or switching impulses in case of 220kv and above. 9. Direct Lightning strike protection calculations (as per IEEE 998) 10. Detailed earth Mat design as per – IEEE 80 2
  • 3. 11. Tender doc and GTP for all the equipments of the substation. Building design and Substation projects undertaken 1. 220kv/66kv AIS Substation at Ludhiana with 60 mva load capacity 3 x 22 mva power transformers. Double Busbar and Transfer bus scheme , Rigid conductors With Pentograph vertical break isolators. Total no of bays = 10 nos Feeder bays = 4 Transformer bays = 3 Bus-coupler bays =1 Bays for future expansion = 2 2. 110kv/33kv AIS Substation at Trivandrum with 40 mva load capacity 2 x 20 mva power transformers. Double Busbar single Breaker scheme , Rigid conductors With Pentograph vertical break isolators. Total no of bays = 5 nos Feeder bays = 2 Transformer bays = 2 Bus-coupler bays =1 WORK DETAILS : AIS SUBSTATION DESIGN AND DRAFTING FOR ETHIOPIA. 220/66/ 33KV SUBSTATION – PRIMARY DESIGN 1. Feedback Infra PVT LTD AUG 2010 - TRIVANDRUM , KERALA Sr.Electrical Engineer WORK DETAILS : PROJECT 1 :- TECHNOPARK AT TRIVANDRUM OF 40 MVA Detailed DESIGN AND TENDER DOCUMENT PREPARATION FOR THE FOLLOWING – 3
  • 4. 1. 110KV U/G TRANSMISSION 2. 33/11KV TOWN DISTRIBUTION PROJECTS 3. 110/33/11KV SUBSTATIONS / SWITCHING STATIONS . 4. DESIGN FOR BUILDING SERVICES related to IT OFFICES and Community Quarters. PROJECT 2 :- INFOPARK AT COCHIN 1. 220/66/11KV SUBSTATION – PRIMARY DESIGN 2. MV/LT DESIGN FOR INFOPARK – 11KV CABLE DISTRIBUTION, DISTRIBUTION TRANSFORMER SIZING AND PLACING AT THE LOAD CENTRES. ROLE : DESIGN,ESTIMATION, TENDER DOC PREPARATION, CLIENT INTERACTION, TEAM SIZE ; 2 ENGINEERS + 4 DRAFTSMEN 3. Parsons Brinckerhoff PVT LTD OCT 2009 TILL JULY 2010 RAISINA ROAD, LEE-MERIDIAN HOTEL, NEW-DELHI Sr.Electrical Design Engineer WORK DETAILS : 20MVA grid station with 10 x 2 mva 11kv DG sets for backup power, twin metering system for main and backup power. DESIGN AND TENDER DOCUMENT PREPARATION FOR 1. MULTIPLE HOUSING PROJECT OF 500ACRES. 2. TOWNSHIP DEVELOPMENT AND DESIGN FOR BUILDING SERVICES. 3. 20MVA ,220KV/66KV SUBSTATION. 4. Detailed engg wrt grid station and township. 5. Working in rules with Punjab Electricicity Board 4
  • 5. Managing a Team size of 4 engineers and draftsmen. Client : IREO , GURGAON NCR. 4. Secon PVT LTD NOV 2004 TILL DEC 2008 #147,WHITE FIELD, EPIP AREA, BANGALORE-560066 WORKED AS ELECTRICAL CONSULTANT WORK DETAILS : ELECTRICAL CONSULTANCY FOR VARIOUS TOWNSHIP/PHE PROJECTS AT LIBYA and Substation primary design TOWN DISTRIBUTION , ILLUMINATION AND PHE DESIGN PROJECT DONE FOR LIBYA INCLUDES THE FOLLOWING: ALL THE DESIGNS CONFIRMING TO IEC STANDARDS. DETAILED HT/LT ELECTRICAL DESIGN RELATED TO TOWNSHIP PROJECTS WHICH INCLUDES LOAD FORECASTING FOR 2025 AND ACCORDINGLY DESIGNING THE NO OF 11KV/0.4KV DISTRIBUTION SUBSTATION, NO OF 220/66/11KV SUBSTATIONS, OR JUST 11KV SWITCHING STATIONS FOR SMALL SETTLEMENTS LESS THAN 100 HECTARES . DECIDING LOAD CENTRE FOR EACH 11KV/0.4KV DISTRIBUTION TRANSFORMER STATION. PREPARATION OF 220/132KV/11KV SLD, DESIGN CALCULATIONS. PROVIDING HT INTERLINK BETWEEN DIFFERENT 220/66/11KV SUBSTATIONS IN THE CASE OF ANY EMERGENCY OPERATION INCURRED. FOR HT/LT U/G DISTRIBUTION, CABLE SIZING DONE CONSIDERING ALL THE DERATING FACTORS, MINIMUM VOLTAGE DROP AND SYSTEM FAULT LEVEL . O/H DISTRIBUTION SYSTEM WITH ACSR CONDUCTORS OF REQUIRED SIZE FOR THE ENTIRE SETTLEMENT WHEREVER U/G DISTRIBUTION IS NOT POSSIBLE. PREPARATION OF HT/LT REGULATION CHART. PREPERATION OF DETAILED HT/LT CABLE LAYOUT DRAWINGS IN CADD WITH TRENCHING DETAILS. ALL THE HT FEEDERS CONNECTED IN RING MAIN, MAXIMUM LOADING ON ONE FEEDER 3.5 MVA AND ON EACH RING AROUND 7 MVA. CONSIDERING PROPER DIVERSITY FACTOR & DEMAND FACTOR FOR RESIDENTIAL AND NONRESIDENTIAL LOADS. DETAILED STREET LIGHTING DESIGN. HIGHMAST LIGHTING DESIGN. SHORT CIRCUIT ANALYSIS PUBLIC HEALTH ENGG PROJECTS : PUBLIC HEALTH ENGINEERING PROJECTS DONE FOR 40 SETTLEMENTS IN LIBYA AS PER GECOL STANDARDS [CONFORMING TO IEC STANDARDS]. BASIC AND DETAILED DESIGN & ENGINEERING OF POWER DISTRIBUTION SYSTEM OF INDUSTRIAL PLANTS, WATER TREATMENT PLANTS ,SEWAGE TREATMENT PLANTS,ELECTRICAL LAYOUTS , CONTROL SCHEMES.  Responsible for electrical design - water supply, sanitation, sewerage and storm water drainage system  Played a pivotal role in designing projects and looking after preparation for general plan for water supply, sanitation, sewerage and storm water drainage system and accompanying works in Libya. 5
  • 6.  Assisted SECON in their on going projects for the electrical design and management of water supply, sanitation, sewerage and storm water drainage  Managed assessment of Electrical Demand for the entire settlement for master plan area taking into account all amenties viz street Lighting, public utilities, housing, private industries, schools , hospitals, etc  Managed the following responsibilities with utmost conviction. DESIGN CALCULATIONS INCLUDE THE FOLLOWING : • HT AND LT REGULATION CALCULATION. • ILLUMINATION DESIGN : INTERIOR LIGHTING DESIGN STREET LIGHTING DESIGN HIGH MAST LIGHTING DESIGN • DETAILED CABLE DESIGN CONSIDERING ALL THE DERATING FACTORS. • SHORT CIRCUIT CALCULATIONS. • LOAD FORECASTING AND TRANSFORMER SIZING. • EVALUATION OF LOAD CENTERS. • PLANT YARD AND PERIMETER LIGHTING DESIGN • ELECTRICAL LOAD CALCULATIONS • INSTALLATION LIGHTING • CABLE AND CONDUIT LAYOUT • EARTHING DESIGN • AC AND VENTILATION  Evaluated capacity of back up generators for all pumping stations and treatment plants.  Demonstrated excellence in designing of electrical layout with regard to HT and LT supply for the entire settlement. ILLUMINATION DESIGN : INTERNAL LIGHTING : ILLUMINATION DESIGN DONE CONSIDERING ALL THE DERATING FACTORS LIKE MAINTENANCE FACTOR ,UTILIZATION FACTOR , WASTE FACTOR etc FOR VARIOUS INSTALLATIONS AS MENTIONED BELOW. EXTERNAL LIGHTING : EXTERNAL LIGHTING DESIGN DONE USING POINT CALCULATION METHOD FOR THE FOLLOWING STANDARDS. SUBSTATION PROJECTS FOR LIBIYA Main Receiving station of 400KV/220KV Each Main Receiving station feeding to 3 nos 220/66kv Main substations Each Main substation feeding to 6 nos 66/11kv secondary substations. So each major Zone having total 19 stations . Main Receiving station of 400KV/220KV - Double busbar+ double breaker +transfer bus scheme with rigid conductors, clearances were given as per 765 kv system. BIL 1425KV Main Substation of 220/66KV - Double busbar+ single breaker +transfer bus scheme with rigid conductors, clearances were given as per 220kv system BIL 900KV 6
  • 7. Secondary Substation of 66/11KV - Double busbar+ single breaker scheme with rigid conductors, clearances were given as per 66 kv system BIL 350KV 5. MEKASTER JAN 1995 - SEP 2001 #401, ST MARKS ROAD, BANGALORE-560001 Asst Design Engineer INDUSTRIAL DESIGN RELATED TO SMALL SCALE INDUSTRIES LT AND HT DESIGN RELATED TO RESIDENTIAL BUILDINGS FOR HOUSING PROJECT.. LOW SCALE AUTOMATION DESIGN FOR SMALL SCALE INDUSTRIES. DEVELOPING CONTROL CIRCUITS FOR VARIOUS APPLICATIONS. SWITCH YARD DESIGN SITE WORK AND CLIENT INTERACTION. REPORTING TO SECTION HEAD. OVERSEAS EXPERIENCE - OCT 1992- NOV 1994 WORKED AS AN ELECTRICAL CONSULTANT IN GULF FOR THE CLIENTS MENTIONED BELOW 6. Oman Concrete Products Inc. Muscat, Sultanate of OMAN PLANT MANAGER  Responsible for production and maintenance in a concrete block plant.  Incharge for ELECTRICAL(LT/HT) and ELECTRO-MECHANICAL DEVICES FOR A CONTINUOUS PROCESS PLANT INDUSTRY.  MANAGED operations of Plant consisting of BESSER machinery of USA, with a capacity to produce 1000 blocks per hour. FOLLOWING ARE THE COMPONENTS OF THE BLOCK PLANT :- CONVEYOR SYSTEM : Actuated by cutler hammer limit switches and proximity switches. MIXTURE PLANT : Controlled mixing of ingredients for blocks actuated by pnuematic cylinders with Ingersol Rand air compressors. VIBRATOR PLANT : From the cuber , mixture is compressed in the mold for specific pressure and then fed to the steam chamber. The vibrator works on cams. CUBER PLANT : For packing steamed blocks .Operated by hydraulic cylinders. STEAM PLANT : Steam generated by a Low pressure Thermax boiler. A water treatment plant for softening hard water. 7
  • 8. 7. AL MOSAWI ELECTRICAL DESIGNER AND CONTRACTORS Manama, Bahrain ELECTRICAL DESIGN ENGINEER 1. ELECTRICAL DESIGN FOR LT/HT INSTALLATIONS FOR HOSPITAL PROJECTS, SCHOOLS IN VARIOUS TOWNS OF BAHRAIN. AND MINI TOWNSHIP PROJECTS. 2. AIS substation design 8. AL HANOUF HEALTH SERVICES Riyadh, Saudi Arabia ELECTRICAL ENGINEER ELECTRICAL MAINTENANCE OF HOSPITAL PLANT IN AL QASSIM PROVINCE, SAUDIA EXCEL TRADERS (ELECTRICAL CONTRACTORS) FEB 1989 - APR 1991 DICKENSON ROAD[OFF COMMERCIAL STREET],BANGALORE-1 Electrical Engineer EXCEL TRADERS (ELECTRICAL CONTRACTORS) AUG 1991 - JULY 1992 DICKENSON ROAD[OFF COMMERCIAL STREET],BANGALORE-1 PROJECT Engineer ELECTRICAL DESIGN OF LT/HT INSTALLATIONS FOR INSTALLATIONS LIKE MULTISTORYED BUILDINGS, HOTELS, HOSPITALS etc. TOWNSHIP DESIGNING. PROJECTS EXECUTED IN BANGALORE : GOLDEN ENCLAVE – SMALL TOWNSHIP AND COMMERCIAL COMPLEX , INFRASTRUCTURE PROJECT ON OLD AIRPORT ROAD, BANGALORE AL-AMEEN HOUSING BOARD , BANGALORE WOCHARDT RESEARCH HOSPITAL , CUNNINGHAM ROAD, BANGALORE PROFESSIONAL AND SOFTWARE ENHANCEMENTS  Electrical and Electronic Controls from Foremen Training Institute, Bangalore.  Digital and analog simulations Low scale Automation  IC simulations.  AUTOCAD- RL 12 / 14 / 2000 / 2002 and AUTOLISP PROGRAMMING.  Finite Element Analysis(Mechanical) from CADD Centre, Bangalore 8
  • 9. DETAILS OF TOWN DISTRIBUTION PROJECTS EXECUTED IN INDIA OTHER INFRASTRUCTURE PROJECTS DESIGNED IN BANGALORE AUG 1991 - JULY 1992 1 GOLDEN ENCLAVE 2 AL-AMEEN HOUSING TOWNSHIP PROJECTS DESIGNED IN LUDHIANA AUG 2009 ONWARDS. 3 LUDHIANA INTEGRATED TOWNSHIP 128 ACRES 20 mva ONGOING PROJECTS : 4 TECHNOCITY – 500ACRE IT CUM TOWNSHIP OF 100MVA IN TRIVANDRUM 5 INFOPARK – 150 ACRES IT-SEZ CUM TOWNSHIP PROJECT IN COCHIN OF 100MVA 9
  • 10. DETAILS OF TOWN DISTRIBUTION PROJECTS EXECUTED IN INDIA OTHER INFRASTRUCTURE PROJECTS DESIGNED IN BANGALORE AUG 1991 - JULY 1992 1 GOLDEN ENCLAVE 2 AL-AMEEN HOUSING TOWNSHIP PROJECTS DESIGNED IN LUDHIANA AUG 2009 ONWARDS. 3 LUDHIANA INTEGRATED TOWNSHIP 128 ACRES 20 mva ONGOING PROJECTS : 4 TECHNOCITY – 500ACRE IT CUM TOWNSHIP OF 100MVA IN TRIVANDRUM 5 INFOPARK – 150 ACRES IT-SEZ CUM TOWNSHIP PROJECT IN COCHIN OF 100MVA 9