1 Project success © Deloitte & Touche LLP and affiliated entities.
Project success is only the
beginning…
Manage your post implementation phase
Christian Rodericks, PMP
PMI-SOC - October 2006
2 Project success © Deloitte & Touche LLP and affiliated entities.
Agenda
• Introduction
• Subject
• Key message/objective
• PMI framework
• Scope of success
• Challenges
• Key success factors
• Closure checklist
• Questions
3 Project success © Deloitte & Touche LLP and affiliated entities.
Introduction
Christian Rodericks, PMP
• Christian is a Manager in the Enterprise Risk Practice. He has over 10
years of project management and enterprise architecture experience;
including ERP systems, integration technologies and custom
application development. Christian’s main focus has been in the
Financial and Technology Industries, and since joining Deloitte,
Christian has provided project advisory services to clients undergoing
large complex system implementations. Christian remains a hands-on
technologist with a deep understanding of many current and legacy
system development technologies. Christian’s academic background
includes a Bachelor of Mathematics degree from the University of
Waterloo and he is a PMI Certified Project Management Professional
(PMP).
4 Project success © Deloitte & Touche LLP and affiliated entities.
Think about your project experience…
• Think about the projects you’ve managed and been involved in over
the years.
• In how many of those projects, were you actively involved with in the
post-implementation phase?
• What was done to enable the project product to be fully transitioned
into the business?
5 Project success © Deloitte & Touche LLP and affiliated entities.
If we think of climbing a mountain as a
project, then what would be our project
go-live date/deliverable?
We probably think of reaching the top of the
mountain as our project deliverable.
6 Project success © Deloitte & Touche LLP and affiliated entities.
Key message
• I believe that it is critical to have proper project management in any
post-implementation phase in order to maximize the value and
acceptance levels from the stakeholders.
• Think about the benefits we could deliver to our stakeholders if we
were to manage our projects beyond go-live until the project was fully
transitioned into the business.
7 Project success © Deloitte & Touche LLP and affiliated entities.
What does PMI say?
• As part of the Integration Management and Procurement Management
areas, PMI provides the following two procedures to be performed in
order to close out an entire project or project phase:
– Administrative closure
– Contract closure
• These procedures will definitely guide us in project closeout.
• The benefit of these procedures is that we can use them to help
transition the project to the business and realize true project success.
8 Project success © Deloitte & Touche LLP and affiliated entities.
Where’s the scope
of success?
9 Project success © Deloitte & Touche LLP and affiliated entities.
Scope of success
• Often a project is considered not to be successful, whilst the project
manager has done a great job.
Initiating Planning Execution Go-live Post-imp Closure
Scope of project
management success
Scope of project
success
Project manager Stakeholders/business user
10 Project success © Deloitte & Touche LLP and affiliated entities.
So what are the challenges?
• We focus on go-live.
• We have less experience in post implementation.
• We need to understand more about the business.
• We trade off long term benefits for short term gains.
11 Project success © Deloitte & Touche LLP and affiliated entities.
Heavy focus on “go-live”
• External/internal pressures to get the project into live mode.
• Project Managers know that there’s a post-implementation phase and
many understand what it takes to run an effective and efficient
transition from the project into the business.
• Pressures from the business community and executive sponsor to
realize value and ROI place enormous demands on the project
manager to deliver a go-live.
12 Project success © Deloitte & Touche LLP and affiliated entities.
Heavy focus on “go-live” (Continued)
• The reality is that large IT projects can often times run over budget,
time and either increase or decrease in scope.
• The business community and executive sponsor’s tolerance levels
shrink within every missed milestone or proposal to delay the go-live,
resulting in:
– Cancelled projects, or
– Added pressure to commit to a “do or die go-live date”
13 Project success © Deloitte & Touche LLP and affiliated entities.
Less experience in post implementation-transition
• As project managers, we have less experience in post-implementation:
– We think of delivering the project through a successful go-live and spend less
time in transitioning the project product to the business
14 Project success © Deloitte & Touche LLP and affiliated entities.
Understanding the business
• Project managers need to understand the business.
• Not all project managers understand or visualize how the product of
the project will run in a departmental/steady state point of view:
– This is why it is essential to include the right business people up front
– In addition, IT will also be involved to access the likelihood of delivering on
those demands
– Be cautious of the business compromises or early acceptances of concepts
presented by IT. They can often be misunderstood by the business, increasing
the risk not meeting their needs
• Running the project to build the system was easy compared to running
the business - the project manager may not have ability to actually
work with the system they implemented and hence want to stay in
their comfort zone and focus on the project only.
15 Project success © Deloitte & Touche LLP and affiliated entities.
Managing the project in the present day
• With aggressive go-live commitments, the project is racing
against time.
• Sometimes, the executive sponsor places more pressure by selecting
a go-live date for the project manager, forcing the project manager
to plan and work backwards from that date to meet the go-live.
• To add complexity, budgets are often frozen.
• We need to help sponsors to understand that on time, on budget is
of no value if the business requirements are not met.
• In many cases, deferred functionality is approved…with unknown
impacts in post-implementation.
• Focus on managing the priorities for your role as a project manager.
16 Project success © Deloitte & Touche LLP and affiliated entities.
Project manager’s big challenge
• “If you’re deeply involved in solving technical problems, who’s
managing the project?”
A big challenge!
• 20% Technical
• 80% Human relations
and management
• 80% Technical
• 20% Human relations
and management
Balance
Project
manager
Technical
specialist
Role
change
17 Project success © Deloitte & Touche LLP and affiliated entities.
So what are the key success factors?
• We need the right project team.
• We need to think beyond go-live.
• We need to understand more about the business.
• We need departmental experience.
• We need to educate our sponsors/stakeholders.
18 Project success © Deloitte & Touche LLP and affiliated entities.
Project team is vital
• Our project team needs to include representatives from business
user community.
• Our project team needs to help translate business requirements to the
technical team members.
• If you can find them, recruit project team members who have
business and technical knowledge.
• Keep the project team intact, as a support structure during the
warranty period.
19 Project success © Deloitte & Touche LLP and affiliated entities.
Think beyond go-live…convince them!
• Like it or not, its how they’ll measure our performance and ability to
deliver:
– We could deliver a project product that technically meets many project
objectives, but due to various reasons, the business user does not accept it
• We can mitigate this by:
– Verifying that our project aligns to company objectives
– Acquiring budget/time approval for post implementation up front
– Acquiring the right team committed up front and keep that team!
– Identifying the real impacts of deferred functionality
– Developing our plan to include a proper transition into production
20 Project success © Deloitte & Touche LLP and affiliated entities.
Know the business
• Before we can persuade the stakeholders about their business, we
need to know it.
• Spend time with the business people to understand the real need
behind the project product.
• Understand the risks/issues within the existing business environment.
• Understand the impacts of the gaps.
• Understand the benefits that the project product will bring to the
business environment.
21 Project success © Deloitte & Touche LLP and affiliated entities.
Will departmental experience help?
• We need to develop some departmental experience to help transition
the results of projects into steady state:
– Departmental experience in the industry of the project that your managing
helps with the understanding process of the business needs
– Increases creditability with the business, IT and the project team
– Increases ability to challenge timelines
– Improves communications with all levels
– Leverages lessons learned and history from other projects
22 Project success © Deloitte & Touche LLP and affiliated entities.
Educate our sponsors
• We need to help sponsors see the project complete at the end of the
post-implementation phase, not at go-live.
• Educate sponsors & stakeholders to consider this role.
23 Project success © Deloitte & Touche LLP and affiliated entities.
Upon closure
• When we finally get to the project closure, we want to verify key
activities:
– Has all remaining work been transitioned?
– Has staff performance been reviewed?
– Have all issues been closed?
– Have all action items been closed?
– Have all change requests been filed?
– Has all product documentation been received?
– Has the stakeholder agreed to the transition levels?
24 Project success © Deloitte & Touche LLP and affiliated entities.
Upon closure (Continued)
• When we finally get to the project closure, we want to verify key
activities: (Continued)
– Does the stakeholder recognise that all work has been completed?
– Have all financial books been closed?
– Has a project review been conducted and documented?
– Have stakeholder comments been gathered?
– Have contracts been closed-out?
– Have all formal approvals been received?
25 Project success © Deloitte & Touche LLP and affiliated entities.
When do we start?
• Plan to manage the post-implementation in your next project.
Questions
Contacts
Bruno Melo
416-601-5926
brmelo@deloitte.ca
Member of
Deloitte Touche Tohmatsu
© Deloitte & Touche LLP and affiliated entities.
Deloitte, one of Canada's leading professional services firms, provides audit, tax, consulting, and
financial advisory services through more than 6,200 people in 50 offices. Deloitte operates in Québec
as Samson Bélair/Deloitte & Touche s.e.n.c.r.l. The firm is dedicated to helping its clients and its
people excel. Deloitte is the Canadian member firm of Deloitte Touche Tohmatsu.
Deloitte refers to one or more of Deloitte Touche Tohmatsu, a Swiss Verein, its member firms, and
their respective subsidiaries and affiliates. As a Swiss Verein (association), neither Deloitte Touche
Tohmatsu nor any of its member firms has any liability for each other's acts or omissions. Each of
the member firms is a separate and independent legal entity operating under the names "Deloitte,"
"Deloitte & Touche," "Deloitte Touche Tohmatsu," or other related names. Services are provided by
the member firms or their subsidiaries or affiliates and not by the Deloitte Touche Tohmatsu Verein.

More Related Content

PPTX
Project Soft Power
PDF
Large Complex Projects (PMI-MY presentation Sept 2012)
PDF
Organizational Transformation Best Practices (Project-Driven Businesses)
PDF
Specifics of Managing Large, Complex Projects
PDF
Large Complex Industrial Projects:Owner specific role and associated requirem...
PDF
Cost Estimation and Control on Projects: Addressing today's challenges
PDF
Blms on project management 101117
PPTX
Creating successful R&D proposals to benefit small and medium enterprises
Project Soft Power
Large Complex Projects (PMI-MY presentation Sept 2012)
Organizational Transformation Best Practices (Project-Driven Businesses)
Specifics of Managing Large, Complex Projects
Large Complex Industrial Projects:Owner specific role and associated requirem...
Cost Estimation and Control on Projects: Addressing today's challenges
Blms on project management 101117
Creating successful R&D proposals to benefit small and medium enterprises

What's hot (18)

PDF
Transform Your PMO Into a Value Center
PPT
Ibm projectmgmt-1
PPTX
The Zombies of Project Management
PDF
Agile Team Resourcing - What It Means and Why You Need It
PDF
Discussion Paper PMO And Merger Projects
PPTX
PDF
Capacity Conquered: Realigning Resources to Respond, React and Recover
PDF
المحاضرة الرابعة - إدارة المشاريع
PPTX
Agile Governance
PPTX
Agile@Scale presentation for PMI Łódź chapeter on 26 June 2013
PPTX
PMP Worldwide Training
PPTX
The 2021 PMO Outlook Report Findings
PPTX
APM Presents - Why Value Management might reveal just what managing projects...
PDF
المحاضرة الثامنة: الرقابة على المشروع
PPTX
Delivering urgent projects - management and system engineering challenges
PDF
المحاضرة الاولي - إدارة المشاريع
PDF
Introduction to Project Management
PPTX
IT Project Management
Transform Your PMO Into a Value Center
Ibm projectmgmt-1
The Zombies of Project Management
Agile Team Resourcing - What It Means and Why You Need It
Discussion Paper PMO And Merger Projects
Capacity Conquered: Realigning Resources to Respond, React and Recover
المحاضرة الرابعة - إدارة المشاريع
Agile Governance
Agile@Scale presentation for PMI Łódź chapeter on 26 June 2013
PMP Worldwide Training
The 2021 PMO Outlook Report Findings
APM Presents - Why Value Management might reveal just what managing projects...
المحاضرة الثامنة: الرقابة على المشروع
Delivering urgent projects - management and system engineering challenges
المحاضرة الاولي - إدارة المشاريع
Introduction to Project Management
IT Project Management
Ad

Viewers also liked (6)

PDF
Alpha Case Study - Project Management Plan Sample
PDF
The Fail Project
PPTX
Restaurant project
PDF
Project Work on fast food restaurants
DOCX
Cafe construction project report
DOC
project on construction of house report.
Alpha Case Study - Project Management Plan Sample
The Fail Project
Restaurant project
Project Work on fast food restaurants
Cafe construction project report
project on construction of house report.
Ad

Similar to Project success post_implementation & management (20)

PDF
Project Management: Your Guide in Acing the Project
PPT
Sameer Mitter | Introduction to Information technology Project Management
PPT
Ch01
PPTX
Ready get set go your project is approved
PPTX
9781337101356_PPT_ch01-Introduction to Project Management.pptx
PPTX
Matinée PMI - Why so many technology projects failing
PPT
Software Project Management Basics
PDF
Project Manager Primer
PPTX
Tom Gorham Class Content
PPTX
An introduction to project management
PPT
Northern Finishing School: IT Project Managment
PPTX
How to drive your project into success?
PPT
Project Management
PPTX
IT projects
PDF
Proyek Management E-Book- (3 Constraint)
PDF
Introduction to PMI and PMP
PPTX
1 b. introduction to project management
PPTX
Project management - Basics for all
PPTX
Projects2016_Franks_PreparingFortheParty-Project Close
PPTX
Week 2 - Session 2-hello world ples.pptx
Project Management: Your Guide in Acing the Project
Sameer Mitter | Introduction to Information technology Project Management
Ch01
Ready get set go your project is approved
9781337101356_PPT_ch01-Introduction to Project Management.pptx
Matinée PMI - Why so many technology projects failing
Software Project Management Basics
Project Manager Primer
Tom Gorham Class Content
An introduction to project management
Northern Finishing School: IT Project Managment
How to drive your project into success?
Project Management
IT projects
Proyek Management E-Book- (3 Constraint)
Introduction to PMI and PMP
1 b. introduction to project management
Project management - Basics for all
Projects2016_Franks_PreparingFortheParty-Project Close
Week 2 - Session 2-hello world ples.pptx

Recently uploaded (20)

PPT
Data mining for business intelligence ch04 sharda
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
HR Introduction Slide (1).pptx on hr intro
PPTX
Principles of Marketing, Industrial, Consumers,
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
IFRS Notes in your pocket for study all the time
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Training And Development of Employee .pdf
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
Business model innovation report 2022.pdf
DOCX
Business Management - unit 1 and 2
PDF
WRN_Investor_Presentation_August 2025.pdf
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
Data mining for business intelligence ch04 sharda
Reconciliation AND MEMORANDUM RECONCILATION
Nidhal Samdaie CV - International Business Consultant
HR Introduction Slide (1).pptx on hr intro
Principles of Marketing, Industrial, Consumers,
Euro SEO Services 1st 3 General Updates.docx
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
IFRS Notes in your pocket for study all the time
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
Ôn tập tiếng anh trong kinh doanh nâng cao
Chapter 5_Foreign Exchange Market in .pdf
Training And Development of Employee .pdf
Belch_12e_PPT_Ch18_Accessible_university.pptx
New Microsoft PowerPoint Presentation - Copy.pptx
Business model innovation report 2022.pdf
Business Management - unit 1 and 2
WRN_Investor_Presentation_August 2025.pdf
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
DOC-20250806-WA0002._20250806_112011_0000.pdf

Project success post_implementation & management

  • 1. 1 Project success © Deloitte & Touche LLP and affiliated entities. Project success is only the beginning… Manage your post implementation phase Christian Rodericks, PMP PMI-SOC - October 2006
  • 2. 2 Project success © Deloitte & Touche LLP and affiliated entities. Agenda • Introduction • Subject • Key message/objective • PMI framework • Scope of success • Challenges • Key success factors • Closure checklist • Questions
  • 3. 3 Project success © Deloitte & Touche LLP and affiliated entities. Introduction Christian Rodericks, PMP • Christian is a Manager in the Enterprise Risk Practice. He has over 10 years of project management and enterprise architecture experience; including ERP systems, integration technologies and custom application development. Christian’s main focus has been in the Financial and Technology Industries, and since joining Deloitte, Christian has provided project advisory services to clients undergoing large complex system implementations. Christian remains a hands-on technologist with a deep understanding of many current and legacy system development technologies. Christian’s academic background includes a Bachelor of Mathematics degree from the University of Waterloo and he is a PMI Certified Project Management Professional (PMP).
  • 4. 4 Project success © Deloitte & Touche LLP and affiliated entities. Think about your project experience… • Think about the projects you’ve managed and been involved in over the years. • In how many of those projects, were you actively involved with in the post-implementation phase? • What was done to enable the project product to be fully transitioned into the business?
  • 5. 5 Project success © Deloitte & Touche LLP and affiliated entities. If we think of climbing a mountain as a project, then what would be our project go-live date/deliverable? We probably think of reaching the top of the mountain as our project deliverable.
  • 6. 6 Project success © Deloitte & Touche LLP and affiliated entities. Key message • I believe that it is critical to have proper project management in any post-implementation phase in order to maximize the value and acceptance levels from the stakeholders. • Think about the benefits we could deliver to our stakeholders if we were to manage our projects beyond go-live until the project was fully transitioned into the business.
  • 7. 7 Project success © Deloitte & Touche LLP and affiliated entities. What does PMI say? • As part of the Integration Management and Procurement Management areas, PMI provides the following two procedures to be performed in order to close out an entire project or project phase: – Administrative closure – Contract closure • These procedures will definitely guide us in project closeout. • The benefit of these procedures is that we can use them to help transition the project to the business and realize true project success.
  • 8. 8 Project success © Deloitte & Touche LLP and affiliated entities. Where’s the scope of success?
  • 9. 9 Project success © Deloitte & Touche LLP and affiliated entities. Scope of success • Often a project is considered not to be successful, whilst the project manager has done a great job. Initiating Planning Execution Go-live Post-imp Closure Scope of project management success Scope of project success Project manager Stakeholders/business user
  • 10. 10 Project success © Deloitte & Touche LLP and affiliated entities. So what are the challenges? • We focus on go-live. • We have less experience in post implementation. • We need to understand more about the business. • We trade off long term benefits for short term gains.
  • 11. 11 Project success © Deloitte & Touche LLP and affiliated entities. Heavy focus on “go-live” • External/internal pressures to get the project into live mode. • Project Managers know that there’s a post-implementation phase and many understand what it takes to run an effective and efficient transition from the project into the business. • Pressures from the business community and executive sponsor to realize value and ROI place enormous demands on the project manager to deliver a go-live.
  • 12. 12 Project success © Deloitte & Touche LLP and affiliated entities. Heavy focus on “go-live” (Continued) • The reality is that large IT projects can often times run over budget, time and either increase or decrease in scope. • The business community and executive sponsor’s tolerance levels shrink within every missed milestone or proposal to delay the go-live, resulting in: – Cancelled projects, or – Added pressure to commit to a “do or die go-live date”
  • 13. 13 Project success © Deloitte & Touche LLP and affiliated entities. Less experience in post implementation-transition • As project managers, we have less experience in post-implementation: – We think of delivering the project through a successful go-live and spend less time in transitioning the project product to the business
  • 14. 14 Project success © Deloitte & Touche LLP and affiliated entities. Understanding the business • Project managers need to understand the business. • Not all project managers understand or visualize how the product of the project will run in a departmental/steady state point of view: – This is why it is essential to include the right business people up front – In addition, IT will also be involved to access the likelihood of delivering on those demands – Be cautious of the business compromises or early acceptances of concepts presented by IT. They can often be misunderstood by the business, increasing the risk not meeting their needs • Running the project to build the system was easy compared to running the business - the project manager may not have ability to actually work with the system they implemented and hence want to stay in their comfort zone and focus on the project only.
  • 15. 15 Project success © Deloitte & Touche LLP and affiliated entities. Managing the project in the present day • With aggressive go-live commitments, the project is racing against time. • Sometimes, the executive sponsor places more pressure by selecting a go-live date for the project manager, forcing the project manager to plan and work backwards from that date to meet the go-live. • To add complexity, budgets are often frozen. • We need to help sponsors to understand that on time, on budget is of no value if the business requirements are not met. • In many cases, deferred functionality is approved…with unknown impacts in post-implementation. • Focus on managing the priorities for your role as a project manager.
  • 16. 16 Project success © Deloitte & Touche LLP and affiliated entities. Project manager’s big challenge • “If you’re deeply involved in solving technical problems, who’s managing the project?” A big challenge! • 20% Technical • 80% Human relations and management • 80% Technical • 20% Human relations and management Balance Project manager Technical specialist Role change
  • 17. 17 Project success © Deloitte & Touche LLP and affiliated entities. So what are the key success factors? • We need the right project team. • We need to think beyond go-live. • We need to understand more about the business. • We need departmental experience. • We need to educate our sponsors/stakeholders.
  • 18. 18 Project success © Deloitte & Touche LLP and affiliated entities. Project team is vital • Our project team needs to include representatives from business user community. • Our project team needs to help translate business requirements to the technical team members. • If you can find them, recruit project team members who have business and technical knowledge. • Keep the project team intact, as a support structure during the warranty period.
  • 19. 19 Project success © Deloitte & Touche LLP and affiliated entities. Think beyond go-live…convince them! • Like it or not, its how they’ll measure our performance and ability to deliver: – We could deliver a project product that technically meets many project objectives, but due to various reasons, the business user does not accept it • We can mitigate this by: – Verifying that our project aligns to company objectives – Acquiring budget/time approval for post implementation up front – Acquiring the right team committed up front and keep that team! – Identifying the real impacts of deferred functionality – Developing our plan to include a proper transition into production
  • 20. 20 Project success © Deloitte & Touche LLP and affiliated entities. Know the business • Before we can persuade the stakeholders about their business, we need to know it. • Spend time with the business people to understand the real need behind the project product. • Understand the risks/issues within the existing business environment. • Understand the impacts of the gaps. • Understand the benefits that the project product will bring to the business environment.
  • 21. 21 Project success © Deloitte & Touche LLP and affiliated entities. Will departmental experience help? • We need to develop some departmental experience to help transition the results of projects into steady state: – Departmental experience in the industry of the project that your managing helps with the understanding process of the business needs – Increases creditability with the business, IT and the project team – Increases ability to challenge timelines – Improves communications with all levels – Leverages lessons learned and history from other projects
  • 22. 22 Project success © Deloitte & Touche LLP and affiliated entities. Educate our sponsors • We need to help sponsors see the project complete at the end of the post-implementation phase, not at go-live. • Educate sponsors & stakeholders to consider this role.
  • 23. 23 Project success © Deloitte & Touche LLP and affiliated entities. Upon closure • When we finally get to the project closure, we want to verify key activities: – Has all remaining work been transitioned? – Has staff performance been reviewed? – Have all issues been closed? – Have all action items been closed? – Have all change requests been filed? – Has all product documentation been received? – Has the stakeholder agreed to the transition levels?
  • 24. 24 Project success © Deloitte & Touche LLP and affiliated entities. Upon closure (Continued) • When we finally get to the project closure, we want to verify key activities: (Continued) – Does the stakeholder recognise that all work has been completed? – Have all financial books been closed? – Has a project review been conducted and documented? – Have stakeholder comments been gathered? – Have contracts been closed-out? – Have all formal approvals been received?
  • 25. 25 Project success © Deloitte & Touche LLP and affiliated entities. When do we start? • Plan to manage the post-implementation in your next project.
  • 28. Member of Deloitte Touche Tohmatsu © Deloitte & Touche LLP and affiliated entities. Deloitte, one of Canada's leading professional services firms, provides audit, tax, consulting, and financial advisory services through more than 6,200 people in 50 offices. Deloitte operates in Québec as Samson Bélair/Deloitte & Touche s.e.n.c.r.l. The firm is dedicated to helping its clients and its people excel. Deloitte is the Canadian member firm of Deloitte Touche Tohmatsu. Deloitte refers to one or more of Deloitte Touche Tohmatsu, a Swiss Verein, its member firms, and their respective subsidiaries and affiliates. As a Swiss Verein (association), neither Deloitte Touche Tohmatsu nor any of its member firms has any liability for each other's acts or omissions. Each of the member firms is a separate and independent legal entity operating under the names "Deloitte," "Deloitte & Touche," "Deloitte Touche Tohmatsu," or other related names. Services are provided by the member firms or their subsidiaries or affiliates and not by the Deloitte Touche Tohmatsu Verein.