This document summarizes a research paper that models and simulates the load frequency control of a three-area interconnected power system incorporating HVDC transmission. It investigates the system's dynamic performance with PI controllers and with optimized PID controllers using Particle Swarm Optimization. The system is simulated with and without an HVDC link connecting the areas in parallel with existing HVAC ties. Results show that the HVDC link improves settling time and reduces oscillations compared to the HVAC-only system.