SlideShare a Scribd company logo
Geo-referencing / Digitization in Q-GIS
Lakshya Pandit
15554007
M.Tech (Infrastructure Systems)
IIT Roorkee
Objective
To geo-reference and digitize the current map of the IIT Roorkee campus (dated 1998), post geo-referencing and adding
relative attributes of the layers to be added.
Methodology
I. Geo-referencing of the Map
• For the geo-referencing of the map, the co-ordinates based on the UTM, are saved and collected from the on-site analysis
by the help of the GRX-2 Sokkia instrument.
• The 14 points located on the map, are dealt with on-site check-up of the respected points with 15 minutes of stationary
time for each point respectively, setting the receiver height at 1.9m from the ground level, and epoch rate less than 5.
• Based on the given map, the points were noted and the data of the co-ordinates were taken into consideration for the
geo-referencing of the map.
Map of IIT Roorkee_1998 Map of IIT Roorkee_1998 (14 Points for geo-referencing)
• The data collected post site-analysis is recovered through the survey spectrum software.
• The zone setting of the co-ordinate system is 43 N , as roorkee falls under the specific zone; and the Co-ordinate type set
is WGS (World Geodetic System _84)
• With the 95% confidence level for the GPS post processing, the report is generated in the HTML format, with Ground
Northings and Ground Eastings data collection as follows :
Report
Report
Report
• Based on the Ground Northings and Ground Eastings of the report data, the points are referred into the
Q-GIS 2.8.5 Wien version through following steps.
• Geo-referencer under the raster edit tool bar is clicked.
• For Georeferencing, first new raster layer is to be
added i.e the existing scanned map of the IIT Roorkee
campus, which is in the .png format.
• The Co-ordinate reference system for the Map is to be
set as WGS 84 / UTM zone 43N
• Once the Map is generated, the points on the map are
to be marked with the required Ground Northings and
Ground Eastings as per the figure in the bottom right
corner.
• During the marking of the points, the emphasis is to be
paid on the marking of the points, which should be
done such that two consecutive points lay at the
farthest opposite ends to each other.
• This ensures the plane nature of the map comes into
play, therefore leading to less distortion in the map,
during the geo-referencing.
• For example, after point 1 i.e on the upper north end of
the map, point 2 i.e. at the lower southern end of the
map is poined, then point 3 at the western end of the
map followed by point 4 at the eastern end and so on.
• Once all the points are put on the map, based on the
UTM system, the transformation settings are to be
adjusted before the initiation of the geo-referencing.
• Transformation type is based on the frequency and
accuracy of the points noted in the georeferencer.
Polynomial 1 is selected.
• Transformation setting determines how the ground
control points are used to transform the image from
source to destination coordinate space.
• Default setting of Resampling method i.e. Nearest
Neighbour is taken into consideration. This determines
the pixel value of the output raster.
• The Output raster is the location where the
georeferenced file will be saved. Accordingly, the
location is set up and the WGS 84 / UTM zone 43N is
selected under the Target SRS.
• Once the transformation settings are set, the
Georeferencing can be initiated. This lead to the
following georeferenced image at the bottom right
corner :
• Post geo-referencing in order to check the map, it is
opened via new project through a new raster layer.
• In order to super-impose the map w.r.t the satellite
image, openlayers plugin via web tool is assessed.
• Through this, the Google satellite is chosen for the
correlation of the location w.r.t the map.
• Once the layer is added, the transparency of the raster
map (georeferenced) layer is temporarily set from 30-
60%, which is accessed through the property dialogue
of the raster layer.
• Post setting of the layer, the location matches with the
georeferenced map of the campus, therefore this can
now be utilized for the digitization in the QGIS for
further stages.
• It is to be made sure that the co-ordinate reference
system for the map lies in the WGS 84 / UTM zone 43N
Figure : Correlation of the Google satellite with the Georeferenced Map of IIT Roorkee
II. Digitization
• Post geo-referencing , the next step is the digitization.
• The Map includes Roads, Infrastructure elements like
buildings, grounds etc, which are to be digitized.
• These are added through layers via SpatiaLite Layer
dialogue box under the Create Layer tool bar within
Layer.
• In order to start with building as a layer, a database it
to be set up, which records the attributes and other
elements within its directory.
• The database location is set up, leading to the Name of
the layer i.e Building in this case. The geometry being
a polygon, Type – Polygon is selected. The CRS is
checked to the WGS 84 / UTM zone 43N.
• The next important step is identifying the attributes
related to the building, and their Type. For example,
Name of the building will have Text type, whereas the
Ground coverage will have the decimal type within the
attribute system.
• Post defining the attributes of the Layer i.e Building,
Digitization initiates.
• The initial step is to make sure the snapping options is
checked with respect to all Layers to decrease the
degree of error during the digitization process
• Once the Snapping Option is checked, the digitization is
started within the Toggle editing mode.
• Toggle editing mode is accessed as shown in the
bottom right image as follows.
• This activates the editing options within the Building
layer which help in digitizing the map.
• By using the Add new feature tool in the upper tool
panel, the polygon can be started to develop in shape.
• The properties related to the Building layer can be
accessed in the Properties dialogue box.
• Using Add feature, the polygon shaping takes into
place, which can be taken from clockwise /
anticlockwise direction.
• Once the polygon is completed, right clicking,
terminates the shaping of the polygon by joining the
last point with the first point automatically.
• Post completion of the Polygon, Dialogue box appears
where the attributes of the building are to be filled, i.e.
the Name, Type, Ground coverage etc.
• With respect to the type of building the information is
added.
• In case of a courtyard the polygon is to be modified.
• This is achieved using the Add ring command in the
upper tool panel, in a similar fashion as with the add
feature.
• Opening within a polygon is done with utilization of the
Add Ring feature.
• It is utilized in similar fashion with respect to the Add
new feature tool command.
• With help of advanced digitizing tool, the cuts are
made more accurate based on the orthagonal nature
of the lines selected.
• Hence, this helps in increased perfection of the
geometry of the particular polygon.
• Once the polygon is complete, but still needs some
minor changes, Node tool in the tool panel can be
utilized to modify individual nodes of the polygon.
• On the completion of the polygon, the attributes of the
building with respect to the area / perimeter of the
polygon can be assessed using the commands within
the attribute table.
• In order to add the area feature within the ground
coverage, the attribute field calculator can be utilized.
• Selecting the Ground coverage as the attribute, the
area function within the expression box can be
accessed.
• The Area function under the Geometry Title is to be
selected with double click, which adds the function as
$area on the empty left box.
• On the addition of the area command, the update field
selection can be added which later updates all the
values under the Ground coverage attribute.
• This shows the resultant area of the polygon as shown
in the adjacent figure, where the area of the Main
building Polygon is shown.
• Similarly various buildings can be updated with
respected to their attributes within this section.
• In case of Road Layer, instead of Polygon type , Line
type is to be selected while adding the layer to the
database.
Figure : Buildings digitized as on 15.02.2016
Figure : Buildings attribute sample of the buildings digitized
Post Digitization / Road Graph Analysis in Q-GIS
Lakshya Pandit
15554007
M.Tech (Infrastructure Systems)
IIT Roorkee
Objective
To analyze the shortest path through road graph post digitization of the the current map of the IIT Roorkee campus (dated
1998).
• The adjacent picture shows the
digitization of the building
infrastructure along with the
respective attributes .
• The attributes include Type of the
building, number of floors, Ground
coverage area and Name of the
building.
• A total of 355 polygon vectors were
generated under the building
infrastructure layer.
• The adjacent attribute tables show the
characteristics of the building
infrastructure digitized.
Building Infrastructure
• The adjacent picture shows the
digitization of the Landscape
infrastructure along with the
respective attributes .
• The attributes include Name and
Ground area of the respective layer.
• A total of 110 polygon vectors were
generated under the landscape
infrastructure layer.
• The adjacent attribute tables show the
characteristics of the landscape
infrastructure digitized.
Landscape Infrastructure
• The adjacent picture shows the
digitization of the Road
infrastructure along with the
respective attributes .
• The attributes include Name, width,
speed, direction and length.
• A total of 270 line vectors were
generated under the road
infrastructure layer.
• The adjacent attribute tables show the
characteristics of the road
infrastructure digitized.
• In the direction attribute, 0 signifies
two-directional, whereas -1&+1 signify
one directional forward and reverse
flow.
Road Infrastructure
• The adjacent picture shows road graph
setting for the shortest path analysis.
• For the analysis, in the transportation
layer, the layer selected is road, and
the direction layer is utilized under the
direction field.
• Similarly for the speed field, the speed
attribute of the road layer is selected,
where different road segments have
different speeds.
• The adjacent picture depicts the
selection of shortest path under the
panel table.
• In the direction attribute, 0 signifies
two-directional, whereas -1&+1 signify
one directional forward and reverse
flow.
Road graph
• The adjacent picture shows the
selection of the abn junction as the
start coordinate and hospital as the
stop coordinate.
• For the analysis, the time is taken as
the deciding factor for the shortest
path analysis.
• The total length of the shortest path
based on time is 1.09635km.
• On calculation the following path(red)
is generated.
• The total time of the shortest path
based on time is .0297555 hours i.e
approximately 2 minutes by car.
Shortest path analysis
Sheet Layouts
Q-GIS : Geo-referencing and Digitization
Q-GIS : Geo-referencing and Digitization
Q-GIS : Geo-referencing and Digitization
Q-GIS : Geo-referencing and Digitization
Q-GIS : Geo-referencing and Digitization

More Related Content

PPT
Introduction to gis
PDF
Geographical Information System (GIS) Georeferencing and Digitization, Bihar ...
PPTX
Georeferencing
PPTX
PPT
Digital Cartography
PPT
Map projections
PPTX
Types of GIS Data
DOCX
PROCESS OF GEOREFERENCING IN QGIS
Introduction to gis
Geographical Information System (GIS) Georeferencing and Digitization, Bihar ...
Georeferencing
Digital Cartography
Map projections
Types of GIS Data
PROCESS OF GEOREFERENCING IN QGIS

What's hot (20)

PPTX
GIS - Topology
PPT
datum
PPTX
Data input techniques - GIS
PDF
Arc gis introduction-ppt
DOCX
Components of GIS
PPTX
Introduction to gis
PPTX
ppt spatial data
PPTX
Raster data and Vector data
PPTX
GIS Modeling
PPT
Geodatabases
PPTX
gis project planning and management
PDF
Cartography intro
PPTX
Understanding Coordinate Systems and Projections for ArcGIS
PPTX
Coordinate systems, datum & map projections
PPTX
DATA in GIS and DATA Query
PPTX
PPT
Digitization in ArcGIS
PDF
Introduction to arc gis
PPT
Remote sensing
PPTX
Introduction to GIS
GIS - Topology
datum
Data input techniques - GIS
Arc gis introduction-ppt
Components of GIS
Introduction to gis
ppt spatial data
Raster data and Vector data
GIS Modeling
Geodatabases
gis project planning and management
Cartography intro
Understanding Coordinate Systems and Projections for ArcGIS
Coordinate systems, datum & map projections
DATA in GIS and DATA Query
Digitization in ArcGIS
Introduction to arc gis
Remote sensing
Introduction to GIS
Ad

Viewers also liked (16)

PPT
Remote Sensing fundamentals
PPTX
GIS Application in Water Resource Management by Engr. Ehtisham Habib
PPTX
Introduction to Remote Sensing
PPT
Intro to GIS and Remote Sensing
PPT
Sensors On 3d Digitization
PPTX
Application of GIS and Remote Sensing in the analysis of Landuse/Landcover ch...
PPTX
Remote sensing
PDF
History of remote sensing
PPTX
Ppt on remote sensing system
PPTX
Remote sensing ppt
PPTX
Urban Landuse/ Landcover change analysis using Remote Sensing and GIS
PPT
GIS presentation
PPT
REMOTE SENSING
PPT
Remote sensing & Gis
PPT
remote sensing
Remote Sensing fundamentals
GIS Application in Water Resource Management by Engr. Ehtisham Habib
Introduction to Remote Sensing
Intro to GIS and Remote Sensing
Sensors On 3d Digitization
Application of GIS and Remote Sensing in the analysis of Landuse/Landcover ch...
Remote sensing
History of remote sensing
Ppt on remote sensing system
Remote sensing ppt
Urban Landuse/ Landcover change analysis using Remote Sensing and GIS
GIS presentation
REMOTE SENSING
Remote sensing & Gis
remote sensing
Ad

Similar to Q-GIS : Geo-referencing and Digitization (20)

PDF
Gis application tutorial
PPTX
2017 PLSC Track: Using a Standard Version of ArcMap with External VRS Recieve...
PPTX
Rs unit iii-gis--- [repaired]
PPTX
Rs unit iii-gis--- [repaired]
PPTX
Applied GIS - 3022.pptx
PPTX
6.3_DEM CREATION AND 3D MODELING.pptx
PPTX
Optimizing Geospatial Operations with Server-side Programming in HBase and Ac...
PPTX
High Accuracy Data Collection with Esri's Collector App
PDF
INPUT AND OUTPUT DATA IN GIS.pdf
PDF
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
PPTX
Web GISfor.pptx
PPTX
Data collection and input overview
PPT
Explore new dimensions with MapInfo Vertical Mapper
PDF
ILWIS 3.0 SUMMARY PRESENTATION
PPTX
2017 ASPRS-RMR Big Data Track: Using ArcGIS and a Digital Elevation Model to ...
PPT
Methods of computation of volumes in surveying.ppt
PPT
Total station, digital self leveling levels,
PPTX
Unit 5 Surveying Modern methods TS GPS
PDF
Charting the Transformation of the Seabed: A Historical Journey along Tunisia...
PPTX
DIGITIZATION.pptx
Gis application tutorial
2017 PLSC Track: Using a Standard Version of ArcMap with External VRS Recieve...
Rs unit iii-gis--- [repaired]
Rs unit iii-gis--- [repaired]
Applied GIS - 3022.pptx
6.3_DEM CREATION AND 3D MODELING.pptx
Optimizing Geospatial Operations with Server-side Programming in HBase and Ac...
High Accuracy Data Collection with Esri's Collector App
INPUT AND OUTPUT DATA IN GIS.pdf
SUPPORT SYSTEM FOR GAS DISTRIBUTION NETWORK
Web GISfor.pptx
Data collection and input overview
Explore new dimensions with MapInfo Vertical Mapper
ILWIS 3.0 SUMMARY PRESENTATION
2017 ASPRS-RMR Big Data Track: Using ArcGIS and a Digital Elevation Model to ...
Methods of computation of volumes in surveying.ppt
Total station, digital self leveling levels,
Unit 5 Surveying Modern methods TS GPS
Charting the Transformation of the Seabed: A Historical Journey along Tunisia...
DIGITIZATION.pptx

Recently uploaded (20)

PDF
Open folder Downloads.pdf yes yes ges yes
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
PDF
Pre independence Education in Inndia.pdf
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
PPH.pptx obstetrics and gynecology in nursing
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Insiders guide to clinical Medicine.pdf
PDF
Introduction-to-Social-Work-by-Leonora-Serafeca-De-Guzman-Group-2.pdf
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PPTX
Open Quiz Monsoon Mind Game Final Set.pptx
PPTX
Open Quiz Monsoon Mind Game Prelims.pptx
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
Open folder Downloads.pdf yes yes ges yes
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
O5-L3 Freight Transport Ops (International) V1.pdf
Microbial disease of the cardiovascular and lymphatic systems
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
Pre independence Education in Inndia.pdf
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPH.pptx obstetrics and gynecology in nursing
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Insiders guide to clinical Medicine.pdf
Introduction-to-Social-Work-by-Leonora-Serafeca-De-Guzman-Group-2.pdf
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Open Quiz Monsoon Mind Game Final Set.pptx
Open Quiz Monsoon Mind Game Prelims.pptx
human mycosis Human fungal infections are called human mycosis..pptx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
102 student loan defaulters named and shamed – Is someone you know on the list?

Q-GIS : Geo-referencing and Digitization

  • 1. Geo-referencing / Digitization in Q-GIS Lakshya Pandit 15554007 M.Tech (Infrastructure Systems) IIT Roorkee
  • 2. Objective To geo-reference and digitize the current map of the IIT Roorkee campus (dated 1998), post geo-referencing and adding relative attributes of the layers to be added.
  • 4. I. Geo-referencing of the Map • For the geo-referencing of the map, the co-ordinates based on the UTM, are saved and collected from the on-site analysis by the help of the GRX-2 Sokkia instrument. • The 14 points located on the map, are dealt with on-site check-up of the respected points with 15 minutes of stationary time for each point respectively, setting the receiver height at 1.9m from the ground level, and epoch rate less than 5. • Based on the given map, the points were noted and the data of the co-ordinates were taken into consideration for the geo-referencing of the map. Map of IIT Roorkee_1998 Map of IIT Roorkee_1998 (14 Points for geo-referencing)
  • 5. • The data collected post site-analysis is recovered through the survey spectrum software. • The zone setting of the co-ordinate system is 43 N , as roorkee falls under the specific zone; and the Co-ordinate type set is WGS (World Geodetic System _84) • With the 95% confidence level for the GPS post processing, the report is generated in the HTML format, with Ground Northings and Ground Eastings data collection as follows : Report
  • 8. • Based on the Ground Northings and Ground Eastings of the report data, the points are referred into the Q-GIS 2.8.5 Wien version through following steps. • Geo-referencer under the raster edit tool bar is clicked.
  • 9. • For Georeferencing, first new raster layer is to be added i.e the existing scanned map of the IIT Roorkee campus, which is in the .png format. • The Co-ordinate reference system for the Map is to be set as WGS 84 / UTM zone 43N • Once the Map is generated, the points on the map are to be marked with the required Ground Northings and Ground Eastings as per the figure in the bottom right corner. • During the marking of the points, the emphasis is to be paid on the marking of the points, which should be done such that two consecutive points lay at the farthest opposite ends to each other. • This ensures the plane nature of the map comes into play, therefore leading to less distortion in the map, during the geo-referencing. • For example, after point 1 i.e on the upper north end of the map, point 2 i.e. at the lower southern end of the map is poined, then point 3 at the western end of the map followed by point 4 at the eastern end and so on.
  • 10. • Once all the points are put on the map, based on the UTM system, the transformation settings are to be adjusted before the initiation of the geo-referencing. • Transformation type is based on the frequency and accuracy of the points noted in the georeferencer. Polynomial 1 is selected. • Transformation setting determines how the ground control points are used to transform the image from source to destination coordinate space. • Default setting of Resampling method i.e. Nearest Neighbour is taken into consideration. This determines the pixel value of the output raster. • The Output raster is the location where the georeferenced file will be saved. Accordingly, the location is set up and the WGS 84 / UTM zone 43N is selected under the Target SRS. • Once the transformation settings are set, the Georeferencing can be initiated. This lead to the following georeferenced image at the bottom right corner :
  • 11. • Post geo-referencing in order to check the map, it is opened via new project through a new raster layer. • In order to super-impose the map w.r.t the satellite image, openlayers plugin via web tool is assessed. • Through this, the Google satellite is chosen for the correlation of the location w.r.t the map. • Once the layer is added, the transparency of the raster map (georeferenced) layer is temporarily set from 30- 60%, which is accessed through the property dialogue of the raster layer. • Post setting of the layer, the location matches with the georeferenced map of the campus, therefore this can now be utilized for the digitization in the QGIS for further stages. • It is to be made sure that the co-ordinate reference system for the map lies in the WGS 84 / UTM zone 43N
  • 12. Figure : Correlation of the Google satellite with the Georeferenced Map of IIT Roorkee
  • 13. II. Digitization • Post geo-referencing , the next step is the digitization. • The Map includes Roads, Infrastructure elements like buildings, grounds etc, which are to be digitized. • These are added through layers via SpatiaLite Layer dialogue box under the Create Layer tool bar within Layer. • In order to start with building as a layer, a database it to be set up, which records the attributes and other elements within its directory. • The database location is set up, leading to the Name of the layer i.e Building in this case. The geometry being a polygon, Type – Polygon is selected. The CRS is checked to the WGS 84 / UTM zone 43N. • The next important step is identifying the attributes related to the building, and their Type. For example, Name of the building will have Text type, whereas the Ground coverage will have the decimal type within the attribute system. • Post defining the attributes of the Layer i.e Building, Digitization initiates.
  • 14. • The initial step is to make sure the snapping options is checked with respect to all Layers to decrease the degree of error during the digitization process • Once the Snapping Option is checked, the digitization is started within the Toggle editing mode. • Toggle editing mode is accessed as shown in the bottom right image as follows. • This activates the editing options within the Building layer which help in digitizing the map. • By using the Add new feature tool in the upper tool panel, the polygon can be started to develop in shape. • The properties related to the Building layer can be accessed in the Properties dialogue box.
  • 15. • Using Add feature, the polygon shaping takes into place, which can be taken from clockwise / anticlockwise direction. • Once the polygon is completed, right clicking, terminates the shaping of the polygon by joining the last point with the first point automatically. • Post completion of the Polygon, Dialogue box appears where the attributes of the building are to be filled, i.e. the Name, Type, Ground coverage etc. • With respect to the type of building the information is added. • In case of a courtyard the polygon is to be modified. • This is achieved using the Add ring command in the upper tool panel, in a similar fashion as with the add feature.
  • 16. • Opening within a polygon is done with utilization of the Add Ring feature. • It is utilized in similar fashion with respect to the Add new feature tool command. • With help of advanced digitizing tool, the cuts are made more accurate based on the orthagonal nature of the lines selected. • Hence, this helps in increased perfection of the geometry of the particular polygon. • Once the polygon is complete, but still needs some minor changes, Node tool in the tool panel can be utilized to modify individual nodes of the polygon. • On the completion of the polygon, the attributes of the building with respect to the area / perimeter of the polygon can be assessed using the commands within the attribute table.
  • 17. • In order to add the area feature within the ground coverage, the attribute field calculator can be utilized. • Selecting the Ground coverage as the attribute, the area function within the expression box can be accessed. • The Area function under the Geometry Title is to be selected with double click, which adds the function as $area on the empty left box. • On the addition of the area command, the update field selection can be added which later updates all the values under the Ground coverage attribute. • This shows the resultant area of the polygon as shown in the adjacent figure, where the area of the Main building Polygon is shown. • Similarly various buildings can be updated with respected to their attributes within this section. • In case of Road Layer, instead of Polygon type , Line type is to be selected while adding the layer to the database.
  • 18. Figure : Buildings digitized as on 15.02.2016 Figure : Buildings attribute sample of the buildings digitized
  • 19. Post Digitization / Road Graph Analysis in Q-GIS Lakshya Pandit 15554007 M.Tech (Infrastructure Systems) IIT Roorkee
  • 20. Objective To analyze the shortest path through road graph post digitization of the the current map of the IIT Roorkee campus (dated 1998).
  • 21. • The adjacent picture shows the digitization of the building infrastructure along with the respective attributes . • The attributes include Type of the building, number of floors, Ground coverage area and Name of the building. • A total of 355 polygon vectors were generated under the building infrastructure layer. • The adjacent attribute tables show the characteristics of the building infrastructure digitized. Building Infrastructure
  • 22. • The adjacent picture shows the digitization of the Landscape infrastructure along with the respective attributes . • The attributes include Name and Ground area of the respective layer. • A total of 110 polygon vectors were generated under the landscape infrastructure layer. • The adjacent attribute tables show the characteristics of the landscape infrastructure digitized. Landscape Infrastructure
  • 23. • The adjacent picture shows the digitization of the Road infrastructure along with the respective attributes . • The attributes include Name, width, speed, direction and length. • A total of 270 line vectors were generated under the road infrastructure layer. • The adjacent attribute tables show the characteristics of the road infrastructure digitized. • In the direction attribute, 0 signifies two-directional, whereas -1&+1 signify one directional forward and reverse flow. Road Infrastructure
  • 24. • The adjacent picture shows road graph setting for the shortest path analysis. • For the analysis, in the transportation layer, the layer selected is road, and the direction layer is utilized under the direction field. • Similarly for the speed field, the speed attribute of the road layer is selected, where different road segments have different speeds. • The adjacent picture depicts the selection of shortest path under the panel table. • In the direction attribute, 0 signifies two-directional, whereas -1&+1 signify one directional forward and reverse flow. Road graph
  • 25. • The adjacent picture shows the selection of the abn junction as the start coordinate and hospital as the stop coordinate. • For the analysis, the time is taken as the deciding factor for the shortest path analysis. • The total length of the shortest path based on time is 1.09635km. • On calculation the following path(red) is generated. • The total time of the shortest path based on time is .0297555 hours i.e approximately 2 minutes by car. Shortest path analysis