Qualification of Dissolution Test
Apparatus and Validation of
Utility System
Presented by : Akshay G. Trivedi
Guided by : Dr. Pintu Prajapati
Enrollment No : 201804103910007
Department of Pharmaceutical Quality Assurance
Maliba Pharmacy College
Uka Tarsadia University
Qualification of Dissolution Test
Apparatus
 Contents :
 Introduction & Types
 Installation Qualification
 Operational Qualification
 Performance Qualification
 Maintenance Schedule
 Qualification Protocol
 References
Introduction and Types
 Dissolution:
 “The process by which a known amount of drug substance goes into solution
per unit of time under standardized conditions.”
 Dissolution testing is used as a qualitative tool to provide measurements of
the bioavailability of a drug as well as to demonstrate bioequivalence from
batch-to-batch.
 Introduction :
 The bioavailability and bioequivalence data obtained can be used to guide the
development of a new formulation and product development processes
toward product optimization, as well as to ensure continuing product quality
and performance of the manufacturing process.
 Requirement for regulatory approval for product marketing.
 Vital component of the overall quality control program.
Introduction and Types
Types of Dissolution Test Apparatus
 IP : Paddle, Basket
 BP : Basket, Paddle, Flow through cell
 USP : Basket, Paddle, Reciprocating cylinder, Flow through cell
Paddle over disc, Rotating cylinder, Reciprocating disc
Installation Qualification
 Procedure
 Acceptance Criteria
 Conclusion
Installation Qualification
 Procedure :
 Details of the Equipment
 Supplier or Manufacturer Name & Address
 Equipment Name, Make & Model No.
 In-house Equipment Code No.
 Location
 Utilities
Installation Qualification
 Installation Procedure :
 Site Inspection, Environmental Conditions and Prerequisite
 Parts Identification List
 Validation of Physical Parameter
 SOPs
 Computerized System
Installation Qualification
 Acceptance Criteria :
 Fulfill the Selection Criteria & its Purpose of Application
 Material of Construction and Name of the Manufacturer & Supplier shall be as
mentioned in the Purchase order
 Meet pre-selected Design Parameters
 Equipment Manual shall be provided
 Utilities of recommended capacities are to be provided
Installation Qualification
 Conclusion :
 The equipment shall be considered qualified for installation provided it meets
all the parameters mentioned in the acceptance criteria.
 After receiving installation report, it shall be evaluated & released for
operational qualification, provided installation report is evaluated & the
equipment is found meeting all parameters of acceptance criteria.
Operational Qualification
Procedure :
 Power ON Check
 Lift Movement Check
 Temperature Accuracy
 Accuracy of Shaft Rotation
 Control of Paddle Wobbling
Operational Qualification
 Control of Paddle Centering
 Control of Distance of Shaft to Side of Vessel
 For Automated Dissolution Systems :
 Software/Hardware Communication
 Operator Interface Functions
 Stress / Boundary / Challenge Testing
Operational Qualification
 Acceptance Criteria :
 All operating inputs provided on the equipment when tested shall successfully
comply to their intended use & meet tolerance limit given by the
manufacturer.
 Perform successfully when operated as per SOP.
 Critical indicators provided on the equipment are calibrated.
 Equipment when operated shall not produce any abnormal sound or show
any discrepancy in its smooth operation.
Operational Qualification
 Conclusion :
 The equipment shall be considered qualified for performance qualification
provided it meets the acceptance criteria of operational qualification.
 The operational test reports shall be evaluated & equipment shall be released
for carrying out the performance qualification.
Performance Qualification
 Procedure :
 Test must be conducted for each of the combinations of vessels and
apparatus.
 USP Calibrator Tablets are used:
Disintegrating Tablets (Prednisone)
Non-disintegrating Tablets (Salicylic Acid)
Performance Qualification
 Effectiveness of dissolution will be qualified by determining drug content in
the solution.
 For the comparison, solution of known concentration of USP Reference
Standard is used.
 Document the deviation details.
Performance Qualification
 Acceptance Criteria :
 The result of the suitability test should be as per USP specification.
 The equipment should work smoothly with minimum noise while operating.
 The equipment should produce intended outputs with respect to quality &
quantity consistently.
Performance Qualification
 Conclusion :
 The equipment shall be considered qualified for regular usage provided it
should meet the acceptance criteria of performance qualification.
 The performance test reports shall be evaluated & equipment shall be
released for Carrying out the routine process.
Maintenance Schedule
Frequency Procedure / Parameter
After Each Test Clean up the system
Weekly Inspect:
• Circulating Water Pump
• Bath Water
Monthly Replace Bath Water
Every 6 Months • Check Temperature Calibration
• Calibration of the system
• Inspect- Guide Rods & Spindle Bearings
Annually Inspect:
• Belts
• Idler Pulleys
Every 2 Years Replace the Belts
Qualification Protocol
Figure of Equipment :
Fig: Various Equipments used for Qualification
Figure of Equipment :
Fig: Temperature Probe – used for measuring
temperature in vessel and in bath
Figure of Equipment :
Fig: Tachometer- used for measuring rotation of shaft
Figure of Equipment :
Fig: Wobble Gauge (with Basket Rim) – used to check
wobbling of basket rim
Figure of Equipment :
Fig: Dissolution Test Apparatus Connected with various
Equipments used for Qualification
Figure of Equipment :
Validation of Utility System
 This study provides a summary of the key validation test functions and
acceptance criteria for each utility system. These are provided as a guideline
for those involved in the validation of any pharmaceutical.
 Approval of this master plan neither provides approval of these test functions
and acceptance criteria for does it limit the test functions and acceptance
criteria included in any protocol.
 final approval of test functions and acceptance criteria is made by approval of
the installation, operational, and where applicable, performance qualification
protocols.
Plant steam
 Test functions :
 Perform installation qualification of deionizer and distillation equipment,
holding tanks, clean steam generator, and distribution system.
 Complete and document all required pre-start-up maintenance procedures
(including cleaning).
 Perform general operational controls verification testing.
 Verify that the system has adequate steam capacity during peak hours of
operation. Confirm that the steam pressure in within 5 psi of the
recommended operating pressure.
 Record the range of all process or equipment parameters (set points,
pressure, etc). Test the water produced by the system to ensure adequate
conductivity.
 Check that the holding tank water quality does not change adversely during
storage in holding tanks.
 Acceptance criteria :
 The system is installed in accordance with design specifications, manufacturer
recommendations, and cGMPs. Instruments are calibrated, identified, and
entered into the calibration program.
 General controls and alarms operate in accordance with design specification.
 The system operates in accordance with design specifications throughout the
operating range or range of intended use.
 System regulators must operate within ± 2 psi of design level.
 The system capacity must be sufficient to operate all system at peak demand
periods.
Pure steam
 Test functions :
 Perform installation qualification.
 Perform general operational controls verification testing.
 Verify that clean steam is fed by a purified water system or WFI system.
 Operate the system per applicable SOPs. Perform sampling as per the
sampling procedure and schedule.
 Record the range of all process or equipment parameters (set points,
pressure, etc.) verified during operational and performance qualification
testing.
 Acceptance criteria :
 The system is installed in accordance with design specifications, manufacturer
recommendations, and cGMPs. Instruments are calibrated, identified, and
entered into the calibrated program.
 General controls and alarms operate in accordance with design specifications.
 Operate the system per applicable SOPs. Perform sampling over a 1- month
period as per the sampling procedure and schedule.
 Test samples for conformance to current USP water for injection monograph.
Water for injection
 Test functions :
 Perform installation qualification. Verify piping, fitting, proper dimensions,
Drawings, wiring, PC software, calibration, and quality of materials.
 Check flow rates, low volume of water supply, excessive pressure drop, and
temperature drop or increase beyond set level.
 Perform general operational controls verification testing. Operate system
throughout the range of intended use.
 System regulators must operate within ± 2 psi of design level.
 Record the range of all process or equipment parameters verified during
operational and performance qualification testing.
 Acceptance criteria :
 The system is installed in accordance with design specifications, manufacturer
recommendations, and cGMPs. Instrument are calibrated, identified, and
entered into the calibration program.
 General controls and alarms operate in accordance with design specifications.
 All samples must meet the following criteria :
 Bacteriological purity. All samples must contain no more than 10 cfu/100 ml.
 Physical properties. The temperature of the hot water for injection must be
greater than 80°C.
Emergency power(standby generator)
 Test functions :
 Perform installation qualification.
 Perform general operational controls verification testing.
 Operate system throughout the range of opening design specifications or
range of intended use.
 Verify that the emergency power generation system has adequate power to
provide all intended users.
 Record the range of all process or equipment parameters verified during
operational and performance qualifications testing.
 Acceptance criteria :
 The system is installed in accordance with design specifications, manufacturer
recommendations, and cGMPs. Instruments are calibrated, identified, and
entered into the calibration program.
 General controls and alarms operate in accordance with design specifications.
 All intended users must operate under normal power source interruption
conditions.
References
 Frost S; “Introduction to the Validation of a Dissolution Apparatus”;
Dissolution Technologies; February 2004; 19-21.
 Sigvardson K; “Laboratory Equipment Qualification”; Pharmaceutical
Technologies; October 2011; 102-108.
 United States Pharmacopeial Convention, Inc; United States Pharmacopeia 26;
Rockville, Maryland: United States Pharmacopeial Convention, Inc; 2003.
 United state pharmacopoeia- 2014.
Qualification of Dissolution Test Apparatus and Validation of Utility System

More Related Content

PPTX
Chemical based hazards in pharmaceutical
PPTX
Pharmaceutical Containers and Closures: An Overview
PPTX
Issue facing modern drug packaging, selection & evaluation of pharmaceuti...
PPTX
Role of quality systems and audits in pharmaceutical manufacturing environment
PPTX
calulation of yields, production record review,change control
DOCX
CAPE Caribbean Studies IA
PPT
Cleaning validation
PPTX
Solubility of drugs
Chemical based hazards in pharmaceutical
Pharmaceutical Containers and Closures: An Overview
Issue facing modern drug packaging, selection & evaluation of pharmaceuti...
Role of quality systems and audits in pharmaceutical manufacturing environment
calulation of yields, production record review,change control
CAPE Caribbean Studies IA
Cleaning validation
Solubility of drugs

What's hot (20)

PPTX
QUALIFICATION OF MANUFACTURING EQUIPMENTS
PPTX
Qualification of Dry Heat Sterilizer or Tunnel.pptx
PPTX
Qualification of laboratory equipments
PPTX
Validation utility system
PPTX
Advanced sterile product manufacturing technology
PPTX
Validation of utility system (water system)
PPTX
Pharmaceutical inspection convention M. Pharmacy
PDF
Introduction to validation
PDF
CHAPTER-1 DEFICIENCIES.pdf
PPTX
Qualification of Autoclave.pptx
PDF
Qualification of tablet compression machine
PPTX
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
PPTX
PPTX
Qualification of manufacturing equipment.
PPTX
Validation utility system
QUALIFICATION OF MANUFACTURING EQUIPMENTS
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of laboratory equipments
Validation utility system
Advanced sterile product manufacturing technology
Validation of utility system (water system)
Pharmaceutical inspection convention M. Pharmacy
Introduction to validation
CHAPTER-1 DEFICIENCIES.pdf
Qualification of Autoclave.pptx
Qualification of tablet compression machine
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
Qualification of manufacturing equipment.
Validation utility system
Ad

Similar to Qualification of Dissolution Test Apparatus and Validation of Utility System (20)

PPT
Validation of equipments
PPTX
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
PPT
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PPTX
Pharmaceutical Validation .pptx
PPTX
Equipment qualification
PPTX
validation-1.pptx
PPTX
Validation and qualification
PPTX
Pharmaceutical validation, Quantification, streamlining, validation masterplan.
PPT
Jatin validation
PPTX
PPTX
4 validation jntu pharmacy
PDF
validationksd-140930004558-phpapp01 (1).pdf
PDF
Cleanroom Qualification
PPTX
Validation (1).pptx
PPTX
Process Validation.pptx
PPTX
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
PPTX
Calibration
PDF
validationmasterplan-180918073044 (3).pdf
PPTX
Validation master plan
Validation of equipments
3.ICH &WHO Guidelines for Calibration And Validation of Equipments.pptx
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
Pharmaceutical Validation .pptx
Equipment qualification
validation-1.pptx
Validation and qualification
Pharmaceutical validation, Quantification, streamlining, validation masterplan.
Jatin validation
4 validation jntu pharmacy
validationksd-140930004558-phpapp01 (1).pdf
Cleanroom Qualification
Validation (1).pptx
Process Validation.pptx
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Calibration
validationmasterplan-180918073044 (3).pdf
Validation master plan
Ad

More from Akshay Trivedi , Maliba Pharmacy College (7)

PPTX
Shrink packaging in pharmaceutical (foil, plastic pouches, bottle seals, tape...
PPTX
International council for harmonization by akshay trivedi
PPTX
CTD and ECTD by Akshay Trivedi
PPTX
Customer focus - customer satisfaction , customer delight & customer complain...
PPTX
Research article discussion for simultaneous method HPLC estimation
PPTX
IPQC for capsule by akshay trivedi
Shrink packaging in pharmaceutical (foil, plastic pouches, bottle seals, tape...
International council for harmonization by akshay trivedi
CTD and ECTD by Akshay Trivedi
Customer focus - customer satisfaction , customer delight & customer complain...
Research article discussion for simultaneous method HPLC estimation
IPQC for capsule by akshay trivedi

Recently uploaded (20)

PPTX
The KM-GBF monitoring framework – status & key messages.pptx
PPTX
2Systematics of Living Organisms t-.pptx
PDF
An interstellar mission to test astrophysical black holes
PPTX
Cell Membrane: Structure, Composition & Functions
PDF
The scientific heritage No 166 (166) (2025)
PPTX
ANEMIA WITH LEUKOPENIA MDS 07_25.pptx htggtftgt fredrctvg
PPTX
Introduction to Cardiovascular system_structure and functions-1
PPTX
famous lake in india and its disturibution and importance
PPTX
BIOMOLECULES PPT........................
PDF
. Radiology Case Scenariosssssssssssssss
PPTX
INTRODUCTION TO EVS | Concept of sustainability
PDF
SEHH2274 Organic Chemistry Notes 1 Structure and Bonding.pdf
PPTX
Protein & Amino Acid Structures Levels of protein structure (primary, seconda...
PPTX
ognitive-behavioral therapy, mindfulness-based approaches, coping skills trai...
PPTX
cpcsea ppt.pptxssssssssssssssjjdjdndndddd
PDF
Formation of Supersonic Turbulence in the Primordial Star-forming Cloud
PPTX
Derivatives of integument scales, beaks, horns,.pptx
PDF
HPLC-PPT.docx high performance liquid chromatography
PDF
Unveiling a 36 billion solar mass black hole at the centre of the Cosmic Hors...
PPTX
G5Q1W8 PPT SCIENCE.pptx 2025-2026 GRADE 5
The KM-GBF monitoring framework – status & key messages.pptx
2Systematics of Living Organisms t-.pptx
An interstellar mission to test astrophysical black holes
Cell Membrane: Structure, Composition & Functions
The scientific heritage No 166 (166) (2025)
ANEMIA WITH LEUKOPENIA MDS 07_25.pptx htggtftgt fredrctvg
Introduction to Cardiovascular system_structure and functions-1
famous lake in india and its disturibution and importance
BIOMOLECULES PPT........................
. Radiology Case Scenariosssssssssssssss
INTRODUCTION TO EVS | Concept of sustainability
SEHH2274 Organic Chemistry Notes 1 Structure and Bonding.pdf
Protein & Amino Acid Structures Levels of protein structure (primary, seconda...
ognitive-behavioral therapy, mindfulness-based approaches, coping skills trai...
cpcsea ppt.pptxssssssssssssssjjdjdndndddd
Formation of Supersonic Turbulence in the Primordial Star-forming Cloud
Derivatives of integument scales, beaks, horns,.pptx
HPLC-PPT.docx high performance liquid chromatography
Unveiling a 36 billion solar mass black hole at the centre of the Cosmic Hors...
G5Q1W8 PPT SCIENCE.pptx 2025-2026 GRADE 5

Qualification of Dissolution Test Apparatus and Validation of Utility System

  • 1. Qualification of Dissolution Test Apparatus and Validation of Utility System Presented by : Akshay G. Trivedi Guided by : Dr. Pintu Prajapati Enrollment No : 201804103910007 Department of Pharmaceutical Quality Assurance Maliba Pharmacy College Uka Tarsadia University
  • 2. Qualification of Dissolution Test Apparatus  Contents :  Introduction & Types  Installation Qualification  Operational Qualification  Performance Qualification  Maintenance Schedule  Qualification Protocol  References
  • 3. Introduction and Types  Dissolution:  “The process by which a known amount of drug substance goes into solution per unit of time under standardized conditions.”  Dissolution testing is used as a qualitative tool to provide measurements of the bioavailability of a drug as well as to demonstrate bioequivalence from batch-to-batch.
  • 4.  Introduction :  The bioavailability and bioequivalence data obtained can be used to guide the development of a new formulation and product development processes toward product optimization, as well as to ensure continuing product quality and performance of the manufacturing process.  Requirement for regulatory approval for product marketing.  Vital component of the overall quality control program.
  • 5. Introduction and Types Types of Dissolution Test Apparatus  IP : Paddle, Basket  BP : Basket, Paddle, Flow through cell  USP : Basket, Paddle, Reciprocating cylinder, Flow through cell Paddle over disc, Rotating cylinder, Reciprocating disc
  • 6. Installation Qualification  Procedure  Acceptance Criteria  Conclusion
  • 7. Installation Qualification  Procedure :  Details of the Equipment  Supplier or Manufacturer Name & Address  Equipment Name, Make & Model No.  In-house Equipment Code No.  Location  Utilities
  • 8. Installation Qualification  Installation Procedure :  Site Inspection, Environmental Conditions and Prerequisite  Parts Identification List  Validation of Physical Parameter  SOPs  Computerized System
  • 9. Installation Qualification  Acceptance Criteria :  Fulfill the Selection Criteria & its Purpose of Application  Material of Construction and Name of the Manufacturer & Supplier shall be as mentioned in the Purchase order  Meet pre-selected Design Parameters  Equipment Manual shall be provided  Utilities of recommended capacities are to be provided
  • 10. Installation Qualification  Conclusion :  The equipment shall be considered qualified for installation provided it meets all the parameters mentioned in the acceptance criteria.  After receiving installation report, it shall be evaluated & released for operational qualification, provided installation report is evaluated & the equipment is found meeting all parameters of acceptance criteria.
  • 11. Operational Qualification Procedure :  Power ON Check  Lift Movement Check  Temperature Accuracy  Accuracy of Shaft Rotation  Control of Paddle Wobbling
  • 12. Operational Qualification  Control of Paddle Centering  Control of Distance of Shaft to Side of Vessel  For Automated Dissolution Systems :  Software/Hardware Communication  Operator Interface Functions  Stress / Boundary / Challenge Testing
  • 13. Operational Qualification  Acceptance Criteria :  All operating inputs provided on the equipment when tested shall successfully comply to their intended use & meet tolerance limit given by the manufacturer.  Perform successfully when operated as per SOP.  Critical indicators provided on the equipment are calibrated.  Equipment when operated shall not produce any abnormal sound or show any discrepancy in its smooth operation.
  • 14. Operational Qualification  Conclusion :  The equipment shall be considered qualified for performance qualification provided it meets the acceptance criteria of operational qualification.  The operational test reports shall be evaluated & equipment shall be released for carrying out the performance qualification.
  • 15. Performance Qualification  Procedure :  Test must be conducted for each of the combinations of vessels and apparatus.  USP Calibrator Tablets are used: Disintegrating Tablets (Prednisone) Non-disintegrating Tablets (Salicylic Acid)
  • 16. Performance Qualification  Effectiveness of dissolution will be qualified by determining drug content in the solution.  For the comparison, solution of known concentration of USP Reference Standard is used.  Document the deviation details.
  • 17. Performance Qualification  Acceptance Criteria :  The result of the suitability test should be as per USP specification.  The equipment should work smoothly with minimum noise while operating.  The equipment should produce intended outputs with respect to quality & quantity consistently.
  • 18. Performance Qualification  Conclusion :  The equipment shall be considered qualified for regular usage provided it should meet the acceptance criteria of performance qualification.  The performance test reports shall be evaluated & equipment shall be released for Carrying out the routine process.
  • 19. Maintenance Schedule Frequency Procedure / Parameter After Each Test Clean up the system Weekly Inspect: • Circulating Water Pump • Bath Water Monthly Replace Bath Water Every 6 Months • Check Temperature Calibration • Calibration of the system • Inspect- Guide Rods & Spindle Bearings Annually Inspect: • Belts • Idler Pulleys Every 2 Years Replace the Belts
  • 20. Qualification Protocol Figure of Equipment : Fig: Various Equipments used for Qualification
  • 21. Figure of Equipment : Fig: Temperature Probe – used for measuring temperature in vessel and in bath Figure of Equipment :
  • 22. Fig: Tachometer- used for measuring rotation of shaft Figure of Equipment :
  • 23. Fig: Wobble Gauge (with Basket Rim) – used to check wobbling of basket rim Figure of Equipment :
  • 24. Fig: Dissolution Test Apparatus Connected with various Equipments used for Qualification Figure of Equipment :
  • 25. Validation of Utility System  This study provides a summary of the key validation test functions and acceptance criteria for each utility system. These are provided as a guideline for those involved in the validation of any pharmaceutical.  Approval of this master plan neither provides approval of these test functions and acceptance criteria for does it limit the test functions and acceptance criteria included in any protocol.  final approval of test functions and acceptance criteria is made by approval of the installation, operational, and where applicable, performance qualification protocols.
  • 26. Plant steam  Test functions :  Perform installation qualification of deionizer and distillation equipment, holding tanks, clean steam generator, and distribution system.  Complete and document all required pre-start-up maintenance procedures (including cleaning).  Perform general operational controls verification testing.  Verify that the system has adequate steam capacity during peak hours of operation. Confirm that the steam pressure in within 5 psi of the recommended operating pressure.  Record the range of all process or equipment parameters (set points, pressure, etc). Test the water produced by the system to ensure adequate conductivity.  Check that the holding tank water quality does not change adversely during storage in holding tanks.
  • 27.  Acceptance criteria :  The system is installed in accordance with design specifications, manufacturer recommendations, and cGMPs. Instruments are calibrated, identified, and entered into the calibration program.  General controls and alarms operate in accordance with design specification.  The system operates in accordance with design specifications throughout the operating range or range of intended use.  System regulators must operate within ± 2 psi of design level.  The system capacity must be sufficient to operate all system at peak demand periods.
  • 28. Pure steam  Test functions :  Perform installation qualification.  Perform general operational controls verification testing.  Verify that clean steam is fed by a purified water system or WFI system.  Operate the system per applicable SOPs. Perform sampling as per the sampling procedure and schedule.  Record the range of all process or equipment parameters (set points, pressure, etc.) verified during operational and performance qualification testing.
  • 29.  Acceptance criteria :  The system is installed in accordance with design specifications, manufacturer recommendations, and cGMPs. Instruments are calibrated, identified, and entered into the calibrated program.  General controls and alarms operate in accordance with design specifications.  Operate the system per applicable SOPs. Perform sampling over a 1- month period as per the sampling procedure and schedule.  Test samples for conformance to current USP water for injection monograph.
  • 30. Water for injection  Test functions :  Perform installation qualification. Verify piping, fitting, proper dimensions, Drawings, wiring, PC software, calibration, and quality of materials.  Check flow rates, low volume of water supply, excessive pressure drop, and temperature drop or increase beyond set level.  Perform general operational controls verification testing. Operate system throughout the range of intended use.  System regulators must operate within ± 2 psi of design level.  Record the range of all process or equipment parameters verified during operational and performance qualification testing.
  • 31.  Acceptance criteria :  The system is installed in accordance with design specifications, manufacturer recommendations, and cGMPs. Instrument are calibrated, identified, and entered into the calibration program.  General controls and alarms operate in accordance with design specifications.  All samples must meet the following criteria :  Bacteriological purity. All samples must contain no more than 10 cfu/100 ml.  Physical properties. The temperature of the hot water for injection must be greater than 80°C.
  • 32. Emergency power(standby generator)  Test functions :  Perform installation qualification.  Perform general operational controls verification testing.  Operate system throughout the range of opening design specifications or range of intended use.  Verify that the emergency power generation system has adequate power to provide all intended users.  Record the range of all process or equipment parameters verified during operational and performance qualifications testing.
  • 33.  Acceptance criteria :  The system is installed in accordance with design specifications, manufacturer recommendations, and cGMPs. Instruments are calibrated, identified, and entered into the calibration program.  General controls and alarms operate in accordance with design specifications.  All intended users must operate under normal power source interruption conditions.
  • 34. References  Frost S; “Introduction to the Validation of a Dissolution Apparatus”; Dissolution Technologies; February 2004; 19-21.  Sigvardson K; “Laboratory Equipment Qualification”; Pharmaceutical Technologies; October 2011; 102-108.  United States Pharmacopeial Convention, Inc; United States Pharmacopeia 26; Rockville, Maryland: United States Pharmacopeial Convention, Inc; 2003.  United state pharmacopoeia- 2014.

Editor's Notes

  • #16: Prednisone – glucocorticoid medication use decrease inflammation.