 Quality Standards for Solar PV Panels;
 Quality Standards for Solar Inverters;
 Quality Standards for Protective Devices;
 Quality Standards for Cables;
 Quality Standards for Other Components;
 Sample Test Certificates, and
 Guidelines for Best Practices.
Quality standards and specifications for GCRT PV
Solar PV Modules/Panels
Mandatory
Advisory
IEC 61215/ IS 14286 Design Qualification and Type Approval for Crystalline
Silicon Terrestrial Photovoltaic (PV) Modules Yes
-
IEC 61646/ IS 16077 Design Qualification and Type Approval for Thin-Film
Terrestrial Photovoltaic (PV) Modules
Yes
-
IEC 62108 Design Qualification and Type Approval for Concentrator
Photovoltaic (CPV) Modules and Assemblies Yes
-
IEC 61701- As applicable Salt Mist Corrosion Testing of Photovoltaic (PV) Modules
Yes
-
IEC 61853- Part 1/ IS
16170 : Part 1
Photovoltaic (PV) module performance testing and energy
rating –: Irradiance and temperature performance
measurements, and power rating
Yes
-
IEC 62716 Photovoltaic (PV) Modules – Ammonia (NH3) Corrosion
Testing
Yes (As per the
site condition like
dairies, toilets)
IEC 61730-1,2 Photovoltaic (PV) Module Safety Qualification – Part 1:
Requirements for Construction, Part 2: Requirements for
Testing
Yes
-
IEC 62804 (Draft
Specifications/TS)
Photovoltaic (PV) modules - Test methods for the detection
of potential-induced degradation. IEC TS 62804-1: Part 1:
Crystalline silicon
Yes (PID-resistant
modules – system
voltage is more
than 600 VDC)
Yes
(PID-resistant
modules – system
voltage is less
than 600 VDC )
IEC 62759-1 Photovoltaic (PV) modules – Transportation testing, Part 1:
Transportation and shipping of module package units Yes
-
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Grid-Tie Solar PV String Inverters/PCUs/ Micro-Inverters
Mandatory
Advisory
IEC 62109-1, IEC 62109-2 Safety of power converters for use in
photovoltaic power systems - Part 1: General
requirements, and Safety of power converters
for use in photovoltaic power systems - Part
2: Particular requirements for inverters.
Safety compliance (Protection degree IP 65
for outdoor mounting, IP 54 for indoor
mounting)
yes
-
IEC/IS 61683 Photovoltaic Systems – Power conditioners:
Procedure for Measuring Efficiency (10%,
25%, 50%, 75% & 90-100% Loading
Conditions)
Yes
-
BS EN 50530
(Will become IEC 62891)
Overall efficiency of grid-connected
photovoltaic inverters:
This European Standard provides a procedure
for the measurement of the accuracy of the
maximum power point tracking (MPPT) of
inverters, which are used in grid-connected
photovoltaic systems. In that case the inverter
energizes a low voltage grid of stable AC
voltage and constant frequency. Both the
static and dynamic MPPT efficiency is
considered.
Yes
-
IEC 62116 or, IEEE 1547 Utility-interconnected Photovoltaic Inverters -
Test Procedure of Islanding Prevention
Measures
Yes
-
IEC 60068-2 (1, 2, 14, 30 & 64) Environmental Testing of PV System – Power
Conditioners and Inverters
a) IEC 60068-2-1:
Environmental testing - Part 2-1: Tests - Test A:
Cold
b) IEC 60068-2-2:
Environmental testing - Part 2-2: Tests - Test B:
Dry heat
c) IEC 60068-2-14:
Environmental testing - Part 2-14: Tests - Test N:
Change of temperature
d) IEC 60068-2-30:
Environmental testing - Part 2-30: Tests - Test
Db: Damp heat, cyclic (12 h + 12 h cycle)
e) IEC 60068-2-64:
Environmental testing - Part 2-64: Tests - Test Fh:
Vibration, broadband random and guidance
Yes
-
IEC 61000- Part 2, 3 & 6 Electromagnetic Interference (EMI), and
Electromagnetic Compatibility (EMC) testing of
PV Inverters (as applicable)
Yes
-
Grid-Tie Solar PV String Inverters/PCUs/ Micro-Inverters
Mandatory
Advisory
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Fuses Mandatory Advisory
IS/IEC 60947 (Part 1, 2 & 3),
EN 50521
General safety requirements for connectors,
switches, circuit breakers (AC/DC):
a) Low-voltage Switchgear and Control-gear,
Part 1: General rules
b) Low-Voltage Switchgear and Control-gear,
Part 2: Circuit Breakers
c) Low-voltage switchgear and Control-gear,
Part 3: Switches, disconnectors, switch-
disconnectors and fuse-combination units
d) EN 50521: Connectors for photovoltaic
systems – Safety requirements and tests
Yes
-
IEC 60269-6 Low-voltage fuses - Part 6: Supplementary
requirements for fuse-links for the protection
of solar photovoltaic energy systems
Yes
-
Surge Arrestors
IEC 61643-11:2011
/ IS 15086-5 (SPD)
Low-voltage surge protective devices - Part
11: Surge protective devices connected to
low-voltage power systems - Requirements
and test methods
Yes
-
Cables
Mandatory
Advisory
IEC 60227/IS 694, IEC
60502/IS 1554 (Part 1 & 2)
General test and measuring method for PVC
(Polyvinyl chloride) insulated cables (for
working voltages up to and including 1100
V, and UV resistant for outdoor installation)
Yes
-
BS EN 50618 Electric cables for photovoltaic systems
(BT(DE/NOT)258), mainly for DC cables Yes
-
Lightning Protection System Components
IEC 62561 Series (Chemical
earthing)
IEC 62561-1
Lightning protection system components
(LPSC) - Part 1: Requirements for
connection components
IEC 62561-2
Lightning protection system components
(LPSC) - Part 2: Requirements for
conductors and earth electrodes
IEC 62561-7
Lightning protection system components
(LPSC) - Part 7: Requirements for earthing
enhancing compounds
Yes
-
Junction Boxes
Mandatory
Advisory
IEC 60529 Junction boxes and solar panel terminal boxes
shall be of the thermo plastic type with IP 65
protection for outdoor use, and IP 54 protection
for indoor use Yes
-
Energy Meter
IS 16444 or, as specified by
the DISCOMs/CEA Metering
Regulations
a.c. Static direct connected watt-hour Smart Meter
Class 1 and 2 — Specification (with Import &
Export/Net energy measurements) Yes
-
Solar PV Roof Mounting Structure
IS 2062/IS 4759 Material for the structure mounting -
Solar PV Roof Mounting Structure:
Aluminium frames will be avoided for installations in coastal areas.
Solar Panels:
Plants installed in high dust geographies like Rajasthan and Gujarat must have the solar panels tested with relevant dust standards
(Applicable standard would be IEC 60068-2-68).
Fuse:
The fuse shall have DIN rail mountable fuse holders and shall be housed in thermoplastic IP 65 enclosures with transparent covers.
Cables:
 For the DC cabling, XLPE or, XLPO insulated and sheathed, UV-stabilized single core flexible copper cables shall be used; Multi-
core cables shall not be used.
 For the AC cabling, PVC or, XLPE insulated and PVC sheathed single or, multi-core flexible copper cables shall be used; Outdoor
AC cables shall have a UV-stabilized outer sheath.
 The total voltage drop on the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0%
 The total voltage drop on the cable segments from the solar grid inverter to the building distribution board shall not exceed 2.0%
 The DC cables from the SPV module array shall run through a UV-stabilized PVC conduit pipe of adequate diameter with a
minimum wall thickness of 1.5mm.
 Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors (MC4) and
couplers.
 All cables and conduit pipes shall be clamped to the rooftop, walls and ceilings with thermo-plastic clamps at intervals not
exceeding 50 cm; the minimum DC cable size shall be 4.0 mm2 copper; the minimum AC cable size shall be 4.0 mm2 copper. In
three phase systems, the size of the neutral wire size shall be equal to the size of the phase wires.
Earthing:
 Separate earthing would be required for solar mounting structure, inverters and lighting arrester. However, double earthing bus
is further recommended for higher safety.
Quality standards and specifications for GCRT PV
Quality standards and specifications for GCRT PV
Supported By:
The Norwegian Framework Agreement (NFA) between the
Norwegian Ministry of Foreign Affairs (MFA) and The Energy and
Resources Institute (TERI).
PV Test-bed for Testing Ten (10)
Solar PV Modules Simultaneously
Sun Simulator
Field Testing of different
Solar PV Technology
Solar Lighting Laboratory
Load Emulator PV Array Simulator Grid Simulator
Smart Controller Laboratory
TERI-SCLab Video, Part 1
TERI-SCLab Video, Part 2
Annual O&M costs should not vary substantially from ~ 2% of capital cost in the first year,
with annual O&M cost escalation rate not varying substantially from 5.72%.
Capital cost break-up should not vary substantially from that given in the table below:
Source: IDBI is lending loan for GCRT
to the Households, upto INR 3 Lacs as
term-loan (through EMI) with no
collateral security.
Thank You
Abhinav Jain, Research Associate
Abhinav.jain@teri.res.in
8882828606

More Related Content

PPTX
Solar Power, Solar cell operation
PDF
Solar cell operation
PDF
A study on modelling and simulation of photovoltaic cells
PPTX
factor affecting on PV performance
PPT
Solar photovoltaic systems
PPT
Efisiensi solar cells
PPTX
Solar PV Cells, Module and Array
DOC
Pv i v characteristic tester(eee499.blogspot.com)
Solar Power, Solar cell operation
Solar cell operation
A study on modelling and simulation of photovoltaic cells
factor affecting on PV performance
Solar photovoltaic systems
Efisiensi solar cells
Solar PV Cells, Module and Array
Pv i v characteristic tester(eee499.blogspot.com)

What's hot (20)

PDF
Solar pv
PPTX
Standalone photovoltaic system sizing based on different approaches
PPTX
How Photovoltaic Cells Work, by Garret Erskine
PPTX
photo voltaic 1
PPT
Solar cell
PPT
Photovoltaic Systems
PDF
procedure sheet for the experiment " SOLAR CELL"
PDF
Partial Shade Detection for PV Solar Panels via CUSUM Algorithm
PPTX
solar cell characteristics
PPTX
Photovoltaic Devices: Life Cycle Considerations
PPTX
Solar Technology Basics
PDF
Solar Mobile Charger Report
PPTX
Fundamentals of Solar PV System
PPT
Solar Mobile Charger PPT
PPTX
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
PDF
a simple mobile battery charger with inverter (ups) &night switch
DOC
Design photovoltaic system
PPSX
Acorn Solar Presentation
PDF
Modeling and simulation of solar photovoltaic module
PPTX
A Seminar on Nuclear Battery
Solar pv
Standalone photovoltaic system sizing based on different approaches
How Photovoltaic Cells Work, by Garret Erskine
photo voltaic 1
Solar cell
Photovoltaic Systems
procedure sheet for the experiment " SOLAR CELL"
Partial Shade Detection for PV Solar Panels via CUSUM Algorithm
solar cell characteristics
Photovoltaic Devices: Life Cycle Considerations
Solar Technology Basics
Solar Mobile Charger Report
Fundamentals of Solar PV System
Solar Mobile Charger PPT
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
a simple mobile battery charger with inverter (ups) &night switch
Design photovoltaic system
Acorn Solar Presentation
Modeling and simulation of solar photovoltaic module
A Seminar on Nuclear Battery
Ad

Similar to Quality standards and specifications for GCRT PV (20)

PPTX
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
PPTX
Session 4 - Solar PV Modules.pptx
PPTX
Session 08 design & safety overview
PDF
Solar PV Codes and Standards
PPTX
Session 04 solar pv modules
PDF
2005_A Review of Single-Phase Grid-Connected Inverters.pdf
PDF
Solar PV Codes and Standards
PDF
Your electrical safety specilist for all equipments Powered AC and DC
PDF
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
PPTX
Session 06 balance of system components
PDF
TECHNICAL SPECIFICATIONS SPy fhytfhjt vdfg
PDF
PPTX
Photovoltaic Training Course - Module 1.2 choosing components
PPTX
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
PDF
IRJET- Embedded System based Multi-Source Leakage Current Protection for Low ...
PPSX
SOLAR PART 2 (1)-SHOW.ppsx
PPTX
SOLAR PART 2 (1).pptx
PDF
IRJET- Power Quality Assessment of Photovoltaic System
PDF
Iaetsd analysis of output dc current injection in 100k w grid
PDF
Real time performance assessment of utility grid interfaced solar photovoltai...
Session 02 - Part 3 Solar Energy (PV Array Efficiency and Output).pptx
Session 4 - Solar PV Modules.pptx
Session 08 design & safety overview
Solar PV Codes and Standards
Session 04 solar pv modules
2005_A Review of Single-Phase Grid-Connected Inverters.pdf
Solar PV Codes and Standards
Your electrical safety specilist for all equipments Powered AC and DC
DPR - 500KWp Solar PV Grid Connected Plant for CUJ june 2023.pdf
Session 06 balance of system components
TECHNICAL SPECIFICATIONS SPy fhytfhjt vdfg
Photovoltaic Training Course - Module 1.2 choosing components
Renewable Energy Technology : 5-day course at IIT Bombay - May 2012
IRJET- Embedded System based Multi-Source Leakage Current Protection for Low ...
SOLAR PART 2 (1)-SHOW.ppsx
SOLAR PART 2 (1).pptx
IRJET- Power Quality Assessment of Photovoltaic System
Iaetsd analysis of output dc current injection in 100k w grid
Real time performance assessment of utility grid interfaced solar photovoltai...
Ad

More from Arpo Mukherjee (7)

PPTX
Solar resource assessment
PPT
Solar PV and its components
PPTX
Solar PV System Designing 2017
PDF
IREDA Induction Program Report 2018
PDF
Suryamitra Solar PV Installar Hand book
PPTX
Living the Change
PPTX
Report edp sigma summit
Solar resource assessment
Solar PV and its components
Solar PV System Designing 2017
IREDA Induction Program Report 2018
Suryamitra Solar PV Installar Hand book
Living the Change
Report edp sigma summit

Recently uploaded (20)

PPTX
The various Industrial Revolutions .pptx
PPTX
Tartificialntelligence_presentation.pptx
PPT
Module 1.ppt Iot fundamentals and Architecture
PDF
Enhancing emotion recognition model for a student engagement use case through...
PDF
STKI Israel Market Study 2025 version august
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PPTX
OMC Textile Division Presentation 2021.pptx
PPTX
Programs and apps: productivity, graphics, security and other tools
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PDF
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
PPTX
cloud_computing_Infrastucture_as_cloud_p
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
Developing a website for English-speaking practice to English as a foreign la...
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
Getting Started with Data Integration: FME Form 101
PDF
August Patch Tuesday
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
PDF
Getting started with AI Agents and Multi-Agent Systems
The various Industrial Revolutions .pptx
Tartificialntelligence_presentation.pptx
Module 1.ppt Iot fundamentals and Architecture
Enhancing emotion recognition model for a student engagement use case through...
STKI Israel Market Study 2025 version august
Final SEM Unit 1 for mit wpu at pune .pptx
OMC Textile Division Presentation 2021.pptx
Programs and apps: productivity, graphics, security and other tools
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
A contest of sentiment analysis: k-nearest neighbor versus neural network
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
cloud_computing_Infrastucture_as_cloud_p
Univ-Connecticut-ChatGPT-Presentaion.pdf
1 - Historical Antecedents, Social Consideration.pdf
Developing a website for English-speaking practice to English as a foreign la...
WOOl fibre morphology and structure.pdf for textiles
Getting Started with Data Integration: FME Form 101
August Patch Tuesday
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
Getting started with AI Agents and Multi-Agent Systems

Quality standards and specifications for GCRT PV

  • 1. “Quality Standards & Specifications for Grid-connected Rooftop Solar PV Power Plants” Friday, 17th Feb. 2017 Capacity Building Programme for SBI Officials State Bank Staff College , Hyderabad Abhinav Jain, RA E&F Division, TERI DS Block, IHC
  • 2.  Quality Standards for Solar PV Panels;  Quality Standards for Solar Inverters;  Quality Standards for Protective Devices;  Quality Standards for Cables;  Quality Standards for Other Components;  Sample Test Certificates, and  Guidelines for Best Practices.
  • 4. Solar PV Modules/Panels Mandatory Advisory IEC 61215/ IS 14286 Design Qualification and Type Approval for Crystalline Silicon Terrestrial Photovoltaic (PV) Modules Yes - IEC 61646/ IS 16077 Design Qualification and Type Approval for Thin-Film Terrestrial Photovoltaic (PV) Modules Yes - IEC 62108 Design Qualification and Type Approval for Concentrator Photovoltaic (CPV) Modules and Assemblies Yes - IEC 61701- As applicable Salt Mist Corrosion Testing of Photovoltaic (PV) Modules Yes - IEC 61853- Part 1/ IS 16170 : Part 1 Photovoltaic (PV) module performance testing and energy rating –: Irradiance and temperature performance measurements, and power rating Yes - IEC 62716 Photovoltaic (PV) Modules – Ammonia (NH3) Corrosion Testing Yes (As per the site condition like dairies, toilets) IEC 61730-1,2 Photovoltaic (PV) Module Safety Qualification – Part 1: Requirements for Construction, Part 2: Requirements for Testing Yes - IEC 62804 (Draft Specifications/TS) Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation. IEC TS 62804-1: Part 1: Crystalline silicon Yes (PID-resistant modules – system voltage is more than 600 VDC) Yes (PID-resistant modules – system voltage is less than 600 VDC ) IEC 62759-1 Photovoltaic (PV) modules – Transportation testing, Part 1: Transportation and shipping of module package units Yes -
  • 9. Grid-Tie Solar PV String Inverters/PCUs/ Micro-Inverters Mandatory Advisory IEC 62109-1, IEC 62109-2 Safety of power converters for use in photovoltaic power systems - Part 1: General requirements, and Safety of power converters for use in photovoltaic power systems - Part 2: Particular requirements for inverters. Safety compliance (Protection degree IP 65 for outdoor mounting, IP 54 for indoor mounting) yes - IEC/IS 61683 Photovoltaic Systems – Power conditioners: Procedure for Measuring Efficiency (10%, 25%, 50%, 75% & 90-100% Loading Conditions) Yes - BS EN 50530 (Will become IEC 62891) Overall efficiency of grid-connected photovoltaic inverters: This European Standard provides a procedure for the measurement of the accuracy of the maximum power point tracking (MPPT) of inverters, which are used in grid-connected photovoltaic systems. In that case the inverter energizes a low voltage grid of stable AC voltage and constant frequency. Both the static and dynamic MPPT efficiency is considered. Yes - IEC 62116 or, IEEE 1547 Utility-interconnected Photovoltaic Inverters - Test Procedure of Islanding Prevention Measures Yes -
  • 10. IEC 60068-2 (1, 2, 14, 30 & 64) Environmental Testing of PV System – Power Conditioners and Inverters a) IEC 60068-2-1: Environmental testing - Part 2-1: Tests - Test A: Cold b) IEC 60068-2-2: Environmental testing - Part 2-2: Tests - Test B: Dry heat c) IEC 60068-2-14: Environmental testing - Part 2-14: Tests - Test N: Change of temperature d) IEC 60068-2-30: Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle) e) IEC 60068-2-64: Environmental testing - Part 2-64: Tests - Test Fh: Vibration, broadband random and guidance Yes - IEC 61000- Part 2, 3 & 6 Electromagnetic Interference (EMI), and Electromagnetic Compatibility (EMC) testing of PV Inverters (as applicable) Yes - Grid-Tie Solar PV String Inverters/PCUs/ Micro-Inverters Mandatory Advisory
  • 14. Fuses Mandatory Advisory IS/IEC 60947 (Part 1, 2 & 3), EN 50521 General safety requirements for connectors, switches, circuit breakers (AC/DC): a) Low-voltage Switchgear and Control-gear, Part 1: General rules b) Low-Voltage Switchgear and Control-gear, Part 2: Circuit Breakers c) Low-voltage switchgear and Control-gear, Part 3: Switches, disconnectors, switch- disconnectors and fuse-combination units d) EN 50521: Connectors for photovoltaic systems – Safety requirements and tests Yes - IEC 60269-6 Low-voltage fuses - Part 6: Supplementary requirements for fuse-links for the protection of solar photovoltaic energy systems Yes - Surge Arrestors IEC 61643-11:2011 / IS 15086-5 (SPD) Low-voltage surge protective devices - Part 11: Surge protective devices connected to low-voltage power systems - Requirements and test methods Yes -
  • 15. Cables Mandatory Advisory IEC 60227/IS 694, IEC 60502/IS 1554 (Part 1 & 2) General test and measuring method for PVC (Polyvinyl chloride) insulated cables (for working voltages up to and including 1100 V, and UV resistant for outdoor installation) Yes - BS EN 50618 Electric cables for photovoltaic systems (BT(DE/NOT)258), mainly for DC cables Yes - Lightning Protection System Components IEC 62561 Series (Chemical earthing) IEC 62561-1 Lightning protection system components (LPSC) - Part 1: Requirements for connection components IEC 62561-2 Lightning protection system components (LPSC) - Part 2: Requirements for conductors and earth electrodes IEC 62561-7 Lightning protection system components (LPSC) - Part 7: Requirements for earthing enhancing compounds Yes -
  • 16. Junction Boxes Mandatory Advisory IEC 60529 Junction boxes and solar panel terminal boxes shall be of the thermo plastic type with IP 65 protection for outdoor use, and IP 54 protection for indoor use Yes - Energy Meter IS 16444 or, as specified by the DISCOMs/CEA Metering Regulations a.c. Static direct connected watt-hour Smart Meter Class 1 and 2 — Specification (with Import & Export/Net energy measurements) Yes - Solar PV Roof Mounting Structure IS 2062/IS 4759 Material for the structure mounting -
  • 17. Solar PV Roof Mounting Structure: Aluminium frames will be avoided for installations in coastal areas. Solar Panels: Plants installed in high dust geographies like Rajasthan and Gujarat must have the solar panels tested with relevant dust standards (Applicable standard would be IEC 60068-2-68). Fuse: The fuse shall have DIN rail mountable fuse holders and shall be housed in thermoplastic IP 65 enclosures with transparent covers. Cables:  For the DC cabling, XLPE or, XLPO insulated and sheathed, UV-stabilized single core flexible copper cables shall be used; Multi- core cables shall not be used.  For the AC cabling, PVC or, XLPE insulated and PVC sheathed single or, multi-core flexible copper cables shall be used; Outdoor AC cables shall have a UV-stabilized outer sheath.  The total voltage drop on the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0%  The total voltage drop on the cable segments from the solar grid inverter to the building distribution board shall not exceed 2.0%  The DC cables from the SPV module array shall run through a UV-stabilized PVC conduit pipe of adequate diameter with a minimum wall thickness of 1.5mm.  Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors (MC4) and couplers.  All cables and conduit pipes shall be clamped to the rooftop, walls and ceilings with thermo-plastic clamps at intervals not exceeding 50 cm; the minimum DC cable size shall be 4.0 mm2 copper; the minimum AC cable size shall be 4.0 mm2 copper. In three phase systems, the size of the neutral wire size shall be equal to the size of the phase wires. Earthing:  Separate earthing would be required for solar mounting structure, inverters and lighting arrester. However, double earthing bus is further recommended for higher safety.
  • 20. Supported By: The Norwegian Framework Agreement (NFA) between the Norwegian Ministry of Foreign Affairs (MFA) and The Energy and Resources Institute (TERI).
  • 21. PV Test-bed for Testing Ten (10) Solar PV Modules Simultaneously Sun Simulator Field Testing of different Solar PV Technology Solar Lighting Laboratory Load Emulator PV Array Simulator Grid Simulator Smart Controller Laboratory TERI-SCLab Video, Part 1 TERI-SCLab Video, Part 2
  • 22. Annual O&M costs should not vary substantially from ~ 2% of capital cost in the first year, with annual O&M cost escalation rate not varying substantially from 5.72%. Capital cost break-up should not vary substantially from that given in the table below: Source: IDBI is lending loan for GCRT to the Households, upto INR 3 Lacs as term-loan (through EMI) with no collateral security.
  • 23. Thank You Abhinav Jain, Research Associate Abhinav.jain@teri.res.in 8882828606