Partnership To Advance Clean Energy-Deployment (PACE-D)
Technical Assistance Program
Presented by
USAID PACE-D TA Program
Apr-18
Solar PV Rooftop Training Program For Entrepreneurs
Session:
SPVRT System Design & Safety Overview
Contents
SPVRT Array Configuration
Determining SPVRT Array Capacity
SPVRT Array – Inverter Matching
Array Mounting Structure – Materials & Design
Contents
Safety Issues – Personal & System Safety
Grid Protection – Anti Islanding
Selection of SPVRT Array and Array BOS Components
Installation Best Practices
SPVRT Array Configuration –
SPVRT Array with Multiple Parallel Strings
SPVRT Array Configuration –
Using Inverter with Multiple MPPT DC Input
SPVRT Array Configuration –
Using Inverter with Single MPPT at Common DC Bus
SPVRT Array Configuration –
Single MPPTs Vs. Multiple MPPT Input
 According to IEC 62548 Photovoltaic array design requirement, when inverters
have multiple MPPT inputs, overcurrent protection of the section of the array
may be treated as a separate PV array and each PV array shall have a switch
disconnector to provide isolation of the inverter
 Where inverter has a single MPPT and multiple input circuits are internally
paralleled onto a common DC bus, each PV section connected to one of those
inputs shall be treated as a sub-array and each PV sub-array shall have a switch
disconnector to provide isolation of the inverter.
Determining SPVRT System Capacity
 Availability of shadow free area
 Installation purpose and budget
 Government program and incentive guidelines
 State Electricity Regulation
 Distribution Transformer capacity
 Connected load
SPVRT Array & Inverter Matching
Matching of SPVRT Array to the voltage specification
of an inverter
Matching of SPVRT Array to the inverter’s current
rating
Matching of SPVRT Array to the inverter’s power rating
Solar PV Rooftop Array & Inverter Matching – Voltage
Matching
Array Mounting Structure – Design & Materials
Thermal Aspects
Expansion /
Contraction of
modules /
Structure
Mechanical
Loads on PV
Structures
To comply with
related standards
Wind
To be rated for
maximum
expected wind
speeds
Material
Accumulation on
PV Array
Snow, ice, others
Corrosion
Mounting to be
made from
corrosion resistant
materials
Support structures and module
mounting arrangements should
comply with
 Applicable building codes
regulations and
 Standards and module
manufacturer’s mounting
requirements
Aspects to be considered
while designing array
mounting structure
IEC 62548
Array Mounting Structure – Flat RCC Roof
Array Mounting Structure – Flat RCC Roof
Array Mounting Structure – Installation on Slant
Roof
Array Mounting Structure – Installation on Slant
Roof
Safety Issues – Personnel & System Safety
 According to IEC 62548 PV arrays for installation on buildings shall have
maximum voltages not greater than 1000V DC
 For protection against electric shock, the requirements of IEC 60364-4-41 shall
apply
 The system shall comply with the Central Electricity Authority (Measures Relating
to Safety and Electricity Supply) Regulations, 2010
 PV module exposed metal earthing and bonding shall be according to 7.4.2 of
IEC 62548
 If a lightning protection system (LPS) is already installed on the building, the PV
system should be integrated into the LPS as appropriate in accordance with IEC
62305-3
SPVRT Array Functional Earthing/Bonding Decision
Tree
Entry
Is the
PV array
maximum voltage
>DVC-A?
Is array
exposed-conductive part
required to be earthed for
lightning protection?
(a)
Is array
exposed-conductive part
required to be earthed for
lightning protection?
(a)
Earth
with conductor sized
according to 7.4.2.1 and
IEC 60364-5-54
Maximum size 6mm2
Earth
with conductor sized
according to 7.4.2.1 and
IEC 60364-5-54
Maximum size 16mm2
NO
YES
NO
YES
No
requirement
NO
YES
IEC 62548
Lightning Protection System for SPVRT System
Installation without external lightning
protection
1. DC input to inverter (per MPPT)
2. AC output of inverter
3. Low voltage input to metering
4. Communication – Data interface
5. Functional Earthing
Source: www.dehn-international.com
Lightning Protection System for SPVRT System
Installation with external lightning
protection with sufficient separation
distance
1. DC input to inverter (per MPPT)
2. AC output of inverter
3. Low voltage input to metering
4. Communication – Data interface
5. Functional Earthing / External
Lightning Protection
Source: www.dehn-international.com
Lightning Protection System for SPVRT System
Installation with external lightning
protection without sufficient
separation distance
1. DC input to inverter (per MPPT)
2. AC output of inverter
3. Low voltage input to metering
4. Communication – Data interface
5. Functional Earthing / External
Lightning Protection
Source: www.dehn-international.com
Grid Protection – Anti-islanding
Anti-islanding Mechanism Disconnects inverter from grid when
Grid power supply is disrupted
Grid goes outside preset inverter
parameters
Passive protection: the inverter
disconnects if it detects grid conditions
which are over or under the voltage
and / or over or under the frequency
settings of the inverter
Active protection: the inverter will either
include frequency or voltage drift- such
that when the inverter is disconnected
from the larger grid, the voltage or
frequency will drift to the point where the
passive protection will cause the inverter
to trip
The inverters disconnect from the grid in either of the above situations to avoid
‘islanding’ through two types of internal protection called passive and active protection
Grid Protection – Anti Islanding
 According to IEEE 1547 and CEA (technical standards for connectivity of the
distributed generation resources) Regulation 2013 - for an unintentional island
the grid tied inverter shall detect the island and cease to energize within two
seconds of the formation of an island
 According to IEEE 1547 the grid connected rooftop soar system shall include an
adjustable delay (or a fixed delay of 5 minutes) that may delay reconnection for
up to five minutes after the grid voltage and frequency restored. As per CEA
Regulation 2013 it shall be for at least 60 seconds
 In case another power generation source like DG set in the consumer facility is
operated when grid is not available, the inverter may sense the grid availability
and in case operation parameters are within the working range it will start
functioning and will start feeding to the DG grid; depends on regulation if
allowed or not
Installation of Isolators
PV Array DC Isolator:
 A double-pole, load-breaking, DC rated isolating (disconnect) switch should be
installed on the DC side of the inverter
 It should be rated appropriately for the voltage and current of the PV system
Inverter AC Isolator:
 Central Electricity Authority (Technical Standards for Connectivity of the Distributed
Generation Resources) Regulations, 2013 requires an inverter AC isolator to be
installed on the output of the inverter
 A Main Switch lockable in off position is required to be installed in the switchboard,
which is located at a height of at-least 2.44m above the ground level
 This allows the PV system to be disconnected from the mains power supply. This
main switch may not be rated for load break nor may have feature of overcurrent
protection
Lidded Cable Tray
Labelled Every 2m
Virtually No
Exposed Conduit
Roof penetrations under solar module
Using fit for purpose equipment
Using black UV rated corrugated
Using SS Cable Ties
Appropriately Labelled
Source: www.gses.in
Cable Management at Array
 Wiring must complied with IEC 60364 or equivalent national standard
 Minimize the area of conductive loops to reduce the magnitude of lightening-
induced overvoltage
Cabling & Interconnection
Marking and signage
Marking & Signage
Documentation
Documentation
As per IEC 62446: Grid-Connected Photovoltaic Systems—Minimum Requirements
for System Documentation, Commissioning Tests and Inspection
 System data
 Nameplate data – Rated power, manufacturers, models and quantities
of PV modules and inverters
 Cover page data - contact information for the customer, system
designer and system installer, relevant project dates
 Wiring Diagrams (Single line diagram with equipment information)
 Data sheets (Module and inverter)
 O&M information
 Test results and commission data
28
Anurag Mishra
Senior Clean Energy Specialist
USAID/India
Email: amishra@usaid.gov
Disclaimer:
This training material is made possible by the support of the American
People through the United States Agency for International
Development (USAID). The contents of this material are the sole
responsibility of Nexant, Inc. and do not necessarily reflect the views of
USAID or the United States Government. This material was prepared
under Contract Number AID-386-C-12-00001.

More Related Content

PPTX
Session 04 solar pv modules
PPTX
Session 06 balance of system components
PPTX
Session 10 grid interconnections & commissioning test procedures
PPTX
Session 03 solar pv rooftop technology overview
PPTX
Session 05 grid connected inverter
PPTX
Session 07 site assessment & planning
PPTX
quiz Solar PV Rooftop Training Entrepreneurship Development
PPTX
Session 19 project performance evaluation Operation & Maintenance planning
Session 04 solar pv modules
Session 06 balance of system components
Session 10 grid interconnections & commissioning test procedures
Session 03 solar pv rooftop technology overview
Session 05 grid connected inverter
Session 07 site assessment & planning
quiz Solar PV Rooftop Training Entrepreneurship Development
Session 19 project performance evaluation Operation & Maintenance planning

What's hot (20)

PPTX
Session 11 overview of simulation software
PPTX
Session 09 spvrt business models
PPTX
Session 13 national policy & regulatory framework & available incentives
PPT
iPLON presentation at Intersolar Mumbai 15 Dec 2011
PPTX
Designing Solar PV Systems ( Utility Scale)
PPTX
Photovoltaic Training Course - Module 2.7 - Commissioning tests
PDF
Photovoltaic Training - Session 4 - Plant Maintenance
PDF
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
PPTX
performance optimization of Solar pv plant through Micro inverter
PPTX
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
PDF
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
PPT
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
PDF
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
PPTX
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
PPTX
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
PPTX
Hybrid Controller | Design 150KW PV with DG1:700KW
PPTX
Renewable energy and grid integration energy transition
PDF
Analysis of PVSyst Loss Diagram
PDF
Brian Patterson: Reinventing Building Power
PDF
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
Session 11 overview of simulation software
Session 09 spvrt business models
Session 13 national policy & regulatory framework & available incentives
iPLON presentation at Intersolar Mumbai 15 Dec 2011
Designing Solar PV Systems ( Utility Scale)
Photovoltaic Training Course - Module 2.7 - Commissioning tests
Photovoltaic Training - Session 4 - Plant Maintenance
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
performance optimization of Solar pv plant through Micro inverter
8.2_IEEE 1547 and Microgrids_Key_EPRI/SNL Microgrid Symposium
Photovoltaic Module Energy Yield Measurements: Existing Approaches and Best P...
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
Photovoltaic Training Course - Module 6.1 - Introduction to offgrid PV
Photovoltaic Training Course - Module 3.1 - Control and telecom systems
Hybrid Controller | Design 150KW PV with DG1:700KW
Renewable energy and grid integration energy transition
Analysis of PVSyst Loss Diagram
Brian Patterson: Reinventing Building Power
Josh Long: Minimum Cyber Security Requirements for a 20 MW Photo Voltaic Field
Ad

Similar to Session 08 design & safety overview (20)

PPT
Quality standards and specifications for GCRT PV
PPTX
8.1.1_PAR 2030.7_Bower_EPRI/SNL Microgrid Symposium
PPTX
file-9.pptx
PPTX
file-9.pptx
PPTX
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
PDF
DG interconnection protection ieee 1547
PDF
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
PDF
Link vue system and solar pv power plant protection
PPTX
Advancements in inverter technology
PDF
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
PPTX
Session 5 - Grid Connected Inverter.pptx
PDF
Electric vehicle and charging infra by link vue system
PDF
IRPTF_Workshop_Presentations (1).pdf
PPTX
Photovoltaic Training Course - Module 1.2 choosing components
PDF
Specification grid tie_spv_plant
PDF
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
PDF
Design & Analysis of Grid Connected Photovoltaic System
PDF
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
PDF
Swot
PDF
Your electrical safety specilist for all equipments Powered AC and DC
Quality standards and specifications for GCRT PV
8.1.1_PAR 2030.7_Bower_EPRI/SNL Microgrid Symposium
file-9.pptx
file-9.pptx
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
DG interconnection protection ieee 1547
Внедрение распределенной энергетики в систему централизованного энергоснабжен...
Link vue system and solar pv power plant protection
Advancements in inverter technology
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Session 5 - Grid Connected Inverter.pptx
Electric vehicle and charging infra by link vue system
IRPTF_Workshop_Presentations (1).pdf
Photovoltaic Training Course - Module 1.2 choosing components
Specification grid tie_spv_plant
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
Design & Analysis of Grid Connected Photovoltaic System
SolarEdge 82.8kW inverter with WiFi & SetApp - Primary unit
Swot
Your electrical safety specilist for all equipments Powered AC and DC
Ad

More from Chirag Jain (10)

PPTX
Session 21 preparation of techno commercial report
PPTX
Session 20 interacting with the client
PPTX
Session 18 tender preparation & evaluation
PPTX
Session 17 project management & monitoring
PPTX
Session 16 contract structure & agreement
PPTX
Session 15 spvrt project financing
PPTX
Session 14 market trends & business proposals
PPTX
Session 12 project costing & economics
PPTX
Session 02 solar energy technologies
PPTX
Session 01 Introduction to the course
Session 21 preparation of techno commercial report
Session 20 interacting with the client
Session 18 tender preparation & evaluation
Session 17 project management & monitoring
Session 16 contract structure & agreement
Session 15 spvrt project financing
Session 14 market trends & business proposals
Session 12 project costing & economics
Session 02 solar energy technologies
Session 01 Introduction to the course

Recently uploaded (20)

PPTX
Introduction to Building Materials
PPTX
Computer Architecture Input Output Memory.pptx
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
Trump Administration's workforce development strategy
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Introduction to Building Materials
Computer Architecture Input Output Memory.pptx
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
B.Sc. DS Unit 2 Software Engineering.pptx
Indian roads congress 037 - 2012 Flexible pavement
Trump Administration's workforce development strategy
AI-driven educational solutions for real-life interventions in the Philippine...
Weekly quiz Compilation Jan -July 25.pdf
Hazard Identification & Risk Assessment .pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Practical Manual AGRO-233 Principles and Practices of Natural Farming
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα

Session 08 design & safety overview

  • 1. Partnership To Advance Clean Energy-Deployment (PACE-D) Technical Assistance Program Presented by USAID PACE-D TA Program Apr-18 Solar PV Rooftop Training Program For Entrepreneurs Session: SPVRT System Design & Safety Overview
  • 2. Contents SPVRT Array Configuration Determining SPVRT Array Capacity SPVRT Array – Inverter Matching Array Mounting Structure – Materials & Design
  • 3. Contents Safety Issues – Personal & System Safety Grid Protection – Anti Islanding Selection of SPVRT Array and Array BOS Components Installation Best Practices
  • 4. SPVRT Array Configuration – SPVRT Array with Multiple Parallel Strings
  • 5. SPVRT Array Configuration – Using Inverter with Multiple MPPT DC Input
  • 6. SPVRT Array Configuration – Using Inverter with Single MPPT at Common DC Bus
  • 7. SPVRT Array Configuration – Single MPPTs Vs. Multiple MPPT Input  According to IEC 62548 Photovoltaic array design requirement, when inverters have multiple MPPT inputs, overcurrent protection of the section of the array may be treated as a separate PV array and each PV array shall have a switch disconnector to provide isolation of the inverter  Where inverter has a single MPPT and multiple input circuits are internally paralleled onto a common DC bus, each PV section connected to one of those inputs shall be treated as a sub-array and each PV sub-array shall have a switch disconnector to provide isolation of the inverter.
  • 8. Determining SPVRT System Capacity  Availability of shadow free area  Installation purpose and budget  Government program and incentive guidelines  State Electricity Regulation  Distribution Transformer capacity  Connected load
  • 9. SPVRT Array & Inverter Matching Matching of SPVRT Array to the voltage specification of an inverter Matching of SPVRT Array to the inverter’s current rating Matching of SPVRT Array to the inverter’s power rating
  • 10. Solar PV Rooftop Array & Inverter Matching – Voltage Matching
  • 11. Array Mounting Structure – Design & Materials Thermal Aspects Expansion / Contraction of modules / Structure Mechanical Loads on PV Structures To comply with related standards Wind To be rated for maximum expected wind speeds Material Accumulation on PV Array Snow, ice, others Corrosion Mounting to be made from corrosion resistant materials Support structures and module mounting arrangements should comply with  Applicable building codes regulations and  Standards and module manufacturer’s mounting requirements Aspects to be considered while designing array mounting structure IEC 62548
  • 12. Array Mounting Structure – Flat RCC Roof
  • 13. Array Mounting Structure – Flat RCC Roof
  • 14. Array Mounting Structure – Installation on Slant Roof
  • 15. Array Mounting Structure – Installation on Slant Roof
  • 16. Safety Issues – Personnel & System Safety  According to IEC 62548 PV arrays for installation on buildings shall have maximum voltages not greater than 1000V DC  For protection against electric shock, the requirements of IEC 60364-4-41 shall apply  The system shall comply with the Central Electricity Authority (Measures Relating to Safety and Electricity Supply) Regulations, 2010  PV module exposed metal earthing and bonding shall be according to 7.4.2 of IEC 62548  If a lightning protection system (LPS) is already installed on the building, the PV system should be integrated into the LPS as appropriate in accordance with IEC 62305-3
  • 17. SPVRT Array Functional Earthing/Bonding Decision Tree Entry Is the PV array maximum voltage >DVC-A? Is array exposed-conductive part required to be earthed for lightning protection? (a) Is array exposed-conductive part required to be earthed for lightning protection? (a) Earth with conductor sized according to 7.4.2.1 and IEC 60364-5-54 Maximum size 6mm2 Earth with conductor sized according to 7.4.2.1 and IEC 60364-5-54 Maximum size 16mm2 NO YES NO YES No requirement NO YES IEC 62548
  • 18. Lightning Protection System for SPVRT System Installation without external lightning protection 1. DC input to inverter (per MPPT) 2. AC output of inverter 3. Low voltage input to metering 4. Communication – Data interface 5. Functional Earthing Source: www.dehn-international.com
  • 19. Lightning Protection System for SPVRT System Installation with external lightning protection with sufficient separation distance 1. DC input to inverter (per MPPT) 2. AC output of inverter 3. Low voltage input to metering 4. Communication – Data interface 5. Functional Earthing / External Lightning Protection Source: www.dehn-international.com
  • 20. Lightning Protection System for SPVRT System Installation with external lightning protection without sufficient separation distance 1. DC input to inverter (per MPPT) 2. AC output of inverter 3. Low voltage input to metering 4. Communication – Data interface 5. Functional Earthing / External Lightning Protection Source: www.dehn-international.com
  • 21. Grid Protection – Anti-islanding Anti-islanding Mechanism Disconnects inverter from grid when Grid power supply is disrupted Grid goes outside preset inverter parameters Passive protection: the inverter disconnects if it detects grid conditions which are over or under the voltage and / or over or under the frequency settings of the inverter Active protection: the inverter will either include frequency or voltage drift- such that when the inverter is disconnected from the larger grid, the voltage or frequency will drift to the point where the passive protection will cause the inverter to trip The inverters disconnect from the grid in either of the above situations to avoid ‘islanding’ through two types of internal protection called passive and active protection
  • 22. Grid Protection – Anti Islanding  According to IEEE 1547 and CEA (technical standards for connectivity of the distributed generation resources) Regulation 2013 - for an unintentional island the grid tied inverter shall detect the island and cease to energize within two seconds of the formation of an island  According to IEEE 1547 the grid connected rooftop soar system shall include an adjustable delay (or a fixed delay of 5 minutes) that may delay reconnection for up to five minutes after the grid voltage and frequency restored. As per CEA Regulation 2013 it shall be for at least 60 seconds  In case another power generation source like DG set in the consumer facility is operated when grid is not available, the inverter may sense the grid availability and in case operation parameters are within the working range it will start functioning and will start feeding to the DG grid; depends on regulation if allowed or not
  • 23. Installation of Isolators PV Array DC Isolator:  A double-pole, load-breaking, DC rated isolating (disconnect) switch should be installed on the DC side of the inverter  It should be rated appropriately for the voltage and current of the PV system Inverter AC Isolator:  Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 requires an inverter AC isolator to be installed on the output of the inverter  A Main Switch lockable in off position is required to be installed in the switchboard, which is located at a height of at-least 2.44m above the ground level  This allows the PV system to be disconnected from the mains power supply. This main switch may not be rated for load break nor may have feature of overcurrent protection
  • 24. Lidded Cable Tray Labelled Every 2m Virtually No Exposed Conduit Roof penetrations under solar module Using fit for purpose equipment Using black UV rated corrugated Using SS Cable Ties Appropriately Labelled Source: www.gses.in Cable Management at Array
  • 25.  Wiring must complied with IEC 60364 or equivalent national standard  Minimize the area of conductive loops to reduce the magnitude of lightening- induced overvoltage Cabling & Interconnection
  • 27. Documentation Documentation As per IEC 62446: Grid-Connected Photovoltaic Systems—Minimum Requirements for System Documentation, Commissioning Tests and Inspection  System data  Nameplate data – Rated power, manufacturers, models and quantities of PV modules and inverters  Cover page data - contact information for the customer, system designer and system installer, relevant project dates  Wiring Diagrams (Single line diagram with equipment information)  Data sheets (Module and inverter)  O&M information  Test results and commission data
  • 28. 28 Anurag Mishra Senior Clean Energy Specialist USAID/India Email: amishra@usaid.gov Disclaimer: This training material is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this material are the sole responsibility of Nexant, Inc. and do not necessarily reflect the views of USAID or the United States Government. This material was prepared under Contract Number AID-386-C-12-00001.

Editor's Notes

  • #27: Note to presenter: 1 Presenter must be familiar with the types/ examples of signage that should be fixed in a grid connected PV system