
A DELGADO DESIGN/BUILD CONCEPT
Matthew Poché
Adam Goldstein
Patricia Andia Jara
Enrique
Garcia
Keith T. Daggett
Professor P. Victor
Mirzai
 VERRADO COMMUNITY
 in 1999 the Verrado Community Master Plan was approved
by the Town Council. The community was annexed to the city
of Buckeye, Arizona.
 In 2007, the Buckeye General Plan designated this property
as a Master Planned Community.
 Of the 7 Phases of development southwest of Phoenix, our
project is situated in Phase 3 South.
 This Preliminary Plat consists of 11 development parcels
(2.101-106 and 2.201-205).
 A single family house located
in Verrado, just 25 miles
outside Phoenix, Arizona.
 Verrado is anchored by a
pedestrian-friendly Main
Street and offers residents
miles of parks and trails,
educational and recreational
facilities, a championship golf
course as well as a variety of
clubs and activities.
 Has a hot desert climate.
The hottest month is August, with an average daily high temperature
of 105°F
 The average low temperature is 43°F in January .
 Elevation: 869 Ft
 Excellent access to
transportation, with
access to Interstate 10
just one mile south and
Loop 303 just five
miles to the east.
GOOGLE EARTH VIDEO
 Our parcel, contains
80 lots, of which we
have chosen lot 157,
oriented lengthwise
north to south.
 The context is predominantly single
family detached dwellings. Duplex
residential buildings are located along
the street.
 The street hierarchy includes a main
north-south avenue: Verrado Way, and
secondary local residential streets.
 The site is located on an east-west
local residential street: E. Delaney
Drive. which has low traffic.
 A view corridor from the street to the
east terminates at a pleasant green
open area, which reduces the effect of
heat gain and brings a microclimate to
the surroundings.
• The contour slopes from the north-west
to the south-east.
• Prevailing winds originating from the
north support the natural ventilation.
• Front landscape set back. Rear gardens
and open area characterize the open
space.
Master bedroom, great room and kitchen
have areas facing north and receive
suitable access to daylight.
Covered patio facing north has daylight
and it is cooler during most part of the day.
Game room and secondary bedroom have
areas facing north and receive access to
daylight.
Second floor has cross ventilation.
c
o
c
o
DUAL FLUSH TOILET
• REQUIRES LESS WATER TO OPERATE.
• PRICE COMPARISON:
COLONY- W TOILET (1.6 GPF) $147
DUAL FLUSH TOILET (1.6 & 1 GPF)
$200
PROFILE SMART 305 ROUND FRONT PLUS–
CAROMA
• HIGH EFFICIENCY DUAL FLUSH TOILET 1.28 & 0.8 GPF
• INTEGRATED SINK FOR GREATER WATER SAVINGS
SOLAR HOT WATER HEATING
• Uses heat from the sun to work
alongside a conventional water
heater.
• The average domestic system
reduces carbon dioxide emissions
by around 400kg per year,
depending on the fuel replaced.
• It is preferable to have a minimum
roof area of 43 sqft. facing south-
east to south-west.
• COST: $5,000 - $7,000
• Savings + Incentives
Division 2 - Earthwork
Division 3 - Concrete
Division 6 - Framing
Division 9 - Finishes
Division 7 - Thermal and
Moisture Protection
Division 8 - Doors and Windows
Division 6 - Wood/Plastic/Composites, & Supplies
Description Unit Quantity
Material Cost,
per Unit
Labor Cost Equipment Cost Total Cost Category Total
Wood and Plastic Fasteners
Framing Nails, Grip-Rite, 3" x 0.120-Guage
Smooth Shank Galvanized, 2000 per Box
Each 20 $28.65 $573.00
Rough Carpentry
Wood Framing Unit Quantity
Material Cost,
per Unit
Labor Cost Equipment Cost Total Cost Category Total
Fascia
2x6, SPF, #2, Subfascia Linear Ft. 418 $0.64 $267.10
2x4, SPF, #2, Outlooks & Nailers Linear Ft. 836 $0.43 $355.92
1st Floor Walls
Beams & Headers
2x12, SPF, #2 Each
2 @ 20', 4 @
16', 17 @ 14', 6
@ 12', 6 @ 10',
9 @ 8'
By Quote $818.59
Plywood, 1/2", OSB/CD, 4X8 sheets Each 9 $11.90 $107.14
Plates
2x4 Plate, Top, SPF Linear Ft 3110 $0.43 $1,323.73
2x6 Plate, Top, SPF* Each 3 @ 8', 3 @ 10' By Quote $34.34
2x4 (Treated) Bottom Plate, at Slab, SPF* Linear Ft 622 $0.50 $309.50
2x4, (Treated) Bottom Plate, at slab Each 3 @ 8', 3 @ 10' By Quote $53.56
2x6 (Treated) Bottom Plate, at Slab, SPF* Each 1 @ 8', 1 @ 10' By Quote $65.47
Arches
5/8" OSB, 4x8* Each 33 $20.36 $671.72
Studs
2x4 Precut @ 116 5/8", SPF Each 704 $4.32 $3,041.28
2x6, precut@ 116 5/8", SPF* Each 18 $6.48 $116.64
2nd Floor Walls
Beams & Headers
2x12, SPF, #2 Each 9 @ 14', 1 @ 10' By Quote $201.89
Plywood, 1/2", OSB/CD, 4X8 sheets Each 3 $11.90 $35.71
Plates
2x4, SPF Linear Ft 2364 $0.42 $997.25
2x6, SPF* Each 4 @ 10’, 4 @ 14’ By Quote $61.06
Studs
2x4, SPF, precut @ 104-5/8" Each 426 $4 $1,656.29
2x6, SPF, precut @ 104-5/8" Each 24 $5.83 $139.97
Stairs:
2x12, SPF Each 11 @ 12', 4 @ 8' By Quote $242.50
Flooring
Subflooring:
3/4" Underlayment, X-Band, "C" Grade, 4X8, UL Plywood,
Tongue & Groove
Each 57 $30.30 $1,727.10
Adhesive, CAQ Type Each 10 $55.00 $550.00
#10 Ring Shank Nails, Pneumatic Strips Each 3 $224.00 $672.00
Exterior Wall sheathing
Windstorm, 7/16", 4'x11', OSB Sheathing Each 158 $19.49 $3,079.42
Tyvek Home Wrap, 9'x150', by Roll Each 5 $137.00 $685.00
Tyvek Stucco Wrap, 5'x200'', by Roll Each 4 $183.63 $734.52
Plastic-Hed Yellowcap Nails, 1", 2000 ct. Carton Each 1 $49.30 $49.30
Roof Decking
Plywood, OSB Techshield, 5/8"*, 4x8 Each 165 $20.35 $3,358.08
Plywood Clips, 5/8, by Carton Each 4 $6.47 $25.88
Rough Carpentry, Total $45,044.97
THROUGH 6/13/2014
ION
UCTION
MING
MING
NG
T. ROUGH-INS
S
ECTIONS
DOOR INSTALLATION
H MATERIALS
STALLATION
TALLATION/FINISHES
NG
ALKWAY CONCRETE
S
S
INISH
ISH
G
AL
SHES
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11THROUGH 6/13/2014
ION
UCTION
MING
MING
NG
T. ROUGH-INS
S
ECTIONS
DOOR INSTALLATION
MATERIALS
STALLATION
TALLATION/FINISHES
NG
ALKWAY CONCRETE
S
S
INISH
ISH
G
AL
SHES
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
INITIAL
CONSTRUCTION
BEGINFOUNDATION
EXCAVATIO
N
HROUGH 6/13/2014
ON
CTION
ING
MING
G
T. ROUGH-INS
ECTIONS
OOR INSTALLATION
MATERIALS
STALLATION
ALLATION/FINISHES
NG
LKWAY CONCRETE
NISH
SH
G
L
SHES
UGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11HROUGH 6/13/2014
ON
CTION
NG
MING
G
. ROUGH-INS
CTIONS
OOR INSTALLATION
MATERIALS
TALLATION
ALLATION/FINISHES
NG
LKWAY CONCRETE
NISH
SH
G
L
HES
UGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11OUGH 6/13/2014
N
TION
G
NG
ROUGH-INS
TIONS
OR INSTALLATION
ATERIALS
ALLATION
LATION/FINISHES
G
WAY CONCRETE
SH
ES
GH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11OUGH 6/13/2014
N
ION
G
G
OUGH-INS
TIONS
OR INSTALLATION
ATERIALS
ALLATION
LATION/FINISHES
WAY CONCRETE
SH
ES
GH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11UGH 6/13/2014
ON
G
OUGH-INS
ONS
R INSTALLATION
TERIALS
LLATION
ATION/FINISHES
WAY CONCRETE
H
S
H
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11GH 6/13/2014
N
UGH-INS
NS
INSTALLATION
ERIALS
ATION
TION/FINISHES
AY CONCRETE
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
VATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
VATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
CONSTRUCTION
ATION
ATION
OOR FRAMING
RAMING
OOR FRAMING
RAMING
SHEATHING
ING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
ROOFING
OR FINISH MATERIALS
TON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
OR PAINTING
WAY & WALKWAY CONCRETE
NCES
& GATE
CAPING
OR DOORS
NG STAIRS
OR TRIM
T FLOOR FINISH
LOOR FINISH
PLUMBING
ELECTRICAL
HVAC
ETRY
ERTOPS
OOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
ATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 112/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
ATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
OR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
OR DOORS
ING STAIRS
OR TRIM
T FLOOR FINISH
FLOOR FINISH
PLUMBING
ELECTRICAL
HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 11014
TION
SHES
ETE
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
FOUNDATIO
N
1STFLOOR
FRAMING
STAIR
FRAMING
2NDFLOOR
FRAMING
PLUMBING/ELECT.ROUGH-INS
FINISH
SHEATHING
PLUMBING/ELECT.ROUGH-
INS
HVACROUGH-
INS
FINISHSTAIRS
WINDOW/EXT.
DOOR
ROUGH-INS
INSPECTIONS
EXT.FINISH
MATERIALS
GYP.BOARD
INSTALLATION
TUB/SHOWER
INSTALLATION
HROUGH 6/13/2014
ON
CTION
NG
ING
G
. ROUGH-INS
CTIONS
OOR INSTALLATION
MATERIALS
TALLATION
ALLATION/FINISHES
G
KWAY CONCRETE
NISH
H
L
HES
UGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
WK 15
INT. PAINT
WK 17 WK 18
OF DAYS: 94
WK 8 WK 9 WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
2/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
VATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
H SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
H ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
IOR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
SCAPING
IOR DOORS
HING STAIRS
IOR TRIM
T FLOOR FINISH
FLOOR FINISH
H PLUMBING
H ELECTRICAL
H HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 11
WK 15 WK 17 WK 18
OF DAYS: 94
WK 8 WK 9 WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
INTERIOR
DOORS
LANDSCAPEIN
G
FENCE&
GATE
TRIMFLOOR
FINISH
APPLIANCES
CARPETFLOOR
FINISH
INTERIOR
TRIM
FINISH
STAIRS
CABINET
RY
FINISH
HVAC
FINISH
ELECT.
FINISH
PLUMBING
FINAL
WALKTHROUGH
FINAL
CLEANING
BATHROOM
FINISHES
COUNTERTO
PS
THROUGH 6/13/2014
ION
UCTION
ING
MING
NG
T. ROUGH-INS
S
ECTIONS
DOOR INSTALLATION
MATERIALS
STALLATION
TALLATION/FINISHES
NG
LKWAY CONCRETE
S
S
NISH
SH
G
AL
SHES
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
WK 19WK 15
INT. PAINT
WK 17 WK 18
94
WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
THROUGH 6/13/2014
TION
UCTION
MING
MING
NG
CT. ROUGH-INS
NS
PECTIONS
DOOR INSTALLATION
G
H MATERIALS
NSTALLATION
TALLATION/FINISHES
ING
ALKWAY CONCRETE
S
RS
FINISH
ISH
NG
CAL
ISHES
G
OUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
MILESTONES
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
STRUCTIONTIMELINE
WK 19WK 15
INT. PAINT
WK 17 WK 18
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
ROOFFRAMING
2NDFLOOR
FRAMING
PRE-
CONSTRUCTION
FOUN`DATIO
N
ISULATION
2/7/2014 THROUGH 6/13/2014
ONSTRUCTION
L CONSTRUCTION
ATION
DATION
OOR FRAMING
FRAMING
LOOR FRAMING
FRAMING
SHEATHING
BING/ELECT. ROUGH-INS
ROUGH-INS
H-INS INSPECTIONS
OW/ EXT. DOOR INSTALLATION
ROOFING
IOR FINISH MATERIALS
ATON
HOWER INSTALLATION
OARD INSTALLATION/FINISHES
OR PAINTING
WAY & WALKWAY CONCRETE
ANCES
& GATE
CAPING
OR DOORS
ING STAIRS
OR TRIM
T FLOOR FINISH
FLOOR FINISH
PLUMBING
ELECTRICAL
HVAC
ETRY
TERTOPS
ROOM FINISHES
CLEANING
WALKTHROUGH
WK 19WK 15
INT. PAINT
WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14
FOUNDATION
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16WK 11
WK 15 WK 17 WK 18
DAYS: 94
WK 8 WK 9 WK 10
5 DAYS A WEEK, 8 HOURS A DAY
WK 12 WK 13 WK 14
MILESTONES
PLUMBING / ELEC.
HVAC
EXT. FINISH
WK 16
ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES
FLOORING, COUNTERTOP, CABINET CONTRACTERS
CALL INT. FINISH, LANDSCAPE CONCTRACTERS
CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS
WK 11
DRIVEWAY/WALKWAY
CONCRETE
INTERIOR
PAINTING
Provides you, our
clients,
with a visual
advantage.
Different exterior color
schemes as well.
Also with a view at
night,
which gives you an
idea of how the
interior lighting
reflects.
 Trace Ceilings
 10’ Ceilings
 Arch Ways
 Open Floor Plan
 Many Windows
For Natural
Lighting
 Residential Construction Management Competition(RCMC) panel of
judges.
 Professor P. Victor Mirzai
 Home Builders Association of Greater New Orleans
 New Orleans Education League of Construction
 Delgado Community College Student Government Association
 Letterman's Reproduction Company
 City Blueprint and Supply Company
 National Housing Endowment
Without their support and along with funding this project it would have never been
completed.
Our TEAM is very happy to have an opportunity to work on this realistic national
competition project. We are extremely thankful to receive feed back
and constructive criticism from the panel of judges.

More Related Content

PDF
CLIMATIC ZONES OF INDIA
PDF
Sold 104-12 pintail place, ingram
PDF
CLIMATIC ZONES a4
PDF
Country Home on Over Half Acre. Stunniing!
PDF
Baltus House Floor Plans
PDF
Sold 52-37 sycamore street
PPT
Going Green Without the Greenbacks, 2011
PDF
8PP BROCHURE BIG NEW HOME SALE 1ST JUNE SINGLE PAGES LR2
CLIMATIC ZONES OF INDIA
Sold 104-12 pintail place, ingram
CLIMATIC ZONES a4
Country Home on Over Half Acre. Stunniing!
Baltus House Floor Plans
Sold 52-37 sycamore street
Going Green Without the Greenbacks, 2011
8PP BROCHURE BIG NEW HOME SALE 1ST JUNE SINGLE PAGES LR2

What's hot (14)

PDF
Southwood flips - Before and After with Pics and Prices
PDF
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
PDF
83 lighthouse brochue
PPT
Going Green Without the Greenbacks
PPT
Lakeshore Gardens Launch
PDF
Casa Grande Elan Brochure - Zricks.com
PDF
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
PDF
Hillcrest adu houses_pcrg
PPSX
Available2
PDF
Dsr lotus towers
PDF
Deacon Commons New Home Brochure
PDF
Acadia, Calgary flips - Before and After
PDF
The High Park Floorplans
PPTX
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
Southwood flips - Before and After with Pics and Prices
YUKON REAL ESTATE, WHITEHORSE REAL ESTATE, YUKON HOMES FOR SALE, WHITEHORSE H...
83 lighthouse brochue
Going Green Without the Greenbacks
Lakeshore Gardens Launch
Casa Grande Elan Brochure - Zricks.com
Westfield, MA 01085 Real Estate Market Report September 2013 for South of Mas...
Hillcrest adu houses_pcrg
Available2
Dsr lotus towers
Deacon Commons New Home Brochure
Acadia, Calgary flips - Before and After
The High Park Floorplans
Resale Villas in Kakkanad Near Infopark | Apartments in Cochin | Noel Projects
Ad

Similar to RCMC PowerPoint Presentation (20)

PDF
EX-13 BUILDING SECTION-Arch D
PDF
MN ASHRAE Spring Seminar 2018
PDF
Stealth Passive House
PDF
Good Energy Haus: PHN Presents Building Electrification, A Passive House Symp...
PDF
Electrify Responsibly with Passive House Plus
PDF
Construction Document set
PDF
Haddonfield Facilities Overview
PDF
Good Energy Haus
PDF
Drawing set for building complex - Three building and swimming poll
PDF
QTO Sample
PPSX
Brigade lake front - Luxury Flats in Whitefield, Bangalore
PDF
Portfolio
PPT
Going Green Without Greenbacks
PDF
Residential Energy Audit Report
PDF
Arch202.Villa.E - Sheet - A4 - SECTION
PDF
Moderate climate
PDF
Passive House in a Cold Climate @ BBBB 2015 WI Conference
PDF
Lexington Pkwy Passive House Plus
PDF
What Makes Us Green
PPTX
Housing and Finance Presentation
EX-13 BUILDING SECTION-Arch D
MN ASHRAE Spring Seminar 2018
Stealth Passive House
Good Energy Haus: PHN Presents Building Electrification, A Passive House Symp...
Electrify Responsibly with Passive House Plus
Construction Document set
Haddonfield Facilities Overview
Good Energy Haus
Drawing set for building complex - Three building and swimming poll
QTO Sample
Brigade lake front - Luxury Flats in Whitefield, Bangalore
Portfolio
Going Green Without Greenbacks
Residential Energy Audit Report
Arch202.Villa.E - Sheet - A4 - SECTION
Moderate climate
Passive House in a Cold Climate @ BBBB 2015 WI Conference
Lexington Pkwy Passive House Plus
What Makes Us Green
Housing and Finance Presentation
Ad

More from Keith Daggett (6)

PDF
ICC Certificate-Keith Daggett
PDF
ICC Certificate-Keith Daggett
PDF
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
PDF
NAHB IBC-RCMC Certificate
PDF
Diploma-DCC AAS
PPTX
Estimating Systems for Homes1
ICC Certificate-Keith Daggett
ICC Certificate-Keith Daggett
A1.2-STAMPED-ProposedLivingFloorPlans Layout1 (2)
NAHB IBC-RCMC Certificate
Diploma-DCC AAS
Estimating Systems for Homes1

Recently uploaded (20)

PDF
Enhancing emotion recognition model for a student engagement use case through...
PPTX
Chapter 5: Probability Theory and Statistics
PDF
A comparative study of natural language inference in Swahili using monolingua...
PPT
Geologic Time for studying geology for geologist
PDF
Zenith AI: Advanced Artificial Intelligence
PDF
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
PDF
August Patch Tuesday
PDF
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PDF
WOOl fibre morphology and structure.pdf for textiles
PPTX
Benefits of Physical activity for teenagers.pptx
PDF
Getting Started with Data Integration: FME Form 101
PDF
STKI Israel Market Study 2025 version august
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
CloudStack 4.21: First Look Webinar slides
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
Architecture types and enterprise applications.pdf
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PPT
What is a Computer? Input Devices /output devices
Enhancing emotion recognition model for a student engagement use case through...
Chapter 5: Probability Theory and Statistics
A comparative study of natural language inference in Swahili using monolingua...
Geologic Time for studying geology for geologist
Zenith AI: Advanced Artificial Intelligence
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
August Patch Tuesday
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
NewMind AI Weekly Chronicles – August ’25 Week III
WOOl fibre morphology and structure.pdf for textiles
Benefits of Physical activity for teenagers.pptx
Getting Started with Data Integration: FME Form 101
STKI Israel Market Study 2025 version august
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
Group 1 Presentation -Planning and Decision Making .pptx
CloudStack 4.21: First Look Webinar slides
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Architecture types and enterprise applications.pdf
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
What is a Computer? Input Devices /output devices

RCMC PowerPoint Presentation

  • 2. Matthew Poché Adam Goldstein Patricia Andia Jara Enrique Garcia Keith T. Daggett Professor P. Victor Mirzai
  • 3.  VERRADO COMMUNITY  in 1999 the Verrado Community Master Plan was approved by the Town Council. The community was annexed to the city of Buckeye, Arizona.  In 2007, the Buckeye General Plan designated this property as a Master Planned Community.  Of the 7 Phases of development southwest of Phoenix, our project is situated in Phase 3 South.  This Preliminary Plat consists of 11 development parcels (2.101-106 and 2.201-205).
  • 4.  A single family house located in Verrado, just 25 miles outside Phoenix, Arizona.  Verrado is anchored by a pedestrian-friendly Main Street and offers residents miles of parks and trails, educational and recreational facilities, a championship golf course as well as a variety of clubs and activities.
  • 5.  Has a hot desert climate. The hottest month is August, with an average daily high temperature of 105°F  The average low temperature is 43°F in January .  Elevation: 869 Ft
  • 6.  Excellent access to transportation, with access to Interstate 10 just one mile south and Loop 303 just five miles to the east. GOOGLE EARTH VIDEO  Our parcel, contains 80 lots, of which we have chosen lot 157, oriented lengthwise north to south.
  • 7.  The context is predominantly single family detached dwellings. Duplex residential buildings are located along the street.  The street hierarchy includes a main north-south avenue: Verrado Way, and secondary local residential streets.  The site is located on an east-west local residential street: E. Delaney Drive. which has low traffic.  A view corridor from the street to the east terminates at a pleasant green open area, which reduces the effect of heat gain and brings a microclimate to the surroundings.
  • 8. • The contour slopes from the north-west to the south-east. • Prevailing winds originating from the north support the natural ventilation. • Front landscape set back. Rear gardens and open area characterize the open space.
  • 9. Master bedroom, great room and kitchen have areas facing north and receive suitable access to daylight. Covered patio facing north has daylight and it is cooler during most part of the day. Game room and secondary bedroom have areas facing north and receive access to daylight. Second floor has cross ventilation. c o c o
  • 10. DUAL FLUSH TOILET • REQUIRES LESS WATER TO OPERATE. • PRICE COMPARISON: COLONY- W TOILET (1.6 GPF) $147 DUAL FLUSH TOILET (1.6 & 1 GPF) $200 PROFILE SMART 305 ROUND FRONT PLUS– CAROMA • HIGH EFFICIENCY DUAL FLUSH TOILET 1.28 & 0.8 GPF • INTEGRATED SINK FOR GREATER WATER SAVINGS
  • 11. SOLAR HOT WATER HEATING • Uses heat from the sun to work alongside a conventional water heater. • The average domestic system reduces carbon dioxide emissions by around 400kg per year, depending on the fuel replaced. • It is preferable to have a minimum roof area of 43 sqft. facing south- east to south-west. • COST: $5,000 - $7,000 • Savings + Incentives
  • 12. Division 2 - Earthwork Division 3 - Concrete Division 6 - Framing Division 9 - Finishes Division 7 - Thermal and Moisture Protection Division 8 - Doors and Windows
  • 13. Division 6 - Wood/Plastic/Composites, & Supplies Description Unit Quantity Material Cost, per Unit Labor Cost Equipment Cost Total Cost Category Total Wood and Plastic Fasteners Framing Nails, Grip-Rite, 3" x 0.120-Guage Smooth Shank Galvanized, 2000 per Box Each 20 $28.65 $573.00 Rough Carpentry Wood Framing Unit Quantity Material Cost, per Unit Labor Cost Equipment Cost Total Cost Category Total Fascia 2x6, SPF, #2, Subfascia Linear Ft. 418 $0.64 $267.10 2x4, SPF, #2, Outlooks & Nailers Linear Ft. 836 $0.43 $355.92 1st Floor Walls Beams & Headers 2x12, SPF, #2 Each 2 @ 20', 4 @ 16', 17 @ 14', 6 @ 12', 6 @ 10', 9 @ 8' By Quote $818.59 Plywood, 1/2", OSB/CD, 4X8 sheets Each 9 $11.90 $107.14 Plates 2x4 Plate, Top, SPF Linear Ft 3110 $0.43 $1,323.73 2x6 Plate, Top, SPF* Each 3 @ 8', 3 @ 10' By Quote $34.34 2x4 (Treated) Bottom Plate, at Slab, SPF* Linear Ft 622 $0.50 $309.50 2x4, (Treated) Bottom Plate, at slab Each 3 @ 8', 3 @ 10' By Quote $53.56 2x6 (Treated) Bottom Plate, at Slab, SPF* Each 1 @ 8', 1 @ 10' By Quote $65.47 Arches 5/8" OSB, 4x8* Each 33 $20.36 $671.72 Studs 2x4 Precut @ 116 5/8", SPF Each 704 $4.32 $3,041.28 2x6, precut@ 116 5/8", SPF* Each 18 $6.48 $116.64
  • 14. 2nd Floor Walls Beams & Headers 2x12, SPF, #2 Each 9 @ 14', 1 @ 10' By Quote $201.89 Plywood, 1/2", OSB/CD, 4X8 sheets Each 3 $11.90 $35.71 Plates 2x4, SPF Linear Ft 2364 $0.42 $997.25 2x6, SPF* Each 4 @ 10’, 4 @ 14’ By Quote $61.06 Studs 2x4, SPF, precut @ 104-5/8" Each 426 $4 $1,656.29 2x6, SPF, precut @ 104-5/8" Each 24 $5.83 $139.97 Stairs: 2x12, SPF Each 11 @ 12', 4 @ 8' By Quote $242.50 Flooring Subflooring: 3/4" Underlayment, X-Band, "C" Grade, 4X8, UL Plywood, Tongue & Groove Each 57 $30.30 $1,727.10 Adhesive, CAQ Type Each 10 $55.00 $550.00 #10 Ring Shank Nails, Pneumatic Strips Each 3 $224.00 $672.00 Exterior Wall sheathing Windstorm, 7/16", 4'x11', OSB Sheathing Each 158 $19.49 $3,079.42 Tyvek Home Wrap, 9'x150', by Roll Each 5 $137.00 $685.00 Tyvek Stucco Wrap, 5'x200'', by Roll Each 4 $183.63 $734.52 Plastic-Hed Yellowcap Nails, 1", 2000 ct. Carton Each 1 $49.30 $49.30 Roof Decking Plywood, OSB Techshield, 5/8"*, 4x8 Each 165 $20.35 $3,358.08 Plywood Clips, 5/8, by Carton Each 4 $6.47 $25.88 Rough Carpentry, Total $45,044.97
  • 15. THROUGH 6/13/2014 ION UCTION MING MING NG T. ROUGH-INS S ECTIONS DOOR INSTALLATION H MATERIALS STALLATION TALLATION/FINISHES NG ALKWAY CONCRETE S S INISH ISH G AL SHES OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11THROUGH 6/13/2014 ION UCTION MING MING NG T. ROUGH-INS S ECTIONS DOOR INSTALLATION MATERIALS STALLATION TALLATION/FINISHES NG ALKWAY CONCRETE S S INISH ISH G AL SHES OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 INITIAL CONSTRUCTION BEGINFOUNDATION EXCAVATIO N HROUGH 6/13/2014 ON CTION ING MING G T. ROUGH-INS ECTIONS OOR INSTALLATION MATERIALS STALLATION ALLATION/FINISHES NG LKWAY CONCRETE NISH SH G L SHES UGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11HROUGH 6/13/2014 ON CTION NG MING G . ROUGH-INS CTIONS OOR INSTALLATION MATERIALS TALLATION ALLATION/FINISHES NG LKWAY CONCRETE NISH SH G L HES UGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11OUGH 6/13/2014 N TION G NG ROUGH-INS TIONS OR INSTALLATION ATERIALS ALLATION LATION/FINISHES G WAY CONCRETE SH ES GH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11OUGH 6/13/2014 N ION G G OUGH-INS TIONS OR INSTALLATION ATERIALS ALLATION LATION/FINISHES WAY CONCRETE SH ES GH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11UGH 6/13/2014 ON G OUGH-INS ONS R INSTALLATION TERIALS LLATION ATION/FINISHES WAY CONCRETE H S H WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11GH 6/13/2014 N UGH-INS NS INSTALLATION ERIALS ATION TION/FINISHES AY CONCRETE WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION VATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION VATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION CONSTRUCTION ATION ATION OOR FRAMING RAMING OOR FRAMING RAMING SHEATHING ING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION ROOFING OR FINISH MATERIALS TON HOWER INSTALLATION OARD INSTALLATION/FINISHES OR PAINTING WAY & WALKWAY CONCRETE NCES & GATE CAPING OR DOORS NG STAIRS OR TRIM T FLOOR FINISH LOOR FINISH PLUMBING ELECTRICAL HVAC ETRY ERTOPS OOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION ATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 112/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION ATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES OR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING OR DOORS ING STAIRS OR TRIM T FLOOR FINISH FLOOR FINISH PLUMBING ELECTRICAL HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 11014 TION SHES ETE WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 FOUNDATIO N 1STFLOOR FRAMING STAIR FRAMING 2NDFLOOR FRAMING PLUMBING/ELECT.ROUGH-INS FINISH SHEATHING PLUMBING/ELECT.ROUGH- INS HVACROUGH- INS FINISHSTAIRS WINDOW/EXT. DOOR ROUGH-INS INSPECTIONS EXT.FINISH MATERIALS GYP.BOARD INSTALLATION TUB/SHOWER INSTALLATION HROUGH 6/13/2014 ON CTION NG ING G . ROUGH-INS CTIONS OOR INSTALLATION MATERIALS TALLATION ALLATION/FINISHES G KWAY CONCRETE NISH H L HES UGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 WK 15 INT. PAINT WK 17 WK 18 OF DAYS: 94 WK 8 WK 9 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 2/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION VATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING H SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION H ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES IOR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE SCAPING IOR DOORS HING STAIRS IOR TRIM T FLOOR FINISH FLOOR FINISH H PLUMBING H ELECTRICAL H HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 11 WK 15 WK 17 WK 18 OF DAYS: 94 WK 8 WK 9 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 INTERIOR DOORS LANDSCAPEIN G FENCE& GATE TRIMFLOOR FINISH APPLIANCES CARPETFLOOR FINISH INTERIOR TRIM FINISH STAIRS CABINET RY FINISH HVAC FINISH ELECT. FINISH PLUMBING FINAL WALKTHROUGH FINAL CLEANING BATHROOM FINISHES COUNTERTO PS THROUGH 6/13/2014 ION UCTION ING MING NG T. ROUGH-INS S ECTIONS DOOR INSTALLATION MATERIALS STALLATION TALLATION/FINISHES NG LKWAY CONCRETE S S NISH SH G AL SHES OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 WK 19WK 15 INT. PAINT WK 17 WK 18 94 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 THROUGH 6/13/2014 TION UCTION MING MING NG CT. ROUGH-INS NS PECTIONS DOOR INSTALLATION G H MATERIALS NSTALLATION TALLATION/FINISHES ING ALKWAY CONCRETE S RS FINISH ISH NG CAL ISHES G OUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 MILESTONES FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 STRUCTIONTIMELINE WK 19WK 15 INT. PAINT WK 17 WK 18 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 ROOFFRAMING 2NDFLOOR FRAMING PRE- CONSTRUCTION FOUN`DATIO N ISULATION 2/7/2014 THROUGH 6/13/2014 ONSTRUCTION L CONSTRUCTION ATION DATION OOR FRAMING FRAMING LOOR FRAMING FRAMING SHEATHING BING/ELECT. ROUGH-INS ROUGH-INS H-INS INSPECTIONS OW/ EXT. DOOR INSTALLATION ROOFING IOR FINISH MATERIALS ATON HOWER INSTALLATION OARD INSTALLATION/FINISHES OR PAINTING WAY & WALKWAY CONCRETE ANCES & GATE CAPING OR DOORS ING STAIRS OR TRIM T FLOOR FINISH FLOOR FINISH PLUMBING ELECTRICAL HVAC ETRY TERTOPS ROOM FINISHES CLEANING WALKTHROUGH WK 19WK 15 INT. PAINT WK 17 WK 18WK 1 WK 2 WK 3 WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 12 WK 13 WK 14 FOUNDATION PLUMBING / ELEC. HVAC EXT. FINISH WK 16WK 11 WK 15 WK 17 WK 18 DAYS: 94 WK 8 WK 9 WK 10 5 DAYS A WEEK, 8 HOURS A DAY WK 12 WK 13 WK 14 MILESTONES PLUMBING / ELEC. HVAC EXT. FINISH WK 16 ORDER TRUSSES, CONCRETE, CALL PLUMBING CONTRACTERS CALL PLUMBING, ELECTRICAL, HVAC CONTRACTERS FOR FINISHES FLOORING, COUNTERTOP, CABINET CONTRACTERS CALL INT. FINISH, LANDSCAPE CONCTRACTERS CALL PLUMBING, ELECTRICAL, HVAC, EXT. FINISH CONTRACTERS WK 11 DRIVEWAY/WALKWAY CONCRETE INTERIOR PAINTING
  • 16. Provides you, our clients, with a visual advantage. Different exterior color schemes as well.
  • 17. Also with a view at night, which gives you an idea of how the interior lighting reflects.
  • 18.  Trace Ceilings  10’ Ceilings  Arch Ways  Open Floor Plan  Many Windows For Natural Lighting
  • 19.  Residential Construction Management Competition(RCMC) panel of judges.  Professor P. Victor Mirzai  Home Builders Association of Greater New Orleans  New Orleans Education League of Construction  Delgado Community College Student Government Association  Letterman's Reproduction Company  City Blueprint and Supply Company  National Housing Endowment Without their support and along with funding this project it would have never been completed. Our TEAM is very happy to have an opportunity to work on this realistic national competition project. We are extremely thankful to receive feed back and constructive criticism from the panel of judges.