NEW NEXT GENERATION
DATA CENTRE /
READING /




InTechnology’s new Reading data centre is embedded in our high availability, multi-meshed
MPLS network and is part of our extensive multi-million pound investment programme.
Combining the very latest cooling technologies, an energy-efficient infrastructure, fully resilient
network equipment and rigorous security, this strategically designed facility offers organisations
cost-effective ISO-compliant* hosting facilitites. It is one of only 5% of UK data centres offering next
generation technologies and the core network connects with other major network providers and
provides multiple routes.

OVERVIEW /                                                      POWER /
•	 350 racks                                                    •	 Guaranteed 100% power availability
•	 Colocated pods/racks and private suites                      •	 3 x 750 kVA generators
•	 15,000 sq ft                                                 •	 Up to 3MW of power into data centre
•	 Highly resilient, N+1 redundancy                             •	 3-8KW per cabinet
•	 Tier 3 design                                                •	 Redundant feeds to cabinets
•	 Carrier neutral                                              •	 N+1 backup generation, with an N+N UPS system
•	 Direct access circuits to InTechnology’s 10Gb core network
•	 Access to virtual server hosting and managed data services   COOLING /
•	 24 /7/365 manned security                                    •	 Leading edge cooling and energy management technologies
                                                                •	 Ultra-efficient Weatherite free air cooling system
SECURITY /                                                      •	 Rittal cold aisle containment units
•	 24/7/365 CCTV onsite and HQ-based monitoring                 •	 Designed to achieve PUE of 1.25
•	 Schneider CCTV door access
•	 Single person, card-access entry                             FIRE PROTECTION /
•	 Intruder alarms                                              •	 IG55 inert gas fire suppression system
•	 24 /7/365 manned security                                    •	 etwork-monitored, highly sensitive Clymac VESDA fire
                                                                   N
•	 PCI DSS QSA input to design**                                   detection system
•	 rocesses and procedures aligned to ISO 27001 and 9001*
   P
                                                                * accreditation scheduled for Q4 2011
                                                                ** accreditation expected Q1 2012
POWER USAGE EFFECTIVENESS (PUE)                                                                          PUE /
                                                                                                         The overall efficiency of a data centre can be
                                                                      5%
                                                                                                         determined by is PUE – the lower the PUE, the
       16%                                          15%                              it equipment
                                                                                                         higher the efficiency. The PUE is calculated by
                40%
                                                                                                         dividing the amount of power entering a data
                                                                                     electrical system
 44%                                                                                                     centre by the power used to run the computer
                                                                                                         infrastructure within it. An efficient but traditional
   PUE=2.5                                                           PUE=1.25        COOLING SYSTEM
                                                                                                         data centre will have a PUE of 2 or above . The
                                                                                                         next generation of data centres have significantly
                                                                                                         lower PUEs, saving some 40 per cent in power
   TRADITIONAL                                            READING                                        costs. InTechnology’s Reading data centre has
  DATA CENTRE /                                         DATA CENTRE /                                    been designed to deliver a PUE of 1.25.




                WORTO
                     N DR
                                                                                      InTechnology Reading
                                              READING
                                              DATA              B3033
                                              CENTRE                                  Commensus House
             WOR




                                                                                      3-5 Worton Drive
              TON




                                        WO
                                        RT
                  DR




       A33                                                                            Reading
                                                               WAY
                                          ON




                                                        RIAL
                                                   IMPE
                                             DR




                                                                                      RG2 0TG
                                                                                      How to find us:
                                   AY
                                  W
                                 AL
                             RI
                            PE




                                                                                      Exit the M4 at Junction 11.
                            IM




                                                   33
                                                  B30




                                                                                      Take the A33 towards Reading.
                       A33
                                                                                      Follow the A33 for a quarter of a mile, turning right at
                                                                                      the roundabout signposted Worton Grange Business Park
                                                                                      onto Imperial Way.
  M4
                                      A33
                                                                                      Follow Imperial Way and take 1st left onto Worton Drive.
                                                                                      InTechnology data centre is approximately half a mile along the
                                                                        B3270
                                                                                      road, on the right, opposite Static Control Components Ltd.
                                                                                      SATNAV ref:
                                 A33
                                                                                M4    RG2 0TG




With nearly 30 years experience as leaders and innovators in the managed services market,
InTechnology is one of the UK’s leading providers of Cloud-based voice and data services to public
and private sector businesses. Trusted by some of the UK’s highest-profile organisations, our
continously upgraded data centres are embedded in our own high availability, multi-meshed,
multi-carrier MPLS network. They offer colocation, virtual hosting and managed data services and
complement our Unified Communications, hosted IP Telephony and hosted Exchange solutions.




To learn more about how we could help you,
call 0800 983 2522 or email contact@intechnology.com

More Related Content

PDF
Cn ptp rdb-federal_br_012012_final
PDF
Ptp810 01 ds-050812-r10
PDF
Small form factor cognitive radio implemented via fpga partial reconfiguratio...
PPT
MetrixInspira company profile
PDF
Low insertion loss of surface mount device low pass filter at 700 MHz
PDF
IRJET- Review on Dynamic Reconfiguration of Filters for Signal Processing
PDF
Field mobile tetra flex fmt ver 1 0 highres
PDF
ECE 24 Final Report 052609
Cn ptp rdb-federal_br_012012_final
Ptp810 01 ds-050812-r10
Small form factor cognitive radio implemented via fpga partial reconfiguratio...
MetrixInspira company profile
Low insertion loss of surface mount device low pass filter at 700 MHz
IRJET- Review on Dynamic Reconfiguration of Filters for Signal Processing
Field mobile tetra flex fmt ver 1 0 highres
ECE 24 Final Report 052609

Viewers also liked (20)

PDF
如何成功营销您的iPhone应用
PPT
Perro y gato
PPS
Las propiedades de_los_mejillones
KEY
Periodic Table
PDF
II prueba de latín
PPTX
Festival Internacional Cervantino 2011
PPS
P. aniversario 1ª parte
PPTX
Fauna de doñana
PPSX
Educación para la ciudadanía
PPTX
WebbMason docBuilder Webinar
DOC
Como En Muchos Otros Grupos De Trastornos Numerosas Enfermedades De La Piel I...
PPT
Maria fatima e dante
PDF
Ragout de seitan al moscatel de chiclana
PPT
Ioana cv
PPT
English haizea arrate
PPTX
PPS
PER A TOTS VOSALTRES
如何成功营销您的iPhone应用
Perro y gato
Las propiedades de_los_mejillones
Periodic Table
II prueba de latín
Festival Internacional Cervantino 2011
P. aniversario 1ª parte
Fauna de doñana
Educación para la ciudadanía
WebbMason docBuilder Webinar
Como En Muchos Otros Grupos De Trastornos Numerosas Enfermedades De La Piel I...
Maria fatima e dante
Ragout de seitan al moscatel de chiclana
Ioana cv
English haizea arrate
PER A TOTS VOSALTRES
Ad

Similar to Reading dc data sheet (2) (20)

PDF
Nran 6 Lxshx R0 En
PDF
An Ultra-Low Cost Solution based on Power-Line Communication
PDF
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
PDF
Cooling in Data Centers
PDF
Connecting electrical appliances to a Home Network using low-cost Power-Line ...
PDF
IRJET- A Review on Paper Problem in OFDM Scheme
PDF
SMART AND INTELLIGENCE HI-TECH ARMY SECURITY SYSTEM
PPTX
Panduit EMEA SI Webinar 7
PDF
Data Centre Hosting Services
PDF
Data centre-hosting-services
PDF
Data centre-hosting-services
PDF
Powering-Up the Industrial Network
PDF
Data Centre Hosting Services
PDF
InTechnology Data Centre Hosting Services
PDF
Data Centre Hosting Services
PDF
In Technology Data Centre Hosting Services
PDF
Facility Optimization
PDF
A Review on Application of Narrowband Power Line Communication in Medium Volt...
PPT
Data Center PUE Reconsidered
Nran 6 Lxshx R0 En
An Ultra-Low Cost Solution based on Power-Line Communication
Ppt4 london - michael rudgyard ( concurrent thinking ) driving efficiencie...
Cooling in Data Centers
Connecting electrical appliances to a Home Network using low-cost Power-Line ...
IRJET- A Review on Paper Problem in OFDM Scheme
SMART AND INTELLIGENCE HI-TECH ARMY SECURITY SYSTEM
Panduit EMEA SI Webinar 7
Data Centre Hosting Services
Data centre-hosting-services
Data centre-hosting-services
Powering-Up the Industrial Network
Data Centre Hosting Services
InTechnology Data Centre Hosting Services
Data Centre Hosting Services
In Technology Data Centre Hosting Services
Facility Optimization
A Review on Application of Narrowband Power Line Communication in Medium Volt...
Data Center PUE Reconsidered
Ad

More from Gareth Huxall (10)

PDF
Calls and lines analysis
PDF
Unified communications-services
PDF
Reading dc brochure guide
PDF
Non geographic numbers
PDF
Managed network-services
PDF
In technology overview
PDF
In technology reading data centre
PDF
Infrastructure as-a-service
PDF
Business calls-and-lines-services
PDF
Sip trunking
Calls and lines analysis
Unified communications-services
Reading dc brochure guide
Non geographic numbers
Managed network-services
In technology overview
In technology reading data centre
Infrastructure as-a-service
Business calls-and-lines-services
Sip trunking

Reading dc data sheet (2)

  • 1. NEW NEXT GENERATION DATA CENTRE / READING / InTechnology’s new Reading data centre is embedded in our high availability, multi-meshed MPLS network and is part of our extensive multi-million pound investment programme. Combining the very latest cooling technologies, an energy-efficient infrastructure, fully resilient network equipment and rigorous security, this strategically designed facility offers organisations cost-effective ISO-compliant* hosting facilitites. It is one of only 5% of UK data centres offering next generation technologies and the core network connects with other major network providers and provides multiple routes. OVERVIEW / POWER / • 350 racks • Guaranteed 100% power availability • Colocated pods/racks and private suites • 3 x 750 kVA generators • 15,000 sq ft • Up to 3MW of power into data centre • Highly resilient, N+1 redundancy • 3-8KW per cabinet • Tier 3 design • Redundant feeds to cabinets • Carrier neutral • N+1 backup generation, with an N+N UPS system • Direct access circuits to InTechnology’s 10Gb core network • Access to virtual server hosting and managed data services COOLING / • 24 /7/365 manned security • Leading edge cooling and energy management technologies • Ultra-efficient Weatherite free air cooling system SECURITY / • Rittal cold aisle containment units • 24/7/365 CCTV onsite and HQ-based monitoring • Designed to achieve PUE of 1.25 • Schneider CCTV door access • Single person, card-access entry FIRE PROTECTION / • Intruder alarms • IG55 inert gas fire suppression system • 24 /7/365 manned security • etwork-monitored, highly sensitive Clymac VESDA fire N • PCI DSS QSA input to design** detection system • rocesses and procedures aligned to ISO 27001 and 9001* P * accreditation scheduled for Q4 2011 ** accreditation expected Q1 2012
  • 2. POWER USAGE EFFECTIVENESS (PUE) PUE / The overall efficiency of a data centre can be 5% determined by is PUE – the lower the PUE, the 16% 15% it equipment higher the efficiency. The PUE is calculated by 40% dividing the amount of power entering a data electrical system 44% centre by the power used to run the computer infrastructure within it. An efficient but traditional PUE=2.5 PUE=1.25 COOLING SYSTEM data centre will have a PUE of 2 or above . The next generation of data centres have significantly lower PUEs, saving some 40 per cent in power TRADITIONAL READING costs. InTechnology’s Reading data centre has DATA CENTRE / DATA CENTRE / been designed to deliver a PUE of 1.25. WORTO N DR InTechnology Reading READING DATA B3033 CENTRE Commensus House WOR 3-5 Worton Drive TON WO RT DR A33 Reading WAY ON RIAL IMPE DR RG2 0TG How to find us: AY W AL RI PE Exit the M4 at Junction 11. IM 33 B30 Take the A33 towards Reading. A33 Follow the A33 for a quarter of a mile, turning right at the roundabout signposted Worton Grange Business Park onto Imperial Way. M4 A33 Follow Imperial Way and take 1st left onto Worton Drive. InTechnology data centre is approximately half a mile along the B3270 road, on the right, opposite Static Control Components Ltd. SATNAV ref: A33 M4 RG2 0TG With nearly 30 years experience as leaders and innovators in the managed services market, InTechnology is one of the UK’s leading providers of Cloud-based voice and data services to public and private sector businesses. Trusted by some of the UK’s highest-profile organisations, our continously upgraded data centres are embedded in our own high availability, multi-meshed, multi-carrier MPLS network. They offer colocation, virtual hosting and managed data services and complement our Unified Communications, hosted IP Telephony and hosted Exchange solutions. To learn more about how we could help you, call 0800 983 2522 or email contact@intechnology.com