SlideShare a Scribd company logo
WELCOME
1
REAL TIME FLOOD
FORECASTING
GUIDED BY PRESENTED BY
MAYA.G.NAIR ALBIN.J.ARACKAL
Lecturer S7 Civil
SNGCE Roll No:3
SNGCE
2
INTRODUCTION
 What Is Real Time Flood Forecasting ??
 Real Time Flood Forecasting systems are
formulated for issuing the flood warnings in
real time in order to prepare the evacuation
plan during flood.
3
FLOOD PROBLEMS IN INDIA
 a) Inundation.
 b) Drainage Congestion due to Urbanization.
 c) Bank Erosion.
4
FOUR ZONES OF FLOODING IN
INDIA
 a) Brahmaputra River Basin.
 b) Ganga River Basin.
 c) North –West Rivers Basin.
 d) Central India and Deccan Rivers Basin.
5
SPECIAL FLOOD PROBLEMS
 a) Problems Of Tal Areas.
 b) River Bank/Bed Erosion.
 c) Sediment Transport by Rivers.
 d) Dam Break Flows.
 e) Urban Drainage.
 f) Flash floods.
 g) Flood due to snowmelt.
 h) Flood in Coastal Areas.
6
NEED FOR REAL TIME FLOOD
FORECASTING
 a) To evacuate the affected people to the safer
places.
 b) To make an intense patrolling of the flood
protection works such as embankments so as
to save them from breaches , failures, etc.
 c) To regulate the flood through barrages and
reservoirs.
 d) to operate multi-purpose reservoirs.
 e) to operate city drains.
7
DEVELOPMENT OF FLOOD
FORECASTING IN INDIA
 In 1969, Government created a Central Flood
Forecasting Directorate.
 In 1970, six Flood Forecasting divisions were
set up on inter state river basins.
 In 1977, the central Flood Forecasting
Organisation comprised of one Chief
Engineer’s Office ,3 circles and 11 divisions.
8
FLOOD WARNINGS
 Whether the river is rising above a certain
specified level, known as danger level.
 Whether the river is rising or falling.
 Whether the stage of the river is ‘low’,
‘medium’ or ‘high’.
9
TECHNIQUE USED IN FLOOD
FORECASTING
 The Real Time Data Acquisition System.
 This technology assembles simple ideas to get
effective results.
 The project implements machine to machine
communication.
 Using this system the information are
collected from remote places.
10
WORKING PROCEDURE
11
12
WORKING PROCEDURE
 Internet based technology make it easier to
control & monitor the system remotely to
present it easier using standard web browsers.
 The system uses various sensors for detecting
rainfall intensity for sensing the water level of
the river.
 The data is first stored in data logger, which
supports CDMA transmissions.
13
 The data is stored and transmitted at a
predefined interval.
 The data is transmitted through wireless
medium over the internet to a data base.
 Then it is analysed and hosted in the website
for general information.
14
FEATURES OF THE PROJECT
 This project is intended for collecting the data
for rainfall and water level for the areas
covered by Ganga basin.
 The data collected from the mapped sites are to
be posted through CDMA over the internet to a
data base server.
15
 All the equipments used in this system
incorporates state of the art and technology (
eg. microcontroller, processors etc) and
provide capability for unattended operation for
at least 1 year at remote places using 12 v
single sealed maintenance free battery.
 Solar supply has been arranged for that area
where the electricity is inaccessible.
16
 All the equipment has been able to withstand
the hostile environment and well secured
against power surge electrostatic discharge etc.
 The system has an inbuilt memory that is able
to store data for at least one year.
17
SENSORS
 The sensors along with the accessories and
facilities for flood fore casting system are
basically Tipping Bucket Rain Gauge, water
level detecting sensor.
 a) water level detecting sensor: The water
level sensor being used in the Steven’s A/F
Encoded mode A F-1.
 b) Rain Gauge: Tipping bucket rain gauge.
18
CONCLUSION
 The real time flood forecasting system protects lives
and save money. The real time data acquisition
system is necessary for food forecasting as the data
can be collected every five minutes from the mapped
station. The apex advantage of real time data
acquisition system is that data is retrieved in real
time. In INDIA flash floods are usually experienced,
as such there is no system for formulating the flash
flood forecast. It results heavy losses of lives and
properties. The real time data acquisition system can
be used to prevent losses due to flash floods.
19
REFERENCES
 1. R. Krzysztofowicz R, A theory of Flood Warning System,
Water Resources Research, 29(12),2007, 3981-3994
 2. L. Naale, C.Saltalippi, Application of a model for flood
forecasting, proc. Of the IASTED/ISSM Int. Conference “
Modelling and Simulation” , pittsburg , 2003, 417-420.
 3. D.W.Reed, A Review of British Flood Forecasting Practice,
Tech. Report N .90, Institute of hydrology , Wallingford ,2005
.
 4 Realtimeforecasting,
http://www.powerset.com/explore/realtimeforecsting,(AUGU
EST2008)
 5. American Society for civil engineers,
http:www.asce.com/info/05/050.
20
THANK YOU…
21

More Related Content

PPTX
Flood forecasting presentation final
PPTX
Hydrological modelling
PDF
REMOTE SENSING & GIS APPLICATIONS IN WATERSHED MANAGEMENT
PDF
Rainfall-Runoff Modelling
PPTX
Precipitation unit 2
PDF
Hydrological modelling i5
PPT
Precipitation and rain gauges
PPTX
Normalized Difference Vegetation Index (NDVI)
Flood forecasting presentation final
Hydrological modelling
REMOTE SENSING & GIS APPLICATIONS IN WATERSHED MANAGEMENT
Rainfall-Runoff Modelling
Precipitation unit 2
Hydrological modelling i5
Precipitation and rain gauges
Normalized Difference Vegetation Index (NDVI)

What's hot (20)

PPTX
Applications of remote sensing and modelling in flood risk analysis and irrig...
PDF
PDF
Surface water runoff
PPTX
Flood frequency analyses
PPTX
Hydrograph
PPTX
Swat & modflow
PPT
Hydrology and hydraulics for design design
PPTX
Flood frequency analysis
PPTX
Seminar on Hydrological modelling
PDF
Hydrology notes
PDF
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
PPT
Flood estimation
PPTX
RAINFALL RUNOFF MODELLING USING HEC-HMS
PPTX
Hec ras flood modeling little river newburyport
PPTX
Surface Water modelling using Remote Sensing
PPTX
Swat model
PDF
Sediment transport
PPTX
Flood & drought management
PPTX
Runoff & Flood Frequency Analysis
PPTX
1 introduction to hydrology
Applications of remote sensing and modelling in flood risk analysis and irrig...
Surface water runoff
Flood frequency analyses
Hydrograph
Swat & modflow
Hydrology and hydraulics for design design
Flood frequency analysis
Seminar on Hydrological modelling
Hydrology notes
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Flood estimation
RAINFALL RUNOFF MODELLING USING HEC-HMS
Hec ras flood modeling little river newburyport
Surface Water modelling using Remote Sensing
Swat model
Sediment transport
Flood & drought management
Runoff & Flood Frequency Analysis
1 introduction to hydrology
Ad

Similar to Real Time Flood Forecasting.ppt (20)

PDF
IRJET- Flood Alerting System through Water Level Meter
PPTX
UNIT.2.pptx
PDF
Design of Early Flood Warning System
PPTX
Cnfms 18-06-14 sai bhaskar
PDF
Smart monitoring system of Najran dam
PDF
Smart Water Meter System for Detecting Sudden Water Leakage
PPTX
3D4-GRP-1-IOT-EARLY-FLOOD-DETECTION-AND-AVOIDANCE-SYSTEM-OF-ARGAO-RIVER.pptx
PDF
SIMULATION OF DRAINAGE IN VIT BY SWMM SOFTWARE
PPTX
213180005 Seminar presentation.pptx
PDF
Mathematical modeling approach for flood management
PDF
Mathematical modeling
PDF
DSD-NL 2021 WaterCoach, here and in Australia - Wang
PDF
Hydrologic Monitoring Network Questionnaire
PDF
Using drones to undertake inspections of open stormwater channels
PPTX
Smart ICT for Weather and Water
PDF
IMPLEMENTATION OF EARLY FLOOD DETECTION AND AVOIDANCE SYSTEM USING LORA
DOC
Smart Dam Monitering & Controling
PDF
185-687-1-PB
PPTX
Water Resources Engineering (CVE 728)--Slide 6.pptx
PPTX
DEVELOPMENT OF WATER YIELD MONITORING SYSTEM THROUGH INTEGRATION OF LOW COST ...
IRJET- Flood Alerting System through Water Level Meter
UNIT.2.pptx
Design of Early Flood Warning System
Cnfms 18-06-14 sai bhaskar
Smart monitoring system of Najran dam
Smart Water Meter System for Detecting Sudden Water Leakage
3D4-GRP-1-IOT-EARLY-FLOOD-DETECTION-AND-AVOIDANCE-SYSTEM-OF-ARGAO-RIVER.pptx
SIMULATION OF DRAINAGE IN VIT BY SWMM SOFTWARE
213180005 Seminar presentation.pptx
Mathematical modeling approach for flood management
Mathematical modeling
DSD-NL 2021 WaterCoach, here and in Australia - Wang
Hydrologic Monitoring Network Questionnaire
Using drones to undertake inspections of open stormwater channels
Smart ICT for Weather and Water
IMPLEMENTATION OF EARLY FLOOD DETECTION AND AVOIDANCE SYSTEM USING LORA
Smart Dam Monitering & Controling
185-687-1-PB
Water Resources Engineering (CVE 728)--Slide 6.pptx
DEVELOPMENT OF WATER YIELD MONITORING SYSTEM THROUGH INTEGRATION OF LOW COST ...
Ad

Recently uploaded (20)

PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Complications of Minimal Access Surgery at WLH
PDF
Computing-Curriculum for Schools in Ghana
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PPTX
Cell Types and Its function , kingdom of life
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
GDM (1) (1).pptx small presentation for students
PPTX
Lesson notes of climatology university.
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PPTX
master seminar digital applications in india
PPTX
Institutional Correction lecture only . . .
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
human mycosis Human fungal infections are called human mycosis..pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Complications of Minimal Access Surgery at WLH
Computing-Curriculum for Schools in Ghana
O5-L3 Freight Transport Ops (International) V1.pdf
STATICS OF THE RIGID BODIES Hibbelers.pdf
Microbial disease of the cardiovascular and lymphatic systems
2.FourierTransform-ShortQuestionswithAnswers.pdf
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Cell Types and Its function , kingdom of life
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Final Presentation General Medicine 03-08-2024.pptx
GDM (1) (1).pptx small presentation for students
Lesson notes of climatology university.
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
master seminar digital applications in india
Institutional Correction lecture only . . .
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf

Real Time Flood Forecasting.ppt

  • 2. REAL TIME FLOOD FORECASTING GUIDED BY PRESENTED BY MAYA.G.NAIR ALBIN.J.ARACKAL Lecturer S7 Civil SNGCE Roll No:3 SNGCE 2
  • 3. INTRODUCTION  What Is Real Time Flood Forecasting ??  Real Time Flood Forecasting systems are formulated for issuing the flood warnings in real time in order to prepare the evacuation plan during flood. 3
  • 4. FLOOD PROBLEMS IN INDIA  a) Inundation.  b) Drainage Congestion due to Urbanization.  c) Bank Erosion. 4
  • 5. FOUR ZONES OF FLOODING IN INDIA  a) Brahmaputra River Basin.  b) Ganga River Basin.  c) North –West Rivers Basin.  d) Central India and Deccan Rivers Basin. 5
  • 6. SPECIAL FLOOD PROBLEMS  a) Problems Of Tal Areas.  b) River Bank/Bed Erosion.  c) Sediment Transport by Rivers.  d) Dam Break Flows.  e) Urban Drainage.  f) Flash floods.  g) Flood due to snowmelt.  h) Flood in Coastal Areas. 6
  • 7. NEED FOR REAL TIME FLOOD FORECASTING  a) To evacuate the affected people to the safer places.  b) To make an intense patrolling of the flood protection works such as embankments so as to save them from breaches , failures, etc.  c) To regulate the flood through barrages and reservoirs.  d) to operate multi-purpose reservoirs.  e) to operate city drains. 7
  • 8. DEVELOPMENT OF FLOOD FORECASTING IN INDIA  In 1969, Government created a Central Flood Forecasting Directorate.  In 1970, six Flood Forecasting divisions were set up on inter state river basins.  In 1977, the central Flood Forecasting Organisation comprised of one Chief Engineer’s Office ,3 circles and 11 divisions. 8
  • 9. FLOOD WARNINGS  Whether the river is rising above a certain specified level, known as danger level.  Whether the river is rising or falling.  Whether the stage of the river is ‘low’, ‘medium’ or ‘high’. 9
  • 10. TECHNIQUE USED IN FLOOD FORECASTING  The Real Time Data Acquisition System.  This technology assembles simple ideas to get effective results.  The project implements machine to machine communication.  Using this system the information are collected from remote places. 10
  • 12. 12
  • 13. WORKING PROCEDURE  Internet based technology make it easier to control & monitor the system remotely to present it easier using standard web browsers.  The system uses various sensors for detecting rainfall intensity for sensing the water level of the river.  The data is first stored in data logger, which supports CDMA transmissions. 13
  • 14.  The data is stored and transmitted at a predefined interval.  The data is transmitted through wireless medium over the internet to a data base.  Then it is analysed and hosted in the website for general information. 14
  • 15. FEATURES OF THE PROJECT  This project is intended for collecting the data for rainfall and water level for the areas covered by Ganga basin.  The data collected from the mapped sites are to be posted through CDMA over the internet to a data base server. 15
  • 16.  All the equipments used in this system incorporates state of the art and technology ( eg. microcontroller, processors etc) and provide capability for unattended operation for at least 1 year at remote places using 12 v single sealed maintenance free battery.  Solar supply has been arranged for that area where the electricity is inaccessible. 16
  • 17.  All the equipment has been able to withstand the hostile environment and well secured against power surge electrostatic discharge etc.  The system has an inbuilt memory that is able to store data for at least one year. 17
  • 18. SENSORS  The sensors along with the accessories and facilities for flood fore casting system are basically Tipping Bucket Rain Gauge, water level detecting sensor.  a) water level detecting sensor: The water level sensor being used in the Steven’s A/F Encoded mode A F-1.  b) Rain Gauge: Tipping bucket rain gauge. 18
  • 19. CONCLUSION  The real time flood forecasting system protects lives and save money. The real time data acquisition system is necessary for food forecasting as the data can be collected every five minutes from the mapped station. The apex advantage of real time data acquisition system is that data is retrieved in real time. In INDIA flash floods are usually experienced, as such there is no system for formulating the flash flood forecast. It results heavy losses of lives and properties. The real time data acquisition system can be used to prevent losses due to flash floods. 19
  • 20. REFERENCES  1. R. Krzysztofowicz R, A theory of Flood Warning System, Water Resources Research, 29(12),2007, 3981-3994  2. L. Naale, C.Saltalippi, Application of a model for flood forecasting, proc. Of the IASTED/ISSM Int. Conference “ Modelling and Simulation” , pittsburg , 2003, 417-420.  3. D.W.Reed, A Review of British Flood Forecasting Practice, Tech. Report N .90, Institute of hydrology , Wallingford ,2005 .  4 Realtimeforecasting, http://www.powerset.com/explore/realtimeforecsting,(AUGU EST2008)  5. American Society for civil engineers, http:www.asce.com/info/05/050. 20