 The Replacement Theory in Operations Research is
 used in the decision making process of replacing a used
 equipment with a substitute; mostly a new equipment
 of better usage. The replacement might be necessary
 due to the deteriorating property or failure or
 breakdown of particular equipment.
 The ‘Replacement Theory’ is used in the cases like;
 existing items have out-lived, or it may not be
 economical anymore to continue with them, or the
 items might have been destroyed either by accident or
 otherwise. The above discussed situations can be
 solved mathematically and categorised on some basis
 which may be called as Replacement Models.
 Items that deteriorate with time e.g. machine
 tools, vehicles, equipment buildings ...

 Illustration: A truck-owner finds out maintenance cost for Truck-X to be Rs 200 for the first
 year & increasing by Rs 2000 every year hence; capital cost of which is Rs 10000.
 Determine the replacement age.
 Items becoming out-of-date due to new developments
 like ordinary weaving looms by automatic, manual
 accounting by tally, computers, cars ...


 Illustration: A truck-owner finds out maintenance cost for Truck-X to be Rs 200 for the first
 year & increasing by Rs 2000 every year hence; capital cost of which is Rs 9 000. Truck-Y
 costs Rs 20 000 whose annual maintenance cost is Rs 400 for first year & then increases by
 Rs 800 every year. The Truck owner has now Truck-X of 1 year age, should he replace it by
 Truck-Y, and if so, when?
 Items which deteriorate with time
 The depreciation of money is considered in calculations




 Illustration: A Lathe Machine costs Rs 5000 whose maintenance cost is Rs 1000 in each of
 the first 4 years & then increases by Rs 200/- every year. Assuming that machine has no
 salvage value & the maintenance cost is incurred in the beginning of each year, determine
 the optimal replacement time for the lathe assuming that time value of money is 10 % p. a.
 Items which do not deteriorate but fail completely after
    certain amount of use like electronic parts, street
    lights...

   Illustration: An office has 1000 bulbs installed of which 20% bulbs keeps on failing each
    week. Individual Bulb replacement costs Rs 3; while Group Replacement costs Re 1 per
    bulb. It is decided to replace all the bulbs simultaneously at fixed interval & also to replace
    the individual bulbs that fail in between. Decide a suitable replacement policy.
Read Full Article at: http://www.rajeshtimane.com/177/academics/replacement_theory.html

                   Give Your Feedback at: timane.rajesh@gmail.com

More Related Content

PPTX
Ibm unit – iii
PPT
Project Financing
PDF
Overview of data communication and networking
PPTX
Pivot table
PPTX
Capital Asset Pricing Model (CAPM)
PPTX
Business Analyst Roles & Responsibilities
PDF
Lecture 1. Introduction of soil & Water Conservation.pdf
PDF
1. principles of measurement
Ibm unit – iii
Project Financing
Overview of data communication and networking
Pivot table
Capital Asset Pricing Model (CAPM)
Business Analyst Roles & Responsibilities
Lecture 1. Introduction of soil & Water Conservation.pdf
1. principles of measurement

What's hot (20)

PPTX
Operations Research - Models
PPTX
Replacement theory
PPTX
Applied Operation Research (AOR) Replacement Theory
PPT
Sequencing problems in Operations Research
PPTX
Methods Of plant Location
PDF
Operations research-an-introduction
PPT
Queuing model
PPTX
Walter’s model on dividend policy
PPTX
Facility location
PPT
Operations Research - Meaning, Origin & Characteristics
PPTX
Operation research and its application
PPTX
Social Cost Benefit Analysis
PPTX
Operation research ppt chapter one
PPTX
Operational research queuing theory
PDF
Plant Location
PPTX
Facility location & steps on location selection
PDF
Operating characteristics ofqueuing system
PPTX
Human Resource Accounting
PPSX
Delivering services through intermediaries and electronic channels
Operations Research - Models
Replacement theory
Applied Operation Research (AOR) Replacement Theory
Sequencing problems in Operations Research
Methods Of plant Location
Operations research-an-introduction
Queuing model
Walter’s model on dividend policy
Facility location
Operations Research - Meaning, Origin & Characteristics
Operation research and its application
Social Cost Benefit Analysis
Operation research ppt chapter one
Operational research queuing theory
Plant Location
Facility location & steps on location selection
Operating characteristics ofqueuing system
Human Resource Accounting
Delivering services through intermediaries and electronic channels
Ad

Similar to Replacement Theory Models in Operations Research by Dr. Rajesh Timane (20)

PDF
Chap5 engeco
PDF
Replacement
PPTX
Replacement theory
PDF
Replacement & Maintenance Analysis Unit IV MG 6863
PPTX
replacementtheory.pptx
PDF
Lecture 5 - Replacement Problem for industrial equipments
PDF
PDF
Review materials for engineering economics
PPTX
Replacement theory
PDF
Replacement and Maintenance Analysis
PPTX
Replacement models and maintenance analysis
PDF
Replacement Strategies
PPTX
162342-d7c108af-90f2-4c63-9623-a677279e8ed2.pptx
PPT
replacement_theory ppt slide in python .
DOC
Article micro
PPTX
10. Operating Cost of tractor. Gate agriculture
PPTX
Construction equipment
PPTX
Week_02_Economics of Power generation and tariff.pptx
DOCX
OR 14 15-unit_3
PPTX
Replacement Theory. by Dr. Babasaheb. J. Mohite
Chap5 engeco
Replacement
Replacement theory
Replacement & Maintenance Analysis Unit IV MG 6863
replacementtheory.pptx
Lecture 5 - Replacement Problem for industrial equipments
Review materials for engineering economics
Replacement theory
Replacement and Maintenance Analysis
Replacement models and maintenance analysis
Replacement Strategies
162342-d7c108af-90f2-4c63-9623-a677279e8ed2.pptx
replacement_theory ppt slide in python .
Article micro
10. Operating Cost of tractor. Gate agriculture
Construction equipment
Week_02_Economics of Power generation and tariff.pptx
OR 14 15-unit_3
Replacement Theory. by Dr. Babasaheb. J. Mohite
Ad

More from Rajesh Timane, PhD (20)

PPTX
Interpretation & Report Writing in Business Research
PPTX
Methods of Data Collection in Business Research
PPTX
Measurements & Scaling Techniques in Research
PPTX
Sampling Design in Research Methodology.
PPTX
Theory Building in Business Research.pptx
PPTX
Agriculture / Farming Startups in India.pptx
PPTX
csr - current trends and opportunities
PPTX
csr key stakeholders
PPTX
csr: legislation
PPTX
CSR - Framework of Social Orientation
PPTX
Introduction to Corporate Social Responsibility
PPTX
Departmental Presentation - Rajesh Timane, PhD
PPTX
1 effective online search dr rajesh timane
PPTX
Copyrights by Dr. Rajesh Timane
PPTX
Introduction to SWAYAM
PDF
Coursera geodesign 2014
PDF
Coursera susdev 2015
PDF
Coursera lead-ei 2014
PPTX
BPR - Benchmarking, Process Analysis, Incentives, Motivation, Quality & Trends
PPTX
Questionnaire Design
Interpretation & Report Writing in Business Research
Methods of Data Collection in Business Research
Measurements & Scaling Techniques in Research
Sampling Design in Research Methodology.
Theory Building in Business Research.pptx
Agriculture / Farming Startups in India.pptx
csr - current trends and opportunities
csr key stakeholders
csr: legislation
CSR - Framework of Social Orientation
Introduction to Corporate Social Responsibility
Departmental Presentation - Rajesh Timane, PhD
1 effective online search dr rajesh timane
Copyrights by Dr. Rajesh Timane
Introduction to SWAYAM
Coursera geodesign 2014
Coursera susdev 2015
Coursera lead-ei 2014
BPR - Benchmarking, Process Analysis, Incentives, Motivation, Quality & Trends
Questionnaire Design

Replacement Theory Models in Operations Research by Dr. Rajesh Timane

  • 2.  The Replacement Theory in Operations Research is used in the decision making process of replacing a used equipment with a substitute; mostly a new equipment of better usage. The replacement might be necessary due to the deteriorating property or failure or breakdown of particular equipment.
  • 3.  The ‘Replacement Theory’ is used in the cases like; existing items have out-lived, or it may not be economical anymore to continue with them, or the items might have been destroyed either by accident or otherwise. The above discussed situations can be solved mathematically and categorised on some basis which may be called as Replacement Models.
  • 4.  Items that deteriorate with time e.g. machine tools, vehicles, equipment buildings ... Illustration: A truck-owner finds out maintenance cost for Truck-X to be Rs 200 for the first year & increasing by Rs 2000 every year hence; capital cost of which is Rs 10000. Determine the replacement age.
  • 5.  Items becoming out-of-date due to new developments like ordinary weaving looms by automatic, manual accounting by tally, computers, cars ... Illustration: A truck-owner finds out maintenance cost for Truck-X to be Rs 200 for the first year & increasing by Rs 2000 every year hence; capital cost of which is Rs 9 000. Truck-Y costs Rs 20 000 whose annual maintenance cost is Rs 400 for first year & then increases by Rs 800 every year. The Truck owner has now Truck-X of 1 year age, should he replace it by Truck-Y, and if so, when?
  • 6.  Items which deteriorate with time  The depreciation of money is considered in calculations Illustration: A Lathe Machine costs Rs 5000 whose maintenance cost is Rs 1000 in each of the first 4 years & then increases by Rs 200/- every year. Assuming that machine has no salvage value & the maintenance cost is incurred in the beginning of each year, determine the optimal replacement time for the lathe assuming that time value of money is 10 % p. a.
  • 7.  Items which do not deteriorate but fail completely after certain amount of use like electronic parts, street lights...  Illustration: An office has 1000 bulbs installed of which 20% bulbs keeps on failing each week. Individual Bulb replacement costs Rs 3; while Group Replacement costs Re 1 per bulb. It is decided to replace all the bulbs simultaneously at fixed interval & also to replace the individual bulbs that fail in between. Decide a suitable replacement policy.
  • 8. Read Full Article at: http://www.rajeshtimane.com/177/academics/replacement_theory.html Give Your Feedback at: timane.rajesh@gmail.com