System Scope Management Mastering Requirements Management Flat-World IT Consulting By Christian D. Kobsa Senior Consultant Flat-World IT Consulting A Use-Case Based View
Course Objective Describe steps to manage scope. Define system scope (resources, budget, time). Establish requirements baseline. Use attribute values to prioritize requirements. Prioritize use cases. List ways to manage expectations. Flat-World IT Consulting Flat-World IT Consulting
Where Are We? Analyze the Problem Understand Stakeholder Needs Define the System Manage System Scope Refine System Definition Manage Requirements Change New System Existing System New Input Incorrect Problem Correct Problem Out of Scope In Scope Flat-World IT Consulting Flat-World IT Consulting
Why Manage Scope? Purpose of scope management: Define input to the selection of requirements to be included in the current iteration. Define the set of features and user cases (and scenarios) that represent some significant central functionality. Define which attributes and traceability's to maintain. Flat-World IT Consulting Flat-World IT Consulting
Scope Management Capture Problem System to build Test User Doc Problem Space Solution Space Traceability Customer Development Team Flat-World IT Consulting Flat-World IT Consulting Needs Features Software Requirements Design
Define System Scope Flat-World IT Consulting Flat-World IT Consulting Scope Time Budget Resources
Establish Requirements Baseline Requirements Baseline The set of features that constitutes the  agreed upon  basis for development and that can only be changed through a formal procedure. Time Project Start Date Target Release Date Feature 1: The system must… Feature 2: The system must… Feature n: The system must… Flat-World IT Consulting Flat-World IT Consulting
Uses for Requirements Attributes Attributes link project elements Flat-World IT Consulting Flat-World IT Consulting Status Risk Priority Effort Cost Feature 10 Approved Low High High High Feature 13 Proposed Medium Low Low Medium Feature 40 Approved High High High Low
Use Cases: Iterative Approach Flat-World IT Consulting Flat-World IT Consulting Use Case A Use Case B Use Case B Use Case A Use Case B Use Case C [scenario 1: main flow] [scenario 2: main flow, alt flow] [scenario 1: main flow] [scenario 2: main flow, alt flow 1] [remaining scenarios and flows] [scenario 3: main flow, alt flow 2] [all scenarios and flows] Iteration n Iteration n + 1 Iteration n + 2
Use Case Prioritization Work use cases linked to features in the baseline scope. Select scenarios for architectural iterations based on flows that: Represent significant, central functionality. Have a substantial architectural coverage; (exercise many architectural elements/interfaces). Stress a specific, delicate point of the architecture. Have been identified as high risk. Prioritize scenarios for future iterations. Flat-World IT Consulting Flat-World IT Consulting Architect
Use Case Prioritization Consider the priority of stakeholder requests and features in the baseline scope. Select the scenarios for the iteration base on the flows that: Trace to high-priority stakeholder requests. Represent the main use of the system (80:20 rule). Are related to features that, once delivered, allow to receive an incremental payment. Provide a key differentiator to major competitor. Prioritize scenarios for future iterations. Flat-World IT Consulting Flat-World IT Consulting Analyst
Process Helps Manage Scope Single Channel for Approval Approved Decision Process Change Control Board (CCB) Flat-World IT Consulting Flat-World IT Consulting
Manage Expectations Why manage expectations? So customers understand why functionality is being deferred. Because people perceive things differently. Because things happen.  A new car! A new car! Flat-World IT Consulting Flat-World IT Consulting
How to Manage Expectations Understand customer expectations. Limit the expectations as appropriate. Clarify assumptions and limitations. Be honest. Don’t under-promise nor over-promise. Flat-World IT Consulting Flat-World IT Consulting
Negotiation Skills Start negotiation skills with high, but reasonable demands. Separate the people from the problem. Focus on interests, not positions. Understand your Best Alternative To A Negotiated Arrangement (BATNA). Invent options for mutual gain. Use diplomacy.  Flat-World IT Consulting Flat-World IT Consulting
The Product Champion Prevents projects from drifting into a technical or political abyss. Helps manage project scope. Owns the product vision. Advocates for the product. Defends against feature creep. Negotiates with management, users, and developers. Maintains a balance between customer needs and what can be delivered on time. Represents the official channel between the customer and the development team Flat-World IT Consulting Flat-World IT Consulting

More Related Content

PPTX
Requirements analysis 2011
PPT
PPT
Requirements elicitation
PPT
Requirement Analysis
PPTX
Requirements elicitation
PPTX
Requirements Elicitation Techniques
PPT
Role of system analyst
PPT
Feasible
Requirements analysis 2011
Requirements elicitation
Requirement Analysis
Requirements elicitation
Requirements Elicitation Techniques
Role of system analyst
Feasible

What's hot (19)

PPTX
Requirements elicitation techniques
PPTX
Introspection. Software Requirement Elicitation Technique
PPTX
2 understanding client support needs
PPTX
Requirements Elicitation
PDF
Software architecture for developers by Simon Brown
PDF
Software requirement elicitation
PPTX
Software Requirement Elicitation Techniques http://www.imran.xyz
PPTX
Ronan Consulting Group - Systems Selection and Implementation
PPTX
System Analyst
PPT
Roles responsibilities of system analyst
PPTX
Requirement Elicitation Techniques/Methods
PDF
Technology to decision analysis
PPSX
Requirement Elicitation
PPT
Week10 Analysing Client Requirements
DOC
Good Practices For Developing User Requirements
PDF
Requirement analysis with use case
PDF
Structured Analysis and Structured Design
PPT
System Design and Analysis 2
DOCX
Saurav Resume_V1.2
Requirements elicitation techniques
Introspection. Software Requirement Elicitation Technique
2 understanding client support needs
Requirements Elicitation
Software architecture for developers by Simon Brown
Software requirement elicitation
Software Requirement Elicitation Techniques http://www.imran.xyz
Ronan Consulting Group - Systems Selection and Implementation
System Analyst
Roles responsibilities of system analyst
Requirement Elicitation Techniques/Methods
Technology to decision analysis
Requirement Elicitation
Week10 Analysing Client Requirements
Good Practices For Developing User Requirements
Requirement analysis with use case
Structured Analysis and Structured Design
System Design and Analysis 2
Saurav Resume_V1.2
Ad

Viewers also liked (16)

PDF
Mastering the Project File
PDF
Mastering the Project File (AltConf)
PPT
Mastering Project Management
PPTX
Final major project pitch
PPT
Final major project mood boards
PPTX
New project specification and implementation
DOCX
Stages Handout
PDF
Webservices: connecting Joomla! with other programs.
PPTX
Project specification
PDF
Clarity ppm financials made easy
PPT
Project Mgmt Fundamentals
PDF
SAP PPM 6.0 powered by HANA
PDF
Guide to Project Portfolio Management
PPTX
Portfolio mangement
PPT
Introduction portfolio management
PPT
Fundamentals of Project Management
Mastering the Project File
Mastering the Project File (AltConf)
Mastering Project Management
Final major project pitch
Final major project mood boards
New project specification and implementation
Stages Handout
Webservices: connecting Joomla! with other programs.
Project specification
Clarity ppm financials made easy
Project Mgmt Fundamentals
SAP PPM 6.0 powered by HANA
Guide to Project Portfolio Management
Portfolio mangement
Introduction portfolio management
Fundamentals of Project Management
Ad

Similar to Requirements Management - Managing Scope (20)

PPT
Feasibility Analysis.ppt
PPSX
20181016 Agile DC 2018 Conf Kanban Case Study for Energy Company
PPT
Define and Manage Requirements with IBM Rational Requirements Composer
PDF
Adept Change Management_Panna Visani 2015_1
PPTX
Define phase lean six sigma tollgate template
DOCX
BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
PPT
How your very large databases can work in the cloud computing world?
PPT
Downloads abc 2006 presentation downloads-ramesh_babu
PDF
Get Smart About Technical Debt
PPTX
BABoK V2 Requirements Analysis (RA)
PPT
1 Billion Events per Day, Israel 3rd Java Technology Day, June 22, 2009
PPT
Extract The Traffic From The Db
PPT
Using periodic audits to prevent catastrophic project failure
PPTX
Improve phase lean six sigma tollgate template
PPTX
Improve phase lean six sigma tollgate template
PDF
Automated legacy portfolio assessment
PPT
Are You Ready To Upgrade: Readiness Considerations and Lessons Learned
PDF
A practice to perfect the big data solution
PDF
Solution Manual for Systems Analysis and Design, 7th Edition, Alan Dennis
PDF
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
Feasibility Analysis.ppt
20181016 Agile DC 2018 Conf Kanban Case Study for Energy Company
Define and Manage Requirements with IBM Rational Requirements Composer
Adept Change Management_Panna Visani 2015_1
Define phase lean six sigma tollgate template
BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
How your very large databases can work in the cloud computing world?
Downloads abc 2006 presentation downloads-ramesh_babu
Get Smart About Technical Debt
BABoK V2 Requirements Analysis (RA)
1 Billion Events per Day, Israel 3rd Java Technology Day, June 22, 2009
Extract The Traffic From The Db
Using periodic audits to prevent catastrophic project failure
Improve phase lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Automated legacy portfolio assessment
Are You Ready To Upgrade: Readiness Considerations and Lessons Learned
A practice to perfect the big data solution
Solution Manual for Systems Analysis and Design, 7th Edition, Alan Dennis
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...

Requirements Management - Managing Scope

  • 1. System Scope Management Mastering Requirements Management Flat-World IT Consulting By Christian D. Kobsa Senior Consultant Flat-World IT Consulting A Use-Case Based View
  • 2. Course Objective Describe steps to manage scope. Define system scope (resources, budget, time). Establish requirements baseline. Use attribute values to prioritize requirements. Prioritize use cases. List ways to manage expectations. Flat-World IT Consulting Flat-World IT Consulting
  • 3. Where Are We? Analyze the Problem Understand Stakeholder Needs Define the System Manage System Scope Refine System Definition Manage Requirements Change New System Existing System New Input Incorrect Problem Correct Problem Out of Scope In Scope Flat-World IT Consulting Flat-World IT Consulting
  • 4. Why Manage Scope? Purpose of scope management: Define input to the selection of requirements to be included in the current iteration. Define the set of features and user cases (and scenarios) that represent some significant central functionality. Define which attributes and traceability's to maintain. Flat-World IT Consulting Flat-World IT Consulting
  • 5. Scope Management Capture Problem System to build Test User Doc Problem Space Solution Space Traceability Customer Development Team Flat-World IT Consulting Flat-World IT Consulting Needs Features Software Requirements Design
  • 6. Define System Scope Flat-World IT Consulting Flat-World IT Consulting Scope Time Budget Resources
  • 7. Establish Requirements Baseline Requirements Baseline The set of features that constitutes the agreed upon basis for development and that can only be changed through a formal procedure. Time Project Start Date Target Release Date Feature 1: The system must… Feature 2: The system must… Feature n: The system must… Flat-World IT Consulting Flat-World IT Consulting
  • 8. Uses for Requirements Attributes Attributes link project elements Flat-World IT Consulting Flat-World IT Consulting Status Risk Priority Effort Cost Feature 10 Approved Low High High High Feature 13 Proposed Medium Low Low Medium Feature 40 Approved High High High Low
  • 9. Use Cases: Iterative Approach Flat-World IT Consulting Flat-World IT Consulting Use Case A Use Case B Use Case B Use Case A Use Case B Use Case C [scenario 1: main flow] [scenario 2: main flow, alt flow] [scenario 1: main flow] [scenario 2: main flow, alt flow 1] [remaining scenarios and flows] [scenario 3: main flow, alt flow 2] [all scenarios and flows] Iteration n Iteration n + 1 Iteration n + 2
  • 10. Use Case Prioritization Work use cases linked to features in the baseline scope. Select scenarios for architectural iterations based on flows that: Represent significant, central functionality. Have a substantial architectural coverage; (exercise many architectural elements/interfaces). Stress a specific, delicate point of the architecture. Have been identified as high risk. Prioritize scenarios for future iterations. Flat-World IT Consulting Flat-World IT Consulting Architect
  • 11. Use Case Prioritization Consider the priority of stakeholder requests and features in the baseline scope. Select the scenarios for the iteration base on the flows that: Trace to high-priority stakeholder requests. Represent the main use of the system (80:20 rule). Are related to features that, once delivered, allow to receive an incremental payment. Provide a key differentiator to major competitor. Prioritize scenarios for future iterations. Flat-World IT Consulting Flat-World IT Consulting Analyst
  • 12. Process Helps Manage Scope Single Channel for Approval Approved Decision Process Change Control Board (CCB) Flat-World IT Consulting Flat-World IT Consulting
  • 13. Manage Expectations Why manage expectations? So customers understand why functionality is being deferred. Because people perceive things differently. Because things happen. A new car! A new car! Flat-World IT Consulting Flat-World IT Consulting
  • 14. How to Manage Expectations Understand customer expectations. Limit the expectations as appropriate. Clarify assumptions and limitations. Be honest. Don’t under-promise nor over-promise. Flat-World IT Consulting Flat-World IT Consulting
  • 15. Negotiation Skills Start negotiation skills with high, but reasonable demands. Separate the people from the problem. Focus on interests, not positions. Understand your Best Alternative To A Negotiated Arrangement (BATNA). Invent options for mutual gain. Use diplomacy. Flat-World IT Consulting Flat-World IT Consulting
  • 16. The Product Champion Prevents projects from drifting into a technical or political abyss. Helps manage project scope. Owns the product vision. Advocates for the product. Defends against feature creep. Negotiates with management, users, and developers. Maintains a balance between customer needs and what can be delivered on time. Represents the official channel between the customer and the development team Flat-World IT Consulting Flat-World IT Consulting

Editor's Notes

  • #3: Scope management means setting boundaries for each iteration. This maintains a “healthy tension” between what the customer wants (maximum number of features) and what development can deliver within a fixed timeframe. This is best done through iterative development. It allows to reassess priorities at the end of each iteration.
  • #4: Here the focus is on setting the baseline scope for the system under development. The best time to decide on the features is AFTER the system is defined, but BEFORE much time is invested into refining details. Beware of wasting time refining systems parts outside the scope of the current system under development. NOTE that this diagram shows only ONE iteration of the process, NOT the entire requirements management lifecycle.
  • #5: Project scope should be managed continuously. However it is easier to make educated decisions AFTER actors, use cases, supplementary specifications are identified. The system analyst applies customer priority, effort, cost, risk values, and other requirements attributes to more accurately rank development priorities. This allows to identify architecturally significant use cases. The iteration plan is developed in parallel by the project manager. It defines the number and frequency of iterations planned for the release. The scope of the project defined in Managing Scope has significant impact on the Iteration Plan . That is because the highest risk elements within scope are planned for early iterations. Other important output from Managing Scope is: Revised vision document. This is necessary, because the system’s analyst and key stakeholder’s understanding of the system functionality and project resources has been refined.
  • #6: In order to properly manage scope it is essential that the development team has agreement from the customer regarding the baseline set of features to develop. This is best accomplished through iterative development; developing and delivering slices of the pie. At the end of each iteration, priorities can be reassessed. To avoid scope creep but allow change, consider the following: Real requirements: identify what is really needed from the business objective. Minimum requirements: make it a conscious effort to develop the minimum set of requirements; no “gold plating”! Record all requirements; identify them by source. Have an agreed upon negotiation and sanctioning process. All requirements must come through a well-defined channel; no ambiguous sources…. Manage expectation and communicate with the customer about what will be in each iteration.  uncover hidden requirements assumed by the domain experienced customer.
  • #7: How do you take a fixed amount of resources and choose the best value to produce for the customer? The scope of a project is defined by the set of requirements allocated to it. Managing project scope to fit the available resources (time, people, and money) is key to managing successful projects. NOTE that managing scope is an continuous activity . It requires iterative (incremental) development. This breaks project scope into smaller , more manageable pieces .
  • #8: How do we know what the needs are? How do we determine priority? How do we reach agreement on what features should be included in the project? Where do we set the baseline commitment for delivery? The key is to under-promise and over-deliver; but not to much! We want to maintain our credibility!!! What stakeholder needs do the features represent? What factors influence the order in which features should be ranked?
  • #9: Once the baseline scope list of features is set, the features have to be allocated to iterations so they can be implemented in a manner that removes project risk, delivering important functionality as early as possible. Attributes play a key role in the decision making process. Requirements attributes are the link between requirements and other project elements. “Status” provides the current status of each requirement; “effort” estimates the work involved to do each requirement, etc. The uses for requirements attributes are: Managing project scope Assigning resources Scheduling Assessing status Calculating software metrics Managing project risk Estimating cost Assuring user safety Attributes can be specified for all types of requirements: needs, features, use cases, supplementary requirements. The attributes to collect at each level are based on what information is needed for management reports and other users.
  • #10: When detailing flows in an iteration, detail them so that each flow forms part of a complete story (scenario) that can be implemented and tested . Hence, based on selected scenarios for a given iteration, elaborate the flows that are part of specific scenarios. These are then used for implementation and testing. A given use case is typically NOT completely written and implemented in a single iteration. Rather, each iteration focuses on a subset of the use case scenarios . The scope of the iteration is driven by the following factors: The top risks to the project The functionality required of the system The time allocated to the iteration The phase and its specific objectives The more architecturally important scenarios get addressed in the early iterations.
  • #11: It is very important to establish a sound architecture in the early iterations. This provides a solid foundation for the rest of the project. That is why, use-case scenarios of architectural importance are done first. How is architectural importance determined? Look for flows that describe the most architecturally significant functionality and map those flows to one or more scenarios. Those use case scenarios are assigned to the first architectural iteration. As the project moves from phase to phase (Inception, Elaboration, Construction, Transition) the criteria for prioritizing use cases changes. During Elaboration select use cases or scenarios to mitigate the technical aspects as quickly as possible. During Construction select use cases or scenarios to deliver essential functionality before non-essential functionality (80:20 rule).
  • #12: Prioritize use cases (or scenarios) based on high priority features that trace to different flows. Get the 20 percent of functionality that solves 80 percent of the stakeholders needs, and implement these as soon as possible. By definition, these 20 percent are usually the highest priority requirements. NOTE: system analyst are not concerned with the technicalities of implementing a use case. That is the concern of the architect.
  • #13: To successfully manage scope, an effective change management process MUST be in place. During the software development life cycle, request are received. They MUST be intercepted and MUST pass through a single approval process. If not, there will be scope creep and chaos!!! Through interception and a single approval process requests can be assessed according to criteria such as: origin, customer priority, support of business goals, schedule impact, etc. NOTE that if there is a CCB it should have representatives from each of the relevant groups.
  • #14: One of the keys to have a happy customer at delivery time, is to manage his expectations of what he will receive.
  • #15: Communication is VERY important! Make sure there are no surprises. Keep the possibilities open.
  • #16: Negotiation skills are key to any successful, multi-party program. It is a professional activity and skill that everyone should strive to improve upon. See “Getting to Yes” by Fisher and Ury. The concept of BATNA looks at the consequences of NOT getting to an agreement. How important is that? What if the customer cancels the project? This provides a bottom line to work from. The key is to focus on the interests of all involved and attempt to come up with creative options that satisfy both sides.
  • #17: This is a very important – often intangible – aspect of having an successful project. Most often it’s not a job title, but a role played by a key individual. Based on research by the Standish Group a staunch product champion, with a solid business vision, often prevents a project from drifting into a technical and/or political abyss. Ask yourself whether you want the product champion on the technical side or the customer side?