Panelists and Moderator

              PM Challenge 2009 – “Making Risk Manageable” Panel

Nick Chrissotimos, NASA Goddard Space Flight Center
Mr. Chrissotimos has 26 years of project/program management experience at the Goddard Space
Flight Center (GSFC). He is currently the Associate Director of Flight Projects for Explorers and
Heliophysics where he is the Program Manager for Explorers, Living with a Star and Solar
Terrestrial Probes.

Joe Fuller, Futron Corporation
Joseph Fuller, Jr. is the founder and President of Futron Corporation. He spent the first 20 years
of his career at the National Aeronautics and Space Administration (NASA) as an aerospace
systems engineer, project manager, and senior executive. He is experienced in the design,
development, and operations of human-piloted and robotics spacecraft, and serves as an expert
advisor on independent space studies and working groups.

Richard Grou, Canadian Space Agency
Graduated from Ecole Polytechnique de Montréal, Richard Grou holds a B.A. Sc in Mechanical
Engineering and is also certified Engineer and Project Management Professional. In 1980, he
joined the Public Service of Canada. He started at the Agency in 2001 where he first held the
position of Project Manager for the implementation of the CSA Project Management Framework
(PAMF). He is currently working at the corporate level of the Canadian Space Agency as a Risk and
Program Assurance Manager within the Safety & Program Assurance Directorate.

Mike McGrath, University of Colorado
Mr. McGrath is the Engineering Director at the Laboratory for Atmospheric and Space Physics
(LASP) at the University of Colorado at Boulder and most recently participated in NASA’s
Aeronomy of Ice in the Mesosphere SMEX Mission as Project Manager. His experience extends
back to the Pioneer Venus mission, and includes NASA’s Voyager, SME, Cassini, TIMED, SNOE and
SORCE missions. He teaches spacecraft design as a Professor Adjunct in Aerospace Engineering,
and is an instructor in CU’s Integrated Teaching and Learning Laboratory.

John Turner, NASA Johnson Space Center
John V. Turner, PhD, has over twenty-three years experience in human space-flight applications,
including: mission operations, engineering development, systems engineering, project management,
risk assessment, and risk management. As a private consultant he has provided risk assessment and
management expertise in the oil and gas, defense acquisition, and airport security applications. He
currently serves as the Risk Manager and Risk Assessment lead for the Constellation human
spaceflight exploration program.

Moderator: Peter J. Rutledge, Ph.D., Quality Assurance & Risk Management Services, Inc.
Currently working as a consultant, Dr. Rutledge retired from the Office of Safety and Mission
Assurance at NASA Headquarters in 2004, after 33 years of Federal service. His last position in
NASA was that of Director, Enterprise Safety and Mission Assurance Division. His entire career
has been in the safety, reliability, and risk fields.
NOTES
Nick Chrissotimos, NASA Goddard Space Flight Center

Risk Management from a Project Manager’s Perspective

•   Project Management is Risk Management (experience, lessons learned, intuition, decision
    making).

•   Use of a Risk Management tool has become essential; understand it but let someone else run it
    and do not let it manage you.

•   Lead System Engineer runs your Risk Management Board (they are not data entry clerks).

•   Understand and track most important risks as the PM (you cannot reasonably manage more
    than 10-20).

•   Know and actively manage your top ten risks (Yellow and Red); know when to accept a risk.

•   SE must keep you aware of which ones are bubbling up (Yellow and Red).

•   Know your risk windows for exposure, separate from mitigation: a risk timeline. Budget profile
    has to be correlated with the risk timeline for effective leveling.

•   Decisions on which risks to mitigate and spend reserve on need to be weighed across all other
    risks and programmatics (preserves precious resources).

•   Always have “plan B” options for mitigating your top ten risks.

•   Make clear to the Risk Management Board the projects, programs, and Center management’s
    5x5 matrix definitions and risk reporting expectations.

•   Know your Residual (accepted) and Single Point Failure risks and make your management aware
    of these.

•   Understand and use your test program as the best risk mitigation when it is appropriate (it is
    already costed).

•   Tracking Risks at the Program Level should be a subset of the Top Ten risks of the projects
    within the program.

•   At the Program level a risk that can never be retired may not make sense to track (most of
    those are usually out of the program’s and projects’ control); you usually watch but you cannot
    do anything about them. You should have already been aware of those (i.e., Budget, LV
    availability, and inflation).
NOTES
Joe Fuller, Futron Corporation

Recent Trends in Risk Management Sophistication

The capability of organizations to perform risk management is growing and becoming more
sophisticated.

   •   2002 MSFC Risk Management Assessment indicated projects operating at maturity Level 2;
       Ares Project assessment in 2007 indicated almost Level 4.

   •   Exploration Technology Development Project (ETDP) combining risk and opportunity
       management represents an increase in sophistication.

   •   Greater use of quantitative risk assessment (PRA, Cost-Schedule Risk Assessment, Dynamic
       Modeling and Simulation).

   •   New NPR 8000.4A calling for integration of CRM and decision-making, including institutional
       risk management.

Enterprise Risk Management (ERM), or Institutional Risk Management (NPR 8000.4A), will
represent a cultural change and the next level of sophistication. Implementing ERM engages and
aligns the workforce to ensure more strategic, comprehensive, and effective risk management.
NOTES
Richard Grou, Canadian Space Agency

The Canadian Space Agency is committed to Integrated Risk Management into all decision making
processes. This requirement is from Treasury Board Canada, the entity that provides oversight of
the Management Function of all Canadian Government Departments and Agencies. Integrated Risk
Management is one Key element of the Management Accountability Framework that sets out the
expectation of Senior Managers for good public service management.

Integrated Risk Management (IRM) is a continuous, proactive, and systematic process to
understand, manage, and communicate risk from an organization-wide perspective. It is about
making strategic decisions that contribute to the achievement of an organization's overall
corporate objectives.

In implementing IRM, CSA is adopting an holistic approach to managing risk and addressing the
following elements:
- CSA Corporate Risk Profile
- Establishing an Integrated Risk Management function
- Incorporation of Risk-Management into Existing Decision-making & Reporting
- Practicing Integrated Risk Management
- Ensuring Continuous Risk Management Learning

A   few Tips:
-    Communicate early and often
-    Base all discussions on fact
-    Credibility and trust take a long time to develop but can be destroyed in an instant
NOTES
Mike McGrath, University of Colorado

•   Project managers continue to seek out new techniques to gain an edge in the
    design/development process. Risk management on projects has been observed to provide a high
    quality return for minimum investment of training time and supporting infrastructure, and is
    proving to be effective in all phases of a project.

•   A formal risk management process is inclusive of the team working on a project, enabling
    focused, supportive discussion through the use of a concise language and a quantitative
    evaluation scale. When used as part of a project management approach, risk management
    supports project-wide participation that encourages discussion and review by the entire project
    team -- irrespective of role or responsibility of the participant.

•   By design, the risk management process is a positive, supporting process, and when structured
    appropriately, risk management encourages information to be revealed, processed, and
    evaluated, accompanied by a logical follow-up process.

•   Risk management is particularly effective in supporting resource shifting in the early phases of
    a project where TRL levels are being advanced, assuming that the appropriate team structure is
    in place, and that a resilient schedule management approach is being used.

•   A risk management process can be tailored to the project scope, and because of the way it
    seamlessly integrates with the design/development process, it scales well with increasing levels
    of project size and complexity.
NOTES
John Turner, NASA Johnson Space Center
•   The RM program must evolve as it progresses from early development through design verification to
    acceptance, operations, and retirement.
        o Examples of Development Issues: Design and verification, setting achievable requirements,
            selecting preliminary architectures, understanding environments and operations, verifying
            achievement of requirements, optimizing risk versus other design commodities and cost, setting
            operational safety baseline, characterizing transition risks.
        o Examples of Operations Issues: Burning down accepted risk baseline, managing new risks as they
            come up, aging, unforeseen system interactions or environmental threats, changes in performance
            or mission goals, retirement issues.
•   RM practice has been fairly schizophrenic over the past 20-30 years. We see major differences between
    what people say about RM in books and at conferences and what we see in practice on programs and
    projects.
•   There is often little formal connection between critical design or operations oriented analyses and risk.
    We should use integrated simulation and modeling techniques early to surface risks and enable action to
    manage them.
•   The way that we understand RM has evolved continuously. Most recently, the agency has been using the
    term Risk-Informed Decision-Making, or RIDM.
        o RIDM Moves beyond managing “risks,” to understanding the risk implications of significant
            decisions.
        o Requires processes to ensure risks are understood and considered in all critical decision-making
            applications.
•   The CxP is working to establish he formal processes and linkages that support RIDM. We have some of
    these pieces in place and are developing others.
        o Significant obstacles to progress:
                 Projects started first. Struggle between the lowest level or “the prime knows best” and
                    doing things consistently across primes.
                        • Everything is a cost, whether it is an addition or deletion, when the prime or govE
                            project does not wish to do it.
                 Parochialism
                 Unrealistic budget restrictions

                                    Risk Informed Decision Making (RIDM)
                                         Knowledge         • KBRs
                                         Management        • PAL
                                                           • Knowledge Capture
                                                                                        Systems
                                                                                       Engineering
                                                                                      • Requirements and TPM
                                 ATP MMRs                     Ops/Test                  Achievability
                                                                                      • Analysis priorities
                                                           • Test Objectives          • Iterative Design and
                                 • Risks Reviewed at                                    Analysis
                                   Authority to Proceed    • Readiness Reviews
                                 • C/S/T Baseline          • Real Time
                                   Decisions                                               Systems Safety

                                                                  Boards/Panels             • Systematic Analysis
                                                                                            • Formal Risk Acceptance
                                                                                            • Establish Operational Safety
                                        Continuous Risk              • Managing risk          Baseline (OSB)
                                                                       through change
                          IRMA         Management (CRM)
                                                                                      Probabilistic Design
                                             • Standards for risk characterization
                                             • CLAS for risks                            and Analysis
                                             • Risk Communication and Reporting      • Standards of Practice
                                               Process                               • LOC LOM Reqts
                                             • Prioritization of risk mitigation     • Integrated Campaign,
                                               proposals                               Architecture, System,
                                                                                       Element Analysis
                       Page 10                        Dynamic Information Linkages
                                                                 NASA CxP                                 John V. Turner, PMC 2009

More Related Content

PDF
Project management roundtable summary final
PPTX
Horn thomas
PPTX
Newman.steve
PPTX
John marinaro pm_process
PDF
Project risk management
PPTX
Sally godfreyheatherrarick
PPT
Hr Management
PDF
Introduction to risk management
Project management roundtable summary final
Horn thomas
Newman.steve
John marinaro pm_process
Project risk management
Sally godfreyheatherrarick
Hr Management
Introduction to risk management

What's hot (20)

PPT
Cassidy.jim
PPTX
Strategies for successful engineering management
PDF
Duncan.william
PPTX
Lou wheatcraft
PDF
Hyatt.mark
PPTX
Project Risk Management
PDF
8. project risk management
PPT
Introduction to-project-management-dabc
PDF
Project Risk Management
PDF
Project mangement chp 1 12
PPTX
Project management for engineers and architects
PPTX
PMP PMBOK 5th Ch 11 Project Risk Management
PDF
Law.richard
PDF
Terry.conroy
PPTX
Amer.tahani
PPT
Barley newhouse
PPTX
Borchardt.heidemarie
PDF
11 project risk management
PDF
K.pagel.beene
PDF
09 project human resources management pmbok 5th
Cassidy.jim
Strategies for successful engineering management
Duncan.william
Lou wheatcraft
Hyatt.mark
Project Risk Management
8. project risk management
Introduction to-project-management-dabc
Project Risk Management
Project mangement chp 1 12
Project management for engineers and architects
PMP PMBOK 5th Ch 11 Project Risk Management
Law.richard
Terry.conroy
Amer.tahani
Barley newhouse
Borchardt.heidemarie
11 project risk management
K.pagel.beene
09 project human resources management pmbok 5th
Ad

Viewers also liked (20)

PDF
Lou.wheatcraft
PDF
Sandra.smalley
PPT
Stambolianv2
PPTX
Augustin.debbie
PDF
Paradis william
PDF
Stock gahm
PDF
O'keefe william
PDF
Rudolphi mike
PDF
Smalley sandra
PDF
Vellinga joe
PDF
Osterkamp jeff
PDF
Seftas krage
PDF
Baniszewski john
PDF
Sampietro marco
PDF
Wood frank
PDF
Trahan stuart
PDF
Wessen randi (cd)
PDF
Yew manson
PDF
Snow lee
PDF
Rackley mike
Lou.wheatcraft
Sandra.smalley
Stambolianv2
Augustin.debbie
Paradis william
Stock gahm
O'keefe william
Rudolphi mike
Smalley sandra
Vellinga joe
Osterkamp jeff
Seftas krage
Baniszewski john
Sampietro marco
Wood frank
Trahan stuart
Wessen randi (cd)
Yew manson
Snow lee
Rackley mike
Ad

Similar to Risk.panel handout (20)

PDF
Cynthia.calhoun
PPTX
S thomas sfield
PDF
Dezfuli youngblood
PPT
9. Risk.ppt
PPT
9. Risk.ppt
PPT
project managment.ppt
PPT
PPT
9. Risk.ppt
PPT
project risk management project risk management
PPT
9. Risk.ppt
PPT
9. Risk.ppt
PPT
9. Risk.ppt
PDF
Ashley.edwards
PDF
Software Project Risks Management (1).pdf
PPTX
Software risk, Configuration Management and QA (1).pptx
PPT
Project risk management
PPTX
Mykhailo Hryhorash: Управління ризиками та змінами (UA)
PPT
PDF
IT Risk managment combined
PDF
Homayoon.dezfuli
Cynthia.calhoun
S thomas sfield
Dezfuli youngblood
9. Risk.ppt
9. Risk.ppt
project managment.ppt
9. Risk.ppt
project risk management project risk management
9. Risk.ppt
9. Risk.ppt
9. Risk.ppt
Ashley.edwards
Software Project Risks Management (1).pdf
Software risk, Configuration Management and QA (1).pptx
Project risk management
Mykhailo Hryhorash: Управління ризиками та змінами (UA)
IT Risk managment combined
Homayoon.dezfuli

More from NASAPMC (14)

PDF
Bejmuk bo
PDF
Wood frank
PDF
Roberts karlene
PDF
Muller ralf
PDF
Mulenburg jerry
PDF
Mitskevich amanda
PDF
Martt anne
PDF
Manzer fred
PDF
Manthos jeff
PDF
Lengyel dave
PDF
Krahula john
PDF
Kroeger lin
PDF
Krage jousha
PDF
Kotnour tim
Bejmuk bo
Wood frank
Roberts karlene
Muller ralf
Mulenburg jerry
Mitskevich amanda
Martt anne
Manzer fred
Manthos jeff
Lengyel dave
Krahula john
Kroeger lin
Krage jousha
Kotnour tim

Recently uploaded (20)

PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PPT
Teaching material agriculture food technology
PPTX
A Presentation on Artificial Intelligence
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPTX
Cloud computing and distributed systems.
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
PDF
Machine learning based COVID-19 study performance prediction
PDF
KodekX | Application Modernization Development
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PDF
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
Dropbox Q2 2025 Financial Results & Investor Presentation
Teaching material agriculture food technology
A Presentation on Artificial Intelligence
Reach Out and Touch Someone: Haptics and Empathic Computing
MYSQL Presentation for SQL database connectivity
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Diabetes mellitus diagnosis method based random forest with bat algorithm
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Cloud computing and distributed systems.
Spectral efficient network and resource selection model in 5G networks
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
Machine learning based COVID-19 study performance prediction
KodekX | Application Modernization Development
Mobile App Security Testing_ A Comprehensive Guide.pdf
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
20250228 LYD VKU AI Blended-Learning.pptx

Risk.panel handout

  • 1. Panelists and Moderator PM Challenge 2009 – “Making Risk Manageable” Panel Nick Chrissotimos, NASA Goddard Space Flight Center Mr. Chrissotimos has 26 years of project/program management experience at the Goddard Space Flight Center (GSFC). He is currently the Associate Director of Flight Projects for Explorers and Heliophysics where he is the Program Manager for Explorers, Living with a Star and Solar Terrestrial Probes. Joe Fuller, Futron Corporation Joseph Fuller, Jr. is the founder and President of Futron Corporation. He spent the first 20 years of his career at the National Aeronautics and Space Administration (NASA) as an aerospace systems engineer, project manager, and senior executive. He is experienced in the design, development, and operations of human-piloted and robotics spacecraft, and serves as an expert advisor on independent space studies and working groups. Richard Grou, Canadian Space Agency Graduated from Ecole Polytechnique de Montréal, Richard Grou holds a B.A. Sc in Mechanical Engineering and is also certified Engineer and Project Management Professional. In 1980, he joined the Public Service of Canada. He started at the Agency in 2001 where he first held the position of Project Manager for the implementation of the CSA Project Management Framework (PAMF). He is currently working at the corporate level of the Canadian Space Agency as a Risk and Program Assurance Manager within the Safety & Program Assurance Directorate. Mike McGrath, University of Colorado Mr. McGrath is the Engineering Director at the Laboratory for Atmospheric and Space Physics (LASP) at the University of Colorado at Boulder and most recently participated in NASA’s Aeronomy of Ice in the Mesosphere SMEX Mission as Project Manager. His experience extends back to the Pioneer Venus mission, and includes NASA’s Voyager, SME, Cassini, TIMED, SNOE and SORCE missions. He teaches spacecraft design as a Professor Adjunct in Aerospace Engineering, and is an instructor in CU’s Integrated Teaching and Learning Laboratory. John Turner, NASA Johnson Space Center John V. Turner, PhD, has over twenty-three years experience in human space-flight applications, including: mission operations, engineering development, systems engineering, project management, risk assessment, and risk management. As a private consultant he has provided risk assessment and management expertise in the oil and gas, defense acquisition, and airport security applications. He currently serves as the Risk Manager and Risk Assessment lead for the Constellation human spaceflight exploration program. Moderator: Peter J. Rutledge, Ph.D., Quality Assurance & Risk Management Services, Inc. Currently working as a consultant, Dr. Rutledge retired from the Office of Safety and Mission Assurance at NASA Headquarters in 2004, after 33 years of Federal service. His last position in NASA was that of Director, Enterprise Safety and Mission Assurance Division. His entire career has been in the safety, reliability, and risk fields.
  • 2. NOTES Nick Chrissotimos, NASA Goddard Space Flight Center Risk Management from a Project Manager’s Perspective • Project Management is Risk Management (experience, lessons learned, intuition, decision making). • Use of a Risk Management tool has become essential; understand it but let someone else run it and do not let it manage you. • Lead System Engineer runs your Risk Management Board (they are not data entry clerks). • Understand and track most important risks as the PM (you cannot reasonably manage more than 10-20). • Know and actively manage your top ten risks (Yellow and Red); know when to accept a risk. • SE must keep you aware of which ones are bubbling up (Yellow and Red). • Know your risk windows for exposure, separate from mitigation: a risk timeline. Budget profile has to be correlated with the risk timeline for effective leveling. • Decisions on which risks to mitigate and spend reserve on need to be weighed across all other risks and programmatics (preserves precious resources). • Always have “plan B” options for mitigating your top ten risks. • Make clear to the Risk Management Board the projects, programs, and Center management’s 5x5 matrix definitions and risk reporting expectations. • Know your Residual (accepted) and Single Point Failure risks and make your management aware of these. • Understand and use your test program as the best risk mitigation when it is appropriate (it is already costed). • Tracking Risks at the Program Level should be a subset of the Top Ten risks of the projects within the program. • At the Program level a risk that can never be retired may not make sense to track (most of those are usually out of the program’s and projects’ control); you usually watch but you cannot do anything about them. You should have already been aware of those (i.e., Budget, LV availability, and inflation).
  • 3. NOTES Joe Fuller, Futron Corporation Recent Trends in Risk Management Sophistication The capability of organizations to perform risk management is growing and becoming more sophisticated. • 2002 MSFC Risk Management Assessment indicated projects operating at maturity Level 2; Ares Project assessment in 2007 indicated almost Level 4. • Exploration Technology Development Project (ETDP) combining risk and opportunity management represents an increase in sophistication. • Greater use of quantitative risk assessment (PRA, Cost-Schedule Risk Assessment, Dynamic Modeling and Simulation). • New NPR 8000.4A calling for integration of CRM and decision-making, including institutional risk management. Enterprise Risk Management (ERM), or Institutional Risk Management (NPR 8000.4A), will represent a cultural change and the next level of sophistication. Implementing ERM engages and aligns the workforce to ensure more strategic, comprehensive, and effective risk management.
  • 4. NOTES Richard Grou, Canadian Space Agency The Canadian Space Agency is committed to Integrated Risk Management into all decision making processes. This requirement is from Treasury Board Canada, the entity that provides oversight of the Management Function of all Canadian Government Departments and Agencies. Integrated Risk Management is one Key element of the Management Accountability Framework that sets out the expectation of Senior Managers for good public service management. Integrated Risk Management (IRM) is a continuous, proactive, and systematic process to understand, manage, and communicate risk from an organization-wide perspective. It is about making strategic decisions that contribute to the achievement of an organization's overall corporate objectives. In implementing IRM, CSA is adopting an holistic approach to managing risk and addressing the following elements: - CSA Corporate Risk Profile - Establishing an Integrated Risk Management function - Incorporation of Risk-Management into Existing Decision-making & Reporting - Practicing Integrated Risk Management - Ensuring Continuous Risk Management Learning A few Tips: - Communicate early and often - Base all discussions on fact - Credibility and trust take a long time to develop but can be destroyed in an instant
  • 5. NOTES Mike McGrath, University of Colorado • Project managers continue to seek out new techniques to gain an edge in the design/development process. Risk management on projects has been observed to provide a high quality return for minimum investment of training time and supporting infrastructure, and is proving to be effective in all phases of a project. • A formal risk management process is inclusive of the team working on a project, enabling focused, supportive discussion through the use of a concise language and a quantitative evaluation scale. When used as part of a project management approach, risk management supports project-wide participation that encourages discussion and review by the entire project team -- irrespective of role or responsibility of the participant. • By design, the risk management process is a positive, supporting process, and when structured appropriately, risk management encourages information to be revealed, processed, and evaluated, accompanied by a logical follow-up process. • Risk management is particularly effective in supporting resource shifting in the early phases of a project where TRL levels are being advanced, assuming that the appropriate team structure is in place, and that a resilient schedule management approach is being used. • A risk management process can be tailored to the project scope, and because of the way it seamlessly integrates with the design/development process, it scales well with increasing levels of project size and complexity.
  • 6. NOTES John Turner, NASA Johnson Space Center • The RM program must evolve as it progresses from early development through design verification to acceptance, operations, and retirement. o Examples of Development Issues: Design and verification, setting achievable requirements, selecting preliminary architectures, understanding environments and operations, verifying achievement of requirements, optimizing risk versus other design commodities and cost, setting operational safety baseline, characterizing transition risks. o Examples of Operations Issues: Burning down accepted risk baseline, managing new risks as they come up, aging, unforeseen system interactions or environmental threats, changes in performance or mission goals, retirement issues. • RM practice has been fairly schizophrenic over the past 20-30 years. We see major differences between what people say about RM in books and at conferences and what we see in practice on programs and projects. • There is often little formal connection between critical design or operations oriented analyses and risk. We should use integrated simulation and modeling techniques early to surface risks and enable action to manage them. • The way that we understand RM has evolved continuously. Most recently, the agency has been using the term Risk-Informed Decision-Making, or RIDM. o RIDM Moves beyond managing “risks,” to understanding the risk implications of significant decisions. o Requires processes to ensure risks are understood and considered in all critical decision-making applications. • The CxP is working to establish he formal processes and linkages that support RIDM. We have some of these pieces in place and are developing others. o Significant obstacles to progress:  Projects started first. Struggle between the lowest level or “the prime knows best” and doing things consistently across primes. • Everything is a cost, whether it is an addition or deletion, when the prime or govE project does not wish to do it.  Parochialism  Unrealistic budget restrictions Risk Informed Decision Making (RIDM) Knowledge • KBRs Management • PAL • Knowledge Capture Systems Engineering • Requirements and TPM ATP MMRs Ops/Test Achievability • Analysis priorities • Test Objectives • Iterative Design and • Risks Reviewed at Analysis Authority to Proceed • Readiness Reviews • C/S/T Baseline • Real Time Decisions Systems Safety Boards/Panels • Systematic Analysis • Formal Risk Acceptance • Establish Operational Safety Continuous Risk • Managing risk Baseline (OSB) through change IRMA Management (CRM) Probabilistic Design • Standards for risk characterization • CLAS for risks and Analysis • Risk Communication and Reporting • Standards of Practice Process • LOC LOM Reqts • Prioritization of risk mitigation • Integrated Campaign, proposals Architecture, System, Element Analysis Page 10 Dynamic Information Linkages NASA CxP John V. Turner, PMC 2009