INTRODUCTION
The Ro-Ro facility was build with the intention to improve the
connectivity between Vallarpadam (ICTT) and Willingdon Island. The
Cochin Port Trust jointly with IWAI had formed a joint management
committee (JMC) for the purpose. LOTS shipping, a Cochin-based
shipping company had won the 10 year contract for ferrying the
containers between Willingdon Island and Vallarpadam by Roll on-Roll
off (RO-RO) and Lift On-Lift Off (LO-LO) modes. The time for
transporting container trucks by RO-RO mode was expected to be 20-25
min. The service enables the movement of containers preventing hundreds
of trucks from the crowding the Cochin roads and has reduced
transportation distance of 38 Km to 2.5Km
“Even though the Ro-Ro provides a window for easier and speedy
movement of container especially from the south of Kerala towards
ICTT Vallarpadam this facility is not being optimally utilized as a
result the actual estimated container moves of 750 containers per
day has fallen down to a maximum of 150 containers per day
therefore the service is suffering from continuous losses”
RESEARCH ISSUESRESEARCH ISSUES
1. Why the Ro-Ro service is unable to perform to its optimal level and
why is it incurring so much of loss in spite of its immense potential?
2. Why is the Ro-Ro service unable to get the expected amount of
cargo for its optimal functioning?
3. Why is the Ro-Ro service incapable of rendering continuous
service and also unable to stick on to their scheduled service time?
OBJECTIVESOBJECTIVES
1.To understand the reason for the incapability of Ro-Ro service in
rendering continuous service?
2.To understand the reasons why the service is not following a strict
time schedule?
3.To identify the reason why is the Ro-Ro service unable to get the
expected amount of cargo for its optimal functioning?
4.To recognize the reasons why the Ro-Ro service is unable to
perform to its optimal level and why is it incurring so much of loss
in spite of its immense potential?
5. To offer suggestions for improvement in the performance of the
service
METHODOLOGYMETHODOLOGY
In order to measure the performance of Ro-Ro service in Cochin Port Trust the
stratified disproportionate random sampling method has been adopted.
At the first level major stake holders of Ro-Ro have been grouped under two
sections namely
1.The service providers
2.Service users
At the second level Ro-Ro operators and Cochin Port Trust are considered as
service providers the truck operators, drivers and freight forwarders are
considered as the major users of Ro-Ro.
Cont…..Cont…..
At the third level in each category 5-15 samples have been surveyed with
help of pre-tested structured interview schedule.
For the purpose of comparison of the monthly performances and the
overall performance of the Ro-Ro service with the expected performance,
secondary data of the Ro-Ro operation and cargo movement have been
collected and analyzed.
SAMPLES SELECTEDSAMPLES SELECTED
SL.NO DEAILS
1 USERS TRUCK OPERATORS 5
TRUCK DRIVERS 10
FREIGHT
FORWARDERS
10
2 SERVICE
PROVIDERS
PORT EMPLOYEES 15
RO-RO EMPLOYEES 5
TOTAL 45
THE RESULT AND DISCUSSION
OF THE STUDY
Cargo handled in Ro-Ro fromCargo handled in Ro-Ro from 23rd
February 2011 to 30th
April
2015
SL.NO TYPE OF CONTAINER NUMBER OF TEU’S
LOADED CONTAINER
1 20 FOOT 64,532
2 40 FOOT 36,253
EMPTY CONTAINER
3 20 FOOT 15,688
4 40 FOOT 12,364
TOTAL 1,28,837
THE CURRENT RO-RO SCENARIOTHE CURRENT RO-RO SCENARIO
Total number of days =1528 days
Total no of working day =1239 days (Excluding Sundays and
customs .
holidays)
Expected or predicted container movement per day = 750 TEU’s
Expected total movement for 1239 days = 9, 29,250 TEU’s (approx.)
Actual movement for 1239 days = 1, 28,837 TEU’s
Therefore average movement per day = Less than 150 TEU’s
SUGGESTIONS PUT FORWARD BY THE SAMPLES TOSUGGESTIONS PUT FORWARD BY THE SAMPLES TO
IMPROVE THE PERFORMANCE OF THE RO-RO SERVICEIMPROVE THE PERFORMANCE OF THE RO-RO SERVICE
1.To improve the quality of the service
i. 62.22% of the population suggested to take measures reduce the
waiting time.
ii. 20% had suggested about increasing by introducing user friendly
services.
iii. 17.77 % of the samples suggested to offer customer oriented
services to improve the overall performance.
Cont…..Cont…..
2.To improve the reliability
i. 37.77% of the population suggested that reliability can be attained
by following a strict time schedule.
ii. Another 37.77% suggested that reliability can be attained by
offering un interrupted services
iii. Remaining 24.44%suggested both above mentioned aspects need
to be incorporated together in order to offer a reliable service.
Cont…..Cont…..
3. For infrastructural development
i. 42.22% suggested to improve the overall infrastructure by modifying or
changing the existing Ro-Ro vessel or by introducing an additional Ro-Ro
vessel.
ii. 4.44% suggested on performance improvement by recruiting trained
employees for the service.
iii. 35.55% believes that technological up gradation can bring about
efficiency and development in the service.
iv. 17.77% suggests all the three above mentioned aspects must be
inculcated together for the best performance .
FINDINGS AND CONCLUSIONS
ADVANTAGES OF USING RO-RO SERVICEADVANTAGES OF USING RO-RO SERVICE
i. Cost efficient and speedier movement
ii. Pollution Reduction
iii. Reducing Traffic Congestion
iv. Enables Eco-friendly transportation
v. Reduction of operation and maintenance cost
vi. Safer mode of transport
REASON FOR THE REDUCTION IN DEMAND OFREASON FOR THE REDUCTION IN DEMAND OF
RO-RORO-RO
i. Trailer drivers have an affinity to wait for Ro-Ro ferry.
ii. The service in not following a proper time schedule hence timely delivery
of cargo can’t be assured
iii. The waiting time for Ro-Ro service is very high
iv. Ro-Ro unable to offer uninterrupted service due to frequently breaks
downs.
v. The present Ro-Ro tariff is not very attractive as the profit made compared
to Road only mode of transport in terms of fuel cost
vi. Lower cargo movement at Vallarpadam container terminal than what was
expected from the facility.
SUGGESTIONS TO IMPROVE THE PERFORMANCESUGGESTIONS TO IMPROVE THE PERFORMANCE
OF RO-RO SERVICEOF RO-RO SERVICE
i. The potential opportunity for highest performance during the peak hours
(8AM-11AM & 4PM-8PM) must be utilized at the most optimal level by
attracting more customers with offers/schemes or special peak time prices .
ii. Waiting time between two consecutive services need to be brought down,
either by reducing the transit time (25 min) or by introducing an additional
Ro-Ro service, at least during the peak hours
iii. Providing refreshment stalls for the waiting trailer drivers reducing their
boredom.
iv. Advanced technological Vessels capable of rendering uninterrupted service
which is more fuel efficient and cost efficient.
Cont…..Cont…..
v. Concession price must be offered for regular Ro-Ro users which help in
retaining these customers
vi. Agreements may be made with the regular users. Credit facility can be made
available for these users with whom agreements have been made which can
further interest the transport operators in using the facility.
vii. Government initiatives must be taken to support the initial performance of
Ro-Ro.
viii. The Ro-Ro service lack proper marketing hence the potential users of the
Ro-Ro must be identified and made aware of the advantages of the facility
.They can be offered attractive packages for using the facility and can be made
loyal customers of the Ro-Ro facility.
THANK YOU….THANK YOU….

More Related Content

PPT
Ro ro presentation Kashec
PPTX
Ppt by mr paul antony cochin port
PPTX
CMMI Lecture - Business Development Cell Mumbai Port Trust
PDF
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
PPTX
Jawaharlal Nehru Port Trust JNPT
PDF
Panama Canal Expansion Impacts on North America Trade
PDF
Impact on trade on expansion of panama canal a dissertation
PPTX
Chennai port trust
Ro ro presentation Kashec
Ppt by mr paul antony cochin port
CMMI Lecture - Business Development Cell Mumbai Port Trust
Study ON Western Hinterland & Analysis of Indias Biggest Sea Port JNPT
Jawaharlal Nehru Port Trust JNPT
Panama Canal Expansion Impacts on North America Trade
Impact on trade on expansion of panama canal a dissertation
Chennai port trust

What's hot (20)

PPT
Connectivity between Bangladesh and Sri Lankan ports
PDF
Traffic enginering highway capacity and los presentation
PPTX
Presentation-on-Water-Transport-System
PDF
Combine coal transshipment project report
PPTX
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
PPT
Zctoms committee meeting
PDF
Saudi Railway Company Presentation - Railways Projects 2014
PDF
Cargo Talk JUNE -2015 Low res 22
PPT
Maritime Development in Bangladesh : Ports and Terminals
PPTX
Kpct presentation
PDF
06 presentation civil-engineering_consultrans
PDF
Delta Marine Highway Presentation
PPTX
Feeder services from and into Mangalore (India)
PDF
M9-EIA-Draft Final Report
PDF
Asset Velocity
PPTX
Development of multimodal transport in north java corridor
PPTX
2 q review
PDF
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
PPTX
Capstone Presentation
PDF
DeltaMarine Highway Report
Connectivity between Bangladesh and Sri Lankan ports
Traffic enginering highway capacity and los presentation
Presentation-on-Water-Transport-System
Combine coal transshipment project report
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
Zctoms committee meeting
Saudi Railway Company Presentation - Railways Projects 2014
Cargo Talk JUNE -2015 Low res 22
Maritime Development in Bangladesh : Ports and Terminals
Kpct presentation
06 presentation civil-engineering_consultrans
Delta Marine Highway Presentation
Feeder services from and into Mangalore (India)
M9-EIA-Draft Final Report
Asset Velocity
Development of multimodal transport in north java corridor
2 q review
Bridges Middle East - Rick Haggett - Qatar Bahrain Causeway Management
Capstone Presentation
DeltaMarine Highway Report
Ad

Similar to Roll On-Roll Off service (20)

PPTX
Study of port performance in india
PPTX
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
PPTX
Multimodal Transport in an Indian Perspective
PPTX
NJFuture Redevelopment Forum 2016 Rooney
PDF
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PPTX
Trade and Investment Forum
PPTX
moloy roy sea and air logistics presentation
PDF
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
PPTX
Pipeline Overview (Pipeline Operations)
PDF
Transnet National Ports Authority Strategic Direction
PPT
The Port Metro Vancouver Interface
DOCX
Training report on railway structure at tata aldesa
PDF
African seaports expansion summit
PPTX
Tata_steel[1].pptx
PDF
BCG - Port of Los Angeles.pdf
DOCX
Measuring and evaluating port performance and productivity
PPTX
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
DOC
Coach rehabilitation workshop bhopal (crws)
PDF
Report on running room facilities
PPT
Clc presentation jjb 01.29.2014 fv
Study of port performance in india
Calcasieu Ship Channel Traffic Study (Port of Lake Charles)
Multimodal Transport in an Indian Perspective
NJFuture Redevelopment Forum 2016 Rooney
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
Trade and Investment Forum
moloy roy sea and air logistics presentation
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Pipeline Overview (Pipeline Operations)
Transnet National Ports Authority Strategic Direction
The Port Metro Vancouver Interface
Training report on railway structure at tata aldesa
African seaports expansion summit
Tata_steel[1].pptx
BCG - Port of Los Angeles.pdf
Measuring and evaluating port performance and productivity
Asia Aviation Associates -Airfreight Stations Summit - Ludhiana Punjab,India
Coach rehabilitation workshop bhopal (crws)
Report on running room facilities
Clc presentation jjb 01.29.2014 fv
Ad

Recently uploaded (20)

PDF
COLEAD A2F approach and Theory of Change
PPTX
Copy- of-Lesson-6-Digestive-System.pptx
PPTX
INDIGENOUS-LANGUAGES-AND-LITERATURE.pptx
PDF
5_tips_to_become_a_Presentation_Jedi_@itseugenec.pdf
PDF
Module 7 guard mounting of security pers
PPTX
Lesson-7-Gas. -Exchange_074636.pptx
PDF
Unnecessary information is required for the
PDF
_Nature and dynamics of communities and community development .pdf
PPTX
Unit 8#Concept of teaching and learning.pptx
PPTX
2025-08-17 Joseph 03 (shared slides).pptx
PDF
MODULE 3 BASIC SECURITY DUTIES AND ROLES.pdf
PPTX
power point presentation ofDracena species.pptx
PPTX
Research Process - Research Methods course
PDF
PM Narendra Modi's speech from Red Fort on 79th Independence Day.pdf
PPTX
NORMAN_RESEARCH_PRESENTATION.in education
PPTX
FINAL TEST 3C_OCTAVIA RAMADHANI SANTOSO-1.pptx
PPTX
Rakhi Presentation vbbrfferregergrgerg.pptx
DOCX
Action plan to easily understanding okey
PPTX
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
PPTX
Knowledge Knockout ( General Knowledge Quiz )
COLEAD A2F approach and Theory of Change
Copy- of-Lesson-6-Digestive-System.pptx
INDIGENOUS-LANGUAGES-AND-LITERATURE.pptx
5_tips_to_become_a_Presentation_Jedi_@itseugenec.pdf
Module 7 guard mounting of security pers
Lesson-7-Gas. -Exchange_074636.pptx
Unnecessary information is required for the
_Nature and dynamics of communities and community development .pdf
Unit 8#Concept of teaching and learning.pptx
2025-08-17 Joseph 03 (shared slides).pptx
MODULE 3 BASIC SECURITY DUTIES AND ROLES.pdf
power point presentation ofDracena species.pptx
Research Process - Research Methods course
PM Narendra Modi's speech from Red Fort on 79th Independence Day.pdf
NORMAN_RESEARCH_PRESENTATION.in education
FINAL TEST 3C_OCTAVIA RAMADHANI SANTOSO-1.pptx
Rakhi Presentation vbbrfferregergrgerg.pptx
Action plan to easily understanding okey
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
Knowledge Knockout ( General Knowledge Quiz )

Roll On-Roll Off service

  • 1. PERFORMANCE & PROSPECTS OF ROLL-ON/ROLL-OFF SERVICE:PERFORMANCE & PROSPECTS OF ROLL-ON/ROLL-OFF SERVICE: A STUDY WITH SPECIAL REFERENCE TO COCHIN PORT TRUSTA STUDY WITH SPECIAL REFERENCE TO COCHIN PORT TRUST INDIAN MARITIME UNIVERSITY SCHOOL OF MARITIME MANAGEMENT COCHIN CAMPUS 29th May 2015
  • 3. The Ro-Ro facility was build with the intention to improve the connectivity between Vallarpadam (ICTT) and Willingdon Island. The Cochin Port Trust jointly with IWAI had formed a joint management committee (JMC) for the purpose. LOTS shipping, a Cochin-based shipping company had won the 10 year contract for ferrying the containers between Willingdon Island and Vallarpadam by Roll on-Roll off (RO-RO) and Lift On-Lift Off (LO-LO) modes. The time for transporting container trucks by RO-RO mode was expected to be 20-25 min. The service enables the movement of containers preventing hundreds of trucks from the crowding the Cochin roads and has reduced transportation distance of 38 Km to 2.5Km
  • 4. “Even though the Ro-Ro provides a window for easier and speedy movement of container especially from the south of Kerala towards ICTT Vallarpadam this facility is not being optimally utilized as a result the actual estimated container moves of 750 containers per day has fallen down to a maximum of 150 containers per day therefore the service is suffering from continuous losses”
  • 5. RESEARCH ISSUESRESEARCH ISSUES 1. Why the Ro-Ro service is unable to perform to its optimal level and why is it incurring so much of loss in spite of its immense potential? 2. Why is the Ro-Ro service unable to get the expected amount of cargo for its optimal functioning? 3. Why is the Ro-Ro service incapable of rendering continuous service and also unable to stick on to their scheduled service time?
  • 6. OBJECTIVESOBJECTIVES 1.To understand the reason for the incapability of Ro-Ro service in rendering continuous service? 2.To understand the reasons why the service is not following a strict time schedule? 3.To identify the reason why is the Ro-Ro service unable to get the expected amount of cargo for its optimal functioning? 4.To recognize the reasons why the Ro-Ro service is unable to perform to its optimal level and why is it incurring so much of loss in spite of its immense potential? 5. To offer suggestions for improvement in the performance of the service
  • 7. METHODOLOGYMETHODOLOGY In order to measure the performance of Ro-Ro service in Cochin Port Trust the stratified disproportionate random sampling method has been adopted. At the first level major stake holders of Ro-Ro have been grouped under two sections namely 1.The service providers 2.Service users At the second level Ro-Ro operators and Cochin Port Trust are considered as service providers the truck operators, drivers and freight forwarders are considered as the major users of Ro-Ro.
  • 8. Cont…..Cont….. At the third level in each category 5-15 samples have been surveyed with help of pre-tested structured interview schedule. For the purpose of comparison of the monthly performances and the overall performance of the Ro-Ro service with the expected performance, secondary data of the Ro-Ro operation and cargo movement have been collected and analyzed.
  • 9. SAMPLES SELECTEDSAMPLES SELECTED SL.NO DEAILS 1 USERS TRUCK OPERATORS 5 TRUCK DRIVERS 10 FREIGHT FORWARDERS 10 2 SERVICE PROVIDERS PORT EMPLOYEES 15 RO-RO EMPLOYEES 5 TOTAL 45
  • 10. THE RESULT AND DISCUSSION OF THE STUDY
  • 11. Cargo handled in Ro-Ro fromCargo handled in Ro-Ro from 23rd February 2011 to 30th April 2015 SL.NO TYPE OF CONTAINER NUMBER OF TEU’S LOADED CONTAINER 1 20 FOOT 64,532 2 40 FOOT 36,253 EMPTY CONTAINER 3 20 FOOT 15,688 4 40 FOOT 12,364 TOTAL 1,28,837
  • 12. THE CURRENT RO-RO SCENARIOTHE CURRENT RO-RO SCENARIO Total number of days =1528 days Total no of working day =1239 days (Excluding Sundays and customs . holidays) Expected or predicted container movement per day = 750 TEU’s Expected total movement for 1239 days = 9, 29,250 TEU’s (approx.) Actual movement for 1239 days = 1, 28,837 TEU’s Therefore average movement per day = Less than 150 TEU’s
  • 13. SUGGESTIONS PUT FORWARD BY THE SAMPLES TOSUGGESTIONS PUT FORWARD BY THE SAMPLES TO IMPROVE THE PERFORMANCE OF THE RO-RO SERVICEIMPROVE THE PERFORMANCE OF THE RO-RO SERVICE 1.To improve the quality of the service i. 62.22% of the population suggested to take measures reduce the waiting time. ii. 20% had suggested about increasing by introducing user friendly services. iii. 17.77 % of the samples suggested to offer customer oriented services to improve the overall performance.
  • 14. Cont…..Cont….. 2.To improve the reliability i. 37.77% of the population suggested that reliability can be attained by following a strict time schedule. ii. Another 37.77% suggested that reliability can be attained by offering un interrupted services iii. Remaining 24.44%suggested both above mentioned aspects need to be incorporated together in order to offer a reliable service.
  • 15. Cont…..Cont….. 3. For infrastructural development i. 42.22% suggested to improve the overall infrastructure by modifying or changing the existing Ro-Ro vessel or by introducing an additional Ro-Ro vessel. ii. 4.44% suggested on performance improvement by recruiting trained employees for the service. iii. 35.55% believes that technological up gradation can bring about efficiency and development in the service. iv. 17.77% suggests all the three above mentioned aspects must be inculcated together for the best performance .
  • 17. ADVANTAGES OF USING RO-RO SERVICEADVANTAGES OF USING RO-RO SERVICE i. Cost efficient and speedier movement ii. Pollution Reduction iii. Reducing Traffic Congestion iv. Enables Eco-friendly transportation v. Reduction of operation and maintenance cost vi. Safer mode of transport
  • 18. REASON FOR THE REDUCTION IN DEMAND OFREASON FOR THE REDUCTION IN DEMAND OF RO-RORO-RO i. Trailer drivers have an affinity to wait for Ro-Ro ferry. ii. The service in not following a proper time schedule hence timely delivery of cargo can’t be assured iii. The waiting time for Ro-Ro service is very high iv. Ro-Ro unable to offer uninterrupted service due to frequently breaks downs. v. The present Ro-Ro tariff is not very attractive as the profit made compared to Road only mode of transport in terms of fuel cost vi. Lower cargo movement at Vallarpadam container terminal than what was expected from the facility.
  • 19. SUGGESTIONS TO IMPROVE THE PERFORMANCESUGGESTIONS TO IMPROVE THE PERFORMANCE OF RO-RO SERVICEOF RO-RO SERVICE i. The potential opportunity for highest performance during the peak hours (8AM-11AM & 4PM-8PM) must be utilized at the most optimal level by attracting more customers with offers/schemes or special peak time prices . ii. Waiting time between two consecutive services need to be brought down, either by reducing the transit time (25 min) or by introducing an additional Ro-Ro service, at least during the peak hours iii. Providing refreshment stalls for the waiting trailer drivers reducing their boredom. iv. Advanced technological Vessels capable of rendering uninterrupted service which is more fuel efficient and cost efficient.
  • 20. Cont…..Cont….. v. Concession price must be offered for regular Ro-Ro users which help in retaining these customers vi. Agreements may be made with the regular users. Credit facility can be made available for these users with whom agreements have been made which can further interest the transport operators in using the facility. vii. Government initiatives must be taken to support the initial performance of Ro-Ro. viii. The Ro-Ro service lack proper marketing hence the potential users of the Ro-Ro must be identified and made aware of the advantages of the facility .They can be offered attractive packages for using the facility and can be made loyal customers of the Ro-Ro facility.