Project Name:
Roller Replacement
Current Problem(s):
Boxes (4X1’s,in particular) arecatchingon the roller
and tippingdue to the largegap between the rollers.
Suggested Solutions(s):
By getting rollers with a much smaller gap,the boxes
will havenothing to catch on, preventing them from
topplingover. This will allowDevin to keep his
attention on his machineinstead of manning the
conveyor belt. Itwill also preventthe boxes from
fallingdown and blockingthe flow throughout the
conveyor set up.
Suggested Products & Quotes:
 Conveyor #11F10EG15B15 - $1,300 (Ashland
Conveyor)
 Model: RS14G-18-1.5-30 - $1,503 (SJF Material
Handling)
 Roller Conveyors - $1,422 (IngallsConveyors)
 Gravity Conveyor - $1342 (FloStor Engineering)
Highlighted is not recommended, but still an option
*Does not includeshipping
Savings/Results:
Accordingto data compiled by Chris,the intern last
summer, the casepacker is responsiblefor
approximately 22%of machine downtime. With new
rollers,thatdowntime can reasonably cutby 2%,
consideringthatone of the issues Devin has is turning
the machine off to forcibly remove an incorrectly
oriented box from the box queue. I only estimate a 2%
elimination becausethe topplingoccurs primarily with
4X1’s,and keeping the boxes upright does not correct
the issueof the boxes being improperly turned.
ROI Calculation:
Estimatinga 2600 hour work year and usingChris’
calculationsof 26%of total worktime being occupied
with maintenance issues,
2600 hours X .26 X .02 X $200/hr = $2,704/yr
Estimated Cost: $1600
ROI: 1600/2,704 = 7 months (approximately)

More Related Content

DOC
Road Repair Marketing
PPTX
Paulequipments
PDF
Cleveland Cascades DCI Sep14
PDF
Decanter centrifuge
PDF
Tutorial06: Deploying lean principles in non-manufacturing operations - The c...
PDF
Paper 43 - Deep Water Pipeline CT 9_2_15
PDF
Bulk Solids Handling Article
PPT
Episode 38 : Bin and Hopper Design
Road Repair Marketing
Paulequipments
Cleveland Cascades DCI Sep14
Decanter centrifuge
Tutorial06: Deploying lean principles in non-manufacturing operations - The c...
Paper 43 - Deep Water Pipeline CT 9_2_15
Bulk Solids Handling Article
Episode 38 : Bin and Hopper Design

Similar to Roller Replacement Project (20)

PPTX
Flexible Gravity conveyor
PDF
How to unlock productivity savings in mining operations part 1
PPT
TDAS 615 Tubing Design pitfalls 2005.ppt
PDF
Conventional Transfer Chute for cement plant .pdf
PDF
ANSYS oil&gas seminar 2013
PDF
Storage and Dispensing Platforms - DENIOS US
PDF
automation final
PDF
Personal Dock Bbuilding 101
PDF
2016 CRW - The Science of Cabling & Optimization Solutions
PDF
An overvew on Speed Frame (Simplex) Machine.pdf
PDF
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
PPT
Universal marine global aquaculture
PDF
Crossrail-C336-Paddington-New-Yard
PDF
Rotacaster Manual Materials Handling Solution Spotlights
PPT
dragline-operation.ppt
PPT
dragline-operation.ppt
PDF
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
PPTX
Thesis Poster Presentation
PDF
Angebot wsb englisch teil 2 2012
PPTX
Thesis Powerpoint
Flexible Gravity conveyor
How to unlock productivity savings in mining operations part 1
TDAS 615 Tubing Design pitfalls 2005.ppt
Conventional Transfer Chute for cement plant .pdf
ANSYS oil&gas seminar 2013
Storage and Dispensing Platforms - DENIOS US
automation final
Personal Dock Bbuilding 101
2016 CRW - The Science of Cabling & Optimization Solutions
An overvew on Speed Frame (Simplex) Machine.pdf
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
Universal marine global aquaculture
Crossrail-C336-Paddington-New-Yard
Rotacaster Manual Materials Handling Solution Spotlights
dragline-operation.ppt
dragline-operation.ppt
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
Thesis Poster Presentation
Angebot wsb englisch teil 2 2012
Thesis Powerpoint
Ad

Roller Replacement Project

  • 1. Project Name: Roller Replacement Current Problem(s): Boxes (4X1’s,in particular) arecatchingon the roller and tippingdue to the largegap between the rollers. Suggested Solutions(s): By getting rollers with a much smaller gap,the boxes will havenothing to catch on, preventing them from topplingover. This will allowDevin to keep his attention on his machineinstead of manning the conveyor belt. Itwill also preventthe boxes from fallingdown and blockingthe flow throughout the conveyor set up. Suggested Products & Quotes:  Conveyor #11F10EG15B15 - $1,300 (Ashland Conveyor)  Model: RS14G-18-1.5-30 - $1,503 (SJF Material Handling)  Roller Conveyors - $1,422 (IngallsConveyors)  Gravity Conveyor - $1342 (FloStor Engineering) Highlighted is not recommended, but still an option *Does not includeshipping Savings/Results: Accordingto data compiled by Chris,the intern last summer, the casepacker is responsiblefor approximately 22%of machine downtime. With new rollers,thatdowntime can reasonably cutby 2%, consideringthatone of the issues Devin has is turning the machine off to forcibly remove an incorrectly oriented box from the box queue. I only estimate a 2% elimination becausethe topplingoccurs primarily with 4X1’s,and keeping the boxes upright does not correct the issueof the boxes being improperly turned. ROI Calculation: Estimatinga 2600 hour work year and usingChris’ calculationsof 26%of total worktime being occupied with maintenance issues, 2600 hours X .26 X .02 X $200/hr = $2,704/yr Estimated Cost: $1600 ROI: 1600/2,704 = 7 months (approximately)