The document outlines the process for designing and constructing a tunnel project including:
1) Conducting site investigations and developing a geological and geotechnical model to design protection works for buildings and assess tunnel alignment and operational parameters.
2) Monitoring tunnel construction including TBM parameters, instrumentation readings, and building surveys to confirm geological profiles and ensure controlled settlement.
3) Implementing safe tunneling practices with minimal infrastructure impact including controlled settlement through optimized TBM face pressures and grout volumes.