SAFE TUNNELLING
It’s All About Process
Management Processes
Demming Cycle - PDCA
Plan – Execute – Monitor/Control - Adjust
Inputs – Process(es) – Output
IDENTIFY & DESIGN
PROTECTION WORKS
GEOLOGICAL -GEOTECHNICAL MODEL
SITE INVESTIGATIONS (All previous data, desk
study, other project data.)
BUILDING RISK ASSESSMENTS &
PROTECTION PLANS. Allowable Limits
of Deformation
ALIGNMENT OF RAIL
TRACK & STATION
LOCATION
INSTRUMENTATION
DESIGN
SETTLEMENT ANALYSIS
Ground loss, shield loss, tailskin
loss, sensitivity
TBM OPERATIONAL PARAMETERS &
RANGE -Face Pressure, grout pressure/volume
SURVEYS FOR UTILITIES, ID NATURE
OF MATERIAL & ALLOWABLE LIMITS
OF DEFORMATION
GEOLOGICAL PROFILE & GEOTECHNICAL
PARAMETERS
SITE INVESTIGATIONS
Supplementary & Instrumentation
Installation
BUILDING CONDITION SURVEYS,
STRUCTURAL SURVEYS,
Confirm Extent and magnitude of
settlement, correctness of face pressure
Confirm /Reassess Geological profile and
face pressures required to ensure settlements
controlled.
Confirm or Revise Building protection Works
as required. Revise risk assessment
MONITORING
TBM Parameters
Face Pressure
Grout Volume & Pressure
Muck Volume
Thrust, torque & Advance Speed
Instrumentation
Drilling Data against geological profile
Planned against actual settlement
Monitoring of Treated Areas
Immediate Actions
Reading Frequency
Accuracy checks
Visual Inspections of surface/buildings
SAFE TUNNELLING
Controlled settlement, minimal impact on
infrastructure, optimised face pressures,
controlled progress
CONSTRUCTION
Tunnelling
TBM Operation
Face pressure,
Grouting Volume & Pressure
Muck Volume
Thrust
Torque
Speed of Advance
Steering / Survey Control
Lining Erection
Build Quality / Repars
Alignment
Ground Treatment
Drilling
Grouting
Verification
Immediate Actions
Alarm Plans
Standard Operating Procedures
Emergency Plans
DESIGN OF TUNNELADVANCE
Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings
Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries
Face Pressures - control of face pressure to avoid stress relaxation & overexcavation
Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning
Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading
Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during
construction
Required Consolidation Works - building protection worked to prevent any adverse effects due to settlement.
High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting
Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation
Probing - predicted geology, tates of penetration
TUNNEL MANAGEMENT PROCESS
DESIGN INPUT
DESIGN PROCESS
DESIGN OUTPUT
CONSTRUCTION INPUT
CONSTRUCTION PROCESS
CONSTRUCTION OUTPUT
Input 'field data'
&/or correction
factors into
design
TBM - GROUND INTERACTION
Compliance with settlement limits
Compliance with Face Pressure & Grout requirements
Compliance with alignment
DAILY/WEEKLY BASISREVIEW OF DATA
TBM Design
Segment
Design/Lining
ALIGNMENT
VALIDATION -
Wriggle survey
ALIGNMENTVERIFICATION
- Track Work Validation
CONFIRM
ALIGNMENT - Design
modifiaction may be
necessary, signalling,
route restrictions.
Basic Inputs – Purpose of the Tunnel
GEOLOGICAL -GEOTECHNICAL MODEL
SITE INVESTIGATIONS (All previous data, desk
study, other project data.)
ALIGNMENT OF RAIL
TRACK & STATION
LOCATION
DESIGNINPUT
Tunnelling process for Safety in design and construction
Tunnelling process for Safety in design and construction
Purpose and Alignment -(Why and Where)
 Tunnel – pedestrian, road, rail, metro, sewer, water,
utilities, drainage, hydropower, gas/oil storage, district
cooling/heating, ventilation, military installations
 Alignment – proximity to existing infrastructure, land take,
access, cover, future development
Ground Conditions
 Geological Survey – regional geology, pre-existing
tunnels, foundations, local knowledge, site investigations,
desk studies, topographical maps, aerial photographs,
literature searches
 Engineering geological considerations
 Geotechnical engineering aspects
 Previous Tunnelling Experience
Design Process – Holistic & Integrated
IDENTIFY &DESIGN
PROTECTION WORKS
BUILDING RISK ASSESSMENTS &
PROTECTION PLANS. Allowable Limits
of Deformation
INSTRUMENTATION
DESIGN
SETTLEMENT ANALYSIS
Ground loss, shield loss, tailskin
loss, sensitivity
TBM OPERATIONAL PARAMETERS &
RANGE -Face Pressure, grout pressure/volume
SURVEYS FORUTILITIES, IDNATURE
OFMATERIAL & ALLOWABLE LIMITS
OFDEFORMATION
GEOLOGICAL PROFILE &GEOTECHNICAL
PARAMETERS
SITE INVESTIGATIONS
Supplementary &Instrumentation
Installation
BUILDING CONDITION SURVEYS,
STRUCTURAL SURVEYS,
DESIGNPROCESS
TBMDesign
Segment
Design/Lining
Existing Infrastructure – Future Development
 Building Condition Surveys
 Utility Surveys
 Building Risk Assessments
 Allowable Settlement / Tolerable Settlement
 Protection Works – ground treatment, underpinning,
future provision works
 Planning permission
Ground Conditions - Facts
 Site Investigations (before, during and possibly after)
 All too often BHs, followed by profiling followed by lab tests etc. &
which proves to be ‘inadequate’
 Proper planning and hazard ID – parameters for design and
distribution, geological profile, info for construction (abrasion,
swelling ground, mineralogy, GWater chemistry, gas) sampling
required, lab tests, in-situ measurements (Ko), SI techniques
(geophysics/BH/Pits/In-situ tests, spatial distribution/frequency of
boring/depth. Rock structure/rockhead/geological interfaces
 Cost benefit – skilled persons can often provide more value than
an expensive in-situ test
Extent / Cost of Investigation
Tunnelling process for Safety in design and construction
“You paY for Your site
investigation whether you
have one or not”.
Tunnelling process for Safety in design and construction
Tunnelling process for Safety in design and construction
Site Investigation: It isn’t over till it’s over
 If there is a problem then the site investigations may
continue with a ‘forensic’ stage and related official
enquiry…
Ground Conditions - Interpretation
 Geotechnical Interpretative Report
 Design parameters, construction considerations, a prediction
 Strength, Permeability, Deformability, Distribution, Variability,
 Abrasivity, Hazards (voids, boulders, faults, geological hazards,
interfaces, stresses, water inflows)
 Soil – Weak Rock – Hard rock
Tunnelling process for Safety in design and construction
“GBR”
 Geotechnical Baseline Report for the settlement of
disputes as to what is and what is not foreseeable and
what the Contractor takes on as risk, and what the
Employer takes on.
 What the Contract says about the ground and how ‘varied
ground’ is paid for
eg Abrasion
Tunnelling Method / Selection
 Type of tunnel and tunnel size
 Ground Conditions
 Contractor experience / preference
 Risk perception
 Tunnel length
 Time available
Conventional – NATM – Hand - D&B
EPBM
Open Shield
Slurry Machine
Lining Design –
 Temporary / Permanent
 Two Pass system
 One pass system
 Segment design
Settlement / Ground Movement
 Expected deformation
 Iteration with existing infrastructure
 Determines type and extent of any ground treatment
Tunnelling process for Safety in design and construction
Tunnelling process for Safety in design and construction
Instrumentation
 Based on settlement
 Building sensitivity
 Utility sensitivity
 “Trigger levels’ and what must be done if levels are
breached; resetting levels is NOT recommended (Nicoll
Highway)
Tunnel Parameters
 Depends on type of tunnel
 NATM – partial headings and type of ground support
 EPBM – face pressure, weight of ground, hazards, grout
pressure
 Protocol to Advance a Tunnel – PAT
 Contingencies if parameters cannot be controlled or are
exceeded (Void Mitigation Plan)
…and coordination, iteration
IDENTIFY & DESIGN
PROTECTION WORKS
BUILDING RISK ASSESSMENTS &
PROTECTION PLANS. Allowable Limits
of Deformation
INSTRUMENTATION
DESIGN
SETTLEMENT ANALYSIS
Ground loss, shield loss, tailskin
loss, sensitivity
TBM OPERATIONAL PARAMETERS &
RANGE -Face Pressure, grout pressure/volume
SURVEYS FOR UTILITIES, ID NATURE
OF MATERIAL & ALLOWABLE LIMITS
OF DEFORMATION
GEOLOGICAL PROFILE & GEOTECHNICAL
PARAMETERS
SITE INVESTIGATIONS
Supplementary & Instrumentation
Installation
BUILDING CONDITION SURVEYS,
STRUCTURAL SURVEYS,
DESIGN PROCESS
TBM Design
SegmentDesign
Design to Construction
DESIGN OUTPUT
CONSTRUCTION INPUT
Tunnel Advance – Design to Execution
DESIGN OF TUNNELADVANCE
Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings
Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries
Face Pressures - control of face pressure to avoid stress relaxation & overexcavation
Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning
Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading
Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during
construction
Required ConsolidationWorks - building protection worked to prevent any adverse effects due to settlement.
High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting
Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation
Probing - predicted geology, tates of penetration
Horizontal & Vertical Alignment
 deeper tunnels have greater pressures
 tight curves may require tapered rings
 Articulated machines
Geotechnical Interpretation -
 Getting the stratigraphy, structure and distribution right.
 geological boundaries
 mixed face conditions
 possible geological hazards
Face Pressures
 Control of face pressure to avoid stress relaxation & over-
excavation
 Earth pressure
 Compressed air / interventions
Tunnelling process for Safety in design and construction
Weights / Volumes
 - assessment of weight based on range of in-situ density,
assess likely use of soil conditioning
 Bulking factors
 Measurement methods (balances, optical scanner,
density, ‘muck skips’)
Settlement Contours & Settlement Limits
 Assessment of extent of predicted settlement, allows a
check to be carried out during construction
Instruments & Instrumentation Plan
 Types & distribution of instruments based on predicted
settlements and location of buildings, frequency of
readings
 Settlements points, prisms, targets
 Inclinometers, extensometers
 Piezometers
 Automated monitoring / Real Time / Automated
Communications
Required Consolidation / Treatment Works
 building protection worked to prevent any adverse effects
due to settlement.
 Compensation grouting
 Underpinning
 Spiling rods / forepoling / canopy tubes
Specialist Works
Tunnelling process for Safety in design and construction
Tunnelling process for Safety in design and construction
High Risk Areas, Structures & Utilities-
 Indicated on drawings to advise of additional
care/reporting
 Third Party involvement (step in rights)
Combined view of buildings, geology,
tunnel, investigation points
Probing / Looking ahead
predicted geology, rates of penetration
Difficult ground / proximity to interfaces
Geophysical techniques (EM, seismic)
Anticipated Anomalies & Actions
Unexpected Conditions & Actions
Contingencies, Emergency Plan
 Loss of face pressure, additional grout, overexcavation
 Surface settlement, chimneys, ground loss
 Collapse
More Ground Investigation?
Construction
CONSTRUCTION
Tunnelling
TBM Operation
Face pressure,
Grouting Volume & Pressure
Muck Volume
Thrust
Torque
Speed of Advance
Steering / Survey Control
Lining Erection
Build Quality / Repars
Alignment
Ground Treatment
Drilling
Grouting
Verification
Immediate Actions
Alarm Plans
Standard Operating Procedures
Tunnelling process for Safety in design and construction
Tunnelling process for Safety in design and construction
Monitoring (Can’t manage/control what you
don’t measure)
MONITORING
TBM Parameters
Face Pressure
Grout Volume & Pressure
Muck Volume
Thrust, torque & Advance Speed
Instrumentation
Drilling Data against geological profile
Planned against actual settlement
Monitoring of Treated Areas
Immediate Actions
Reading Frequency
Accuracy checks
Visual Inspections of surface/buildings
Records of Tunnelling
 Tunnel parameters that must be controlled to ensure
minimum impact on the ground and existing infrastructure.
Tunnelling process for Safety in design and construction
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
19:09:06
19:25:46
19:42:26
19:59:06
20:15:46
20:32:26
20:49:06
21:05:46
21:22:26
Bulkheadpressures(bar)
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
29.11.2001
29.11.2001
29.11.2001
29.11.2001
29.11.2001
29.11.2001
29.11.2001
29.11.2001
29.11.2001
Bulkheadpressures(bar)
W0159 W0160 W0161 W0162 W0163 W0164 W0165
CONTROL OF THE GROUTING VOLUMES
0
2
4
6
8
10
12
14
16
18
20
334
338
342
346
350
354
358
362
366
370
374
378
382
386
390
394
398
402
406
410
414
418
422
426
430
434
438
442
446
450
454
458
462
466
470
474
478
482
486
490
494
498
502
506
510
514
518
522
526
530
Grouted ring number
Secondarygroutvolume(m3)
-10
-8
-6
-4
-2
0
2
4
6
8
10
334
338
342
346
350
354
358
362
366
370
374
378
382
386
390
394
398
402
406
410
414
418
422
426
430
434
438
442
446
450
454
458
462
466
470
474
478
482
486
490
494
498
502
506
510
514
518
522
526
530
Longitudinalgroutvolume(m3)
Secondary grout volume Longitudinal grout volume lower limit
NOTE: the lower limit is defined in the "Folha da Escavaçâo".
MANAGEMENT OF FACE SUPPORT PRESSURES DURING THE ADVANCE
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
336
340
344
348
352
356
360
364
368
372
376
380
384
388
392
396
400
404
408
412
416
420
424
428
432
436
440
444
448
452
456
460
464
468
472
476
480
484
488
492
496
500
504
508
512
516
520
524
528
532
Mounted ring number
P7averagepressures(bar)
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
4,0
631,6
637,2
642,8
648,4
654,0
659,6
665,2
670,8
676,4
682,0
687,6
693,2
698,8
704,4
710,0
715,6
721,2
726,8
732,4
738,0
743,6
749,2
754,8
760,4
766,0
771,6
777,2
782,8
788,4
794,0
799,6
805,2
810,8
816,4
822,0
827,6
833,2
838,8
844,4
850,0
855,6
861,2
866,8
872,4
878,0
883,6
889,2
894,8
900,4
906,0
Head chainage (m)
P7averagepressures(bar)
P7 average value upper limit lower limit
NOTE: Lower and upper limits are the ones
defined in the "Folha da Escavaçâo".
CONTROL OF THE EXCAVATED WEIGHTS
0
50
100
150
200
250
300
336
340
344
348
352
356
360
364
368
372
376
380
384
388
392
396
400
404
408
412
416
420
424
428
432
436
440
444
448
452
456
460
464
468
472
476
480
484
488
492
496
500
504
508
512
516
520
524
528
532
Mounted ring number
Weight(t)
0
50
100
150
200
250
300
631,6
637,2
642,8
648,4
654,0
659,6
665,2
670,8
676,4
682,0
687,6
693,2
698,8
704,4
710,0
715,6
721,2
726,8
732,4
738,0
743,6
749,2
754,8
760,4
766,0
771,6
777,2
782,8
788,4
794,0
799,6
805,2
810,8
816,4
822,0
827,6
833,2
838,8
844,4
850,0
855,6
861,2
866,8
872,4
878,0
883,6
889,2
894,8
900,4
906,0
Head chainage (m)
Weight(t)
Actual excavated weight upper limit lower limit
NOTE: Lower and upper limits are defined
using the in-situ densities after the face
surveys.
Tunnelling process for Safety in design and construction
Key Parameters
 Pulse Blood pressure, temperature – NOT intensive care
all the time
 Too much data can result in analysis paralysis and
prevent timely decisions from being made.
 Keep your finger on the pulse!
Settlement – physical measurement of
performance
Settlement Profile across the Tunnel Section at GF1
Settlement Profile along the Tunnel Alingment
-350
-300
-250
-200
-150
-100
-50
0
Settlement(mm)
West Bound East Bound T ot alL1247
EB WB
-300
-250
-200
-150
-100
-50
0
-100-80-60-40-20020406080
Distance away from Tunnel face
Maximumsettlement(mm)
West bound
East bound
L1257
15 m
Purpose of Instrumentation
 Confirm assumptions and apply a ‘field factor’ if required
 Revisit building assessments and need for possible
remediation works
Instrumentation & Monitoring
 Instrumentation and Monitoring (I&M) does NOT stop risk
 I&M allows risk to be seen
 Murphy’s Law – “accidents tend to happen where there
are no instruments”
Tunnelling process for Safety in design and construction
Tunnelling process for Safety in design and construction
Coordination & Collaboration
SAFE TUNNELLING
TBM - GROUND INTERACTION
Compliance with settlementlimits
Compliance with Face Pressure & Grout requirements
Compliance with alignment
DAILY/WEEKLY BASISREVIEW OF DATA
Construction Performance Reviews
Shift Engineer
Monitoring Team
for each area
Site Engineers
Design Staff
Construction
Manager
KTRC/C3C ?
Handover
Meeting
Daily Monitoring
data collation
Review data &
prepare
Tunnel/Excavation
Performance
Meeting
Issue Agreed
Record
Issue Weekly
Review Report
Internal Coordination
Meeting
Project Manager's
Review Meeting
Tunnel / Excavation Construction Review Process
D A I L Y
W E E K L Y
Information
Information
Information
Information
Information
Information
Review and
identify actions if
required
M O N T H L Y
Breaches of Limits – Escalation process
 Red Amber Green
 Green - Business as usual. Operating within expected norms and
no impact on outside world.
 Amber – working outside of anticipated norms and potential for
adverse effects – tunnel teams and implementation of remedial
works on ‘alert’ and standing by. Increased vigilance, scenarios
reviewed and plans revised based on situation,
 Red – adverse effects likely, Action plans implemented; stop
tunnelling and implement plans formulated during amber.
Feedback Loops
Alignment – ensure the tunnel is in the correct place
and take necessary actions
Monitoring and actual performance against design
assumptions
Change design if required / if possible:
➢opportunities in better ground,
➢ increased risk in poorer ground or sub-optimal
equipment selection and workarounds required
Changes in ground and possible claims against any
contractual baseline
Construction Output
SAFE TUNNELLING
Controlled settlement, minimal impact on
infrastructure, optimised face pressures,
controlled progress
IDENTIFY & DESIGN
PROTECTION WORKS
GEOLOGICAL -GEOTECHNICAL MODEL
SITE INVESTIGATIONS (All previous data, desk
study, other project data.)
BUILDING RISK ASSESSMENTS &
PROTECTION PLANS. Allowable Limits
of Deformation
ALIGNMENT OF RAIL
TRACK & STATION
LOCATION
INSTRUMENTATION
DESIGN
SETTLEMENT ANALYSIS
Ground loss, shield loss, tailskin
loss, sensitivity
TBM OPERATIONAL PARAMETERS &
RANGE -Face Pressure, grout pressure/volume
SURVEYS FOR UTILITIES, ID NATURE
OF MATERIAL & ALLOWABLE LIMITS
OF DEFORMATION
GEOLOGICAL PROFILE & GEOTECHNICAL
PARAMETERS
SITE INVESTIGATIONS
Supplementary & Instrumentation
Installation
BUILDING CONDITION SURVEYS,
STRUCTURAL SURVEYS,
Confirm Extent and magnitude of
settlement, correctness of face pressure
Confirm /Reassess Geological profile and
face pressures required to ensure settlements
controlled.
Confirm or Revise Building protection Works
as required. Revise risk assessment
MONITORING
TBM Parameters
Face Pressure
Grout Volume & Pressure
Muck Volume
Thrust, torque & Advance Speed
Instrumentation
Drilling Data against geological profile
Planned against actual settlement
Monitoring of Treated Areas
Immediate Actions
Reading Frequency
Accuracy checks
Visual Inspections of surface/buildings
SAFE TUNNELLING
Controlled settlement, minimal impact on
infrastructure, optimised face pressures,
controlled progress
CONSTRUCTION
Tunnelling
TBM Operation
Face pressure,
Grouting Volume & Pressure
Muck Volume
Thrust
Torque
Speed of Advance
Steering / Survey Control
Lining Erection
Build Quality / Repars
Alignment
Ground Treatment
Drilling
Grouting
Verification
Immediate Actions
Alarm Plans
Standard Operating Procedures
Emergency Plans
DESIGN OF TUNNELADVANCE
Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings
Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries
Face Pressures - control of face pressure to avoid stress relaxation & overexcavation
Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning
Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading
Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during
construction
Required Consolidation Works - building protection worked to prevent any adverse effects due to settlement.
High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting
Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation
Probing - predicted geology, tates of penetration
TUNNEL MANAGEMENT PROCESS
DESIGN INPUT
DESIGN PROCESS
DESIGN OUTPUT
CONSTRUCTION INPUT
CONSTRUCTION PROCESS
CONSTRUCTION OUTPUT
Input 'field data'
&/or correction
factors into
design
TBM - GROUND INTERACTION
Compliance with settlement limits
Compliance with Face Pressure & Grout requirements
Compliance with alignment
DAILY/WEEKLY BASISREVIEW OF DATA
TBM Design
Segment
Design/Lining
ALIGNMENT
VALIDATION -
Wriggle survey
ALIGNMENTVERIFICATION
- Track Work Validation
CONFIRM
ALIGNMENT - Design
modifiaction may be
necessary, signalling,
route restrictions.
Holistic View
 Many specialist areas contribute to the tunnel design
 Many views and opinions
 Many data sources
 Lots of data available
 Multiple stakeholders along the alignment and through the
process
 One error can be enough to be catastrophic!!
Tunnelling process for Safety in design and construction

More Related Content

DOCX
Lewis Phil - Resume 11-2015
PDF
Analysis of Foundation Failure in Concrete Structure
DOC
Resume Rev 02 (1)
DOC
RESUME-2 10-26-15
PPTX
bs:copbs101
PDF
CV-NKN-09.05.16
PDF
CV Aryo W
Lewis Phil - Resume 11-2015
Analysis of Foundation Failure in Concrete Structure
Resume Rev 02 (1)
RESUME-2 10-26-15
bs:copbs101
CV-NKN-09.05.16
CV Aryo W

Similar to Tunnelling process for Safety in design and construction (20)

PDF
Safe Tunnellling - A Management Process
PDF
20200727 IEM WEBINAR .pdf
PPT
Orec DOE summary
PPTX
ppt viva.pptx
PDF
Non-destructive_Testing-with-the-Georadar-Method_TUV_Rheinland
PDF
Quang do's resume
DOC
TARIQUE ALSTOM
DOC
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
DOCX
Complete Info
PPT
Buried Flexible Pipelines AS2566
PPT
General Geotechnical Presentation
PDF
CFF.CV_10.07.2016
PPTX
MineExcellence Blasting Platfrom
PPTX
Mine excellence products description final june 2021
PPT
2 surface mine planning
PDF
GeoSS-BCA-EC7-Briefing on ground investigation
PPT
GI For Tunnel Projects
DOCX
Cv career history
PDF
GeoSS,18SEAGS, 2013, Singapore
PDF
GeoSS,18SEAGS,CTS,04062013, A
Safe Tunnellling - A Management Process
20200727 IEM WEBINAR .pdf
Orec DOE summary
ppt viva.pptx
Non-destructive_Testing-with-the-Georadar-Method_TUV_Rheinland
Quang do's resume
TARIQUE ALSTOM
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
Complete Info
Buried Flexible Pipelines AS2566
General Geotechnical Presentation
CFF.CV_10.07.2016
MineExcellence Blasting Platfrom
Mine excellence products description final june 2021
2 surface mine planning
GeoSS-BCA-EC7-Briefing on ground investigation
GI For Tunnel Projects
Cv career history
GeoSS,18SEAGS, 2013, Singapore
GeoSS,18SEAGS,CTS,04062013, A
Ad

More from Malcolm Peart (20)

PDF
Micromanagement.pdf
PDF
Decisions- a flow approach
PDF
Problem solving decisions
PPTX
Troubled projects recovery
PPTX
Project planning
DOC
Four disciplines of execution notes
DOC
Pmi processes pmbok6 jan 2019
PPT
Letter writing
DOC
Leadership essay peart
PPT
Letter writing
PPTX
Project management stakeholder feb 2018
DOC
PMI four reasons for failure
DOC
E mail protocol 020807
PDF
Eternal triangle - PM Areas, Risk & influence
PDF
Passing blame & evading responsibility
DOC
Letter writing
PDF
Failing projects downward spiral
PPT
Risk management - A short course
PPT
Report Writing - A Project Management Perspective
DOC
Claim aide memoire
Micromanagement.pdf
Decisions- a flow approach
Problem solving decisions
Troubled projects recovery
Project planning
Four disciplines of execution notes
Pmi processes pmbok6 jan 2019
Letter writing
Leadership essay peart
Letter writing
Project management stakeholder feb 2018
PMI four reasons for failure
E mail protocol 020807
Eternal triangle - PM Areas, Risk & influence
Passing blame & evading responsibility
Letter writing
Failing projects downward spiral
Risk management - A short course
Report Writing - A Project Management Perspective
Claim aide memoire
Ad

Recently uploaded (20)

PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
Geodesy 1.pptx...............................................
PPT
Mechanical Engineering MATERIALS Selection
PDF
Digital Logic Computer Design lecture notes
DOCX
573137875-Attendance-Management-System-original
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Lecture Notes Electrical Wiring System Components
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
Structs to JSON How Go Powers REST APIs.pdf
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
bas. eng. economics group 4 presentation 1.pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Geodesy 1.pptx...............................................
Mechanical Engineering MATERIALS Selection
Digital Logic Computer Design lecture notes
573137875-Attendance-Management-System-original
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Lecture Notes Electrical Wiring System Components
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
OOP with Java - Java Introduction (Basics)
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Structs to JSON How Go Powers REST APIs.pdf
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx

Tunnelling process for Safety in design and construction

  • 2. Management Processes Demming Cycle - PDCA Plan – Execute – Monitor/Control - Adjust Inputs – Process(es) – Output
  • 3. IDENTIFY & DESIGN PROTECTION WORKS GEOLOGICAL -GEOTECHNICAL MODEL SITE INVESTIGATIONS (All previous data, desk study, other project data.) BUILDING RISK ASSESSMENTS & PROTECTION PLANS. Allowable Limits of Deformation ALIGNMENT OF RAIL TRACK & STATION LOCATION INSTRUMENTATION DESIGN SETTLEMENT ANALYSIS Ground loss, shield loss, tailskin loss, sensitivity TBM OPERATIONAL PARAMETERS & RANGE -Face Pressure, grout pressure/volume SURVEYS FOR UTILITIES, ID NATURE OF MATERIAL & ALLOWABLE LIMITS OF DEFORMATION GEOLOGICAL PROFILE & GEOTECHNICAL PARAMETERS SITE INVESTIGATIONS Supplementary & Instrumentation Installation BUILDING CONDITION SURVEYS, STRUCTURAL SURVEYS, Confirm Extent and magnitude of settlement, correctness of face pressure Confirm /Reassess Geological profile and face pressures required to ensure settlements controlled. Confirm or Revise Building protection Works as required. Revise risk assessment MONITORING TBM Parameters Face Pressure Grout Volume & Pressure Muck Volume Thrust, torque & Advance Speed Instrumentation Drilling Data against geological profile Planned against actual settlement Monitoring of Treated Areas Immediate Actions Reading Frequency Accuracy checks Visual Inspections of surface/buildings SAFE TUNNELLING Controlled settlement, minimal impact on infrastructure, optimised face pressures, controlled progress CONSTRUCTION Tunnelling TBM Operation Face pressure, Grouting Volume & Pressure Muck Volume Thrust Torque Speed of Advance Steering / Survey Control Lining Erection Build Quality / Repars Alignment Ground Treatment Drilling Grouting Verification Immediate Actions Alarm Plans Standard Operating Procedures Emergency Plans DESIGN OF TUNNELADVANCE Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries Face Pressures - control of face pressure to avoid stress relaxation & overexcavation Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during construction Required Consolidation Works - building protection worked to prevent any adverse effects due to settlement. High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation Probing - predicted geology, tates of penetration TUNNEL MANAGEMENT PROCESS DESIGN INPUT DESIGN PROCESS DESIGN OUTPUT CONSTRUCTION INPUT CONSTRUCTION PROCESS CONSTRUCTION OUTPUT Input 'field data' &/or correction factors into design TBM - GROUND INTERACTION Compliance with settlement limits Compliance with Face Pressure & Grout requirements Compliance with alignment DAILY/WEEKLY BASISREVIEW OF DATA TBM Design Segment Design/Lining ALIGNMENT VALIDATION - Wriggle survey ALIGNMENTVERIFICATION - Track Work Validation CONFIRM ALIGNMENT - Design modifiaction may be necessary, signalling, route restrictions.
  • 4. Basic Inputs – Purpose of the Tunnel GEOLOGICAL -GEOTECHNICAL MODEL SITE INVESTIGATIONS (All previous data, desk study, other project data.) ALIGNMENT OF RAIL TRACK & STATION LOCATION DESIGNINPUT
  • 7. Purpose and Alignment -(Why and Where)  Tunnel – pedestrian, road, rail, metro, sewer, water, utilities, drainage, hydropower, gas/oil storage, district cooling/heating, ventilation, military installations  Alignment – proximity to existing infrastructure, land take, access, cover, future development
  • 8. Ground Conditions  Geological Survey – regional geology, pre-existing tunnels, foundations, local knowledge, site investigations, desk studies, topographical maps, aerial photographs, literature searches  Engineering geological considerations  Geotechnical engineering aspects  Previous Tunnelling Experience
  • 9. Design Process – Holistic & Integrated IDENTIFY &DESIGN PROTECTION WORKS BUILDING RISK ASSESSMENTS & PROTECTION PLANS. Allowable Limits of Deformation INSTRUMENTATION DESIGN SETTLEMENT ANALYSIS Ground loss, shield loss, tailskin loss, sensitivity TBM OPERATIONAL PARAMETERS & RANGE -Face Pressure, grout pressure/volume SURVEYS FORUTILITIES, IDNATURE OFMATERIAL & ALLOWABLE LIMITS OFDEFORMATION GEOLOGICAL PROFILE &GEOTECHNICAL PARAMETERS SITE INVESTIGATIONS Supplementary &Instrumentation Installation BUILDING CONDITION SURVEYS, STRUCTURAL SURVEYS, DESIGNPROCESS TBMDesign Segment Design/Lining
  • 10. Existing Infrastructure – Future Development  Building Condition Surveys  Utility Surveys  Building Risk Assessments  Allowable Settlement / Tolerable Settlement  Protection Works – ground treatment, underpinning, future provision works  Planning permission
  • 11. Ground Conditions - Facts  Site Investigations (before, during and possibly after)  All too often BHs, followed by profiling followed by lab tests etc. & which proves to be ‘inadequate’  Proper planning and hazard ID – parameters for design and distribution, geological profile, info for construction (abrasion, swelling ground, mineralogy, GWater chemistry, gas) sampling required, lab tests, in-situ measurements (Ko), SI techniques (geophysics/BH/Pits/In-situ tests, spatial distribution/frequency of boring/depth. Rock structure/rockhead/geological interfaces  Cost benefit – skilled persons can often provide more value than an expensive in-situ test
  • 12. Extent / Cost of Investigation
  • 14. “You paY for Your site investigation whether you have one or not”.
  • 17. Site Investigation: It isn’t over till it’s over  If there is a problem then the site investigations may continue with a ‘forensic’ stage and related official enquiry…
  • 18. Ground Conditions - Interpretation  Geotechnical Interpretative Report  Design parameters, construction considerations, a prediction  Strength, Permeability, Deformability, Distribution, Variability,  Abrasivity, Hazards (voids, boulders, faults, geological hazards, interfaces, stresses, water inflows)  Soil – Weak Rock – Hard rock
  • 20. “GBR”  Geotechnical Baseline Report for the settlement of disputes as to what is and what is not foreseeable and what the Contractor takes on as risk, and what the Employer takes on.  What the Contract says about the ground and how ‘varied ground’ is paid for
  • 22. Tunnelling Method / Selection  Type of tunnel and tunnel size  Ground Conditions  Contractor experience / preference  Risk perception  Tunnel length  Time available
  • 23. Conventional – NATM – Hand - D&B
  • 24. EPBM
  • 27. Lining Design –  Temporary / Permanent  Two Pass system  One pass system  Segment design
  • 28. Settlement / Ground Movement  Expected deformation  Iteration with existing infrastructure  Determines type and extent of any ground treatment
  • 31. Instrumentation  Based on settlement  Building sensitivity  Utility sensitivity  “Trigger levels’ and what must be done if levels are breached; resetting levels is NOT recommended (Nicoll Highway)
  • 32. Tunnel Parameters  Depends on type of tunnel  NATM – partial headings and type of ground support  EPBM – face pressure, weight of ground, hazards, grout pressure  Protocol to Advance a Tunnel – PAT  Contingencies if parameters cannot be controlled or are exceeded (Void Mitigation Plan)
  • 33. …and coordination, iteration IDENTIFY & DESIGN PROTECTION WORKS BUILDING RISK ASSESSMENTS & PROTECTION PLANS. Allowable Limits of Deformation INSTRUMENTATION DESIGN SETTLEMENT ANALYSIS Ground loss, shield loss, tailskin loss, sensitivity TBM OPERATIONAL PARAMETERS & RANGE -Face Pressure, grout pressure/volume SURVEYS FOR UTILITIES, ID NATURE OF MATERIAL & ALLOWABLE LIMITS OF DEFORMATION GEOLOGICAL PROFILE & GEOTECHNICAL PARAMETERS SITE INVESTIGATIONS Supplementary & Instrumentation Installation BUILDING CONDITION SURVEYS, STRUCTURAL SURVEYS, DESIGN PROCESS TBM Design SegmentDesign
  • 34. Design to Construction DESIGN OUTPUT CONSTRUCTION INPUT
  • 35. Tunnel Advance – Design to Execution DESIGN OF TUNNELADVANCE Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries Face Pressures - control of face pressure to avoid stress relaxation & overexcavation Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during construction Required ConsolidationWorks - building protection worked to prevent any adverse effects due to settlement. High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation Probing - predicted geology, tates of penetration
  • 36. Horizontal & Vertical Alignment  deeper tunnels have greater pressures  tight curves may require tapered rings  Articulated machines
  • 37. Geotechnical Interpretation -  Getting the stratigraphy, structure and distribution right.  geological boundaries  mixed face conditions  possible geological hazards
  • 38. Face Pressures  Control of face pressure to avoid stress relaxation & over- excavation  Earth pressure  Compressed air / interventions
  • 40. Weights / Volumes  - assessment of weight based on range of in-situ density, assess likely use of soil conditioning  Bulking factors  Measurement methods (balances, optical scanner, density, ‘muck skips’)
  • 41. Settlement Contours & Settlement Limits  Assessment of extent of predicted settlement, allows a check to be carried out during construction
  • 42. Instruments & Instrumentation Plan  Types & distribution of instruments based on predicted settlements and location of buildings, frequency of readings  Settlements points, prisms, targets  Inclinometers, extensometers  Piezometers  Automated monitoring / Real Time / Automated Communications
  • 43. Required Consolidation / Treatment Works  building protection worked to prevent any adverse effects due to settlement.  Compensation grouting  Underpinning  Spiling rods / forepoling / canopy tubes
  • 47. High Risk Areas, Structures & Utilities-  Indicated on drawings to advise of additional care/reporting  Third Party involvement (step in rights)
  • 48. Combined view of buildings, geology, tunnel, investigation points
  • 49. Probing / Looking ahead predicted geology, rates of penetration Difficult ground / proximity to interfaces Geophysical techniques (EM, seismic)
  • 50. Anticipated Anomalies & Actions Unexpected Conditions & Actions Contingencies, Emergency Plan  Loss of face pressure, additional grout, overexcavation  Surface settlement, chimneys, ground loss  Collapse
  • 52. Construction CONSTRUCTION Tunnelling TBM Operation Face pressure, Grouting Volume & Pressure Muck Volume Thrust Torque Speed of Advance Steering / Survey Control Lining Erection Build Quality / Repars Alignment Ground Treatment Drilling Grouting Verification Immediate Actions Alarm Plans Standard Operating Procedures
  • 55. Monitoring (Can’t manage/control what you don’t measure) MONITORING TBM Parameters Face Pressure Grout Volume & Pressure Muck Volume Thrust, torque & Advance Speed Instrumentation Drilling Data against geological profile Planned against actual settlement Monitoring of Treated Areas Immediate Actions Reading Frequency Accuracy checks Visual Inspections of surface/buildings
  • 56. Records of Tunnelling  Tunnel parameters that must be controlled to ensure minimum impact on the ground and existing infrastructure.
  • 59. CONTROL OF THE GROUTING VOLUMES 0 2 4 6 8 10 12 14 16 18 20 334 338 342 346 350 354 358 362 366 370 374 378 382 386 390 394 398 402 406 410 414 418 422 426 430 434 438 442 446 450 454 458 462 466 470 474 478 482 486 490 494 498 502 506 510 514 518 522 526 530 Grouted ring number Secondarygroutvolume(m3) -10 -8 -6 -4 -2 0 2 4 6 8 10 334 338 342 346 350 354 358 362 366 370 374 378 382 386 390 394 398 402 406 410 414 418 422 426 430 434 438 442 446 450 454 458 462 466 470 474 478 482 486 490 494 498 502 506 510 514 518 522 526 530 Longitudinalgroutvolume(m3) Secondary grout volume Longitudinal grout volume lower limit NOTE: the lower limit is defined in the "Folha da Escavaçâo".
  • 60. MANAGEMENT OF FACE SUPPORT PRESSURES DURING THE ADVANCE 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 336 340 344 348 352 356 360 364 368 372 376 380 384 388 392 396 400 404 408 412 416 420 424 428 432 436 440 444 448 452 456 460 464 468 472 476 480 484 488 492 496 500 504 508 512 516 520 524 528 532 Mounted ring number P7averagepressures(bar) 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 631,6 637,2 642,8 648,4 654,0 659,6 665,2 670,8 676,4 682,0 687,6 693,2 698,8 704,4 710,0 715,6 721,2 726,8 732,4 738,0 743,6 749,2 754,8 760,4 766,0 771,6 777,2 782,8 788,4 794,0 799,6 805,2 810,8 816,4 822,0 827,6 833,2 838,8 844,4 850,0 855,6 861,2 866,8 872,4 878,0 883,6 889,2 894,8 900,4 906,0 Head chainage (m) P7averagepressures(bar) P7 average value upper limit lower limit NOTE: Lower and upper limits are the ones defined in the "Folha da Escavaçâo".
  • 61. CONTROL OF THE EXCAVATED WEIGHTS 0 50 100 150 200 250 300 336 340 344 348 352 356 360 364 368 372 376 380 384 388 392 396 400 404 408 412 416 420 424 428 432 436 440 444 448 452 456 460 464 468 472 476 480 484 488 492 496 500 504 508 512 516 520 524 528 532 Mounted ring number Weight(t) 0 50 100 150 200 250 300 631,6 637,2 642,8 648,4 654,0 659,6 665,2 670,8 676,4 682,0 687,6 693,2 698,8 704,4 710,0 715,6 721,2 726,8 732,4 738,0 743,6 749,2 754,8 760,4 766,0 771,6 777,2 782,8 788,4 794,0 799,6 805,2 810,8 816,4 822,0 827,6 833,2 838,8 844,4 850,0 855,6 861,2 866,8 872,4 878,0 883,6 889,2 894,8 900,4 906,0 Head chainage (m) Weight(t) Actual excavated weight upper limit lower limit NOTE: Lower and upper limits are defined using the in-situ densities after the face surveys.
  • 63. Key Parameters  Pulse Blood pressure, temperature – NOT intensive care all the time  Too much data can result in analysis paralysis and prevent timely decisions from being made.  Keep your finger on the pulse!
  • 64. Settlement – physical measurement of performance Settlement Profile across the Tunnel Section at GF1 Settlement Profile along the Tunnel Alingment -350 -300 -250 -200 -150 -100 -50 0 Settlement(mm) West Bound East Bound T ot alL1247 EB WB -300 -250 -200 -150 -100 -50 0 -100-80-60-40-20020406080 Distance away from Tunnel face Maximumsettlement(mm) West bound East bound L1257 15 m
  • 65. Purpose of Instrumentation  Confirm assumptions and apply a ‘field factor’ if required  Revisit building assessments and need for possible remediation works
  • 66. Instrumentation & Monitoring  Instrumentation and Monitoring (I&M) does NOT stop risk  I&M allows risk to be seen  Murphy’s Law – “accidents tend to happen where there are no instruments”
  • 69. Coordination & Collaboration SAFE TUNNELLING TBM - GROUND INTERACTION Compliance with settlementlimits Compliance with Face Pressure & Grout requirements Compliance with alignment DAILY/WEEKLY BASISREVIEW OF DATA
  • 70. Construction Performance Reviews Shift Engineer Monitoring Team for each area Site Engineers Design Staff Construction Manager KTRC/C3C ? Handover Meeting Daily Monitoring data collation Review data & prepare Tunnel/Excavation Performance Meeting Issue Agreed Record Issue Weekly Review Report Internal Coordination Meeting Project Manager's Review Meeting Tunnel / Excavation Construction Review Process D A I L Y W E E K L Y Information Information Information Information Information Information Review and identify actions if required M O N T H L Y
  • 71. Breaches of Limits – Escalation process  Red Amber Green  Green - Business as usual. Operating within expected norms and no impact on outside world.  Amber – working outside of anticipated norms and potential for adverse effects – tunnel teams and implementation of remedial works on ‘alert’ and standing by. Increased vigilance, scenarios reviewed and plans revised based on situation,  Red – adverse effects likely, Action plans implemented; stop tunnelling and implement plans formulated during amber.
  • 72. Feedback Loops Alignment – ensure the tunnel is in the correct place and take necessary actions Monitoring and actual performance against design assumptions Change design if required / if possible: ➢opportunities in better ground, ➢ increased risk in poorer ground or sub-optimal equipment selection and workarounds required Changes in ground and possible claims against any contractual baseline
  • 73. Construction Output SAFE TUNNELLING Controlled settlement, minimal impact on infrastructure, optimised face pressures, controlled progress
  • 74. IDENTIFY & DESIGN PROTECTION WORKS GEOLOGICAL -GEOTECHNICAL MODEL SITE INVESTIGATIONS (All previous data, desk study, other project data.) BUILDING RISK ASSESSMENTS & PROTECTION PLANS. Allowable Limits of Deformation ALIGNMENT OF RAIL TRACK & STATION LOCATION INSTRUMENTATION DESIGN SETTLEMENT ANALYSIS Ground loss, shield loss, tailskin loss, sensitivity TBM OPERATIONAL PARAMETERS & RANGE -Face Pressure, grout pressure/volume SURVEYS FOR UTILITIES, ID NATURE OF MATERIAL & ALLOWABLE LIMITS OF DEFORMATION GEOLOGICAL PROFILE & GEOTECHNICAL PARAMETERS SITE INVESTIGATIONS Supplementary & Instrumentation Installation BUILDING CONDITION SURVEYS, STRUCTURAL SURVEYS, Confirm Extent and magnitude of settlement, correctness of face pressure Confirm /Reassess Geological profile and face pressures required to ensure settlements controlled. Confirm or Revise Building protection Works as required. Revise risk assessment MONITORING TBM Parameters Face Pressure Grout Volume & Pressure Muck Volume Thrust, torque & Advance Speed Instrumentation Drilling Data against geological profile Planned against actual settlement Monitoring of Treated Areas Immediate Actions Reading Frequency Accuracy checks Visual Inspections of surface/buildings SAFE TUNNELLING Controlled settlement, minimal impact on infrastructure, optimised face pressures, controlled progress CONSTRUCTION Tunnelling TBM Operation Face pressure, Grouting Volume & Pressure Muck Volume Thrust Torque Speed of Advance Steering / Survey Control Lining Erection Build Quality / Repars Alignment Ground Treatment Drilling Grouting Verification Immediate Actions Alarm Plans Standard Operating Procedures Emergency Plans DESIGN OF TUNNELADVANCE Horizontal & Vertical Alignment - deeper tunnels have greater pressures, tight curves may require tapered rings Geotechnical Interpretation - possible geological hazards, mixed face conditions, geological boundaries Face Pressures - control of face pressure to avoid stress relaxation & overexcavation Weights / Volumes - assessment of weight based on range of in-situ density, assess likely use of soil conditioning Instrument Plan - types & distribution of instruments based on predicted settlements and location of buildings, frequency of reading Settlement Contours & Settlement Limits - assessment of extent of predicted settlement, allows a check to be carried out during construction Required Consolidation Works - building protection worked to prevent any adverse effects due to settlement. High Risk Areas, Structures & utilities- indicated on drawings to advise of additional care/reporting Anticipated Anomalies & Actions - Loss of face pressure, additional grout, overexcavation Probing - predicted geology, tates of penetration TUNNEL MANAGEMENT PROCESS DESIGN INPUT DESIGN PROCESS DESIGN OUTPUT CONSTRUCTION INPUT CONSTRUCTION PROCESS CONSTRUCTION OUTPUT Input 'field data' &/or correction factors into design TBM - GROUND INTERACTION Compliance with settlement limits Compliance with Face Pressure & Grout requirements Compliance with alignment DAILY/WEEKLY BASISREVIEW OF DATA TBM Design Segment Design/Lining ALIGNMENT VALIDATION - Wriggle survey ALIGNMENTVERIFICATION - Track Work Validation CONFIRM ALIGNMENT - Design modifiaction may be necessary, signalling, route restrictions.
  • 75. Holistic View  Many specialist areas contribute to the tunnel design  Many views and opinions  Many data sources  Lots of data available  Multiple stakeholders along the alignment and through the process  One error can be enough to be catastrophic!!