SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001
Dept. Version 2013-0 Page 1 of 4
GENERAL SAFETY
1.PERSONAL PROTECTIVE EQUIPMENT
CSA or ANSI equivalent personal protective equipment must be worn
2 EMERGENCY
In case of an emergency, stop the equipment by pressing the red emergency stop button.
All employees should be familiar with the location of the emergency stop buttons on the equipment they operate, as their
exact location can differ from location to location (branch to branch)
LOTO (Lock Out Tag Out) Reference LOTO STD
If any of these DISCONNECTS are in the “ON” position notify your supervisor.
ONLY THOSE WHO ARE TRAINED CAN LOCK OUT/TAG OUT
TRAINING:
Only those who have been trained on Lock Out/Tag out (LOTO) should perform LOTO.
Inform Supervisor and/or Safety Manager if any locks are missing or out of place
Please read the Corrosion Service Lock Out Tag Out Policy for more details, including disciplinary process
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Implem Date N/A Date Created: JUNE 14 2013 Document # SWP-1XX-001
Dept. MFG Version 2013-0 Page 1 of 4
OFF POSITION
DIFFERENT POWER RATING DISCONNECTS
ON POSITION
Page 2 of 3
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001
Dept. Version 2013-0 Page 1 of 4
Lock Out Tag Out Procedure
1. Prepare For Shutdown
Everyone in the area must be informed that Lockout/Tagout will be performed and on which machines.
2. Identify Sources of Hazardous Energy on the machine/equipment
Assess equipment and identify the hazardous energy sources (figure 1.0), either potential or kinetic and
determine the most effective method to achieve a “ZERO ENERGY STATE”. Contact Manufacturing
Engineer (Julian Kalac) to help identify system shutdown procedures.
3. Shutdown
Follow proprietary equipment and system shutdown procedures normally used to stopping the
equipment and return equipment to a “ZERO ENERGY STATE” by methods described under “General
Lockout Guidelines” in Figure 1.0. This will likely mean turning or pressing the “stop” button
4. Apply Lock and Tag Information.
Locks
— Each worker will shall obtain his/her own individually keyed lock. This is the workers own safety
equipment is not to be loaned. (No duplicate or master keys).
— When more than one person use a multi-hinged hasp lockout device.
Tags
Lockout tags should include the following information:
— Date, Time. Workers Name(s), Department(s).
— Reason why equipment has been disconnected
5. Verify Effectiveness of Lockout
Ensure that all equipment energy sources are re-tested and a “ZERO ENERGY STATE” has ben achieved.
Use equipment specified testing devices for system shutdown confirmation such as Volt Meters, pressure
gauges, blocks, bleeding devices or cycling systems procedures.
6. Release From Lockout/Tagout
Before locks/tags are removed and energy is restored to the machine/equipment, inspect the work area
to ensure components are operationally intact. Each lock and tag should be removed from each energy-
isolating device by the worker who applied the lock and tag.
Page 3 of 3
SAFE WORK PROCEDURE
LOCK OUT TAG OUT
Created by Julian K. Approved by GEORGE A. Department Manufac. Eng.
Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001
Dept. Version 2013-0 Page 1 of 4
FIGURE 1
ENERGY FORM ENERGY SOURCE GENERAL LOCKOUT GUIDELINE
Electricity
power transmission lines;
machine power cords;
motors;
solenoids;
capacitors (stored
electrical energy)
Turn off power at machine first (i.e., at point of operation
switch), and then at the main disconnect switch for the
machine; lock and tag main disconnect switch (or remove
fuses from box, and then lock and tag box).
Fully discharge all capacitive systems (e.g., cycle machine to
drain power from capacitors) according to manufacturer’s
instructions.
Fluid pressure
hydraulic systems (e.g.,
hydraulic presses, rams,
cylinders, hammers)
Shut off, lock (with chains, built-in lockout devices, or
lockout attachments) and tag valves; bleed off and blank
lines as necessary.
Air pressure
pneumatic systems (e.g.,
lines, pressure reservoirs,
accumulators, air surge
tanks, rams, cylinders)
Shut off, lock (with chains, built-in lockout devices, or
lockout attachments) and tag valves; bleed off excess air;
if pressure cannot be relieved, block any possible
movement of machinery.
Kinetic energy
blades;
flywheels;
materials in supply lines of
bins or silos
Stop and block machine parts (e.g., stop flywheels and
ensure that they do not recycle); review entire cycle of
mechanical motion, ensure that all motions are stopped.
Block material from moving into area of work;
Potential energy
springs (e.g., in air brake cylinders);
actuators; counter weights;
raised loads;
top or movable part of a
press or lifting device
If possible, lower all suspended parts and loads to the
lowers (rest) position, block parts that might be moved
by gravity; release or block spring energy.
Pressurized liquids
and gases
supply lines;
storage tanks and vessels
Shut off, lock (with chains, built-in lockout devices, or
lockout attachments) and tag valves; bleed off excess
liquids or gases; blank lines as necessary.

More Related Content

PPTX
FreeRTOS basics (Real time Operating System)
PPTX
PART-1 : Mastering RTOS FreeRTOS and STM32Fx with Debugging
PPTX
PART-2 : Mastering RTOS FreeRTOS and STM32Fx with Debugging
PDF
Chapter 7 8051 programming in c
PPTX
Train the trainer
PDF
The Future of Digital Health in 2022
PPT
Manufacturing excellence
PPTX
LOTO Training
FreeRTOS basics (Real time Operating System)
PART-1 : Mastering RTOS FreeRTOS and STM32Fx with Debugging
PART-2 : Mastering RTOS FreeRTOS and STM32Fx with Debugging
Chapter 7 8051 programming in c
Train the trainer
The Future of Digital Health in 2022
Manufacturing excellence
LOTO Training

What's hot (20)

PPTX
Machine guards
PPS
Lockout Tagout
PPTX
Health and safety induction
PPTX
Health and Safety Induction Training
PPTX
General HSE Training (Level 1 & 2)
PPT
Emergency response
PPSX
Emergency Response Training
DOCX
21 confined space working risk assessment templates
PPTX
Presentation working at height
PPTX
Basic Safety Induction .pptx
PPT
Working at-height
PPT
Industrial safetY of height works
PPT
Loto training
PPT
Lockout/Tagout
PPT
Basic safety orientation training
PPT
Behavior Based Safety
PPT
DOC-20220402-WA0048..ppt- Permit To Work Procedure
PPT
New Employee Safety Orientation by BLR
PPTX
Work At Height
Machine guards
Lockout Tagout
Health and safety induction
Health and Safety Induction Training
General HSE Training (Level 1 & 2)
Emergency response
Emergency Response Training
21 confined space working risk assessment templates
Presentation working at height
Basic Safety Induction .pptx
Working at-height
Industrial safetY of height works
Loto training
Lockout/Tagout
Basic safety orientation training
Behavior Based Safety
DOC-20220402-WA0048..ppt- Permit To Work Procedure
New Employee Safety Orientation by BLR
Work At Height
Ad

Viewers also liked (16)

PPT
Lockout tagout
DOC
Ben Version 2-page LOTO Procedure TEMPLATE
PDF
Catalogue khoa LOTO (Lockout Tagout)_TIFACO
PDF
Lockout tagout safety awareness - online 2009
PPS
Loto.ppt
PPTX
Safe System of Work (SSW)
PPT
Curso loto
PDF
Loto online slides
PPT
0051 travamento seguran%e7a-92sld
PDF
Controle e bloqueio de energia
PPT
Lockout Tag Out
DOCX
Lockout tagout safety awareness - online 2009
PPT
Lockout tagout
PPT
8 steps-to-ensure-proper-lockout-tagout
PPT
Lockout tagout
PPT
Lock Out Tag Out
Lockout tagout
Ben Version 2-page LOTO Procedure TEMPLATE
Catalogue khoa LOTO (Lockout Tagout)_TIFACO
Lockout tagout safety awareness - online 2009
Loto.ppt
Safe System of Work (SSW)
Curso loto
Loto online slides
0051 travamento seguran%e7a-92sld
Controle e bloqueio de energia
Lockout Tag Out
Lockout tagout safety awareness - online 2009
Lockout tagout
8 steps-to-ensure-proper-lockout-tagout
Lockout tagout
Lock Out Tag Out
Ad

Similar to Lock Out Tag Out Safe Work Procedure (20)

PDF
Live wire testing lock out tag out safe work procedure
PPT
Lock Out - Tag Out - Try Out Safety Course 2014
PDF
Lockout Tagout - Protecting Lives and Machinery.
PPTX
PDF
Machine Safeguarding with Lock Out Tag Out
PPTX
LOTO Lock Out and Tag Out Procedure.pptx
PPTX
Lockout tagout refresher training
PPT
Lock-out _ Tag-out_ Safety_ Presentation
PDF
Procedure 1
PPTX
Lockout Tagout - Protecting Lives and Machinery.
PPT
Unit 9 loto pwr_pt
PPT
Unit 9 loto pwr_pt
PPT
Unit 9 loto pwr_pt
PDF
LOCKOUT TAGOUT.pdf
PDF
Safety Tip: Lockout/Tagout (LOTO)
PPT
Unit 9 loto pwr_pt
PDF
LOTO 2
PPTX
LOTO & ENERGY ISOLATION.pptx
PPTX
LOTO 2022 - Energy Isolation Process .pptx
PPT
LOTO_4b4-hazardous-energys-trainings.ppt
Live wire testing lock out tag out safe work procedure
Lock Out - Tag Out - Try Out Safety Course 2014
Lockout Tagout - Protecting Lives and Machinery.
Machine Safeguarding with Lock Out Tag Out
LOTO Lock Out and Tag Out Procedure.pptx
Lockout tagout refresher training
Lock-out _ Tag-out_ Safety_ Presentation
Procedure 1
Lockout Tagout - Protecting Lives and Machinery.
Unit 9 loto pwr_pt
Unit 9 loto pwr_pt
Unit 9 loto pwr_pt
LOCKOUT TAGOUT.pdf
Safety Tip: Lockout/Tagout (LOTO)
Unit 9 loto pwr_pt
LOTO 2
LOTO & ENERGY ISOLATION.pptx
LOTO 2022 - Energy Isolation Process .pptx
LOTO_4b4-hazardous-energys-trainings.ppt

More from Julian Kalac P.Eng (20)

PDF
2025 JULIAN KALAC Lean Six Sigma improvements in SDLC, IT , Audit and FINANCE...
PDF
2025- LEAN 6 SIGMA IMPROVEMENTS MFG SCM WAREHOUSE DISTRIBUTION.pdf
PDF
CTC Vacation Forfeit Purchase Po;licy.pdf
PDF
6-SIGMA ENGINEERING DEPLOYMENT PROGRAM.pdf
PDF
2023-AI POWERED KPI DASHBOARD Julian Kalac.pdf
PDF
0-FINAL ARB Funding Compliance Report FINAL - Copy.pdf
PDF
2023-Overview of-LEAN basics in Software Development.pdf
PDF
2025 Gen-AI inventive solution Automated SOC report processing by Julian Ka...
PDF
2023 Julian Kalac CTC ITGC User Access Testing Improvement.pdf
PDF
Design tolerances using Six Sigma Statistical tolerances
PDF
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
PDF
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
PDF
Batch & Queue vs Lean Continuous Flow
PDF
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
PDF
Design for Six Sigma in Automotive
PDF
1000 Ton Transfer Press Risk Assessment
PDF
Lean logistics
PDF
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PDF
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
PDF
Julian Kalac lean 6 sigma project list--2018
2025 JULIAN KALAC Lean Six Sigma improvements in SDLC, IT , Audit and FINANCE...
2025- LEAN 6 SIGMA IMPROVEMENTS MFG SCM WAREHOUSE DISTRIBUTION.pdf
CTC Vacation Forfeit Purchase Po;licy.pdf
6-SIGMA ENGINEERING DEPLOYMENT PROGRAM.pdf
2023-AI POWERED KPI DASHBOARD Julian Kalac.pdf
0-FINAL ARB Funding Compliance Report FINAL - Copy.pdf
2023-Overview of-LEAN basics in Software Development.pdf
2025 Gen-AI inventive solution Automated SOC report processing by Julian Ka...
2023 Julian Kalac CTC ITGC User Access Testing Improvement.pdf
Design tolerances using Six Sigma Statistical tolerances
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
Batch & Queue vs Lean Continuous Flow
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
Design for Six Sigma in Automotive
1000 Ton Transfer Press Risk Assessment
Lean logistics
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
Julian Kalac lean 6 sigma project list--2018

Recently uploaded (20)

PDF
Design Guidelines and solutions for Plastics parts
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PPTX
wireless networks, mobile computing.pptx
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PDF
Applications of Equal_Area_Criterion.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
Measurement Uncertainty and Measurement System analysis
PPTX
Principal presentation for NAAC (1).pptx
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
Computer organization and architecuture Digital Notes....pdf
PPTX
Module 8- Technological and Communication Skills.pptx
Design Guidelines and solutions for Plastics parts
Exploratory_Data_Analysis_Fundamentals.pdf
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
20250617 - IR - Global Guide for HR - 51 pages.pdf
August -2025_Top10 Read_Articles_ijait.pdf
wireless networks, mobile computing.pptx
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Applications of Equal_Area_Criterion.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Measurement Uncertainty and Measurement System analysis
Principal presentation for NAAC (1).pptx
Information Storage and Retrieval Techniques Unit III
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
MLpara ingenieira CIVIL, meca Y AMBIENTAL
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Computer organization and architecuture Digital Notes....pdf
Module 8- Technological and Communication Skills.pptx

Lock Out Tag Out Safe Work Procedure

  • 1. Page 1 of 3 SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001 Dept. Version 2013-0 Page 1 of 4 GENERAL SAFETY 1.PERSONAL PROTECTIVE EQUIPMENT CSA or ANSI equivalent personal protective equipment must be worn 2 EMERGENCY In case of an emergency, stop the equipment by pressing the red emergency stop button. All employees should be familiar with the location of the emergency stop buttons on the equipment they operate, as their exact location can differ from location to location (branch to branch) LOTO (Lock Out Tag Out) Reference LOTO STD If any of these DISCONNECTS are in the “ON” position notify your supervisor. ONLY THOSE WHO ARE TRAINED CAN LOCK OUT/TAG OUT TRAINING: Only those who have been trained on Lock Out/Tag out (LOTO) should perform LOTO. Inform Supervisor and/or Safety Manager if any locks are missing or out of place Please read the Corrosion Service Lock Out Tag Out Policy for more details, including disciplinary process SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Implem Date N/A Date Created: JUNE 14 2013 Document # SWP-1XX-001 Dept. MFG Version 2013-0 Page 1 of 4 OFF POSITION DIFFERENT POWER RATING DISCONNECTS ON POSITION
  • 2. Page 2 of 3 SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001 Dept. Version 2013-0 Page 1 of 4 Lock Out Tag Out Procedure 1. Prepare For Shutdown Everyone in the area must be informed that Lockout/Tagout will be performed and on which machines. 2. Identify Sources of Hazardous Energy on the machine/equipment Assess equipment and identify the hazardous energy sources (figure 1.0), either potential or kinetic and determine the most effective method to achieve a “ZERO ENERGY STATE”. Contact Manufacturing Engineer (Julian Kalac) to help identify system shutdown procedures. 3. Shutdown Follow proprietary equipment and system shutdown procedures normally used to stopping the equipment and return equipment to a “ZERO ENERGY STATE” by methods described under “General Lockout Guidelines” in Figure 1.0. This will likely mean turning or pressing the “stop” button 4. Apply Lock and Tag Information. Locks — Each worker will shall obtain his/her own individually keyed lock. This is the workers own safety equipment is not to be loaned. (No duplicate or master keys). — When more than one person use a multi-hinged hasp lockout device. Tags Lockout tags should include the following information: — Date, Time. Workers Name(s), Department(s). — Reason why equipment has been disconnected 5. Verify Effectiveness of Lockout Ensure that all equipment energy sources are re-tested and a “ZERO ENERGY STATE” has ben achieved. Use equipment specified testing devices for system shutdown confirmation such as Volt Meters, pressure gauges, blocks, bleeding devices or cycling systems procedures. 6. Release From Lockout/Tagout Before locks/tags are removed and energy is restored to the machine/equipment, inspect the work area to ensure components are operationally intact. Each lock and tag should be removed from each energy- isolating device by the worker who applied the lock and tag.
  • 3. Page 3 of 3 SAFE WORK PROCEDURE LOCK OUT TAG OUT Created by Julian K. Approved by GEORGE A. Department Manufac. Eng. Revision Date N/A Date Created: JUNE 14 2013 Document # WI-1XX-001 Dept. Version 2013-0 Page 1 of 4 FIGURE 1 ENERGY FORM ENERGY SOURCE GENERAL LOCKOUT GUIDELINE Electricity power transmission lines; machine power cords; motors; solenoids; capacitors (stored electrical energy) Turn off power at machine first (i.e., at point of operation switch), and then at the main disconnect switch for the machine; lock and tag main disconnect switch (or remove fuses from box, and then lock and tag box). Fully discharge all capacitive systems (e.g., cycle machine to drain power from capacitors) according to manufacturer’s instructions. Fluid pressure hydraulic systems (e.g., hydraulic presses, rams, cylinders, hammers) Shut off, lock (with chains, built-in lockout devices, or lockout attachments) and tag valves; bleed off and blank lines as necessary. Air pressure pneumatic systems (e.g., lines, pressure reservoirs, accumulators, air surge tanks, rams, cylinders) Shut off, lock (with chains, built-in lockout devices, or lockout attachments) and tag valves; bleed off excess air; if pressure cannot be relieved, block any possible movement of machinery. Kinetic energy blades; flywheels; materials in supply lines of bins or silos Stop and block machine parts (e.g., stop flywheels and ensure that they do not recycle); review entire cycle of mechanical motion, ensure that all motions are stopped. Block material from moving into area of work; Potential energy springs (e.g., in air brake cylinders); actuators; counter weights; raised loads; top or movable part of a press or lifting device If possible, lower all suspended parts and loads to the lowers (rest) position, block parts that might be moved by gravity; release or block spring energy. Pressurized liquids and gases supply lines; storage tanks and vessels Shut off, lock (with chains, built-in lockout devices, or lockout attachments) and tag valves; bleed off excess liquids or gases; blank lines as necessary.