Make To Stock- Strategy 10
With Configurable Material
Document prepared by
Akshay Kulkarni
https://www.linkedin.com/in/akshay-kulkarni-005417175/
MTS - Variant Configuration Overview
➢In Make to stock product is manufactured without reference to sales order.
➢Let's take an example of car manufacturing process, they have already created their standard variant & they
use to manufacture the product and keep it in stock & business is not waiting for customer to place an order
why because this is more saleable Variant/Product.
➢ Production is done based upon forecast of the saleable Variant/Product .
➢ Similarly in our case, FG_Pavilion1 variant is a combination of 16GB, 512GB, CoreI7, Silver colour and this
variant is more saleable variant/ Product, which is shown in page number 3.
➢Requirement type for MTS is LSF & PIR requirement class is 100.
➢Requirement type KEK is determined for strategy 25 and also item category TAC.
NOTE :- Refer MTO Variant configuration document for more information.
MTS -Variant Configuration – Laptop Manufacturing
FG_Pavilion (KMAT)
HDD Processor Colour
RAM
4GB 8GB 16GB 128GB 256GB 512GB Core I5 Core I7 Gray Silver
FG_Pavilion1 (FERT)
FG_Pavilion1 variant is a combination of 16GB, 512GB, CoreI7, Silver.
Variant Material
Configurable Material
Difference between Class Type - 200 & Class Type - 300
➢ Class 200 and 300 are both defined for the materials.
➢ Class 300 is mainly used for a variant material used for variant configuration.
➢ We can also classify materials under class 200 which do not have to be configurable materials, but allows to use
the defined characteristics and restrict the usage for a specific purpose.
➢ Class type 200 is for classes that are used as class items in bills of material.
➢ Class type 300 is for variant configuration.
Make to Stock – Variant Configuration
Step 1 :- Create a material (Variant material) “FG_Pavilion1” (FERT) & In MRP 3 view we need to assign
configurable material i.e. (FG_Pavilion - KMAT) and also define characteristics values – MM01
Step 2 :- Create link to configurable material and assign variant to configurable material - CS40.
Step 3 :- Change Routings and assign variant to configurable material – CA02.
Step 4 :- Create Production version – C223 / MM02.
Step 5 :- Create Material Cost estimate – CK11N.
Step 6 :- Costing Run – CK24.
Step 7 :- Planned independent requirements – MD61
Step 8 :- MRP Run – MD02 / MD01N.
Step 9 :- Convert Planned order to Production order & release of production order – MD04.
Step 10:- Goods issue, confirmation & Goods receipt of production order –CO15.
Step 1 :- Create a material (Variant material) “FG_Pavilion1” (FERT) & In MRP 3 view we need to assign
configurable material i.e. (FG_Pavilion - KMAT) and also define characteristics values – MM01
Sr no Material Master views
1 Basic data 1
2 Basic data 2
3 Sales : sales org.1
4 Sales : sales org.1
5 Sales : General/Plant
6 MRP1
7 MRP2
8 MRP3
9 MRP4
10 Work scheduling
11 Accounting 1
12 Accounting 2
13 Costing 1
14 Costing 2
These are the views , we need to select
Material FG_Pavilion1
Industry Mechanical Engineering
Material Type Finished Product
Basic data1
Basic data2
Sales : sales org.1
Sales : sales org.2
Sales : General/Plant
MRP1
MRP2
MRP3
Assign configurable material i.e. FG_PAVILION and choose configure variant.
MRP3
Choose respective values i.e. RAM_16GB, HDD_512GB, COREI7, SILVER_COLOUR.
MRP4
Work scheduling
Accounting1
Accounting2
Costing1
Costing2
Material FG_PAVILION1 (Variant Material )created.
Step 2 :- Create link to configurable material and assign variant to configurable material - CS40.
Create link to configurable material and assign variant to configurable material
Save it.
Step 3 :- Change Routings and assign variant to configurable material – CA02.
Routing Header Details
Enter configurable material and go to header
details and assign variant material.
Change Routings and assign variant to configurable material.
Routing was saved with group 50001160 and material FG_PAVILION.
.
Step 4 :- Create Production version – C223 / MM02.
.
Save it
Step 5 :- Create Material Cost estimate – CK11N.
.
Click on Enter
Create Material Cost estimate
.
Step 6 :- Costing Run – CK24.
.
.
Costing Run
.
Step 7 :- Planned independent requirements – MD61
.
Step 8 :- MRP Run – MD02 / MD01N.
.
Step 9 :- Convert Planned order to Production order & release of production order – MD04.
.
Order number 1000408 saved
Step 10:- Goods issue, confirmation & Goods receipt of production order –CO15.
.
.
Display of production order – CO03.
.
.
Display of production order – CO03.
.
.
Display of production order – CO03.
.
.
THANK YOU

More Related Content

PDF
Sap mm-end-user-manual
PDF
Sap pp shop floor control configuration
DOCX
Subcontracting configuration
PDF
SAP MTO Variant Configuration by Akshay Kulkarni
PPTX
240935187-Handling-Unit-Management-in-SAP-Packing-During-Outbound-Process.pptx
PDF
Asset purchase
PDF
Parametrage magasin wm sap s4 hana
PDF
Rappel-en-SD-SAP 2.pdf
Sap mm-end-user-manual
Sap pp shop floor control configuration
Subcontracting configuration
SAP MTO Variant Configuration by Akshay Kulkarni
240935187-Handling-Unit-Management-in-SAP-Packing-During-Outbound-Process.pptx
Asset purchase
Parametrage magasin wm sap s4 hana
Rappel-en-SD-SAP 2.pdf

What's hot (20)

DOC
How to guide-fiori-mm_en_xx
PDF
Selection Profile in SAP PM
PPTX
Storage location control in SAP WM
PPTX
SAP MM Material Master with Configurations
PDF
Sap wm pdf
PDF
Automatic batch determination based on shelf life
DOCX
Important sap ewm tables for key functional areas
PDF
Sap controlling doc=venu+venu
PPSX
Sap EWM Introduction
DOCX
Automatic picking configuration in delivery in sap sd
PDF
SAP STO config
PDF
Scm660 handling-unit-management
PPTX
SAP EWM Kitting
PPTX
1 dados mestres e inbound1
PDF
SAP-WM_ Document on Warehouse Management .pdf
PPT
Processo sd
PDF
Administering maximo asset management
DOC
Scheduling agreement output message configuration
DOC
Logistic execution step by step config
PDF
Batch Determination Based Delivery ATP and Auto Delivery Quantity Adjustment
How to guide-fiori-mm_en_xx
Selection Profile in SAP PM
Storage location control in SAP WM
SAP MM Material Master with Configurations
Sap wm pdf
Automatic batch determination based on shelf life
Important sap ewm tables for key functional areas
Sap controlling doc=venu+venu
Sap EWM Introduction
Automatic picking configuration in delivery in sap sd
SAP STO config
Scm660 handling-unit-management
SAP EWM Kitting
1 dados mestres e inbound1
SAP-WM_ Document on Warehouse Management .pdf
Processo sd
Administering maximo asset management
Scheduling agreement output message configuration
Logistic execution step by step config
Batch Determination Based Delivery ATP and Auto Delivery Quantity Adjustment
Ad

Similar to SAP Make to Stock Variant Configurations_Akshay Kulkarni (20)

DOC
Variant Configuration
PDF
SAP Variant Configuration example by KMR software
PDF
sap-variant-configurationpdf
PDF
SAP ERP INTELLIGENCE
PDF
Variant confg
PDF
Variant material
PDF
147623883 sap-cin-mm
DOCX
Variant configuration.docx
PDF
SAP Configuration Guide for Functional Modules (Based on IDES)
PDF
Variant configuration-training-document
DOCX
SAP MM Essential Master Data
DOCX
Purchase process
PPT
Enterprise wide information systems - configuring sap
PDF
MM Configuration Path
PDF
Sap mm configurations customization detailss
PDF
Fms technical guide for ABAP
PPTX
FI - MM.pptx
PDF
Evolution to 3.0
PDF
S4F POC Article Master
PDF
Microsoft Dynamics Nav 2013 Application Design Mark Brummel
Variant Configuration
SAP Variant Configuration example by KMR software
sap-variant-configurationpdf
SAP ERP INTELLIGENCE
Variant confg
Variant material
147623883 sap-cin-mm
Variant configuration.docx
SAP Configuration Guide for Functional Modules (Based on IDES)
Variant configuration-training-document
SAP MM Essential Master Data
Purchase process
Enterprise wide information systems - configuring sap
MM Configuration Path
Sap mm configurations customization detailss
Fms technical guide for ABAP
FI - MM.pptx
Evolution to 3.0
S4F POC Article Master
Microsoft Dynamics Nav 2013 Application Design Mark Brummel
Ad

Recently uploaded (20)

PPTX
TLE Review Electricity (Electricity).pptx
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
August Patch Tuesday
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
Mushroom cultivation and it's methods.pdf
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPTX
Chapter 5: Probability Theory and Statistics
PDF
Hybrid model detection and classification of lung cancer
PDF
Heart disease approach using modified random forest and particle swarm optimi...
PDF
Approach and Philosophy of On baking technology
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
WOOl fibre morphology and structure.pdf for textiles
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PPTX
A Presentation on Artificial Intelligence
PPTX
A Presentation on Touch Screen Technology
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
TLE Review Electricity (Electricity).pptx
Unlocking AI with Model Context Protocol (MCP)
MIND Revenue Release Quarter 2 2025 Press Release
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Encapsulation_ Review paper, used for researhc scholars
August Patch Tuesday
Assigned Numbers - 2025 - Bluetooth® Document
Mushroom cultivation and it's methods.pdf
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Chapter 5: Probability Theory and Statistics
Hybrid model detection and classification of lung cancer
Heart disease approach using modified random forest and particle swarm optimi...
Approach and Philosophy of On baking technology
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
1 - Historical Antecedents, Social Consideration.pdf
WOOl fibre morphology and structure.pdf for textiles
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
A Presentation on Artificial Intelligence
A Presentation on Touch Screen Technology
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf

SAP Make to Stock Variant Configurations_Akshay Kulkarni

  • 1. Make To Stock- Strategy 10 With Configurable Material Document prepared by Akshay Kulkarni https://www.linkedin.com/in/akshay-kulkarni-005417175/
  • 2. MTS - Variant Configuration Overview ➢In Make to stock product is manufactured without reference to sales order. ➢Let's take an example of car manufacturing process, they have already created their standard variant & they use to manufacture the product and keep it in stock & business is not waiting for customer to place an order why because this is more saleable Variant/Product. ➢ Production is done based upon forecast of the saleable Variant/Product . ➢ Similarly in our case, FG_Pavilion1 variant is a combination of 16GB, 512GB, CoreI7, Silver colour and this variant is more saleable variant/ Product, which is shown in page number 3. ➢Requirement type for MTS is LSF & PIR requirement class is 100. ➢Requirement type KEK is determined for strategy 25 and also item category TAC. NOTE :- Refer MTO Variant configuration document for more information.
  • 3. MTS -Variant Configuration – Laptop Manufacturing FG_Pavilion (KMAT) HDD Processor Colour RAM 4GB 8GB 16GB 128GB 256GB 512GB Core I5 Core I7 Gray Silver FG_Pavilion1 (FERT) FG_Pavilion1 variant is a combination of 16GB, 512GB, CoreI7, Silver. Variant Material Configurable Material
  • 4. Difference between Class Type - 200 & Class Type - 300 ➢ Class 200 and 300 are both defined for the materials. ➢ Class 300 is mainly used for a variant material used for variant configuration. ➢ We can also classify materials under class 200 which do not have to be configurable materials, but allows to use the defined characteristics and restrict the usage for a specific purpose. ➢ Class type 200 is for classes that are used as class items in bills of material. ➢ Class type 300 is for variant configuration.
  • 5. Make to Stock – Variant Configuration Step 1 :- Create a material (Variant material) “FG_Pavilion1” (FERT) & In MRP 3 view we need to assign configurable material i.e. (FG_Pavilion - KMAT) and also define characteristics values – MM01 Step 2 :- Create link to configurable material and assign variant to configurable material - CS40. Step 3 :- Change Routings and assign variant to configurable material – CA02. Step 4 :- Create Production version – C223 / MM02. Step 5 :- Create Material Cost estimate – CK11N. Step 6 :- Costing Run – CK24. Step 7 :- Planned independent requirements – MD61 Step 8 :- MRP Run – MD02 / MD01N. Step 9 :- Convert Planned order to Production order & release of production order – MD04. Step 10:- Goods issue, confirmation & Goods receipt of production order –CO15.
  • 6. Step 1 :- Create a material (Variant material) “FG_Pavilion1” (FERT) & In MRP 3 view we need to assign configurable material i.e. (FG_Pavilion - KMAT) and also define characteristics values – MM01 Sr no Material Master views 1 Basic data 1 2 Basic data 2 3 Sales : sales org.1 4 Sales : sales org.1 5 Sales : General/Plant 6 MRP1 7 MRP2 8 MRP3 9 MRP4 10 Work scheduling 11 Accounting 1 12 Accounting 2 13 Costing 1 14 Costing 2 These are the views , we need to select Material FG_Pavilion1 Industry Mechanical Engineering Material Type Finished Product
  • 10. Sales : sales org.2
  • 12. MRP1
  • 13. MRP2
  • 14. MRP3 Assign configurable material i.e. FG_PAVILION and choose configure variant.
  • 15. MRP3 Choose respective values i.e. RAM_16GB, HDD_512GB, COREI7, SILVER_COLOUR.
  • 16. MRP4
  • 22. Step 2 :- Create link to configurable material and assign variant to configurable material - CS40.
  • 23. Create link to configurable material and assign variant to configurable material Save it.
  • 24. Step 3 :- Change Routings and assign variant to configurable material – CA02. Routing Header Details Enter configurable material and go to header details and assign variant material.
  • 25. Change Routings and assign variant to configurable material. Routing was saved with group 50001160 and material FG_PAVILION. .
  • 26. Step 4 :- Create Production version – C223 / MM02. . Save it
  • 27. Step 5 :- Create Material Cost estimate – CK11N. . Click on Enter
  • 28. Create Material Cost estimate .
  • 29. Step 6 :- Costing Run – CK24. . .
  • 31. Step 7 :- Planned independent requirements – MD61 .
  • 32. Step 8 :- MRP Run – MD02 / MD01N. .
  • 33. Step 9 :- Convert Planned order to Production order & release of production order – MD04. . Order number 1000408 saved
  • 34. Step 10:- Goods issue, confirmation & Goods receipt of production order –CO15. . .
  • 35. Display of production order – CO03. . .
  • 36. Display of production order – CO03. . .
  • 37. Display of production order – CO03. . .