15 May 2015
Scaled Agile Meets the Ground
2©Alliance Global Services 2015
Agenda
 Understand Agility
 Business Case Implementation
 Execution Strategies & Challenges
 Recommendations
 Q & A
3©Alliance Global Services 2015
UNDERSTAND AGILITY
4©Alliance Global Services 2015
Is it delivering code to production every 11 sec?
It is delivering code to production every hour, day, week, two weeks,
months?
Is it maximize learning from real users as quickly as every day?
Is it the ability to change the software within an hour/ day for the change
identified?
It depends on the amount of agility
needed by business
What do we mean by Agile?
5©Alliance Global Services 2015
Define Agility Needs
Understand Business Context / needs
Understand the Production Roll out Frequency
Understand the Feedback Frequency Cycles
Understand the Technology Support/ Maturity
Understand the Organization Support/ Maturity
Identification of Right Agility needs is key for the
success of project since the impact is high
For ex. the distribution of non value added work for a
2 weeks sprint is 16%
3 weeks sprint is 12.5%
6©Alliance Global Services 2015
SYNOPSIS OF TEXTILE CARE PROJECT
7©Alliance Global Services 2015
NORTH AMERICA
300 Plants EUROPE
2000 Plants
Product
Owner
Product
Owner
App 1
App 2 App 3License
License
Custom Application
0License
Development Center:
Hyderabad
No vendor management required
Business Objective
8©Alliance Global Services 2015
Project Snapshot
Real Time Application Software
 Data acquisition from Meters and Sensors real time for each plant
 Real Time Data Display in TVs and Dashboards for Plant Engineers and
Operators
 Consolidated Central Reporting System
No of Plants: 300 in US, 2000 in Europe
Team Size: 42 Product Owners Location: US & Europe
Duration: 12 Months Development Team Location: Hyderabad
No of Stories: 600 No of Teams: 6
No of Sprints: 45 Sprint Duration: 2 weeks to 3 weeks
9©Alliance Global Services 2015
Plant Overview
Conventional
Washer 1
Conventional
Washer 2
Conventional
Washer 3
Tunnel
Washer
Allen Bradley
Controller
Mitsubishi
Controller
Local Application
Dispensers
(Automated Product
Injections)
Real Time Data Display
(Extended TVs)Dispensers
(Automated Product
Injections)
10©Alliance Global Services 2015
Central Overview
Consolidated
Central Reporting
System
Offline Application
External System
Local Plant 1
Local Plant 2
Local Plant 3
Local Plant 4
11©Alliance Global Services 2015
AGILE APPROACH TAKEN FOR PROJECT
12©Alliance Global Services 2015
13©Alliance Global Services 2015
JumpStart Purpose
Understand the user roles of <the product>
Understand and further define the
functionality and the recommended
technical approach and architecture
Determine high-level size and effort
estimates
14©Alliance Global Services 2015
JumpStart Purpose (continued)
This is generally one sprint worth of activities. A general guideline is for 5 – 6 months of project effort the
JumpStart shouldn’t take more than 2 weeks of effort. If you are spending more time than that you are probably
over analyzing. It is important to recognize that you don’t need to get all the stories defined at the granular level
– just enough to get started and create high level release plan. Idea creation never ends, and it certainly doesn’t
end at the time of the business vision.
Define an Implementation approach for <the
product> including tools, team, and estimated
timeline
Define the Pilot target and subsequent
releases
Define the Project Governance
15©Alliance Global Services 2015
Execution Strategy - JumpStartOneumbrella
Conducted
JumpStart Phase
which helped us to
bring in all the
stakeholders to a
single location. Objective
Defined the
Product Vision,
Identification of
Unknown and Risk
areas with
Mitigation Plans,
High level product
Backlog,
Architecture/Design
KnowledgeSharing
Product owners
spread across the
globe, Created a
Proxy Product
Team considering
the Distributed
location challenges.
16©Alliance Global Services 2015
Execution Strategy – Team Formation/Changes
Project Progress Span
Focus Team
Team A
Cross-Function
Integration
TeamTeam A
Team B
Team A
Team B
Team B
Cross-Function
17©Alliance Global Services 2015
Execution Strategy – Process Transformation
1 Product Team
1 Product Team
5 Scrum Teams
1 Product Team
2 Scrum Teams
1 Kanban Team
18©Alliance Global Services 2015
Execution Strategy – Team Collaboration
Monthly
Release
Review
Meeting
Weekly
Backlog
Grooming
Weekly
Focus
Meetings
(UI, DB,
Design,
Testing
Scrum
Ceremonies
19©Alliance Global Services 2015
The Challenge !!!
1
Hi… Mr Hardware
!!!
 
Hardware
Service
Database
Software
UI
20©Alliance Global Services 2015
Testing Complexities Of Hardware and Software
Create “Virtual
Hardware”
Service
Software
Database
Hurray !!!
Application
Tested Hardware
&
Virtual Hardware
meets !!!
21©Alliance Global Services 2015
Understand the signal pattern and frequency sent
from the hardware
2
• Virtual hardware needs to
understand that pattern.
Actual hardware
• Every hardware have a particular signal pattern and frequency
Virtual Hardware
22©Alliance Global Services 2015
PLC Simulator Tool (Virtual Hardware for Washer)
• This tool will be sending data to PLC that
would be the replica of signals sent by actual
Washer
Write Data to PLC
• The tool must have provision for creating
multiple simulators for multiple washersCreate multiple virtual
hardware in the test module
• Provide options to configure the virtual
hardware to effectively create test scenariosConfigure the virtual
hardware
• This tool must be able to simulate PLC for
multiple washers at a time (multithreading)Multi tasking of each
washer
23©Alliance Global Services 2015
Result
• MVP as business needed
• Delivered 40 Successful Sprints
• High satisfaction from end users, product sponsor/owners
• High satisfaction from team and internal stakeholders
24©Alliance Global Services 2015
Recommendations
• Before hitting the ground understand your agility needs
• Define the agile approach to be followed
• Agility needs of project can vary during the project life cycle,
change of course correction as needed
25©Alliance Global Services 2015
Thank You
Krishna Mohan Tunuguntla
Sr. Project Manager
ktunuguntla@allianceglobalservices.com
http://www.allianceglobalservices.com

More Related Content

PDF
Lightning talk Accenture
PPTX
Agile conference 2013
PPTX
Introduction - #ATAGTR2016
PDF
How to Measure Agility Project Success in Business Terms
PPTX
Powering Safe Launch @ Scale (Feature Flags, Targeting, Experimentation)
PPTX
Unlocking Excellence with Agile Metrics
PDF
Agile dashboard
PDF
Scrum_BLR 10th meet up 13 sept-2014 - The Slippery Slope from Agile to Scrum ...
Lightning talk Accenture
Agile conference 2013
Introduction - #ATAGTR2016
How to Measure Agility Project Success in Business Terms
Powering Safe Launch @ Scale (Feature Flags, Targeting, Experimentation)
Unlocking Excellence with Agile Metrics
Agile dashboard
Scrum_BLR 10th meet up 13 sept-2014 - The Slippery Slope from Agile to Scrum ...

What's hot (19)

PDF
Reliability at scale
PPTX
Webinar gwava webiste
PPTX
Featured Modules for your Projects!
PDF
Agile Metrics : A seminal approach for calculating Metrics in Agile Projects
PDF
Software Development with Agile Waterfall Hybrid Method
PDF
Agile Software Development at UPT DEGI | Nov, 2015
PDF
Live Webinar- Making Test Automation 10x Faster for Continuous Delivery- By R...
PDF
Applying both Agile and Waterfall in one project
PPTX
Webinar: Development with Agile, Waterfall and Agile-Waterfall Hybrid
PPTX
Embedded meets Agile
PDF
Requirements Management applied in an agile Project Environment
PDF
Agifall - Combining Waterfall and Agile Development Process for Digital and S...
PDF
5 Principles to Managing Your Application Lifecycle with SpiraTeam
PDF
Agile Gurugram 2016 | Conference | Implementing agile in non-agile environmen...
KEY
Agile Software Development, Overview
PPTX
Operationalizing your Virtual Network: Getting to the Next Level with SDN/NFV...
PPTX
Startup safari 2020 making s3 more resilient using lambda@edge
PDF
Imagine Digital Safety Assured - Arno van de Velde (Micro Focus)
PPTX
Experience Report : Agile transformation & implementation - Cisco Video Bus...
Reliability at scale
Webinar gwava webiste
Featured Modules for your Projects!
Agile Metrics : A seminal approach for calculating Metrics in Agile Projects
Software Development with Agile Waterfall Hybrid Method
Agile Software Development at UPT DEGI | Nov, 2015
Live Webinar- Making Test Automation 10x Faster for Continuous Delivery- By R...
Applying both Agile and Waterfall in one project
Webinar: Development with Agile, Waterfall and Agile-Waterfall Hybrid
Embedded meets Agile
Requirements Management applied in an agile Project Environment
Agifall - Combining Waterfall and Agile Development Process for Digital and S...
5 Principles to Managing Your Application Lifecycle with SpiraTeam
Agile Gurugram 2016 | Conference | Implementing agile in non-agile environmen...
Agile Software Development, Overview
Operationalizing your Virtual Network: Getting to the Next Level with SDN/NFV...
Startup safari 2020 making s3 more resilient using lambda@edge
Imagine Digital Safety Assured - Arno van de Velde (Micro Focus)
Experience Report : Agile transformation & implementation - Cisco Video Bus...
Ad

Viewers also liked (15)

PDF
Distributed Agile Development
PPTX
Harnessing Agile Development In Distributed Environment Dusan K Part
PPTX
Webinar on Distributed Agile Development - what works and why
PPT
Software Development Agile Distributed Delivery Model
PDF
Distributed Software Development in Brazil: A Historical Review
PDF
Distributed Agile Development
PPTX
Using Scrum Values to Build the Engineering Culture
PDF
Scaling Agile and distributed development webinar v1.0
PPTX
Distributed Agile Development
PDF
Agile Software Development with Remote Teams
PDF
Agile Brazil 2010 - DSD + Open Source + Agile Methods
PDF
Agile Software Development With SCRUM
PPTX
User stories in agile software development
PDF
High Quality Software Development with Agile and Scrum
PPTX
You think you know agile
Distributed Agile Development
Harnessing Agile Development In Distributed Environment Dusan K Part
Webinar on Distributed Agile Development - what works and why
Software Development Agile Distributed Delivery Model
Distributed Software Development in Brazil: A Historical Review
Distributed Agile Development
Using Scrum Values to Build the Engineering Culture
Scaling Agile and distributed development webinar v1.0
Distributed Agile Development
Agile Software Development with Remote Teams
Agile Brazil 2010 - DSD + Open Source + Agile Methods
Agile Software Development With SCRUM
User stories in agile software development
High Quality Software Development with Agile and Scrum
You think you know agile
Ad

Similar to Scaled agile meets the ground (20)

PDF
Agile Transformation
PDF
Agile Development Methodologies for Highly Regulated Organizations
PPTX
Real-time Product Management
PPTX
Introducing the Rational Solution for Agile ALM
PPTX
Introducing agilealm
PDF
Agile Development: From Good to Great
PPTX
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
PDF
Agile Development Methodology: Best Practices and Use Cases
PDF
Take Agile to Next Level
PDF
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
PDF
Rapid Deployment of ERP solutions using Lean & Agile Methods
PDF
Agile Development in Highly Regulated Organizations
PPSX
Directions NA Water-Agile-Fall methodology and NAV implementation
PDF
IMPLEMENTATION OF SCALED AGILE AND DEVOPS
PPT
The Agile Revolution of IBM
PPSX
Agile Methodologies
PPTX
India Agile Week 2015
PDF
InterConnect 2016 Continuous Visibility DTA-3268
PDF
Achieving Continuous Visibility Across the DevOps Lifecycle
PDF
Agility at Scale: WebSphere’s Agile Transformation
Agile Transformation
Agile Development Methodologies for Highly Regulated Organizations
Real-time Product Management
Introducing the Rational Solution for Agile ALM
Introducing agilealm
Agile Development: From Good to Great
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
Agile Development Methodology: Best Practices and Use Cases
Take Agile to Next Level
Rapid Deployment of ERP solutions using agile practices by Husni Roukbi
Rapid Deployment of ERP solutions using Lean & Agile Methods
Agile Development in Highly Regulated Organizations
Directions NA Water-Agile-Fall methodology and NAV implementation
IMPLEMENTATION OF SCALED AGILE AND DEVOPS
The Agile Revolution of IBM
Agile Methodologies
India Agile Week 2015
InterConnect 2016 Continuous Visibility DTA-3268
Achieving Continuous Visibility Across the DevOps Lifecycle
Agility at Scale: WebSphere’s Agile Transformation

More from India Scrum Enthusiasts Community (20)

PPTX
Deciphering Agile Big Data
PPTX
Rubber Meets the Road
PPTX
Can Agile Enthusiasm See The Organization Through?
PPTX
Agile​ ​HR​ ​From​ ​the​ ​trenches
PDF
PPTX
Software 4.0 : “How” of Building Software Driven Business
PPTX
Agile Digital Architecture
PPTX
Governance mechanism to further business agility
PDF
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
PDF
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
PDF
Wave 2 of Agile: Agile Leadership Redefined
PDF
Agile Engineering Environment – 2017
PPTX
Management for Agility and Outcomes
PPTX
Agile Mindset Shifting: Agile For All
PDF
Agile Engineering Environment – 2017
PDF
Wave 2 of Agile: Agile Leadership Redefined
PDF
Five (Oops!) Six Mistakes You are Making as a Leader
PPTX
Empower the Forbidden Power Players
PPTX
Agility in Education System for Digital India
PPTX
So what’s this “Teal” Organizations thing?
Deciphering Agile Big Data
Rubber Meets the Road
Can Agile Enthusiasm See The Organization Through?
Agile​ ​HR​ ​From​ ​the​ ​trenches
Software 4.0 : “How” of Building Software Driven Business
Agile Digital Architecture
Governance mechanism to further business agility
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
Wave 2 of Agile: Agile Leadership Redefined
Agile Engineering Environment – 2017
Management for Agility and Outcomes
Agile Mindset Shifting: Agile For All
Agile Engineering Environment – 2017
Wave 2 of Agile: Agile Leadership Redefined
Five (Oops!) Six Mistakes You are Making as a Leader
Empower the Forbidden Power Players
Agility in Education System for Digital India
So what’s this “Teal” Organizations thing?

Recently uploaded (20)

PPT
risk management (contd.) Risk Identification Risk Components and Drivers Risk...
PPTX
EMOTIONAL INTELLIGENCE IN LEADERSHIP.pptx
PDF
250816-Risk Evaluation & Mitigation Strategy-CQS.pdf
PPT
The Management Spectrum 4 Ps in Project Management
PDF
TED Talk on how to make TED Talk slides.pdf
PDF
The Untold Story of Swami Vijay Kumar Durai: Building PRS International
PPTX
management development and careerr planning.pptx
PPTX
Ryan Daly Gallardo Prod Management PPT .pptx
PDF
Personal-Professional-Development-in-Nursing-1.pdf
PPTX
Time Management Techniques_All Rules.pptx
PDF
Boost the power of design | Design Impulse
PPTX
Lean Thinking: Making Efficiency an Everyday Thing
PPTX
Basics of Project Management for development of leadership skills in practice
PPTX
Organizing and Staffing, Staffing process.pptx
PPTX
Common Methods of Performance Appraisal.pptx
PPT
Operations Management Supply-Chain Management
PPTX
Review of "Living Beyond Self Doubt" by Som Bathla
PDF
How to Present a Project Proposal to Stakeholders for Approval?
PPTX
Unit 1-setting up practice arvhitectweyre
PPTX
HRM mmm presentation pragati pandey.pptx
risk management (contd.) Risk Identification Risk Components and Drivers Risk...
EMOTIONAL INTELLIGENCE IN LEADERSHIP.pptx
250816-Risk Evaluation & Mitigation Strategy-CQS.pdf
The Management Spectrum 4 Ps in Project Management
TED Talk on how to make TED Talk slides.pdf
The Untold Story of Swami Vijay Kumar Durai: Building PRS International
management development and careerr planning.pptx
Ryan Daly Gallardo Prod Management PPT .pptx
Personal-Professional-Development-in-Nursing-1.pdf
Time Management Techniques_All Rules.pptx
Boost the power of design | Design Impulse
Lean Thinking: Making Efficiency an Everyday Thing
Basics of Project Management for development of leadership skills in practice
Organizing and Staffing, Staffing process.pptx
Common Methods of Performance Appraisal.pptx
Operations Management Supply-Chain Management
Review of "Living Beyond Self Doubt" by Som Bathla
How to Present a Project Proposal to Stakeholders for Approval?
Unit 1-setting up practice arvhitectweyre
HRM mmm presentation pragati pandey.pptx

Scaled agile meets the ground

  • 1. 15 May 2015 Scaled Agile Meets the Ground
  • 2. 2©Alliance Global Services 2015 Agenda  Understand Agility  Business Case Implementation  Execution Strategies & Challenges  Recommendations  Q & A
  • 3. 3©Alliance Global Services 2015 UNDERSTAND AGILITY
  • 4. 4©Alliance Global Services 2015 Is it delivering code to production every 11 sec? It is delivering code to production every hour, day, week, two weeks, months? Is it maximize learning from real users as quickly as every day? Is it the ability to change the software within an hour/ day for the change identified? It depends on the amount of agility needed by business What do we mean by Agile?
  • 5. 5©Alliance Global Services 2015 Define Agility Needs Understand Business Context / needs Understand the Production Roll out Frequency Understand the Feedback Frequency Cycles Understand the Technology Support/ Maturity Understand the Organization Support/ Maturity Identification of Right Agility needs is key for the success of project since the impact is high For ex. the distribution of non value added work for a 2 weeks sprint is 16% 3 weeks sprint is 12.5%
  • 6. 6©Alliance Global Services 2015 SYNOPSIS OF TEXTILE CARE PROJECT
  • 7. 7©Alliance Global Services 2015 NORTH AMERICA 300 Plants EUROPE 2000 Plants Product Owner Product Owner App 1 App 2 App 3License License Custom Application 0License Development Center: Hyderabad No vendor management required Business Objective
  • 8. 8©Alliance Global Services 2015 Project Snapshot Real Time Application Software  Data acquisition from Meters and Sensors real time for each plant  Real Time Data Display in TVs and Dashboards for Plant Engineers and Operators  Consolidated Central Reporting System No of Plants: 300 in US, 2000 in Europe Team Size: 42 Product Owners Location: US & Europe Duration: 12 Months Development Team Location: Hyderabad No of Stories: 600 No of Teams: 6 No of Sprints: 45 Sprint Duration: 2 weeks to 3 weeks
  • 9. 9©Alliance Global Services 2015 Plant Overview Conventional Washer 1 Conventional Washer 2 Conventional Washer 3 Tunnel Washer Allen Bradley Controller Mitsubishi Controller Local Application Dispensers (Automated Product Injections) Real Time Data Display (Extended TVs)Dispensers (Automated Product Injections)
  • 10. 10©Alliance Global Services 2015 Central Overview Consolidated Central Reporting System Offline Application External System Local Plant 1 Local Plant 2 Local Plant 3 Local Plant 4
  • 11. 11©Alliance Global Services 2015 AGILE APPROACH TAKEN FOR PROJECT
  • 13. 13©Alliance Global Services 2015 JumpStart Purpose Understand the user roles of <the product> Understand and further define the functionality and the recommended technical approach and architecture Determine high-level size and effort estimates
  • 14. 14©Alliance Global Services 2015 JumpStart Purpose (continued) This is generally one sprint worth of activities. A general guideline is for 5 – 6 months of project effort the JumpStart shouldn’t take more than 2 weeks of effort. If you are spending more time than that you are probably over analyzing. It is important to recognize that you don’t need to get all the stories defined at the granular level – just enough to get started and create high level release plan. Idea creation never ends, and it certainly doesn’t end at the time of the business vision. Define an Implementation approach for <the product> including tools, team, and estimated timeline Define the Pilot target and subsequent releases Define the Project Governance
  • 15. 15©Alliance Global Services 2015 Execution Strategy - JumpStartOneumbrella Conducted JumpStart Phase which helped us to bring in all the stakeholders to a single location. Objective Defined the Product Vision, Identification of Unknown and Risk areas with Mitigation Plans, High level product Backlog, Architecture/Design KnowledgeSharing Product owners spread across the globe, Created a Proxy Product Team considering the Distributed location challenges.
  • 16. 16©Alliance Global Services 2015 Execution Strategy – Team Formation/Changes Project Progress Span Focus Team Team A Cross-Function Integration TeamTeam A Team B Team A Team B Team B Cross-Function
  • 17. 17©Alliance Global Services 2015 Execution Strategy – Process Transformation 1 Product Team 1 Product Team 5 Scrum Teams 1 Product Team 2 Scrum Teams 1 Kanban Team
  • 18. 18©Alliance Global Services 2015 Execution Strategy – Team Collaboration Monthly Release Review Meeting Weekly Backlog Grooming Weekly Focus Meetings (UI, DB, Design, Testing Scrum Ceremonies
  • 19. 19©Alliance Global Services 2015 The Challenge !!! 1 Hi… Mr Hardware !!!   Hardware Service Database Software UI
  • 20. 20©Alliance Global Services 2015 Testing Complexities Of Hardware and Software Create “Virtual Hardware” Service Software Database Hurray !!! Application Tested Hardware & Virtual Hardware meets !!!
  • 21. 21©Alliance Global Services 2015 Understand the signal pattern and frequency sent from the hardware 2 • Virtual hardware needs to understand that pattern. Actual hardware • Every hardware have a particular signal pattern and frequency Virtual Hardware
  • 22. 22©Alliance Global Services 2015 PLC Simulator Tool (Virtual Hardware for Washer) • This tool will be sending data to PLC that would be the replica of signals sent by actual Washer Write Data to PLC • The tool must have provision for creating multiple simulators for multiple washersCreate multiple virtual hardware in the test module • Provide options to configure the virtual hardware to effectively create test scenariosConfigure the virtual hardware • This tool must be able to simulate PLC for multiple washers at a time (multithreading)Multi tasking of each washer
  • 23. 23©Alliance Global Services 2015 Result • MVP as business needed • Delivered 40 Successful Sprints • High satisfaction from end users, product sponsor/owners • High satisfaction from team and internal stakeholders
  • 24. 24©Alliance Global Services 2015 Recommendations • Before hitting the ground understand your agility needs • Define the agile approach to be followed • Agility needs of project can vary during the project life cycle, change of course correction as needed
  • 25. 25©Alliance Global Services 2015 Thank You Krishna Mohan Tunuguntla Sr. Project Manager ktunuguntla@allianceglobalservices.com http://www.allianceglobalservices.com

Editor's Notes

  • #8: Business Objective is to replace a varied and outdated multiple Off Shelf software around the globe with single custom written software. This will help the customer bring/share in all the varied business flows across the globe in to a single platform by removing license cost of $1M /year with potential increase the brand image and market presence. The solution needs to be delivered by a fixed date, otherwise it will cost $1M additional for the next year licenses. Key Challenges: Fixed Date of Delivery and go live (Cost of failure is $1M from licenses and multi-million opportunity loss) Product Owners across the Globe with varied knowledge and expectation Resistance to help from existing Off shelf Product vendors Known Unknowns in key areas, Re-Engineering needs
  • #13: Remove Project Name Remove the word CI
  • #14: The outcome of this phase is what I’ll mention next – and these are all further reasons why this is a really valuable exercise. During the Jumpstart you should be able to gain… Understand the user roles of <the product> Actual users Stakeholders Supporting & Maintenance users Any external system users Elaborate & Alignment on the Product Vision Define the User Story/Epics backlog for <the product> and prioritize based on business need, various dependencies like other systems, resources, timeline, interdependencies of the requirements Identify technical approach: logical architecture, systems integrations & blueprints, recommended tools, products & platforms, testing strategy & approach Create initial relative sizing estimates for the user stories and epics – these should generally be at a ‘t-shirt size’ Identify major risks, technical or functional areas, that require additional investigation and mitigation
  • #15: Define an Implementation approach for <the product> including tools, team, and estimated timeline Define prioritization and trade off approach Identify resources needed to implement <the product> Define the Pilot target and subsequent releases Create targeted Pilot release backlog and follow-on release themes Define the Project Governance Identification of the team and approach for project governance All these activities should constitute about 2-3 weeks for a Jumpstart. This of course would vary by product size and your goals for release planning. It’s also important to note that the level of detail goal is basically ‘enough for the team to get started’ – and so if every element of every user story isn’t fully elaborated – that’s okay – the idea creation shouldn’t end with the jumpstart – and the business stakeholders need to recognize that they will be involved throughout the agile development lifecycle.
  • #18: Induce the required agility as needed, Started with Proxy Product Team and Scrum Teams. As we move along, KANBAN teams has been formed as required which run in parallel with SCRUM Teams Once the considerable of product is built, there can be a need of Integration team. Form the Integration team with smart people across other teams. The focuses of this team to resolve the any integration issues/develop the integration layers and make the application stable. This team can be executed on task based approach (Kanban)
  • #19: Due the Scrum Team Structure, there are many chances of losing the common focus needed across all the team i.e. Testing Focus, UI Focus, Architecture Focus – We have scheduled separate meetings once in a week for collaboration and ensuring the consistent practices followed across all teams.