A software development life cycle is a set of
stages which indicates how we could develop
software. It usually shows either a descriptive
or prescriptive characterization of how
software is or should be developed.
Also called SDLC


SDLC is a process followed for a software
project, within a software organization. It
consists of a detailed plan describing how to
develop, maintain, replace and alter or
enhance specific software.


A typical Software Development life cycle
consists of the following stages:








Stage 1: Feasibility Study
Stage 2: Requirements Analysis
Stage 3: System Design
Stage 4: Development
Stage 5: Testing
Stage 6: Implementation
Stage 7: Maintenance




Ensure delivery of high quality systems
Provide strong management controls
Maximize productivity


There are various software development life
cycle models defined and designed which are
followed during software development process.
The are also called Software process Models







Water Fall Model *
Spiral Model
V Model
Iterative Model
Prototyping *
RAD(Rapid Application Development) *


The Waterfall Model was first Process Model
to be introduced. It is also referred to as a
linear-sequential life cycle model or classic
software life cycle or sequential model or
traditional waterfall process model .It is
very simple to understand and use. In a
waterfall model, each phase must be
completed before the next phase can beg in
and there is no overlapping in the phases
SDLC and Software Process Models


A feasibility study establishes whether or not
the project is to proceed. It may be that the
system is unnecessary, too expensive or too
risky. One approach to a feasibility study is to
perform cost-benefit analysis


All possible requirements of the system to be
developed are captured in this phase and
documented in a requirement specification
doc. the developer finds out what the user
(client or customer) wants the software to do
and records the requirements as clearly as
possible. The product of this stage is a
requirements specification.


The requirement specifications from first
phase are studied in this phase and system
design is prepared.


The detailed designs are converted into
instructions written in the programming
language. If system is large it is developed
into small programs or modules called units .
There may be a choice of programming
languages, from which one must be selected.
The product is the code


All units of the system coded are tested
separately for errors and failures (unit
testing). The overall system is also
tested(system testing).


Once all testing is done, the product is
deployed in the customer environment or
released into the market. At this phase the
system is put to use.
When the software is in use, sooner or later it
will almost certainly need fixing or enhancing.
Making these changes constitutes
maintenance. Software maintenance often
goes on for years after the software is first
constructed. The product of this activity is
the modified software

Organized approach with specific stages
Reflects common engineering practices
It is documentation driven, that is,
documentation is produced at every
stage
 Simple and easy to understand and use
 Clearly defined stages.
 Provides structure to inexperienced staff









Doesn’t cope well with changes required by
the client
Development teams might wait for each
other
The customer only sees a working version of
the product after it has been coded. This may
result in disaster if any undetected problems
are precipitated to this stage.
All requirements must be known upfront


Prototyping is the practice of building an
early version of a system which does not
necessarily reflect all the features of the final
system, but rather those which are of
interest.
In prototyping, the customer is presented at a
very early stage with a working version of the
system. (It may not be a complete system, but
it is at least part of the system and it works.) They
can check that it does what they want,
or specify modifications. The developer amends
the system and demonstrates it again
and again until it does what the customer wants.
Thus the main purpose of prototyping
is ensuring that the user’s needs are satisfied




Throwaway Prototyping
Evolutionary Prototyping




In throwaway prototyping the various
versions of the system are constructed and
then thrown away. (The final system is
implemented in some different way.)
A throwaway prototype implements only
those requirements that are poorly
understood. It is discarded after the desired
information is learned


Throwaway prototyping is sometimes called
rapid prototyping and as the name suggests,
a rapid prototype should cost very little and
take very little time to develop.
This type of prototyping is based on the idea
of developing an initial implementation,
exposing it to user comment and refining it
through repeated stages until an adequate
system has been developed



Evolutionary Prototyping has a very big
advantage over Throwaway Prototyping. The
advantage is in the fact that evolutionary
prototypes are functional systems. Although
they may not have all the features the users
have planned, they may be used on an
interim basis until the final system is
delivered.
▪ Prototypes may be easily changed or even discarded.
▪ Prototyping may improve communication between and among developers
and customers
▪ Users may be more satisfied with systems developed using prototyping.
▪ A prototype may provide the proof of concept necessary to attract funding.
▪ A prototype may serve as a marketing tool.
▪ A prototype may serve as the basis for operational specifications.
▪ Early visibility of the prototype may help management assess progress.
▪ Exploratory prototyping allows productive work to proceed despite initial
uncertainties.
▪ Prototypes may demonstrate progress at an early stage of development.
▪ Prototypes may provide early training for future users of the system.
▪ Prototyping may prevent unpleasant surprises by calling attention to
incomplete or inconsistent requirements, or to missing functionality.
▪ Prototyping may encourage an excess of change requests.
▪ Working prototypes may lead management and customers to believe
that the final product is almost ready for delivery.
▪ The excellent (or disappointing) performance characteristics of
prototypes may mislead the customer.
▪ Customers may not be prepared to provide the level or frequency of
feedback required for iterative prototyping.
▪ Customers may not be willing to participate in the iteration cycle
over the long haul
▪ Developers may have difficulty writing the back-end code needed to
support the slick front-end interface designed with the prototyping
tool.
▪ Due to time and market constraints, system specifications may be
frozen before the prototyping process has reached a definitive stage.
▪ During prototyping, the only "design specification" is the prototype
itself, which may allow uncontrolled change.
▪ Early prototypes may be of low fidelity, dismissed as toys.


RAD is a linear sequential software
development process model that emphasis
an extremely short development cycle using a
component based construction approach



Rapid Application Development as “an
approach to building computer systems
which combines Computer-Assisted Software
Engineering (CASE) tools and techniques






Business Modeling:
Data Modeling
Process Modeling
Application Generation
Testing and Turn over
 In this phase, define the flow of information



within the organization, so that it covers all the
functions. Questions like what information
drives the business process, what information
is generated, who generates it, where does
the information go, who process it and so on.
This helps in clearly understand the nature,
type ,source and process of information
 In this phase, convert the component of the

information flow into a set of data objects.
Each object is referred as an Entity that are
needed to support the business. The
attributes (character of each entity) are
identified and the relation between these
data objects (entities) is defined.


The data object defined in the data modeling
phase are transformed to achieve the
information flow necessary to implement a
business function. In addition adding
, deleting, modifying and retrieving the data
objects are included in process modeling.


In this phase, the generation of the application
and coding take place. Using fourth generation
programming languages or 4 GL tools is the
preferred choice for the software developers




Many of the programming components have
already been tested since RAD emphasis
reuse. This reduces overall testing time. But
new components must be tested and all
interfaces must be fully exercised
Resembles the final tasks in the SDLC
implementation phase, including data
conversion, testing, changeover to the new
system, and user training.


Due to emphasis on rapid development , it results
in the delivery of fully functional project in short
time period.



It encourages the development of program
component reusable.



Can obtain support from automated tools and
techniques.






It requires dedication and commitment on the part
of the developers as well as the client to meet
the deadline. If either party is indifferent in needs
of other, the project will run into serious problem.
Its application area is restricted to system that are
modular and reusable in nature.
It is not suitable for the applications that have a
high degree of technical risk.
It is not suitable for the large projects because
they require more manpower for creating
multiple RAD groups.

More Related Content

PPT
Software Prototyping
PPTX
Software Engineering
PPTX
Software quality assurance
PPTX
Software requirement and specification
PPTX
Software testing and process
PPTX
Software quality assurance
PPT
CHAPTER 6 REQUIREMENTS MODELING: SCENARIO based Model , Class based moddel
PPT
Requirement specification (SRS)
Software Prototyping
Software Engineering
Software quality assurance
Software requirement and specification
Software testing and process
Software quality assurance
CHAPTER 6 REQUIREMENTS MODELING: SCENARIO based Model , Class based moddel
Requirement specification (SRS)

What's hot (20)

PPTX
Fundamental software engineering activities
PPS
Software Devlopment Life Cycle
PPTX
Validation testing
PPT
Chapter19 rapid application development
PPTX
Software development life cycle (SDLC)
PPT
Software Testing Strategies
PPTX
Software Testing or Quality Assurance
PPTX
Software Development Process
PPT
Introduction to Software Engineering
PPTX
Software process Models
PPTX
Component based software engineering
PPTX
Software Process Models
PPTX
Spiral Model
PPTX
Formal Approaches to SQA.pptx
PPT
Test cases planning
PPT
Ch 11-component-level-design
PPTX
Iterative model
PPT
PDF
3. ch 2-process model
PPT
Spiral model presentation
Fundamental software engineering activities
Software Devlopment Life Cycle
Validation testing
Chapter19 rapid application development
Software development life cycle (SDLC)
Software Testing Strategies
Software Testing or Quality Assurance
Software Development Process
Introduction to Software Engineering
Software process Models
Component based software engineering
Software Process Models
Spiral Model
Formal Approaches to SQA.pptx
Test cases planning
Ch 11-component-level-design
Iterative model
3. ch 2-process model
Spiral model presentation
Ad

Viewers also liked (20)

PPSX
Process model in Software engeneering
PPTX
PPTX
Lecture 02 Software Process Model
PPT
IT Software Development Life Cycle
PPTX
Software Development Life Cycle (SDLC)
PPT
Software Development Life Cycle
PPTX
Software Process Models
PPTX
Software Development Process Models (SCRUM Methodology)
PPT
Software process model
PDF
Software engineering lecture notes
PPTX
Introduction To Software Engineering
PDF
A Software Problem (and a maybe-solution)
PPT
Lecture 19 design concepts
PPT
The Software Development Process
PPTX
Software Engineering - Lecture 02
PPTX
Lecture 05 Software Quality Management
PPTX
Java Programming- Introduction to Java Applet Programs
PPT
Types of Software testing
PPT
Process model in Software engeneering
Lecture 02 Software Process Model
IT Software Development Life Cycle
Software Development Life Cycle (SDLC)
Software Development Life Cycle
Software Process Models
Software Development Process Models (SCRUM Methodology)
Software process model
Software engineering lecture notes
Introduction To Software Engineering
A Software Problem (and a maybe-solution)
Lecture 19 design concepts
The Software Development Process
Software Engineering - Lecture 02
Lecture 05 Software Quality Management
Java Programming- Introduction to Java Applet Programs
Types of Software testing
Ad

Similar to SDLC and Software Process Models (20)

DOCX
software engineering
PPT
Kelis king - software development life cycle (sdlc)
PPT
Kelis king - software development life cycle (sdlc)
PPT
SE_models_1.ppt
PPT
SE_models_1.ppt
PPT
SE_models_1.ppt
PPT
SE_models_1.ppt
PPT
PROCESS MODELS.ppt
PPTX
PPTX
Software Engineering Unit 1 AKTU Complete
PPT
system development life cycle
PPTX
4_59247024118127714222222222222222255.pptx
PPTX
Software models
PPTX
SELECTION OF AN APPROPRIATE PROJECT APPROACH.pptx
PPTX
Software Engineering- Crisis and Process Models
PPT
4_5904438571426647861wodowdmpwdmpwds.ppt
PPT
Software Process Model in software engineering
PPT
Chapter 3 Software Process Model of .ppt
PPTX
The process
software engineering
Kelis king - software development life cycle (sdlc)
Kelis king - software development life cycle (sdlc)
SE_models_1.ppt
SE_models_1.ppt
SE_models_1.ppt
SE_models_1.ppt
PROCESS MODELS.ppt
Software Engineering Unit 1 AKTU Complete
system development life cycle
4_59247024118127714222222222222222255.pptx
Software models
SELECTION OF AN APPROPRIATE PROJECT APPROACH.pptx
Software Engineering- Crisis and Process Models
4_5904438571426647861wodowdmpwdmpwds.ppt
Software Process Model in software engineering
Chapter 3 Software Process Model of .ppt
The process

Recently uploaded (20)

PDF
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
PPT
Teaching material agriculture food technology
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
KodekX | Application Modernization Development
PDF
Encapsulation theory and applications.pdf
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Electronic commerce courselecture one. Pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
MYSQL Presentation for SQL database connectivity
Per capita expenditure prediction using model stacking based on satellite ima...
Dropbox Q2 2025 Financial Results & Investor Presentation
Advanced methodologies resolving dimensionality complications for autism neur...
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
Teaching material agriculture food technology
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
KodekX | Application Modernization Development
Encapsulation theory and applications.pdf
Network Security Unit 5.pdf for BCA BBA.
Unlocking AI with Model Context Protocol (MCP)
Building Integrated photovoltaic BIPV_UPV.pdf
Mobile App Security Testing_ A Comprehensive Guide.pdf
Reach Out and Touch Someone: Haptics and Empathic Computing
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
“AI and Expert System Decision Support & Business Intelligence Systems”
Electronic commerce courselecture one. Pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...

SDLC and Software Process Models

  • 1. Lecture tw0 Nana Kwabena Sarpong (J-Prompt Professional Institute of Technology) naksarpong@gmail.com
  • 2.   A software development life cycle is a set of stages which indicates how we could develop software. It usually shows either a descriptive or prescriptive characterization of how software is or should be developed. Also called SDLC
  • 3.  SDLC is a process followed for a software project, within a software organization. It consists of a detailed plan describing how to develop, maintain, replace and alter or enhance specific software.
  • 4.  A typical Software Development life cycle consists of the following stages:        Stage 1: Feasibility Study Stage 2: Requirements Analysis Stage 3: System Design Stage 4: Development Stage 5: Testing Stage 6: Implementation Stage 7: Maintenance
  • 5.    Ensure delivery of high quality systems Provide strong management controls Maximize productivity
  • 6.  There are various software development life cycle models defined and designed which are followed during software development process. The are also called Software process Models       Water Fall Model * Spiral Model V Model Iterative Model Prototyping * RAD(Rapid Application Development) *
  • 7.  The Waterfall Model was first Process Model to be introduced. It is also referred to as a linear-sequential life cycle model or classic software life cycle or sequential model or traditional waterfall process model .It is very simple to understand and use. In a waterfall model, each phase must be completed before the next phase can beg in and there is no overlapping in the phases
  • 9.  A feasibility study establishes whether or not the project is to proceed. It may be that the system is unnecessary, too expensive or too risky. One approach to a feasibility study is to perform cost-benefit analysis
  • 10.  All possible requirements of the system to be developed are captured in this phase and documented in a requirement specification doc. the developer finds out what the user (client or customer) wants the software to do and records the requirements as clearly as possible. The product of this stage is a requirements specification.
  • 11.  The requirement specifications from first phase are studied in this phase and system design is prepared.
  • 12.  The detailed designs are converted into instructions written in the programming language. If system is large it is developed into small programs or modules called units . There may be a choice of programming languages, from which one must be selected. The product is the code
  • 13.  All units of the system coded are tested separately for errors and failures (unit testing). The overall system is also tested(system testing).
  • 14.  Once all testing is done, the product is deployed in the customer environment or released into the market. At this phase the system is put to use.
  • 15. When the software is in use, sooner or later it will almost certainly need fixing or enhancing. Making these changes constitutes maintenance. Software maintenance often goes on for years after the software is first constructed. The product of this activity is the modified software 
  • 16. Organized approach with specific stages Reflects common engineering practices It is documentation driven, that is, documentation is produced at every stage  Simple and easy to understand and use  Clearly defined stages.  Provides structure to inexperienced staff   
  • 17.     Doesn’t cope well with changes required by the client Development teams might wait for each other The customer only sees a working version of the product after it has been coded. This may result in disaster if any undetected problems are precipitated to this stage. All requirements must be known upfront
  • 18.  Prototyping is the practice of building an early version of a system which does not necessarily reflect all the features of the final system, but rather those which are of interest.
  • 19. In prototyping, the customer is presented at a very early stage with a working version of the system. (It may not be a complete system, but it is at least part of the system and it works.) They can check that it does what they want, or specify modifications. The developer amends the system and demonstrates it again and again until it does what the customer wants. Thus the main purpose of prototyping is ensuring that the user’s needs are satisfied 
  • 21.   In throwaway prototyping the various versions of the system are constructed and then thrown away. (The final system is implemented in some different way.) A throwaway prototype implements only those requirements that are poorly understood. It is discarded after the desired information is learned
  • 22.  Throwaway prototyping is sometimes called rapid prototyping and as the name suggests, a rapid prototype should cost very little and take very little time to develop.
  • 23. This type of prototyping is based on the idea of developing an initial implementation, exposing it to user comment and refining it through repeated stages until an adequate system has been developed 
  • 24.  Evolutionary Prototyping has a very big advantage over Throwaway Prototyping. The advantage is in the fact that evolutionary prototypes are functional systems. Although they may not have all the features the users have planned, they may be used on an interim basis until the final system is delivered.
  • 25. ▪ Prototypes may be easily changed or even discarded. ▪ Prototyping may improve communication between and among developers and customers ▪ Users may be more satisfied with systems developed using prototyping. ▪ A prototype may provide the proof of concept necessary to attract funding. ▪ A prototype may serve as a marketing tool. ▪ A prototype may serve as the basis for operational specifications. ▪ Early visibility of the prototype may help management assess progress. ▪ Exploratory prototyping allows productive work to proceed despite initial uncertainties. ▪ Prototypes may demonstrate progress at an early stage of development. ▪ Prototypes may provide early training for future users of the system. ▪ Prototyping may prevent unpleasant surprises by calling attention to incomplete or inconsistent requirements, or to missing functionality.
  • 26. ▪ Prototyping may encourage an excess of change requests. ▪ Working prototypes may lead management and customers to believe that the final product is almost ready for delivery. ▪ The excellent (or disappointing) performance characteristics of prototypes may mislead the customer. ▪ Customers may not be prepared to provide the level or frequency of feedback required for iterative prototyping. ▪ Customers may not be willing to participate in the iteration cycle over the long haul ▪ Developers may have difficulty writing the back-end code needed to support the slick front-end interface designed with the prototyping tool. ▪ Due to time and market constraints, system specifications may be frozen before the prototyping process has reached a definitive stage. ▪ During prototyping, the only "design specification" is the prototype itself, which may allow uncontrolled change. ▪ Early prototypes may be of low fidelity, dismissed as toys.
  • 27.  RAD is a linear sequential software development process model that emphasis an extremely short development cycle using a component based construction approach  Rapid Application Development as “an approach to building computer systems which combines Computer-Assisted Software Engineering (CASE) tools and techniques
  • 28.      Business Modeling: Data Modeling Process Modeling Application Generation Testing and Turn over
  • 29.  In this phase, define the flow of information  within the organization, so that it covers all the functions. Questions like what information drives the business process, what information is generated, who generates it, where does the information go, who process it and so on. This helps in clearly understand the nature, type ,source and process of information
  • 30.  In this phase, convert the component of the information flow into a set of data objects. Each object is referred as an Entity that are needed to support the business. The attributes (character of each entity) are identified and the relation between these data objects (entities) is defined.
  • 31.  The data object defined in the data modeling phase are transformed to achieve the information flow necessary to implement a business function. In addition adding , deleting, modifying and retrieving the data objects are included in process modeling.
  • 32.  In this phase, the generation of the application and coding take place. Using fourth generation programming languages or 4 GL tools is the preferred choice for the software developers
  • 33.   Many of the programming components have already been tested since RAD emphasis reuse. This reduces overall testing time. But new components must be tested and all interfaces must be fully exercised Resembles the final tasks in the SDLC implementation phase, including data conversion, testing, changeover to the new system, and user training.
  • 34.  Due to emphasis on rapid development , it results in the delivery of fully functional project in short time period.  It encourages the development of program component reusable.  Can obtain support from automated tools and techniques.
  • 35.     It requires dedication and commitment on the part of the developers as well as the client to meet the deadline. If either party is indifferent in needs of other, the project will run into serious problem. Its application area is restricted to system that are modular and reusable in nature. It is not suitable for the applications that have a high degree of technical risk. It is not suitable for the large projects because they require more manpower for creating multiple RAD groups.