SlideShare a Scribd company logo
SEISMIC RETROFITTING USING
PRECAST ELEMENTS
RETROFITTING
• Modification of existing building
• 3 methods
• Increasing lateral load carrying capacity
• Increasing ductility of beams and columns
• Reducing seismic response
2
Improvement of
seismic
performance
Increase strength
Installation of
wall
Installation of
frame
Installation of
brace
Increase ductility
Confining
columns or
beams
Reduce response
Installation of
dampers
Installation of
isolators
3
1.PRECAST CONCRETE FRAMES
• External PCaPC frame
• On existing or new foundation
• 2 methods
• PCaPC outer-frame method
• PCaPC parallel unit-frame method
4
5
CONSTRUCTION
1. Evaluation of seismic capacity
2. Selecting desired retrofit method
3. Excavation of the ground for extending or
construction of foundation
4. Erection of PCaC columns
6
5. Setting of PCaC beams
6. Filling joints
7. Post-tensioning beam - column joints
8. Providing shear transfer
9. Integration of external frame with building
7
Excavation of ground Assembling columns
and beams
8
Post-tensioning beam
column joint
Tensioning diagonal
ties
9
Shear transfer by pre-
stressing bar View after retrofit
10
CONNECTIONS
• Column - foundation: splice sleeve connectors
• Column - column: splice sleeve connectors
• Column - beam: post-tensioning
• Vertical joints: high strength non-shrink grout
• Horizontal joints: non-shrink mortar
11
JOINTS
12
SHEAR TRANSFER
By pre-stressing bar By floor slab
13
OUTER-FRAME METHOD
14
PARALLEL UNIT-FRAME METHOD
15
ADVANTAGES
• Faster construction
• Less or no interior work
• Ventilation and lighting unaffected
• Room layout unchanged
16
LIMITATIONS
• Building concrete strength - 13.5MPa
• Cost - $20,000 to $25,000
• Outer-frame method – 14 storeys
• Parallel unit-frame method – 12 storeys
17
NOTE
• Outer-frame method: 1999 to 2012: 493 projects
• Parallel unit-frame method: 2005 to 2012: 220
projects
• Tohoku earthquake (March 2011) of intensity 9
on moment magnitude scale - 59 buildings
survived
18
2.PRECAST CONCRETE BRACE
• 5 unit assemblage
• 4 legs and a central unit
• Pre-stress through external cables
• Brace fits the frame by itself
• Frictional control joints
19
BRACE
20
FSSP DEVICE
• When subjected to
seismic load only one
diagonal works
effectively
• Tension diagonal held in
place by FSSP
21
DESIGN ISSUES
22
23
NOTE
• Suggested by Susumu Kono & Fumio
Watanabe
• Lateral load carrying capacity increased by 3
times
• Remedies to brittle failure: CFT & FRC
24
3.PRECAST ARMATURE CROSS WALL
• Replacement of timber members
• PCaP elements pinned at joints
• Light grouting
• Cotter pin
• Truss arrangement: tensional strength
• Pre-stress: bending strength
25
Cross wall Joint
26
NOTE
• Proposed by Wani Ahmad & Javed Ahmad
Bhat
• 18kN: 36mm x 36mm: 8-5mmφ: 8.1kg
• Revives traditional construction methodology
• Standardization required
27
REFERENCE
• Kiyoji Takeda, Kyoya Tanaka, Toshiaki Someya, Asao Sakuda and Yoshiteru Ohno;
“Seismic retrofit of reinforced concrete buildings in Japan using external precast,
pre-stressed concrete frames”; PCI Journal Summer 2013, Volume 58, Pages 41-61.
• Mamoru Oda, Susumu Kono and Fumio Watanabe; “Seismic retrofit of RC buildings
with pre-stressed precast CFT and FRC braces”; The 14th World Conference on
Earthquake Engineering, October 2008, Beijing, China.
• Susumu Kono and Fumio Watanabe; “Retrofitting RC structures with precast pre-
stressed concrete braces”; Proceedings of the 8th U.S. National Conference on
Earthquake Engineering, April 2006, California, USA.
28
REFERENCE
• Toshimi Kabeyasawa (Editor); “Recent development of seismic retrofit
methods in Japan”; Japan Building Disaster Prevention Association; January
2005.
• Wani Ahmad and Javed Ahmad Bhat; “Pre-tensioned precast elements as a
replacement to wooden bracings in the armature cross-wall system: An
approach to revive forgotten heritage”; IJCIET 2012, Volume 3, Issue 2, Pages
181-187.
• http://en.wikipedia.org/wiki/Seismic_retrofit
29
THANK YOU
30

More Related Content

PPT
Retrofitting
PPTX
Retrofitting of buildings
PPTX
Kiran more (retrofitting presentation)te b
PPTX
Retrofitting of concrete structure
PPTX
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
PDF
Retrofitting sequences by mostafa sameer
PPTX
Retrofitting
PPTX
Retrofitting of Masonry Buildings
Retrofitting
Retrofitting of buildings
Kiran more (retrofitting presentation)te b
Retrofitting of concrete structure
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Retrofitting sequences by mostafa sameer
Retrofitting
Retrofitting of Masonry Buildings

What's hot (20)

PPSX
Retrofitting
PPTX
RETROFITTING OF CONCRETE STRUCTURE
PPT
Retrofitting
PPTX
Retrofitting case study of RCC structure
PPTX
Rcc jacketing
PPTX
Presentation
PPTX
Seismic retrofitting techniques
PPTX
Retrofitting of rcc structures
PPTX
Lecture earthquake-4
PDF
seismic retrofit
PPTX
Seismic retrofitting of heritage building- case study
PPT
SEISMIC RETROFITTING
PPT
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
PPT
Seismic Retrofitting On RC Structures-Pushover Analysis
PPTX
Comparison of Different Retrofitting Techniques for Masonry Buildings
PPTX
Design of Precast Elements
PPTX
Jacketing
PDF
Methods for seismic retrofitting of structures comments
PDF
column jacketing
PPTX
Retrofitting of RC Beam Column Joint
Retrofitting
RETROFITTING OF CONCRETE STRUCTURE
Retrofitting
Retrofitting case study of RCC structure
Rcc jacketing
Presentation
Seismic retrofitting techniques
Retrofitting of rcc structures
Lecture earthquake-4
seismic retrofit
Seismic retrofitting of heritage building- case study
SEISMIC RETROFITTING
METHODS OF RETROFITTING EARTHQUAKE DAMAGES
Seismic Retrofitting On RC Structures-Pushover Analysis
Comparison of Different Retrofitting Techniques for Masonry Buildings
Design of Precast Elements
Jacketing
Methods for seismic retrofitting of structures comments
column jacketing
Retrofitting of RC Beam Column Joint
Ad

Viewers also liked (20)

PDF
Seismic Retrofitting Techniques
PPTX
Seismic Retrofitting of Masonry Structures
PPTX
Seismic retrofit of building structures
PDF
LITERATURE WORK STUDY OF PRECAST CONCRETE CONNECTIONS IN SEISMIC
PDF
Influence of material variability on the seismic response of pile foundation
PDF
Seismic Retrofitting of a RC Building by Adding Steel Plate Shear Walls
DOCX
SEISMIC RETROFITTING OF BUILDINGS
PDF
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
PDF
Code approaches to seismic design of masonry infiled rc frames
PPT
TALL BUILDINGS
PDF
Loads structure
PDF
Behavior of rc structure under earthquake loading
DOCX
Seismic analysis of multi storey reinforced concrete buildings frame”
PDF
Earthquake Engineering
PDF
RETROFITTING
PPT
Earthquake resistant low rise building
PPTX
Loads acting on buildings
PPTX
Seismic Analysis
PPTX
Stability of High-Rise Buildings
PPTX
Seismic retrofitting techniques of rcc
Seismic Retrofitting Techniques
Seismic Retrofitting of Masonry Structures
Seismic retrofit of building structures
LITERATURE WORK STUDY OF PRECAST CONCRETE CONNECTIONS IN SEISMIC
Influence of material variability on the seismic response of pile foundation
Seismic Retrofitting of a RC Building by Adding Steel Plate Shear Walls
SEISMIC RETROFITTING OF BUILDINGS
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
Code approaches to seismic design of masonry infiled rc frames
TALL BUILDINGS
Loads structure
Behavior of rc structure under earthquake loading
Seismic analysis of multi storey reinforced concrete buildings frame”
Earthquake Engineering
RETROFITTING
Earthquake resistant low rise building
Loads acting on buildings
Seismic Analysis
Stability of High-Rise Buildings
Seismic retrofitting techniques of rcc
Ad

Similar to seismic retrofitting using precast elements (20)

PPT
Analysisanddesignofamulti storey staad pro.
PPT
Fibre Reinforced Polymer
PPTX
Tony
PPTX
Gandhi Setu Bridge Patna that is the Longest fully prestressed concrete bridg...
PPTX
RC_Structure_Detailed (1hhrfhjjjjjhgg).pptx
PPTX
CRITICAL REVIEW ON MECHANICAL ANCHORAGE AS REPLACEMENT OF BENT BAR
PPT
PRE STRESSED CONCRETE
PPTX
Shear in Reinforced Concrete Slabs under Concentrated Loads close to Supports
PDF
Seismic design for apical shear wall.pdf
PPTX
retrofitting
PPTX
GEOGRIDS IN CONCRETE
PDF
Form work_Advanced Construction Technology (Semester-6), Civil Engineering
PPTX
BIG BEAM 2014-2015
PPTX
prestressed concrete and precast concrete technology.pptx
PPTX
Stress ribbon-bridges
PDF
Connections of earthquake resisting precast reinforced concrete building(en n...
PPTX
stress ribbon bridge by kaiser malik
PPTX
Harshitha_Presentation-3.pptx
PDF
Proposed Bridge over the Preston River in East Bunbury, Western Australia
Analysisanddesignofamulti storey staad pro.
Fibre Reinforced Polymer
Tony
Gandhi Setu Bridge Patna that is the Longest fully prestressed concrete bridg...
RC_Structure_Detailed (1hhrfhjjjjjhgg).pptx
CRITICAL REVIEW ON MECHANICAL ANCHORAGE AS REPLACEMENT OF BENT BAR
PRE STRESSED CONCRETE
Shear in Reinforced Concrete Slabs under Concentrated Loads close to Supports
Seismic design for apical shear wall.pdf
retrofitting
GEOGRIDS IN CONCRETE
Form work_Advanced Construction Technology (Semester-6), Civil Engineering
BIG BEAM 2014-2015
prestressed concrete and precast concrete technology.pptx
Stress ribbon-bridges
Connections of earthquake resisting precast reinforced concrete building(en n...
stress ribbon bridge by kaiser malik
Harshitha_Presentation-3.pptx
Proposed Bridge over the Preston River in East Bunbury, Western Australia

Recently uploaded (20)

PPTX
Safety Seminar civil to be ensured for safe working.
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
additive manufacturing of ss316l using mig welding
PPT
Project quality management in manufacturing
PDF
Well-logging-methods_new................
PDF
PPT on Performance Review to get promotions
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
Construction Project Organization Group 2.pptx
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
web development for engineering and engineering
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
DOCX
573137875-Attendance-Management-System-original
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
Safety Seminar civil to be ensured for safe working.
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
CYBER-CRIMES AND SECURITY A guide to understanding
Model Code of Practice - Construction Work - 21102022 .pdf
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
additive manufacturing of ss316l using mig welding
Project quality management in manufacturing
Well-logging-methods_new................
PPT on Performance Review to get promotions
Embodied AI: Ushering in the Next Era of Intelligent Systems
Construction Project Organization Group 2.pptx
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
web development for engineering and engineering
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
573137875-Attendance-Management-System-original
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Automation-in-Manufacturing-Chapter-Introduction.pdf

seismic retrofitting using precast elements

  • 2. RETROFITTING • Modification of existing building • 3 methods • Increasing lateral load carrying capacity • Increasing ductility of beams and columns • Reducing seismic response 2
  • 3. Improvement of seismic performance Increase strength Installation of wall Installation of frame Installation of brace Increase ductility Confining columns or beams Reduce response Installation of dampers Installation of isolators 3
  • 4. 1.PRECAST CONCRETE FRAMES • External PCaPC frame • On existing or new foundation • 2 methods • PCaPC outer-frame method • PCaPC parallel unit-frame method 4
  • 5. 5
  • 6. CONSTRUCTION 1. Evaluation of seismic capacity 2. Selecting desired retrofit method 3. Excavation of the ground for extending or construction of foundation 4. Erection of PCaC columns 6
  • 7. 5. Setting of PCaC beams 6. Filling joints 7. Post-tensioning beam - column joints 8. Providing shear transfer 9. Integration of external frame with building 7
  • 8. Excavation of ground Assembling columns and beams 8
  • 10. Shear transfer by pre- stressing bar View after retrofit 10
  • 11. CONNECTIONS • Column - foundation: splice sleeve connectors • Column - column: splice sleeve connectors • Column - beam: post-tensioning • Vertical joints: high strength non-shrink grout • Horizontal joints: non-shrink mortar 11
  • 13. SHEAR TRANSFER By pre-stressing bar By floor slab 13
  • 16. ADVANTAGES • Faster construction • Less or no interior work • Ventilation and lighting unaffected • Room layout unchanged 16
  • 17. LIMITATIONS • Building concrete strength - 13.5MPa • Cost - $20,000 to $25,000 • Outer-frame method – 14 storeys • Parallel unit-frame method – 12 storeys 17
  • 18. NOTE • Outer-frame method: 1999 to 2012: 493 projects • Parallel unit-frame method: 2005 to 2012: 220 projects • Tohoku earthquake (March 2011) of intensity 9 on moment magnitude scale - 59 buildings survived 18
  • 19. 2.PRECAST CONCRETE BRACE • 5 unit assemblage • 4 legs and a central unit • Pre-stress through external cables • Brace fits the frame by itself • Frictional control joints 19
  • 21. FSSP DEVICE • When subjected to seismic load only one diagonal works effectively • Tension diagonal held in place by FSSP 21
  • 23. 23
  • 24. NOTE • Suggested by Susumu Kono & Fumio Watanabe • Lateral load carrying capacity increased by 3 times • Remedies to brittle failure: CFT & FRC 24
  • 25. 3.PRECAST ARMATURE CROSS WALL • Replacement of timber members • PCaP elements pinned at joints • Light grouting • Cotter pin • Truss arrangement: tensional strength • Pre-stress: bending strength 25
  • 27. NOTE • Proposed by Wani Ahmad & Javed Ahmad Bhat • 18kN: 36mm x 36mm: 8-5mmφ: 8.1kg • Revives traditional construction methodology • Standardization required 27
  • 28. REFERENCE • Kiyoji Takeda, Kyoya Tanaka, Toshiaki Someya, Asao Sakuda and Yoshiteru Ohno; “Seismic retrofit of reinforced concrete buildings in Japan using external precast, pre-stressed concrete frames”; PCI Journal Summer 2013, Volume 58, Pages 41-61. • Mamoru Oda, Susumu Kono and Fumio Watanabe; “Seismic retrofit of RC buildings with pre-stressed precast CFT and FRC braces”; The 14th World Conference on Earthquake Engineering, October 2008, Beijing, China. • Susumu Kono and Fumio Watanabe; “Retrofitting RC structures with precast pre- stressed concrete braces”; Proceedings of the 8th U.S. National Conference on Earthquake Engineering, April 2006, California, USA. 28
  • 29. REFERENCE • Toshimi Kabeyasawa (Editor); “Recent development of seismic retrofit methods in Japan”; Japan Building Disaster Prevention Association; January 2005. • Wani Ahmad and Javed Ahmad Bhat; “Pre-tensioned precast elements as a replacement to wooden bracings in the armature cross-wall system: An approach to revive forgotten heritage”; IJCIET 2012, Volume 3, Issue 2, Pages 181-187. • http://en.wikipedia.org/wiki/Seismic_retrofit 29