TALES OF THREE CITIES PROJEC T 1
A CITY IN KUALA LUMPUR
JALAN ENAM
SENTUL
SENTUL
PHASE1PHASE2PHASE3
BRITISH COLONIZATION
WW 2 AND JAPANESE
OCCUPATION
URBAN REVIVAL BY YTL
[ONGOING]
-BUILDING WITH DISTINCT
FUNCTIONALITY AS A
FOCAL POINT FOR AS
SYMTRICAL RADIAL DEVEL-
OPEMENT
-BUILDING SCATTERED
AROUND FOCAL POINT
WITH LONG DISTANCE IN
BETWEEN EACH OTHER.
-CLUSTER OF RELATIVELY
ORGANIZED PLANNING
SIGNIFIY DEVELOPMENT
IN GROUP WITH SHARED
FUNCTIONALITY
PHASE 1
-URBAN SPRAWL ALONG THE
MAIN AXIS IN ARRCODANCE TO
THE NEED FOR TRANSPORTA-
TION
-CLUSTER NOT WITHIN WALK-
ABILITY DISTANCE OF EACH
OTHER
-MULTIPLE CLUSTERS WITH DE-
FINED MONO-FUNCTIONALITY
PHASE 2
- URBAN PLANING OCCURS IN
RELATION WITH OTHER CLUS-
TERS
-CONNECTION OFSECONDARY
PATHS INTO A COMPLETE
SYSTEM AS A WHOLE
-EMERGENCE OF DENSER MIXED
USE PLANNING IN SEPARATE
CLUSTER THAT ONLY RESPOND
TO THE OTHER CLUSTER, IGNOR-
ING THE EXISTING CONTEXT
PHASE 3
SUSTAINABLE
NEIGHBOURHOOD
LINEAR OPEN SPACE
BESIDE THE MAIN ROAD
LINEAR OPEN SPACE
BETWEEN 2 BUILDINGS
FORM
1
ELEVATED ENCLOSED OPEN SPACE ENCLOSED COURTYARD ENCLOSED OPEN SPACE
The form of D6 and D7 has promoted the communal
space in within the buildings itself and has achieved the
Library concept that wanted to introduced by the YTL
developer. But this form has also significantly disrupted
the exisiting communal patterns as it has taken the use-
able public spaces and chnged it into privatized public
space. This only benefits the residents of the building but
not the people around the buildings as they are not
allowed to go in.
ACTIVITIES
EDUCATIONRESIDENTIALRELIGOUS
Amenities around Jalan Enam that contributes
convenience of the users.
TAMARIND CONDO
CAPERS CONDO
SAFFRON
METHODIST BOY SCHOOL
SMK LA SALLE SENTUL
SMK SENTUL UTAMA
SJKC SENTUL
SJKT SENTUL
MASJID JAMEK PEKAN SENTUL
GRACE METHODIST CHURCH
GURDWARA SAHIB SENTUL
MIRACLE CHAPEL SENTUL
CHURCH OF CHRIST
200m
400m
Walking distant to nearby
amenities is within reach of
200m.
MOVEMENT PATTERN
Site is well connected by
vehicular pattern
In term of the walking distant to ameni-
ties, D6 and D7 has a good coverage of
amenities at a short walking distant. This
scenario favours the residents more than
the existing communites. Further more,
this will burden the exisitng communi-
ties due to the alienated building in the
context as well as the sentul was sepa-
rated into Sentul East and Sentul West
by the KTM railway, causing a distur-
bance to exisitng movement patterns.
1 MIXED USE
COMMUNITY
SENTUL
The open space swithin the street are
clearly discontinued from the
surrounding space which privatized it
to the usage of the street residents only.
The potential of open space was not
utilized in the best possible sense.
The functionality of the selected street
has secluded itself from the surrounding
context and essetially inhibit the
interconnection between the space
separated by the developed street.
2
The transportation masterplan from
the development has achieved partial
success in activation of Sentul city.
However, it is still lacking in term of
the intraconnection within the smaller
districts.
URBAN REVIVAL
FORM
Form and facade of new development does not integrate itself into the existing context, making it an
awkward presence within its surrounding old shoplots and thus, conquering with a brute dictatorship.
ACTIVITIESOld shoplot are mono-functioned and they transform into mixed use buinding in new condstruction
Development of D6 and D7 were not beneficial to the surrounding context as it was limited to the access
of its own users only. This has create a social exclusion of the locality and ultimately cause the locals to
move out due to the continuous demolition of existing social space.
3MOVEMENT
PATTERNPEDESTRIAN MOVEMENT
3VEHICULAR MOVEMENT
Construction of KTM station causes it to become
an edge that separates east and west sides of Sentul
leading to urban decay as rate of development
between these two areas are very different.
CONCLUSION
-Successful establishment of landmarks and public transportation that are however secluded and does
not activate the existing context.
-Complete reformation is practiced in urban planning instead of adaptive redevelopment approach which
posed high risk of devastation of current cultural and social heritage.
-Urban revival masterplan does not inform the existing community and urban design towards self revival
but completely ignore the existing context which results in high number of neglected land in between the
new development and existing community.
PENGYEP SIANG 0315259
NICOLAS WONG XIAO EN 0314377
WOO WEN JIAN 0315123
LIEW QIAO LI
LIMYEE QUN
CHUNG WEI JIN
LIM LI ERN
NG WAN ZEW 0317746
THANK YOU

More Related Content

PPTX
Petronas Towers
PPTX
RETRACTABLE STRUCTURES
PPTX
SHELL STRUCTURES
PPTX
CASE STUDY OF KLPAC.pptx
PDF
B.tech Project 1 - Industrialised Building Systems
PDF
Form Active system
PPT
Arches - Form Active Structure System
PDF
ARCHITECTURE, ANALYSIS AND DESIGN OF SKYSCRAPER
Petronas Towers
RETRACTABLE STRUCTURES
SHELL STRUCTURES
CASE STUDY OF KLPAC.pptx
B.tech Project 1 - Industrialised Building Systems
Form Active system
Arches - Form Active Structure System
ARCHITECTURE, ANALYSIS AND DESIGN OF SKYSCRAPER

What's hot (20)

PPTX
Marina bay sands
PDF
Designing for long spans 2
PDF
National mosque malaysia
PDF
Architectural Design Project Design Report
PDF
Acoustic material market survey.pdf
PPTX
Petronas twin towers malaysia
PDF
Stadium Negara Precedent Study Report
PDF
Precast-concrete Details
PPTX
World one (Lodha Tower)
PDF
Asian Architecture Case Study Report
PPTX
Vector active systems
PDF
Culture and History 2: National Mosque
DOCX
Project 2
PPT
Cable systems - form active structure system
PPTX
Acp and glazing
PPTX
Case Study: High Rise Buildings
PDF
Jin Mao Tower
PDF
An Acoustic Case Study on Calvary Convention Centre Report
PPTX
Rigid frame systems
PDF
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Marina bay sands
Designing for long spans 2
National mosque malaysia
Architectural Design Project Design Report
Acoustic material market survey.pdf
Petronas twin towers malaysia
Stadium Negara Precedent Study Report
Precast-concrete Details
World one (Lodha Tower)
Asian Architecture Case Study Report
Vector active systems
Culture and History 2: National Mosque
Project 2
Cable systems - form active structure system
Acp and glazing
Case Study: High Rise Buildings
Jin Mao Tower
An Acoustic Case Study on Calvary Convention Centre Report
Rigid frame systems
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Ad

More from Pengeneee Peng (20)

PDF
INTEGRATION
DOCX
CALCULATION
DOCX
ACOUSTIC
DOCX
LIGHTING
PDF
Thematic Analysis
PDF
FETTICCINE BRIDGE
PDF
[Group] building structure project
PDF
Individual Caluculation
PDF
PPTX
Studio presentation
PDF
PDF
COMP APP 2A
PDF
Work In Progress 1
PDF
Measured Drawings
PDF
BCON Report
PDF
BCON Report
PDF
PDF
PDF
Portfolio
PDF
Case Study
INTEGRATION
CALCULATION
ACOUSTIC
LIGHTING
Thematic Analysis
FETTICCINE BRIDGE
[Group] building structure project
Individual Caluculation
Studio presentation
COMP APP 2A
Work In Progress 1
Measured Drawings
BCON Report
BCON Report
Portfolio
Case Study
Ad

Recently uploaded (20)

PDF
Introduction to Data Science and Data Analysis
PDF
[EN] Industrial Machine Downtime Prediction
PPTX
Topic 5 Presentation 5 Lesson 5 Corporate Fin
PPTX
sac 451hinhgsgshssjsjsjheegdggeegegdggddgeg.pptx
PPTX
Pilar Kemerdekaan dan Identi Bangsa.pptx
PPTX
IBA_Chapter_11_Slides_Final_Accessible.pptx
PDF
Optimise Shopper Experiences with a Strong Data Estate.pdf
PPTX
Acceptance and paychological effects of mandatory extra coach I classes.pptx
DOCX
Factor Analysis Word Document Presentation
PPTX
(Ali Hamza) Roll No: (F24-BSCS-1103).pptx
PPTX
STERILIZATION AND DISINFECTION-1.ppthhhbx
PPTX
Managing Community Partner Relationships
PPTX
QUANTUM_COMPUTING_AND_ITS_POTENTIAL_APPLICATIONS[2].pptx
PDF
Data Engineering Interview Questions & Answers Cloud Data Stacks (AWS, Azure,...
PPTX
Database Infoormation System (DBIS).pptx
PDF
Business Analytics and business intelligence.pdf
PDF
Jean-Georges Perrin - Spark in Action, Second Edition (2020, Manning Publicat...
PDF
Introduction to the R Programming Language
PPTX
modul_python (1).pptx for professional and student
PPTX
importance of Data-Visualization-in-Data-Science. for mba studnts
Introduction to Data Science and Data Analysis
[EN] Industrial Machine Downtime Prediction
Topic 5 Presentation 5 Lesson 5 Corporate Fin
sac 451hinhgsgshssjsjsjheegdggeegegdggddgeg.pptx
Pilar Kemerdekaan dan Identi Bangsa.pptx
IBA_Chapter_11_Slides_Final_Accessible.pptx
Optimise Shopper Experiences with a Strong Data Estate.pdf
Acceptance and paychological effects of mandatory extra coach I classes.pptx
Factor Analysis Word Document Presentation
(Ali Hamza) Roll No: (F24-BSCS-1103).pptx
STERILIZATION AND DISINFECTION-1.ppthhhbx
Managing Community Partner Relationships
QUANTUM_COMPUTING_AND_ITS_POTENTIAL_APPLICATIONS[2].pptx
Data Engineering Interview Questions & Answers Cloud Data Stacks (AWS, Azure,...
Database Infoormation System (DBIS).pptx
Business Analytics and business intelligence.pdf
Jean-Georges Perrin - Spark in Action, Second Edition (2020, Manning Publicat...
Introduction to the R Programming Language
modul_python (1).pptx for professional and student
importance of Data-Visualization-in-Data-Science. for mba studnts

SENTUL

  • 1. TALES OF THREE CITIES PROJEC T 1 A CITY IN KUALA LUMPUR JALAN ENAM
  • 4. PHASE1PHASE2PHASE3 BRITISH COLONIZATION WW 2 AND JAPANESE OCCUPATION URBAN REVIVAL BY YTL [ONGOING]
  • 5. -BUILDING WITH DISTINCT FUNCTIONALITY AS A FOCAL POINT FOR AS SYMTRICAL RADIAL DEVEL- OPEMENT -BUILDING SCATTERED AROUND FOCAL POINT WITH LONG DISTANCE IN BETWEEN EACH OTHER. -CLUSTER OF RELATIVELY ORGANIZED PLANNING SIGNIFIY DEVELOPMENT IN GROUP WITH SHARED FUNCTIONALITY PHASE 1
  • 6. -URBAN SPRAWL ALONG THE MAIN AXIS IN ARRCODANCE TO THE NEED FOR TRANSPORTA- TION -CLUSTER NOT WITHIN WALK- ABILITY DISTANCE OF EACH OTHER -MULTIPLE CLUSTERS WITH DE- FINED MONO-FUNCTIONALITY PHASE 2
  • 7. - URBAN PLANING OCCURS IN RELATION WITH OTHER CLUS- TERS -CONNECTION OFSECONDARY PATHS INTO A COMPLETE SYSTEM AS A WHOLE -EMERGENCE OF DENSER MIXED USE PLANNING IN SEPARATE CLUSTER THAT ONLY RESPOND TO THE OTHER CLUSTER, IGNOR- ING THE EXISTING CONTEXT PHASE 3
  • 9. LINEAR OPEN SPACE BESIDE THE MAIN ROAD LINEAR OPEN SPACE BETWEEN 2 BUILDINGS FORM
  • 10. 1 ELEVATED ENCLOSED OPEN SPACE ENCLOSED COURTYARD ENCLOSED OPEN SPACE The form of D6 and D7 has promoted the communal space in within the buildings itself and has achieved the Library concept that wanted to introduced by the YTL developer. But this form has also significantly disrupted the exisiting communal patterns as it has taken the use- able public spaces and chnged it into privatized public space. This only benefits the residents of the building but not the people around the buildings as they are not allowed to go in.
  • 11. ACTIVITIES EDUCATIONRESIDENTIALRELIGOUS Amenities around Jalan Enam that contributes convenience of the users. TAMARIND CONDO CAPERS CONDO SAFFRON METHODIST BOY SCHOOL SMK LA SALLE SENTUL SMK SENTUL UTAMA SJKC SENTUL SJKT SENTUL MASJID JAMEK PEKAN SENTUL GRACE METHODIST CHURCH GURDWARA SAHIB SENTUL MIRACLE CHAPEL SENTUL CHURCH OF CHRIST
  • 12. 200m 400m Walking distant to nearby amenities is within reach of 200m. MOVEMENT PATTERN Site is well connected by vehicular pattern In term of the walking distant to ameni- ties, D6 and D7 has a good coverage of amenities at a short walking distant. This scenario favours the residents more than the existing communites. Further more, this will burden the exisitng communi- ties due to the alienated building in the context as well as the sentul was sepa- rated into Sentul East and Sentul West by the KTM railway, causing a distur- bance to exisitng movement patterns.
  • 15. The open space swithin the street are clearly discontinued from the surrounding space which privatized it to the usage of the street residents only. The potential of open space was not utilized in the best possible sense.
  • 16. The functionality of the selected street has secluded itself from the surrounding context and essetially inhibit the interconnection between the space separated by the developed street.
  • 17. 2 The transportation masterplan from the development has achieved partial success in activation of Sentul city. However, it is still lacking in term of the intraconnection within the smaller districts.
  • 19. FORM
  • 20. Form and facade of new development does not integrate itself into the existing context, making it an awkward presence within its surrounding old shoplots and thus, conquering with a brute dictatorship.
  • 21. ACTIVITIESOld shoplot are mono-functioned and they transform into mixed use buinding in new condstruction Development of D6 and D7 were not beneficial to the surrounding context as it was limited to the access of its own users only. This has create a social exclusion of the locality and ultimately cause the locals to move out due to the continuous demolition of existing social space.
  • 23. 3VEHICULAR MOVEMENT Construction of KTM station causes it to become an edge that separates east and west sides of Sentul leading to urban decay as rate of development between these two areas are very different.
  • 24. CONCLUSION -Successful establishment of landmarks and public transportation that are however secluded and does not activate the existing context. -Complete reformation is practiced in urban planning instead of adaptive redevelopment approach which posed high risk of devastation of current cultural and social heritage. -Urban revival masterplan does not inform the existing community and urban design towards self revival but completely ignore the existing context which results in high number of neglected land in between the new development and existing community. PENGYEP SIANG 0315259 NICOLAS WONG XIAO EN 0314377 WOO WEN JIAN 0315123 LIEW QIAO LI LIMYEE QUN CHUNG WEI JIN LIM LI ERN NG WAN ZEW 0317746