Risk Assessment Program
Trainer: Mr. Muizz Anibire, MSc
Tel: +966501296203, Email: muizzanibire10@gmail.com
Risk Treatment
The ISO 31000 Risk Management Process and Risk Treatment Tools
Risk Treatment
 Risk treatment is defined by ISO Guide 73 (ANSI/ASSE Z690.1-
2011) as the ‘process to modify risk’.
 Risk treatments that deal with negative consequences are sometimes
referred to as “risk mitigation”, “risk elimination”, “risk prevention”
and “risk reduction”. (ANSI/ASSE Z690.1-2011)
 Risk treatment involves the selection and application of risk
reduction measures for a risk which is judged to be unacceptable. It
is the end result or output of the risk assessment process used to
control the identified hazard and reduce its risk.
 Without acting upon the risk assessment’s findings and treating risk,
a risk assessment is of no value, and in fact may lead to negligence
of the organization (Popov, Lyon, Hollcroft, 2016).
 Decisions on treating a risk will likely depend on the costs and
benefits of risk and the costs and benefits of implementing
improved controls (refer to ALARP concept).
Risk Treatment
 Risk treatment can involve:
 avoiding the risk by deciding not to start or continue with the activity that
gives rise to the risk;
 taking or increasing risk in order to pursue an opportunity;
 removing the risk source;
 changing the likelihood;
 changing the consequences;
 sharing the risk with another party or parties [including contracts and risk
financing; and
 retaining the risk by informed decision.
Risk Treatment
 Risk treatment requires the risk assessment team or decision makers
to determine the options available, and their degree of risk
reduction, reliability, and associated cost to implement and maintain.
 Feasible control options that may reduce or eliminate the risk from
the identified hazard(s) are identified using internal and external
resources.
 Existing internal sources include the OSH professional, experienced
stakeholders and operators familiar with the hazard and control
methods. Input from affected workers knowledgeable in the
operation, equipment or process is advised.
 External resources such as manufacturers' literature and engineering
reports; OSH-related research from institutes, and professional
organizations such as ASSE and AIHA; regulatory standards and
guidance; industry best practices; industry consensus standards;
National Institute for Occupational Safety and Health (NIOSH)
publications are also available.
Risk Treatment
 Risk treatment plans can involve a single control or multiple risk
reduction measures to accomplish the risk reduction desired.
Concepts such as ‘inherently safe design’, ‘layers of protection’,
‘recognized and generally accepted good engineering practices’
and ‘safer technology and alternatives’ along with the hierarchy
of controls should be incorporated into the risk treatment plan.
 Risk treatment selection requires a balancing of the overall costs,
and the financial and non-financial benefits, including legal and
regulatory requirements. This requires some investigation into
the suppliers of the risk treatment, and associated costs including
purchase price, installation, training, maintenance and services
costs, as well as the expected life span of the treatment.
 Risks with extremely high severity potential, but low likelihood may warrant
risk treatment even when the costs of the treatment are not justified in a
typical cost benefit analysis.
Risk Treatment Selection Methods
Risk Treatment
Note 1: Recognized and Generally Accepted Good Engineering Practices (RAGAGEP)
Introduced by OSHA in the CFR 29, 1910.119 Process Safety Management (PSM) standard.
RAGAGEP involves the selection and application of appropriate engineering, operating, and
maintenance knowledge when designing, operating and maintaining chemical facilities with the
purpose of ensuring safety and preventing process safety incidents.
Note 2: Safer Technology and Alternatives (STAA)
One risk reduction approach for chemical incident prevention developed and implemented by
industry and stakeholders, is the promulgation of requirements for safer technology and
alternatives or STAA. The concept of safer technology and alternatives has been incorporated
into both the U.S. Environmental Protection Agency’s (EPA’s) Risk Management Plan standard
and OSHA’s Process Safety Management standard. STAA refers to risk reduction strategies
developed through analysis using a hierarchy of controls model illustrated in the figure next slide.
Risk Treatment: Safer Technology and Alternatives (STAA)
Documenting and Communicating Risk
 Risk assessment results should be well documented to
demonstrate the methods, communicate the results and to be
referred to and understood by different people at different times.
 In ANSI Z590.3-2011, 7.12, Document the Results, it suggests
documenting the names, titles, and qualifications of the risk
assessment team, the methods, hazards identified, risks, controls
and follow-up actions.
 A risk register is one well accepted method of documenting the
risk assessment and its results.
 The Risk Assessment has little value if it is not effectively communicated to
all affected stakeholders. Communication must start from the beginning,
during the context phase throughout the process and include monitoring and
verifying risk reduction results.
Documenting and Communicating Risk
Risk Register
Case
#
Location Task
Hazard
#
Hazard
Current
State
Risk
Level
Additional
Controls
Completion
Date
Future
State
Risk
Level
1 QC Lab Plasma cutter 1.1
Electrical
Shock 14.00 Adm. 2/20/15 12.00
1 QC Lab Plasma cutter 1.2 burns 15.20
Adm.,
PPE 3/15/15 12.00
1 QC Lab Plasma cutter 1.3 arc flash 11.20 Adm. 2/20/15 9.80
1 QC Lab Plasma cutter 1.4 noise 19.00 Eng. 3/15/15 8.40
1 QC Lab Plasma cutter 1.5 fire 14.00 Adm. 3/15/15 12.00
1 QC Lab Plasma cutter 1.6 dust 11.20 Adm. 3/15/15 9.60
2 QC Lab
Weld
Destruct 2.1
ergo-
strains 14.00 Adm. 4/15/15 12.00
2 QC Lab
Weld
Destruct 2.2 vibration 19.00 Elim. 4/15/15 4.80
2 QC Lab
Weld
Destruct 2.3 noise 11.20 PPE 4/15/15 10.80
2 QC Lab
Weld
Destruct 2.4 struck by 15.20 PPE 2/20/15 14.40
2 QC Lab
Weld
Destruct 2.5 dust 16.00 Multi-Eng. 4/15/15 8.40
2 QC Lab
Weld
Destruct 2.6
struck
against 11.40 Multi-Eng. 3/15/15 6.30
2 QC Lab
Weld
Destruct 2.7
falls same
level 16.00 Eng. 3/15/15 11.20
3
Finishin
g Wash Station 3.1 hot liquid 9.00 Sub. 4/15/15 6.30
3
Finishin
g Wash Station 3.2
struck
against 14.25 Elim. 4/15/15 0.20
3
Finishin
g Wash Station 3.3
chem-
corrosive 11.20 Sub. 4/15/15 4.20
3
Finishin
g Wash Station 3.4
hot
surfaces 14.25 Elim. 4/15/15 2.10
3
Finishin
g Wash Station 3.5 mechanical 9.60 Multi-Eng. 3/15/15 4.80
3
Finishin
g Wash Station 3.6
ergo-
strains 11.20 Elim. 4/15/15 0.20
Risk Treatment Tracking– Interactive Tool
Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication

More Related Content

PPTX
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
PPTX
Session 05_Risk Assessment Program for YSP_Risk Analysis II
PPTX
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
PPTX
Risk Assessment Program For Young Safety Professionals (YSP)
PPTX
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
PPTX
Session 03_Risk Assessment Program for YSP_Risk Identification
PPTX
Session 07_Risk Assessment Program for YSP_Risk Evaluation
PPTX
Session 06_Risk Assessment Program for YSP_Risk Analysis III
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 05_Risk Assessment Program for YSP_Risk Analysis II
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Risk Assessment Program For Young Safety Professionals (YSP)
Session 01 _Risk Assessment Program for YSP_Introduction, Definitions and Sta...
Session 03_Risk Assessment Program for YSP_Risk Identification
Session 07_Risk Assessment Program for YSP_Risk Evaluation
Session 06_Risk Assessment Program for YSP_Risk Analysis III

What's hot (20)

PPTX
Session 04_Risk Assessment Program for YSP_Risk Analysis I
PPTX
ISO 31000 risk management process
PDF
Risk assessment tools and techniques
PDF
Risk Analysis PowerPoint Presentation Slides
PPT
Risk analysis
PDF
HAZARD ANALYSES
PDF
Kinds of hazard and risk management
PPTX
Unit 5 risk assessment and management
PPSX
Risk analysis
PDF
risk analysis
PPTX
Risk assessment presentation
PPT
Safety hazard-identification-on-construction-projects
PPTX
Hazard and Risk Management
PDF
Risk assessment and management
PDF
Hirarc slide
PPT
Risk assesment
PPTX
Hazard analysis
PDF
OHSAS Hazard identification & Risk assessment
PDF
Risk Management
PDF
Implementing Risk Management
Session 04_Risk Assessment Program for YSP_Risk Analysis I
ISO 31000 risk management process
Risk assessment tools and techniques
Risk Analysis PowerPoint Presentation Slides
Risk analysis
HAZARD ANALYSES
Kinds of hazard and risk management
Unit 5 risk assessment and management
Risk analysis
risk analysis
Risk assessment presentation
Safety hazard-identification-on-construction-projects
Hazard and Risk Management
Risk assessment and management
Hirarc slide
Risk assesment
Hazard analysis
OHSAS Hazard identification & Risk assessment
Risk Management
Implementing Risk Management
Ad

Similar to Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication (20)

PDF
Running the risk | Insight, issue 2
PPT
Topic5
PDF
Accelerating the Development of Medical Devices: The Value of Proactive Risk ...
PDF
Risk Analysis and.pdf
PDF
Risk Analysis & Management | Gaurav Singh Rajput
PPTX
Quality risk management
PDF
ICH Q9 QUALITY RISK MANAGEMENT(QRM)
PPTX
Quality Risk Management (ICHQ9). Understanding and Implimentation pptx
PPTX
ISO: 14971 Quality risk management of medical devices
PDF
Haccp training guide
PDF
2_Models for risk assessment_online 2020.pdf
PPTX
Quality Risk Management
PPTX
Ich guidelines on risk assessment and risk mangment
PDF
QMRS OSH 06 RISK MANUAL
PPTX
Qrm presentation
PPTX
Quality Management System.pptx
PDF
Risk management and environmental monitoring
PPTX
Quality Risk Management
PPTX
UNIT-IITechnology Transfer Protocol.pptx
DOCX
Risk Assessment
Running the risk | Insight, issue 2
Topic5
Accelerating the Development of Medical Devices: The Value of Proactive Risk ...
Risk Analysis and.pdf
Risk Analysis & Management | Gaurav Singh Rajput
Quality risk management
ICH Q9 QUALITY RISK MANAGEMENT(QRM)
Quality Risk Management (ICHQ9). Understanding and Implimentation pptx
ISO: 14971 Quality risk management of medical devices
Haccp training guide
2_Models for risk assessment_online 2020.pdf
Quality Risk Management
Ich guidelines on risk assessment and risk mangment
QMRS OSH 06 RISK MANUAL
Qrm presentation
Quality Management System.pptx
Risk management and environmental monitoring
Quality Risk Management
UNIT-IITechnology Transfer Protocol.pptx
Risk Assessment
Ad

More from Muizz Anibire (20)

DOCX
Questionnaire Template.docx
PDF
Turing’s Computing Machinery and Intelligence.pdf
PPTX
أحكام الجنائز -FUNERAL RITES
PPTX
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
PPTX
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
PDF
Guidelines on writing a research paper
PDF
Tall buildings in urban context
PPTX
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
PPTX
Construction Safety Training_Session 08_Demolition using Explosives
PPTX
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
PPTX
Construction Safety Training_Session 05_Access Equipment and Fall Protection
PPTX
Construction Safety Training_Session 04_Working at Heights and Over Water
PPTX
Construction Safety Training_Session 03_Confined Spaces and Underground Works
PPTX
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
PPTX
Construction Safety Training_Session 01_Overview of the Construction Industry
PDF
Sample risk assessment report for dcc safety students
PPTX
A holistic framework for the post occupancy evaluation of campus residential ...
PDF
An integrated fire safety assessment of a student housing facility
PDF
Fire drill report
PDF
Before the deming’s 14 points for management
Questionnaire Template.docx
Turing’s Computing Machinery and Intelligence.pdf
أحكام الجنائز -FUNERAL RITES
A MACHINE LEARNING-BASED FRAMEWORK FOR DELAY MITIGATION IN TALL BUILDING PROJ...
CAUSES OF DELAY IN TALL BUILDING PROJECTS IN GCC COUNTRIES
Guidelines on writing a research paper
Tall buildings in urban context
Session 09_Risk Assessment Program for YSP_Risk Assessment Tools and Practica...
Construction Safety Training_Session 08_Demolition using Explosives
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 03_Confined Spaces and Underground Works
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 01_Overview of the Construction Industry
Sample risk assessment report for dcc safety students
A holistic framework for the post occupancy evaluation of campus residential ...
An integrated fire safety assessment of a student housing facility
Fire drill report
Before the deming’s 14 points for management

Recently uploaded (20)

PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPT
Total quality management ppt for engineering students
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
Current and future trends in Computer Vision.pptx
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
737-MAX_SRG.pdf student reference guides
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Artificial Intelligence
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Nature of X-rays, X- Ray Equipment, Fluoroscopy
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Total quality management ppt for engineering students
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Safety Seminar civil to be ensured for safe working.
Visual Aids for Exploratory Data Analysis.pdf
August 2025 - Top 10 Read Articles in Network Security & Its Applications
III.4.1.2_The_Space_Environment.p pdffdf
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Fundamentals of Mechanical Engineering.pptx
Current and future trends in Computer Vision.pptx
Soil Improvement Techniques Note - Rabbi
Exploratory_Data_Analysis_Fundamentals.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
737-MAX_SRG.pdf student reference guides
distributed database system" (DDBS) is often used to refer to both the distri...
Artificial Intelligence
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf

Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication

  • 1. Risk Assessment Program Trainer: Mr. Muizz Anibire, MSc Tel: +966501296203, Email: muizzanibire10@gmail.com
  • 2. Risk Treatment The ISO 31000 Risk Management Process and Risk Treatment Tools
  • 3. Risk Treatment  Risk treatment is defined by ISO Guide 73 (ANSI/ASSE Z690.1- 2011) as the ‘process to modify risk’.  Risk treatments that deal with negative consequences are sometimes referred to as “risk mitigation”, “risk elimination”, “risk prevention” and “risk reduction”. (ANSI/ASSE Z690.1-2011)  Risk treatment involves the selection and application of risk reduction measures for a risk which is judged to be unacceptable. It is the end result or output of the risk assessment process used to control the identified hazard and reduce its risk.  Without acting upon the risk assessment’s findings and treating risk, a risk assessment is of no value, and in fact may lead to negligence of the organization (Popov, Lyon, Hollcroft, 2016).  Decisions on treating a risk will likely depend on the costs and benefits of risk and the costs and benefits of implementing improved controls (refer to ALARP concept).
  • 4. Risk Treatment  Risk treatment can involve:  avoiding the risk by deciding not to start or continue with the activity that gives rise to the risk;  taking or increasing risk in order to pursue an opportunity;  removing the risk source;  changing the likelihood;  changing the consequences;  sharing the risk with another party or parties [including contracts and risk financing; and  retaining the risk by informed decision.
  • 5. Risk Treatment  Risk treatment requires the risk assessment team or decision makers to determine the options available, and their degree of risk reduction, reliability, and associated cost to implement and maintain.  Feasible control options that may reduce or eliminate the risk from the identified hazard(s) are identified using internal and external resources.  Existing internal sources include the OSH professional, experienced stakeholders and operators familiar with the hazard and control methods. Input from affected workers knowledgeable in the operation, equipment or process is advised.  External resources such as manufacturers' literature and engineering reports; OSH-related research from institutes, and professional organizations such as ASSE and AIHA; regulatory standards and guidance; industry best practices; industry consensus standards; National Institute for Occupational Safety and Health (NIOSH) publications are also available.
  • 6. Risk Treatment  Risk treatment plans can involve a single control or multiple risk reduction measures to accomplish the risk reduction desired. Concepts such as ‘inherently safe design’, ‘layers of protection’, ‘recognized and generally accepted good engineering practices’ and ‘safer technology and alternatives’ along with the hierarchy of controls should be incorporated into the risk treatment plan.  Risk treatment selection requires a balancing of the overall costs, and the financial and non-financial benefits, including legal and regulatory requirements. This requires some investigation into the suppliers of the risk treatment, and associated costs including purchase price, installation, training, maintenance and services costs, as well as the expected life span of the treatment.  Risks with extremely high severity potential, but low likelihood may warrant risk treatment even when the costs of the treatment are not justified in a typical cost benefit analysis.
  • 8. Risk Treatment Note 1: Recognized and Generally Accepted Good Engineering Practices (RAGAGEP) Introduced by OSHA in the CFR 29, 1910.119 Process Safety Management (PSM) standard. RAGAGEP involves the selection and application of appropriate engineering, operating, and maintenance knowledge when designing, operating and maintaining chemical facilities with the purpose of ensuring safety and preventing process safety incidents. Note 2: Safer Technology and Alternatives (STAA) One risk reduction approach for chemical incident prevention developed and implemented by industry and stakeholders, is the promulgation of requirements for safer technology and alternatives or STAA. The concept of safer technology and alternatives has been incorporated into both the U.S. Environmental Protection Agency’s (EPA’s) Risk Management Plan standard and OSHA’s Process Safety Management standard. STAA refers to risk reduction strategies developed through analysis using a hierarchy of controls model illustrated in the figure next slide.
  • 9. Risk Treatment: Safer Technology and Alternatives (STAA)
  • 10. Documenting and Communicating Risk  Risk assessment results should be well documented to demonstrate the methods, communicate the results and to be referred to and understood by different people at different times.  In ANSI Z590.3-2011, 7.12, Document the Results, it suggests documenting the names, titles, and qualifications of the risk assessment team, the methods, hazards identified, risks, controls and follow-up actions.  A risk register is one well accepted method of documenting the risk assessment and its results.  The Risk Assessment has little value if it is not effectively communicated to all affected stakeholders. Communication must start from the beginning, during the context phase throughout the process and include monitoring and verifying risk reduction results.
  • 11. Documenting and Communicating Risk Risk Register Case # Location Task Hazard # Hazard Current State Risk Level Additional Controls Completion Date Future State Risk Level 1 QC Lab Plasma cutter 1.1 Electrical Shock 14.00 Adm. 2/20/15 12.00 1 QC Lab Plasma cutter 1.2 burns 15.20 Adm., PPE 3/15/15 12.00 1 QC Lab Plasma cutter 1.3 arc flash 11.20 Adm. 2/20/15 9.80 1 QC Lab Plasma cutter 1.4 noise 19.00 Eng. 3/15/15 8.40 1 QC Lab Plasma cutter 1.5 fire 14.00 Adm. 3/15/15 12.00 1 QC Lab Plasma cutter 1.6 dust 11.20 Adm. 3/15/15 9.60 2 QC Lab Weld Destruct 2.1 ergo- strains 14.00 Adm. 4/15/15 12.00 2 QC Lab Weld Destruct 2.2 vibration 19.00 Elim. 4/15/15 4.80 2 QC Lab Weld Destruct 2.3 noise 11.20 PPE 4/15/15 10.80 2 QC Lab Weld Destruct 2.4 struck by 15.20 PPE 2/20/15 14.40 2 QC Lab Weld Destruct 2.5 dust 16.00 Multi-Eng. 4/15/15 8.40 2 QC Lab Weld Destruct 2.6 struck against 11.40 Multi-Eng. 3/15/15 6.30 2 QC Lab Weld Destruct 2.7 falls same level 16.00 Eng. 3/15/15 11.20 3 Finishin g Wash Station 3.1 hot liquid 9.00 Sub. 4/15/15 6.30 3 Finishin g Wash Station 3.2 struck against 14.25 Elim. 4/15/15 0.20 3 Finishin g Wash Station 3.3 chem- corrosive 11.20 Sub. 4/15/15 4.20 3 Finishin g Wash Station 3.4 hot surfaces 14.25 Elim. 4/15/15 2.10 3 Finishin g Wash Station 3.5 mechanical 9.60 Multi-Eng. 3/15/15 4.80 3 Finishin g Wash Station 3.6 ergo- strains 11.20 Elim. 4/15/15 0.20
  • 12. Risk Treatment Tracking– Interactive Tool