Optimized concepts for loading &
installing Offshore wind turbines
Transport & Installation for Offshore Wind | 28-30 April, 2015
Page 2
Table of contents
4
Logistics / Sea-fastening3
Transport Equipment2
Installation Equipment
Introduction1 Introduction1
Page 3
Introduction
Jesper Møller
Senior Key Expert Offshore Installation
• Started in Bonus Energy A/S in 1998
• Lifting Specialist in 2009
• Lifting Expert in 2011
• Senior Key Expert in 2014
Currently heading
− Global Offshore lifting department
− Global competence center for lifting
Page 4
Table of contents
4
Logistics / Sea-fastening3
Transport Equipment2
Installation Equipment
Introduction1
Transport Equipment2
Page 5
Transport equipment
Transport equipment overview 6.0 MW
Page 6
Transport Equipment
Transporting systems increasing safety and
ensuring transport with less component damages
Tower transportTransport nacelle rear end
Transport frame for hub
 All handling / lifting performed without touching the component
 Transport equipment mounted at production facility and used until
pre-assembly / installation
 Transport damages reduced to a minimum
 Cost reductions and increased safety due to reduced number of
lifting operations
 Only one option for lifting the components
 Reduction of heavy lifts for personnel (slings, shackles etc.)
 Tower transportation equipment also used for lifting
What we achieve…
Transport frame for hub
Complete nacelle at the pre-assembly site ready for functional test
 Assembly of nacelle rear end, generator and hub
 Mounting of turner tool
 Functional test of the complete nacelle before it is shipped to site
On the pre-assembly site…
Page 7
Transport Equipment
The art of transporting 75 m blades from
production to site in the safest and most cost-effective way
• All equipment mounted at production site and used during
transport to pre-assembly site
• Main lifting eyes for single point lifting, i.e. lifting operations
performed only in transport equipment without touching the
component
• Friction pads on tip clamp for ensuring optimal fixation of the
blade in correct position and elimination of transport
damages
• Possible to transport blade with stud bolts and blade bearing
cover mounted from production
 Transport damages reduced to a minimum
 Number of handlings reduced
 Reduction of heavy lifts for personnel (slings, shackles etc.)
 Cost reductions and increased safety due to reduced number of
lifting operations
Blade resting in tip clampA Frame mounted on root end
How it works…
What we achieve…
B75 transport
Page 8
Transport Equipment
How to move 75 m blades internally
without compromising flexibility and safety?
• Consists of two parts – root end and tip end mover
• Enables flexible blade transport at production facility / harbor
• Tuck master for root end / tip end remote controlled by technician on
ground = high maneuverability
• Cost reductions and increased safety due to reduced number of
lifting operations
Blade mover for internal transport…
Root end mover Tip end mover
Page 9
Table of contents
4
Logistic/Sea-fastening3
Transport Equipment2
Installation Equipment
Introduction1
Logistics / Sea-fastening3
Page 10
Logistics / Sea-fastening
Logistics during load-out and installation
• Single blade concept chosen to utilize the space onboard the vessel
and at the quay side in the best possible way while at the same time
allowing for higher installation wind speed
• Deck layout is prepared to allow for towers and nacelles to be
loaded using the vessel crane while blades are being loaded
simultaneously using shore cranes
• All sea-fastening is pre-installed on the installation vessel and
prepared for main components and auxiliary equipment
• Fixed platforms incl. rails and stairways for the blade rack
ensuring easy access and safe working conditions for technicians
How it works…
Page 11
Logistics / Sea-fastening
How to ensure safe fastening of towers while at the same time
reducing crane time and speeding up installation
• Towers secured by means of pin bolts which ensures easy and safe
mounting and demounting of the towers
• Everything is pre-mounted and the tower can be lifted directly from the
harbor to the installation ship thereby reducing crane time
• Platforms incl. rails and stairways for easy access also ensuring safe
working conditions for technicians
• Implementation of partly hydraulic sea-fastening solution has reduced
installation time even further
• The hydraulic sea-fastening is design approved by DNV
How it works…
Page 12
Logistics / Sea-fastening
Nacelle secured only by means of corner stoppers
ensuring shortest possible crane time
• Nacelle lifted from harbor and landed on the vessel deck where it is secured
only by means of corner stoppers (no other sea-fastening required)
• With no additional equipment needed, crane time is reduced to a minimum
• All sea-fastening is approved by the MWS
• All used equipment is returned on the empty nacelle frame
How it works…
Corner stoppers for nacelle sea-fastening
Page 13
Logistics / Sea-fastening
Blade rack design reducing lifts and manual handling during
load-out while at the same time easing installation
Tip end sea-fastening
Root end sea-fastening
• Blades positioned slightly offset in blade rack making it possible to
always lift the top blade for installation
• Same interface used for transport and sea-fastening at the blade root
end
• When lifting the blade onto the vessel, blade root end is secured in the
blade rack by means of a pin ensuring no uplift and no sideways
movement
• For installation, root end equipment bolts are loosened, and the blade
can be lifted directly - without demounting sea-fastening
• At the tip end, the blade is secured by means of crossed slings which
can be opened to allow for direct lifting of the blade
• All in all – crane time is reduced to an absolute minimum
How it works…
Page 14
Table of contents
4 Installation Equipment
Logistic/Sea-fastening3
Transport Equipment2
Introduction1
Installation Equipment4
Page 15
Installation Equipment
Traverse system - how to increase safety while
at the same time reducing the overall installation time?
Guide wire
Tack wire
Traverse
Lifting yoke
Offshore tower Offshore Nacelle Offshore Blade
Page 16
Installation Equipment
How to ensure fast and safe
full tower lifts at high wind speeds?
• Gripper is designed for installation at an average wind speed of 14 m/s
• Stairways and platform integrated for safe and easy access
• Reduction of lifting brackets and loose parts improving safety and reducing
heavy lifts for technicians
• Only fiber pads touching the tower flange
• Tower cover remains mounted during lift
• Only mechanically operated - no hydraulics / electrical systems
• Traverse system enabling rotation of tower for alignment on TP, ie. no
manual handling
• Full GL approval – design, production and load test
How it works…
What we achieve…
 Reduction of installation time compared to traditionally bolted lifting
brackets
 No damages to towers due to fiber pads
 Increased safety and improved working
environment for technicians
Page 17
Installation Equipment
How to safely install a 350 t nacelle 110 m above water level
• Designed for installation at average wind speed of 14 m/s
• Trunnion has the same design for all three lifting devices for our main
component lifts: tower, nacelle and yoke
• Integrated stairways for safe and easy access and preparatory work
• Three-point lift ensuring stable positioning of the nacelle
• Remote-controlled horizontal adjustment during lift
• Reduction of lifting brackets and loose parts improving safety and
reducing heavy lifts for technicians
• Full GL approval – design, production and load test
How it works…
What we achieve…
 Reduction of installation time compared to other known solutions
 Increased safety and improved working environment for technicians
 Future-proof – designed for next generation nacelles
Page 18
Installation Equipment
A flexible giant enabling single blade installation
of B75 blades in average wind speed of 14 m/s
• Single blade installation in average wind speed of 14 m/s
• Dedicated sea fastening frame incl. stairways and platform
• Fully automatic - using a remote control, a technician is able to control the fixation of slings
around the blade
• Data collection allowing for documentation of all lifting operations
• Patented design
• Yaw function allowing for blade adjustments in height while maintaining tagline tension
• Active tilt function allowing horizontal adjustment during installation
• Pitch function is build into the yoke
• Full DNV approval – design, production and load test
How it works…
 No working in heights and no manual
handling of slings improving safety and
reducing installation time
 Preparatory work can be performed without
cherry pickers due to integrated stairways and
platform
 Yaw, tilt and pitch functions allowing for
adjustment of the blade during installation
What we achieve…
Janett lifting yoke – 14 m long, 8 m high and heavy
Page 19
Thank you!
Jesper Møller
Senior Key Expert
Offshore Installation
Fiskergade 1
7100 Vejle
Phone: +45 30375310
E-mail:
jml@siemens.com
siemens.com/answers

More Related Content

PDF
Euro-Rigging presentation 2013
PPTX
Lifting and handling solutions for heavy wind turbine components - Fyns Kran ...
PDF
Optimized Concepts for Loading_Installing OffshoreWindTurbines
PPTX
2018 CRW: Engineered Lift Plans From A to Z
PPTX
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
PPTX
Safety & Quality Aspects in '3-S' System of Construction
PPTX
Jim wiethorn
PPT
Align Production Systems: Innovation in Movement
Euro-Rigging presentation 2013
Lifting and handling solutions for heavy wind turbine components - Fyns Kran ...
Optimized Concepts for Loading_Installing OffshoreWindTurbines
2018 CRW: Engineered Lift Plans From A to Z
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
Safety & Quality Aspects in '3-S' System of Construction
Jim wiethorn
Align Production Systems: Innovation in Movement

What's hot (14)

PDF
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
PPTX
Shipyard layout improvement
PDF
Evaluating logistical challenges of offshore module transportation
PPTX
Forth Road Bridge - Truss End Link failure -22 dec
PDF
Foundationnotes 121120064719-phpapp01
PPTX
Definitions of lifts
PPTX
Demolition of a former mine site - Luke Egan and David Wood
PPTX
Understanding the cause - Alan Burns and Gerard Chitty
PDF
MOQ Platform installation_Lesson learnt_Rev B
PDF
Austroads Bridge Conference 2017
PPT
Handling training
PDF
ELENG_shiprepair
PPTX
Equipment failure - a liability or an asset? - Roger Costanzi
PPT
Lift Design
Foiling Week™ 2015. July 2nd - Presentation by Larry Knauer: "The Rave V Wind...
Shipyard layout improvement
Evaluating logistical challenges of offshore module transportation
Forth Road Bridge - Truss End Link failure -22 dec
Foundationnotes 121120064719-phpapp01
Definitions of lifts
Demolition of a former mine site - Luke Egan and David Wood
Understanding the cause - Alan Burns and Gerard Chitty
MOQ Platform installation_Lesson learnt_Rev B
Austroads Bridge Conference 2017
Handling training
ELENG_shiprepair
Equipment failure - a liability or an asset? - Roger Costanzi
Lift Design
Ad

Similar to Siemens: Optimized concepts for loading & installing offshore wind turbines (20)

PDF
WhitePaper_LoadSpreadingandSeafastening
PDF
Seven Borealis
PDF
Seven borealis
PDF
Seven borealis
PDF
Cranes Design Practice and Maintenance 2nd Edition Ing J. Verschoof
PPTX
Material handling equipments
PDF
100t-XGC100A-crawler.pdf
PDF
NORTH SEA BROCHURES
PPTX
Sanford Hospital PowerPoint
PDF
Innovo's products brochures
PDF
ottobre 2016 - articolo Saipem bollettino SPE
PPT
0264 GustoMSC_PowerPointTemplate_08_2010[1].PPT
PPTX
paper selected for national conference at IMU-MUMBAI
PDF
Slewing-Mobile-Crane-Up-to-100T_SLG_TLILIC0014_SAMPLE.pdf
PDF
Rebo general presentation 2014-07
PDF
Offshore substation design in Ramboll
PPTX
Richard Turnbull CV Supplement 2012
PDF
Hoisting equipment 1
PDF
JDN Monocrane - The Leader in Cranes
WhitePaper_LoadSpreadingandSeafastening
Seven Borealis
Seven borealis
Seven borealis
Cranes Design Practice and Maintenance 2nd Edition Ing J. Verschoof
Material handling equipments
100t-XGC100A-crawler.pdf
NORTH SEA BROCHURES
Sanford Hospital PowerPoint
Innovo's products brochures
ottobre 2016 - articolo Saipem bollettino SPE
0264 GustoMSC_PowerPointTemplate_08_2010[1].PPT
paper selected for national conference at IMU-MUMBAI
Slewing-Mobile-Crane-Up-to-100T_SLG_TLILIC0014_SAMPLE.pdf
Rebo general presentation 2014-07
Offshore substation design in Ramboll
Richard Turnbull CV Supplement 2012
Hoisting equipment 1
JDN Monocrane - The Leader in Cranes
Ad

More from Torben Haagh (20)

PDF
Siemens Gamesaa, RCAM Tecnologies, Goldwind, Nabrawind, ESTEYO confirmed spea...
PDF
ISO26262 Conference 2019
PDF
SOTIF Conference 2019 - APTIV, Toyota, Delphi Tech, Texas Instruments
PDF
Daimler, Audi, and Volvo, at Advanced E-Motor - Advanced E-Motor Technology C...
PDF
Volkswagen, Ford, and PSA Group - Intelligent Automotive Lighting Agenda 2019
PDF
14th International Conference Innovative Seating 2019
PDF
Agenda - Airport Operational Excellence and Automation 2019, Frankfurt Am Ma...
PDF
Agenda: Interior Cabin Innovation for Automated Vehicles 2019
PDF
Cognitive Automation 2019, Berlin, Germany
PDF
Präsentation zu Roll-Out Messsysteme Infrastruktur bei EnBW
PDF
Is there potential for robotics in finance and accounting?
PDF
Mythos und Realität des ERF
PDF
Expert interview with Nexans - the 66kV cabling technology
PDF
ENERCON - Energy System Change: Era of Feed-in Tariffs is coming to an end
PDF
Innovative Ansätze im Mahn- und Inkassoprozess - Kundenorientiertes Mahnen in...
PDF
Letzte Chance auf Ihr Konferenzticket
PDF
Effizienter mit Kooperationen bei Integra-Partnern
PDF
Digitalisierte bAV
PDF
Die Bank von morgen
PDF
"Die Zeit-Zielscheibe" von Zach Davis
Siemens Gamesaa, RCAM Tecnologies, Goldwind, Nabrawind, ESTEYO confirmed spea...
ISO26262 Conference 2019
SOTIF Conference 2019 - APTIV, Toyota, Delphi Tech, Texas Instruments
Daimler, Audi, and Volvo, at Advanced E-Motor - Advanced E-Motor Technology C...
Volkswagen, Ford, and PSA Group - Intelligent Automotive Lighting Agenda 2019
14th International Conference Innovative Seating 2019
Agenda - Airport Operational Excellence and Automation 2019, Frankfurt Am Ma...
Agenda: Interior Cabin Innovation for Automated Vehicles 2019
Cognitive Automation 2019, Berlin, Germany
Präsentation zu Roll-Out Messsysteme Infrastruktur bei EnBW
Is there potential for robotics in finance and accounting?
Mythos und Realität des ERF
Expert interview with Nexans - the 66kV cabling technology
ENERCON - Energy System Change: Era of Feed-in Tariffs is coming to an end
Innovative Ansätze im Mahn- und Inkassoprozess - Kundenorientiertes Mahnen in...
Letzte Chance auf Ihr Konferenzticket
Effizienter mit Kooperationen bei Integra-Partnern
Digitalisierte bAV
Die Bank von morgen
"Die Zeit-Zielscheibe" von Zach Davis

Recently uploaded (20)

PPTX
Biodiversity of nature in environmental studies.pptx
PPTX
102602734019608717246081273460745534.pptx
PPTX
sustainable-development in tech-ppt[1].pptx
PPTX
Environmental pollutants for natural res
PPTX
Plant Production 7.pptx in grade 7 students
PPTX
Arugula. Crop used for medical plant in kurdistant
PPTX
Pollution, it's Types and Impacts on Global context.pptx
PPTX
IMPACTS OF CHEMICAL FERTILIZERS -CHEMPROJ (11).pptx
PPTX
the solar system janDNsdnfanscssfsaaansf
PPT
PPTPresentation3 jhsvdasvdjhavsdhsvjcksjbc.jasb..ppt
PPTX
Soil chemistry lecture 20 presentations agriculture
PPTX
RadiationSafetyPt120252026nucchemis.pptx
PDF
Effective factors on adoption of intercropping and it’s role on development o...
PPTX
Minor Species of nutmeg, cinnamon and clove
PPTX
NSTP1 NSTP1NSTP1NSTP1NSTP1NSTP1NSTP1NSTP
PPTX
"One Earth Celebrating World Environment Day"
PPTX
Conformity-and-Deviance module 7 ucsp grade 12
PPTX
Biodiversity.udfnfndrijfreniufrnsiufnriufrenfuiernfuire
PDF
The European Green Deal (EU Green Deal)
PDF
Cave Diggers Simplified cave survey methods and mapping
Biodiversity of nature in environmental studies.pptx
102602734019608717246081273460745534.pptx
sustainable-development in tech-ppt[1].pptx
Environmental pollutants for natural res
Plant Production 7.pptx in grade 7 students
Arugula. Crop used for medical plant in kurdistant
Pollution, it's Types and Impacts on Global context.pptx
IMPACTS OF CHEMICAL FERTILIZERS -CHEMPROJ (11).pptx
the solar system janDNsdnfanscssfsaaansf
PPTPresentation3 jhsvdasvdjhavsdhsvjcksjbc.jasb..ppt
Soil chemistry lecture 20 presentations agriculture
RadiationSafetyPt120252026nucchemis.pptx
Effective factors on adoption of intercropping and it’s role on development o...
Minor Species of nutmeg, cinnamon and clove
NSTP1 NSTP1NSTP1NSTP1NSTP1NSTP1NSTP1NSTP
"One Earth Celebrating World Environment Day"
Conformity-and-Deviance module 7 ucsp grade 12
Biodiversity.udfnfndrijfreniufrnsiufnriufrenfuiernfuire
The European Green Deal (EU Green Deal)
Cave Diggers Simplified cave survey methods and mapping

Siemens: Optimized concepts for loading & installing offshore wind turbines

  • 1. Page 1 Optimized concepts for loading & installing Offshore wind turbines Transport & Installation for Offshore Wind | 28-30 April, 2015
  • 2. Page 2 Table of contents 4 Logistics / Sea-fastening3 Transport Equipment2 Installation Equipment Introduction1 Introduction1
  • 3. Page 3 Introduction Jesper Møller Senior Key Expert Offshore Installation • Started in Bonus Energy A/S in 1998 • Lifting Specialist in 2009 • Lifting Expert in 2011 • Senior Key Expert in 2014 Currently heading − Global Offshore lifting department − Global competence center for lifting
  • 4. Page 4 Table of contents 4 Logistics / Sea-fastening3 Transport Equipment2 Installation Equipment Introduction1 Transport Equipment2
  • 5. Page 5 Transport equipment Transport equipment overview 6.0 MW
  • 6. Page 6 Transport Equipment Transporting systems increasing safety and ensuring transport with less component damages Tower transportTransport nacelle rear end Transport frame for hub  All handling / lifting performed without touching the component  Transport equipment mounted at production facility and used until pre-assembly / installation  Transport damages reduced to a minimum  Cost reductions and increased safety due to reduced number of lifting operations  Only one option for lifting the components  Reduction of heavy lifts for personnel (slings, shackles etc.)  Tower transportation equipment also used for lifting What we achieve… Transport frame for hub Complete nacelle at the pre-assembly site ready for functional test  Assembly of nacelle rear end, generator and hub  Mounting of turner tool  Functional test of the complete nacelle before it is shipped to site On the pre-assembly site…
  • 7. Page 7 Transport Equipment The art of transporting 75 m blades from production to site in the safest and most cost-effective way • All equipment mounted at production site and used during transport to pre-assembly site • Main lifting eyes for single point lifting, i.e. lifting operations performed only in transport equipment without touching the component • Friction pads on tip clamp for ensuring optimal fixation of the blade in correct position and elimination of transport damages • Possible to transport blade with stud bolts and blade bearing cover mounted from production  Transport damages reduced to a minimum  Number of handlings reduced  Reduction of heavy lifts for personnel (slings, shackles etc.)  Cost reductions and increased safety due to reduced number of lifting operations Blade resting in tip clampA Frame mounted on root end How it works… What we achieve… B75 transport
  • 8. Page 8 Transport Equipment How to move 75 m blades internally without compromising flexibility and safety? • Consists of two parts – root end and tip end mover • Enables flexible blade transport at production facility / harbor • Tuck master for root end / tip end remote controlled by technician on ground = high maneuverability • Cost reductions and increased safety due to reduced number of lifting operations Blade mover for internal transport… Root end mover Tip end mover
  • 9. Page 9 Table of contents 4 Logistic/Sea-fastening3 Transport Equipment2 Installation Equipment Introduction1 Logistics / Sea-fastening3
  • 10. Page 10 Logistics / Sea-fastening Logistics during load-out and installation • Single blade concept chosen to utilize the space onboard the vessel and at the quay side in the best possible way while at the same time allowing for higher installation wind speed • Deck layout is prepared to allow for towers and nacelles to be loaded using the vessel crane while blades are being loaded simultaneously using shore cranes • All sea-fastening is pre-installed on the installation vessel and prepared for main components and auxiliary equipment • Fixed platforms incl. rails and stairways for the blade rack ensuring easy access and safe working conditions for technicians How it works…
  • 11. Page 11 Logistics / Sea-fastening How to ensure safe fastening of towers while at the same time reducing crane time and speeding up installation • Towers secured by means of pin bolts which ensures easy and safe mounting and demounting of the towers • Everything is pre-mounted and the tower can be lifted directly from the harbor to the installation ship thereby reducing crane time • Platforms incl. rails and stairways for easy access also ensuring safe working conditions for technicians • Implementation of partly hydraulic sea-fastening solution has reduced installation time even further • The hydraulic sea-fastening is design approved by DNV How it works…
  • 12. Page 12 Logistics / Sea-fastening Nacelle secured only by means of corner stoppers ensuring shortest possible crane time • Nacelle lifted from harbor and landed on the vessel deck where it is secured only by means of corner stoppers (no other sea-fastening required) • With no additional equipment needed, crane time is reduced to a minimum • All sea-fastening is approved by the MWS • All used equipment is returned on the empty nacelle frame How it works… Corner stoppers for nacelle sea-fastening
  • 13. Page 13 Logistics / Sea-fastening Blade rack design reducing lifts and manual handling during load-out while at the same time easing installation Tip end sea-fastening Root end sea-fastening • Blades positioned slightly offset in blade rack making it possible to always lift the top blade for installation • Same interface used for transport and sea-fastening at the blade root end • When lifting the blade onto the vessel, blade root end is secured in the blade rack by means of a pin ensuring no uplift and no sideways movement • For installation, root end equipment bolts are loosened, and the blade can be lifted directly - without demounting sea-fastening • At the tip end, the blade is secured by means of crossed slings which can be opened to allow for direct lifting of the blade • All in all – crane time is reduced to an absolute minimum How it works…
  • 14. Page 14 Table of contents 4 Installation Equipment Logistic/Sea-fastening3 Transport Equipment2 Introduction1 Installation Equipment4
  • 15. Page 15 Installation Equipment Traverse system - how to increase safety while at the same time reducing the overall installation time? Guide wire Tack wire Traverse Lifting yoke Offshore tower Offshore Nacelle Offshore Blade
  • 16. Page 16 Installation Equipment How to ensure fast and safe full tower lifts at high wind speeds? • Gripper is designed for installation at an average wind speed of 14 m/s • Stairways and platform integrated for safe and easy access • Reduction of lifting brackets and loose parts improving safety and reducing heavy lifts for technicians • Only fiber pads touching the tower flange • Tower cover remains mounted during lift • Only mechanically operated - no hydraulics / electrical systems • Traverse system enabling rotation of tower for alignment on TP, ie. no manual handling • Full GL approval – design, production and load test How it works… What we achieve…  Reduction of installation time compared to traditionally bolted lifting brackets  No damages to towers due to fiber pads  Increased safety and improved working environment for technicians
  • 17. Page 17 Installation Equipment How to safely install a 350 t nacelle 110 m above water level • Designed for installation at average wind speed of 14 m/s • Trunnion has the same design for all three lifting devices for our main component lifts: tower, nacelle and yoke • Integrated stairways for safe and easy access and preparatory work • Three-point lift ensuring stable positioning of the nacelle • Remote-controlled horizontal adjustment during lift • Reduction of lifting brackets and loose parts improving safety and reducing heavy lifts for technicians • Full GL approval – design, production and load test How it works… What we achieve…  Reduction of installation time compared to other known solutions  Increased safety and improved working environment for technicians  Future-proof – designed for next generation nacelles
  • 18. Page 18 Installation Equipment A flexible giant enabling single blade installation of B75 blades in average wind speed of 14 m/s • Single blade installation in average wind speed of 14 m/s • Dedicated sea fastening frame incl. stairways and platform • Fully automatic - using a remote control, a technician is able to control the fixation of slings around the blade • Data collection allowing for documentation of all lifting operations • Patented design • Yaw function allowing for blade adjustments in height while maintaining tagline tension • Active tilt function allowing horizontal adjustment during installation • Pitch function is build into the yoke • Full DNV approval – design, production and load test How it works…  No working in heights and no manual handling of slings improving safety and reducing installation time  Preparatory work can be performed without cherry pickers due to integrated stairways and platform  Yaw, tilt and pitch functions allowing for adjustment of the blade during installation What we achieve… Janett lifting yoke – 14 m long, 8 m high and heavy
  • 19. Page 19 Thank you! Jesper Møller Senior Key Expert Offshore Installation Fiskergade 1 7100 Vejle Phone: +45 30375310 E-mail: jml@siemens.com siemens.com/answers