Türkseven and Ertek
Turkseven, C.H., and Ertek, G. (2003). "Simulation modeling for quality and productivity in
steel cord manufacturing," in Chick, S., Sánchez, P., Ferrin,D., and Morrice, D.J. (eds.). Pro-
ceedings of 2003 Winter Simulation Conference. Institute of Electrical and Electronics Engi-
neers (IEEE), Piscataway, New Jersey.
Note: This is the final draft version of this paper. Please cite this paper (or this final draft) as
above. You can download this final draft from http://research.sabanciuniv.edu.
SIMULATION MODELING FOR QUALITY AND PRODUCTIVITY
IN STEEL CORD MANUFACTURING
Can Hulusi Türkseven
School of Industrial Engineering
Purdue University
315 N. Grant Street
West Lafayette, IN 47907-2023, U.S.A.
Gürdal Ertek
Faculty of Engineering and Natural Sciences
Sabancı University
Orhanli, Tuzla, 34956
Istanbul, TURKEY
Türkseven and Ertek
ABSTRACT
We describe the application of simulation modeling to estimate and improve quality and
productivity performance of a steel cord manufacturing system. We describe the typical steel
cord manufacturing plant, emphasize its distinguishing characteristics, identify various pro-
duction settings and discuss applicability of simulation as a management decision support tool.
Besides presenting the general structure of the developed simulation model, we focus on wire
fractures, which can be an important source of system disruption.
1 INTRODUCTION
Steel cord is typically used as the main reinforcement material in manufacture of steel radial
tires. It strengthens the tire to provide fuel savings, long mileage, safety and comfort. The
manufacture of steel cord takes place through continuous processes where wire semi-products
are stored on discrete inventory units, namely “spool”s (Figure 1). The steel cord plant is oper-
ated with multiple –possibly conflicting- objectives, both quality related (ex: minimizing the
number of final spools containing knot defects) and productivity related (ex: increasing
throughput). Modeling this type of manufacturing requires special considerations applicable to
a narrow scope of industries. One such consideration is the reversal of the wire wound on the
spools at each bunching operation. Manufacturing systems with similar operating characteris-
tics include cable manufacturing (electric/energy/fiber-optic), nylon cord manufacturing, cop-
per rod manufacturing.
Literature on steel cord manufacturing is not extensive, since this is a very specialized type
of manufacturing, and the systems required are produced and installed by only a handful of
companies in the world. We refer the interested readers to the following two studies: Thomas
et al. (2002) report improvement of operations in a steel cord manufacturing company using
simulation. Mercankaya (2003) develops an optimization-based decision support system for
steel cord manufacturing.
We first describe the manufacturing process and outline research objectives. After discuss-
ing various modeling approaches for possible configurations and discussing the relevance of
simulation modeling, we describe the simulation model, including inputs, decision variables,
Türkseven and Ertek
ouputs and results obtained. We conclude with a discussion of future research areas in produc-
tion planning for the described systems.
Figure 1. Spool on which Wire is Wound
2 THE MANUFACTURING PROCESS
In steel cord manufacturing incoming raw material, the “steel rod wire”, is thinned into “fila-
ment”s which are used in successive bunching operations to construct the “steel cord” final
products (Figure 2). Between every bunching operation, the intermediate wire products are
wound onto spools of varying capacities (in the scale of thousands of meters). Steel rod wire
enters the steel cord plant with a radius of ~2.5mm and passes through dry drawing and wet
drawing, accompanied with other operations (including chemical processes such as copper and
zinc plating) to produce filaments with a radius of ~0.2mm. Filaments coming out of wet-
drawing are wound on spools and are referred to as “payoff”. Payoff becomes the raw material
for bunching and spiralling operations. At each bunching operation, bunched wires enter as
“core” to be bunched with a new layer of payoff (filaments) to form “take-up”. The “take-up” in
turn becomes the “core” for the following bunching operation (Figure 3).
Türkseven and Ertek
Dry drawing I & II
Annealing
Cold air bath
Cold water bath
Acidic solution
Basic solution
Spiralling
Bunching
Wet drawing
Copper plating
Zinc plating
Packaging
to Copper plating
Steel wire rod
Filament
Steel cord
Begin Production
End production
RESEARCHFOCUSRESEARCHFOCUSFigure 2. Production Processes in Steel Cord Manufacturing
8
Steel wire rod
(raw material)
Filament (payoff)
Final product
(construction)
3+8+12x0.2+1+1
3+8x0.2
Bunched
steel wire
3x0.2
Bunched
steel wire
1
2
8
7
10
11
5
4
6
39
12
5 4
1
2
36
7
2 1
3
SpiralSpiral filamentfilament
Bunching 2 Bunching 3
& Spiralling
Bunching1Drawing
Operation
Core
Figure 3. Cross-section of 3+8+12x0.2+1 Construction at Successive Bunching Operations
Türkseven and Ertek
In each bunching operation the take-up consumes a pay-off longer than its own length, ac-
cording to a “usage factor”. For example, in a bunching operation with a usage ratio of 0.9,
100000 meters of payoff bunches with 90000 meters of core to produce 90000 meters of take-
up. As the product advances along the production line, its thickness increases and thus it takes
a longer payoff to cover the take-up; i.e. the usage ratio decreases. Input ratios are discussed
with other input parameters in Section 5.
The final steel cord product is obtained by spiralling a single filament after the final bunch-
ing operation, and is referred to as “construction”. Figure 3 illustrates the cross-section of the
wire semi-products at various bunching stages in manufacturing of construction
“3+8+12x0.2+1”. The naming convention for labeling constructions (and semi-product
bunched wires) uses a “+” sign to denote each additonal bunching operation. The construction
“3+8+12x0.2+1” is obtained by bunching 3 filaments of length 0.2mm in the first bunching op-
eration, then 8 filaments, and then 12 filaments at 0.2mm, followed by a single spiralled fila-
ment.
Despite product variety (possibly in the scale of hundreds), we focus in our research on
production of a particular construction and analyze quality and productivity issues for that sin-
gle final product. Our approach can be validly applied in analysis and improvement of steel
cord plants where a particular construction constitutes a major share of the production load or
is of primary importance for another reason.
As the spool of core and spools of payoff are used in a bunching operation, any of the spools
may run out first. The time it takes for this run-out is a function of the spool lengths and pro-
duction rates of the machines, besides other factors, some of which are discussed below. As
run-out takes place, the bunching machine gradually slows down and finally stops. A setup is
performed by a skilled operator to feed the next spool with the same kind of wire (core or pay-
off) into the machine. Payoff or core spool is tied at the wire location where the machine had
stopped, and production in that machine restarts. Since the stopping takes place gradually, a
certain amount of wire is typically wasted at every “change-over”. This tying of changed spools
results in a knot, which is an undesired situation. When the take-up spool (the spool on which
the semi-product wire out of a bunching operation is wound) is completely full, a change of
take-up is performed. Besides knots due to spool changes, “wire fractures”, seemingly random
Türkseven and Ertek
breaks of the wire due to structural properties, may also result in considerable number of addi-
tional knots. By tagging an information card on each spool the locations of knots can be rec-
orded. If the sources of knots (whether they are due to changeovers or fractures) are not rec-
orded, the resulting data would not be perfectly valid from a statistical point of view.
After the spiralling operation the steel cord is cut into specified lengths and wound onto fi-
nal spools, which are eventually packaged for customers. Tire manufacturers prefer that the
spools with the final cuts of steel cords contain no knots at all. Final spools that contain knots,
namely “rejected spools”, are classified as second quality and are sold at a very low price.
Therefore, it is an important management objective to decrease the number of knots and the
number of rejected spools.
The motivation of our research has been to identify improved operating policies, specifically
“optimal” spool lengths for each bunching operation, such that quality and productivity are
improved. Both of these two performance measures can be improved if the number of rejected
spools (spools containing knots) is reduced.
3 MODELING APPROACHES
In this section we discuss under what conditions simulation is a suitable modeling approach
for steel cord manufacturing and discuss various modeling issues. Typically the steel cord final
product is obtained after more than one bunching operation. For example, the construction
3+8+12x0.2+1 goes through 3 successive bunching operations and a final spiralling operation
(Figure 3). If machines of all bunching operations had the same cycle times connected serially,
and/or if random fractures were negligible, modeling the steel cord manufacturing process
would be a fairly simple task. For now, we assume that fracture knots constitute a minor por-
tion of the knots and can be ignored. In Section 4 we provide a detailed discussion of wire frac-
tures and describe approaches to validate data collected on them. We consider three cases that
correspond to various manufacturing settings, as illustrated in Figure 4.
In Case 1, we assume that each successive bunching operation is connected serially, and the
take-up (output wire) of a bunching operation is directly fed into the next one as core (input
wire) without any work-in-process spool inventory. The quality and productivity of this system
Türkseven and Ertek
would be very high, as production takes place continously except the final cuts. The quality
output of this hypothetical system is 100% and constitutes an upper bound on quality perfor-
mance of a real-world plant.
In Case 2, we assume that in-process inventories are stored on spools, and the serial nature
of Case 1 is kept. In this type of a system, knots do occur due to spool changes, yet knot loca-
tions at the end of bunching processes can be computed easily as multiples of spool lengths.
From these locations, the number of spools containing knots can be computed (Figure 5). We
can apply search algorithms to find spool lengths that minimize the number of rejected final
spools.
Case 3 is much more representitive of how steel cord manufacturing takes place in the real
world. Since machine production rates vary for different bunching operations, the numbers of
machines at each bunching operation are typically different. Work-in-process wires are stored
on spools, which are queued before the next set of bunching machines. For operational sim-
plicity, operators use a FIFO (First In First Out) queueing discipline in selecting the next spool
to enter bunching operations. It is extremely difficult to identify mathematically the order in
which spools are queued. Operator times, number of knots, knot locations, heuristic operating
policies (described in Section 6), the current state of the spools in the system, machine speeds
and other factors all affect the time it takes to complete a take-up spool. A linear programming
based model that takes these factors as parameters can be questioned with respect to validity,
as the constraints to reflect fairly complex nature of operations would require definition of a
large number of variables, many of them integer. Therefore, we believe that simulation model-
ing is the best way to analyze the described system. The existence of wire fractures only
strengthens this conclusion.
Türkseven and Ertek
Bunching 1 Bunching 2 Bunching 3
Bunching 1 Bunching 2 Bunching 3
Bunching 1 Bunching 2 Bunching 3
Bunching 1 Bunching 2
Bunching 2
Bunching 3
Bunching 3
Bunching 3
CASE 3CASE 3
CASE 2CASE 2
CASE 1CASE 1
Figure 4. Various Manufacturing Scenarios which Require Different Modeling Approaches
4 MODELING WIRE FRACTURES
Wire fractures may constitute a significant percentage of all the knots, depending on the quali-
ty of incoming steel rod wire, heterogeneity caused by dry drawing processes, the plant envi-
ronment, machine characteristics, and other factors. As opposed to knots from change-overs,
which may be controlled –at least to some degree- through scheduling, wire fractures are un-
controllable. Since the frequency and locations of knots have great impact on quality and
productivity, one would ask the essential question of whether any patterns exist in wire frac-
ture locations. As part of our study, we collected this data from bunching machines in a par-
ticular steel cord plant and carried out basic statistical analysis. The data collected gives the lo-
cations of wire fractures in spools entering the final bunching operation.
Türkseven and Ertek
xx x x xx x xx x xx x xx xxx x x x xx xxx
Spool length
for Bunching 1
Spool length
for Bunching 2
Spool length
for Bunching 3
Steel cord construction
Figure 5. Locations of Knots in Case 2. The x Signs Denote the Knots Due to Change-overs. The
Intervals Shown in Brackets Correspond to Lengths of Work-in-Process Spools, and Are
Decision Variables in the Simulation Model.
Fracture locations have been thought to be related to the location of previous fractures, the lo-
cations of previous knots, core and payoff lengths. Production specialists suggested that these
issues do not affect the fractures. It was tested if fracture locations and frequency followed any
distribution. However, statistical analysis of the data did not suggest any patterns. Fracture lo-
cations have been assumed random (uniform distribution) in the simulation model. Thus, in-
ter-fracture distances are assumed to follow exponential distribution and the number of frac-
tures on unit length of wire is assumed to follow poisson distribution. In addition to a known
historical average value for the percentage of fractures, an estimate can also be obtained from a
sample collected during a particular time interval. One important question is whether the col-
lected data agrees with the patterns observed historically. This can be formulated as a statisti-
cal null-hypothesis and tested using statistical techniques.
Türkseven and Ertek
5 SIMULATION MODEL
5.1Description
In the simulation, the number of rejected spools (a measure of both quality and productivity) is
computed given a set of spool lengths. Through grid-search on spool lengths, the optimal spool
lengths can be determined.
The optimal spool lengths are constrained to be within a certain percentage of the current
spool lengths. This constraint is imposed by plant managers as a result of the strategy of mak-
ing gradual changes over time, as opposed to rushing in radical changes in short time periods.
One other reason for such constraints is the impact on other operational measures. For exam-
ple, selecting the spool lengths that are too short would lead to prohibitively frequent payoff or
core changes, and increased operator costs.
Some production issues are almost unique to this particular type of manufacturing: An ex-
ample is that the locations of knots are reversed at every spool change. When a wound spool of
length h with knot locations (k1, k2, ..., kn) is fed into the bunching operation, the unwinding re-
sults in knot locations (h-kn, ..., h-k2, h-k1).
5.2 Implementation
The simulation was programmed in C++ language, and takes ~1 minute running time to com-
pute performance measures for a 10 ton production schedule (10 simulation experiments are
performed). We preferred programming with a general-purpose language, as there are com-
plexities (ex: reversing of knot locations at bunching operations) that would be next to impos-
sible to reflect using spreadsheets and would have to be custom-programmed if a simulation
language or modeling software were used.
Türkseven and Ertek
5.3 Model Inputs, Decision Variables and Outputs
Input Parameters:
 Usage ratios: Ratio of take-up length to incoming payoff length at bunching and sprial-
ling operations. As the diameter of the wire increases, usage ratios decrease.
 Wire densities: Linear density of wires on spools. These density values are used to con-
vert meter based calculations to tones, as calculations in the plant are carried out on a
weight basis.
 Fracture ratios: Expected number of fractures per ton at each bunching operation.
 Machine characteristics and quantities: Primarily the production rates, the rate at which
bunching machines bunch payoff filament on core to produce take-up.
 Knotting time: The time it takes to restart the bunching process following a changeover
or fracture. This time is very dependent on the source of the knot and is in the scale of 1-
20 minutes.
 Final spool length: The length of final cuts that are wound on spools to be packaged and
sent to tire manufacturers. These final cuts should be free of any knots.
Decision variables:
 Spool lengths: The length of wires on the take up and payoff spools.
Outputs:
 Number of accepted spools: The number of final spools that contain no knots.
 Number of rejected spools: The number of final spools that contain knots.
 Rejected wire length: The length of total rejected wire between knots, with a length
smaller than final cut length.
Türkseven and Ertek
 Throughput time: Total time required to convert a given tonnage of payoff to steel cord.
6 RESULTS
The simulation program provides an accurate estimation of the system performance measures
given a particular setting. The results were validated with historical data from an existing steel
cord plant and the simulation model was observed to be valid. The program was used to de-
termine optimal spool lengths within a constrained search space. The accuracy of the simula-
tion can be increased through increasing simulation run lengths and number of simulations
and applying experimental design and output analysis techniques.
If there is inaccuracy in implementing any type of policy, the simulation can be used only as
a strategic testing tool to evaluate operating policies. Conclusions/suggestions obtained
through the simulation analysis of the analyzed manufacturing plant are as follows:
 Some of the current operational rules used by operators are proven to be useful. One
such heuristic rule is performing a take-up change-over if only a few hundred meters
have remained on the bunching operation. This is a reasonable approach: If the final
spool length is greater than the remaining distance, winding the take-up completely
would result in a rejected final spool further down the production line. The simulation
model suggested that this indeed is a very helpful rule and should be implemented by all
the operators.
 Feasibility of implementing dynamic control policies can be investigated. For example,
current FIFO rule for selecting among queued spools for bunching can be replaced by a
more sophisticated approach. The simulation model can be used to evaluate such
changes in operational policies. However, this would also require that measurements be
very accurate and that computers be placed at the plant floor.
Türkseven and Ertek
7 FUTURE RESEARCH
Even though the developed simulation model accurately reflects the characteristics of the ana-
lyzed plant, the model can be extended to include new features (such as compensating for ma-
chine break-downs) and operational rules (such as dynamic spool selection). Meanwhile, it can
also be used to test the economic feasibility of investing in new manufacturing technology, in-
cluding better machines. A long term project could be developing the current tool into a gener-
ic modeling environment to analyze systems with similar manufacturing characteristics.
ACKNOWLEDGMENTS
We would like to thank Mr. Turgut Uzer for allowing us to share our experiences with academ-
ia. We would like to thank the anonymous referee and the proceeding editors for their valuable
corrections and remarks.
REFERENCES
Thomas, J., J. Todi, and A. Paranjpe. Optimization of operations in a steel wire manufacturing
company. In Proceedings of 2002 Winter Simulation Conference, ed. E. Yucesan, C. H.
Chen, J. L. Snowdon, and J. M. Charnes, 1151-1156. Piscataway, New Jersey: Institute of
Electrical and Electronics Engineers.
Mercankaya, B. 2003. Sales forecasting and production planning of BEKSA in the context of
supply chain management. Sabanci University, Istanbul, Turkey.
AUTHOR BIOGRAPHIES
CAN H. TÜRKSEVEN is a graduate student at Purdue University. He received his B.S. from
Manufacturing Systems Engineering Program from Sabancı University, Istanbul, Turkey, in
2003.
Türkseven and Ertek
GÜRDAL ERTEK is an assistant professor at Sabancı University. He received his B.S. from
Industrial Engineering Department of Boğaziçi University, Istanbul, Turkey in 1994 and his
Ph.D. from School of Industrial and Systems Engineering at Georgia Institute of Technology,
Atlanta, GA, in 2001. His research areas include supply chain planning, material handling,
production planning and simulation analysis.

More Related Content

PDF
OPTIMIZATION OF WIRE EDM PARAMETERS TO ACHIEVE A FINE SURFACE FINISH
PDF
OPTIMIZATIONS OF MACHINING PARAMETER IN WIRE EDM FOR 316L STAINLESS STEEL BY ...
PDF
IRJET- Behavior of Castellated Beam with Sinusoidal Openings
PPT
Machining of MMC
PDF
Research paper published ijsrms_process optimization using doe_edm_javed muja...
PPT
ADVANCE MANUFACTURING PROCESS
PDF
Optimization of the Process Parameters of Wire Cut EDM - A Review
PDF
IRJET- Modeling and Design Analysis of Die Profile of Extrusion of Square...
OPTIMIZATION OF WIRE EDM PARAMETERS TO ACHIEVE A FINE SURFACE FINISH
OPTIMIZATIONS OF MACHINING PARAMETER IN WIRE EDM FOR 316L STAINLESS STEEL BY ...
IRJET- Behavior of Castellated Beam with Sinusoidal Openings
Machining of MMC
Research paper published ijsrms_process optimization using doe_edm_javed muja...
ADVANCE MANUFACTURING PROCESS
Optimization of the Process Parameters of Wire Cut EDM - A Review
IRJET- Modeling and Design Analysis of Die Profile of Extrusion of Square...

What's hot (19)

DOCX
Advanced Material Process Techniques Exteriments
PPTX
U6 p2 ntm processes
PPTX
DMLS (Direct metal laser sintering)
PDF
Modeling and optimization of edm process parameters a review
PDF
Performance Study of Wire Cut Electric Discharge Machining Process by Using T...
PDF
Dr. R. Narayanasamy - Presentation on Formability of Deep Drawing Grade Steels
PDF
ME6004 - UNCONVENTIONAL MACHINING PROCESS BY Mr.P.HARIPRASAD/AP/MECH/KIT/CBE
PDF
A review on the state
DOC
UNCONVENTIONAL MACHINE PROCESS INTRODUCTION
PPTX
Unconventional machining process (2)
PPT
Investigation on electrochemical discharge machining of fibre composites
PDF
Analysis of Machining Characteristics of Cryogenically Treated Die Steels Usi...
PDF
A Review on Parametric Optimization in Wire Electric Discharge Machining
PPTX
Wire electric discharge machine
PPT
DESIGN AND FABRICATION OF DIE FOR BLOW FORMING
PDF
Report on EDM,LJM, USM & ECM
PDF
Ei33805816
PPT
Optimization of wedm process parameters using taguchi method
PPTX
MRR improvement in electrical discharge machining
Advanced Material Process Techniques Exteriments
U6 p2 ntm processes
DMLS (Direct metal laser sintering)
Modeling and optimization of edm process parameters a review
Performance Study of Wire Cut Electric Discharge Machining Process by Using T...
Dr. R. Narayanasamy - Presentation on Formability of Deep Drawing Grade Steels
ME6004 - UNCONVENTIONAL MACHINING PROCESS BY Mr.P.HARIPRASAD/AP/MECH/KIT/CBE
A review on the state
UNCONVENTIONAL MACHINE PROCESS INTRODUCTION
Unconventional machining process (2)
Investigation on electrochemical discharge machining of fibre composites
Analysis of Machining Characteristics of Cryogenically Treated Die Steels Usi...
A Review on Parametric Optimization in Wire Electric Discharge Machining
Wire electric discharge machine
DESIGN AND FABRICATION OF DIE FOR BLOW FORMING
Report on EDM,LJM, USM & ECM
Ei33805816
Optimization of wedm process parameters using taguchi method
MRR improvement in electrical discharge machining
Ad

Similar to Simulation modeling for quality and productivity in steel cord manufacturing (20)

PPT
Simulation modeling for quality and productivity in steel cord manufacturing
PDF
IRJET- Analysis on Thread Rolling using Flat Dies
PDF
Experimental Analysis on Wire Arc Additive Manufacturing
PDF
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
PDF
IRJET-Cyclic Response of Perforated Beam in Steel Column Joints
PDF
Behaviour Analysis of Corroded Wires Based on Statistical Models
PDF
Review of Relay Processes and Design Optimization for Low Voltage Operation
PDF
IRJET- Analytical Study on Bolted Endplate Connection with Different Bolt Mat...
PDF
ANALYTICAL STUDY ON MOMENT ROTATION CURVE FOR BEAM- COLUMN STEEL CONNECTION W...
PPT
Application of local search methods for solving a quadratic assignment proble...
PDF
Modeling and Simulation of Biaxial Strained P-MOSFETs: Application to a Singl...
PDF
Non-Linear Analysis of Steel Domes Coated with GFRP having Circular Cutouts
PDF
Cable Manufacturing 101.pdf
PDF
Stiffening and Strengthening of Deteriorated Cellular Beams by Local Post- Te...
PDF
Model Development and Analysis of Four Bar Mechanism
PDF
Involute Spline Profile Generation using Wire EDM Process
DOCX
227_finalpaper_rev14
PDF
Study of process parameter of wire electric discharge machining the review
PDF
F012124650
PDF
Design And Analysis Of Chain Outer Link By Using Composite Material
Simulation modeling for quality and productivity in steel cord manufacturing
IRJET- Analysis on Thread Rolling using Flat Dies
Experimental Analysis on Wire Arc Additive Manufacturing
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
IRJET-Cyclic Response of Perforated Beam in Steel Column Joints
Behaviour Analysis of Corroded Wires Based on Statistical Models
Review of Relay Processes and Design Optimization for Low Voltage Operation
IRJET- Analytical Study on Bolted Endplate Connection with Different Bolt Mat...
ANALYTICAL STUDY ON MOMENT ROTATION CURVE FOR BEAM- COLUMN STEEL CONNECTION W...
Application of local search methods for solving a quadratic assignment proble...
Modeling and Simulation of Biaxial Strained P-MOSFETs: Application to a Singl...
Non-Linear Analysis of Steel Domes Coated with GFRP having Circular Cutouts
Cable Manufacturing 101.pdf
Stiffening and Strengthening of Deteriorated Cellular Beams by Local Post- Te...
Model Development and Analysis of Four Bar Mechanism
Involute Spline Profile Generation using Wire EDM Process
227_finalpaper_rev14
Study of process parameter of wire electric discharge machining the review
F012124650
Design And Analysis Of Chain Outer Link By Using Composite Material
Ad

More from Gurdal Ertek (20)

PDF
Supplier and buyer driven channels in a two-stage supply chain
PDF
Visual and analytical mining of transactions data for production planning ...
PPT
Visual and analytical mining of transactions data for production planning ...
PPT
Visual and analytical mining of transactions data for production planning ...
PDF
Visual and analytical mining of sales transaction data for production plannin...
PDF
A tutorial on crossdocking
PDF
Application of local search methods for solving a quadratic assignment proble...
PDF
Compiere ERP/CRM Uygulamasının Kurulumu
PDF
Financial benchmarking of transportation companies in the New York Stock Exch...
PDF
Development of an Interactive Simulation of Steel Cord Manufacturing for Indu...
PDF
Application of the analytic hierarchy process (AHP) for selection of forecast...
PDF
Spreadsheet Optimization of Flow for WIP Goods at a Yarn and Tire Cord Manufa...
PDF
Optimizing waste collection in an organized industrial region: A case study
PDF
Demonstrating warehousing concepts through interactive animations
PDF
Decision Support For Packing In Warehouses
PDF
A framework for visualizing association mining results
PDF
Application of the cutting stock problem to a construction company: A case study
PDF
Benchmarking the Turkish apparel retail industry through data envelopment ana...
PDF
Teaching warehousing concepts through interactive animations and 3D models
PDF
Impact of Cross Aisles in a Rectangular Warehouse:A Computational Study
Supplier and buyer driven channels in a two-stage supply chain
Visual and analytical mining of transactions data for production planning ...
Visual and analytical mining of transactions data for production planning ...
Visual and analytical mining of transactions data for production planning ...
Visual and analytical mining of sales transaction data for production plannin...
A tutorial on crossdocking
Application of local search methods for solving a quadratic assignment proble...
Compiere ERP/CRM Uygulamasının Kurulumu
Financial benchmarking of transportation companies in the New York Stock Exch...
Development of an Interactive Simulation of Steel Cord Manufacturing for Indu...
Application of the analytic hierarchy process (AHP) for selection of forecast...
Spreadsheet Optimization of Flow for WIP Goods at a Yarn and Tire Cord Manufa...
Optimizing waste collection in an organized industrial region: A case study
Demonstrating warehousing concepts through interactive animations
Decision Support For Packing In Warehouses
A framework for visualizing association mining results
Application of the cutting stock problem to a construction company: A case study
Benchmarking the Turkish apparel retail industry through data envelopment ana...
Teaching warehousing concepts through interactive animations and 3D models
Impact of Cross Aisles in a Rectangular Warehouse:A Computational Study

Recently uploaded (20)

PPTX
SAP 2 completion done . PRESENTATION.pptx
PPTX
Pilar Kemerdekaan dan Identi Bangsa.pptx
PPTX
Managing Community Partner Relationships
PPTX
STERILIZATION AND DISINFECTION-1.ppthhhbx
PPTX
modul_python (1).pptx for professional and student
PPTX
AI Strategy room jwfjksfksfjsjsjsjsjfsjfsj
PPTX
FMIS 108 and AISlaudon_mis17_ppt_ch11.pptx
PDF
Data Engineering Interview Questions & Answers Cloud Data Stacks (AWS, Azure,...
PPTX
Copy of 16 Timeline & Flowchart Templates – HubSpot.pptx
PPTX
sac 451hinhgsgshssjsjsjheegdggeegegdggddgeg.pptx
PPTX
Market Analysis -202507- Wind-Solar+Hybrid+Street+Lights+for+the+North+Amer...
PPTX
Introduction to Inferential Statistics.pptx
PDF
Jean-Georges Perrin - Spark in Action, Second Edition (2020, Manning Publicat...
PDF
Data Engineering Interview Questions & Answers Batch Processing (Spark, Hadoo...
PDF
Optimise Shopper Experiences with a Strong Data Estate.pdf
PDF
Votre score augmente si vous choisissez une catégorie et que vous rédigez une...
PDF
[EN] Industrial Machine Downtime Prediction
PPTX
New ISO 27001_2022 standard and the changes
PPT
lectureusjsjdhdsjjshdshshddhdhddhhd1.ppt
PPT
ISS -ESG Data flows What is ESG and HowHow
SAP 2 completion done . PRESENTATION.pptx
Pilar Kemerdekaan dan Identi Bangsa.pptx
Managing Community Partner Relationships
STERILIZATION AND DISINFECTION-1.ppthhhbx
modul_python (1).pptx for professional and student
AI Strategy room jwfjksfksfjsjsjsjsjfsjfsj
FMIS 108 and AISlaudon_mis17_ppt_ch11.pptx
Data Engineering Interview Questions & Answers Cloud Data Stacks (AWS, Azure,...
Copy of 16 Timeline & Flowchart Templates – HubSpot.pptx
sac 451hinhgsgshssjsjsjheegdggeegegdggddgeg.pptx
Market Analysis -202507- Wind-Solar+Hybrid+Street+Lights+for+the+North+Amer...
Introduction to Inferential Statistics.pptx
Jean-Georges Perrin - Spark in Action, Second Edition (2020, Manning Publicat...
Data Engineering Interview Questions & Answers Batch Processing (Spark, Hadoo...
Optimise Shopper Experiences with a Strong Data Estate.pdf
Votre score augmente si vous choisissez une catégorie et que vous rédigez une...
[EN] Industrial Machine Downtime Prediction
New ISO 27001_2022 standard and the changes
lectureusjsjdhdsjjshdshshddhdhddhhd1.ppt
ISS -ESG Data flows What is ESG and HowHow

Simulation modeling for quality and productivity in steel cord manufacturing

  • 1. Türkseven and Ertek Turkseven, C.H., and Ertek, G. (2003). "Simulation modeling for quality and productivity in steel cord manufacturing," in Chick, S., Sánchez, P., Ferrin,D., and Morrice, D.J. (eds.). Pro- ceedings of 2003 Winter Simulation Conference. Institute of Electrical and Electronics Engi- neers (IEEE), Piscataway, New Jersey. Note: This is the final draft version of this paper. Please cite this paper (or this final draft) as above. You can download this final draft from http://research.sabanciuniv.edu. SIMULATION MODELING FOR QUALITY AND PRODUCTIVITY IN STEEL CORD MANUFACTURING Can Hulusi Türkseven School of Industrial Engineering Purdue University 315 N. Grant Street West Lafayette, IN 47907-2023, U.S.A. Gürdal Ertek Faculty of Engineering and Natural Sciences Sabancı University Orhanli, Tuzla, 34956 Istanbul, TURKEY
  • 2. Türkseven and Ertek ABSTRACT We describe the application of simulation modeling to estimate and improve quality and productivity performance of a steel cord manufacturing system. We describe the typical steel cord manufacturing plant, emphasize its distinguishing characteristics, identify various pro- duction settings and discuss applicability of simulation as a management decision support tool. Besides presenting the general structure of the developed simulation model, we focus on wire fractures, which can be an important source of system disruption. 1 INTRODUCTION Steel cord is typically used as the main reinforcement material in manufacture of steel radial tires. It strengthens the tire to provide fuel savings, long mileage, safety and comfort. The manufacture of steel cord takes place through continuous processes where wire semi-products are stored on discrete inventory units, namely “spool”s (Figure 1). The steel cord plant is oper- ated with multiple –possibly conflicting- objectives, both quality related (ex: minimizing the number of final spools containing knot defects) and productivity related (ex: increasing throughput). Modeling this type of manufacturing requires special considerations applicable to a narrow scope of industries. One such consideration is the reversal of the wire wound on the spools at each bunching operation. Manufacturing systems with similar operating characteris- tics include cable manufacturing (electric/energy/fiber-optic), nylon cord manufacturing, cop- per rod manufacturing. Literature on steel cord manufacturing is not extensive, since this is a very specialized type of manufacturing, and the systems required are produced and installed by only a handful of companies in the world. We refer the interested readers to the following two studies: Thomas et al. (2002) report improvement of operations in a steel cord manufacturing company using simulation. Mercankaya (2003) develops an optimization-based decision support system for steel cord manufacturing. We first describe the manufacturing process and outline research objectives. After discuss- ing various modeling approaches for possible configurations and discussing the relevance of simulation modeling, we describe the simulation model, including inputs, decision variables,
  • 3. Türkseven and Ertek ouputs and results obtained. We conclude with a discussion of future research areas in produc- tion planning for the described systems. Figure 1. Spool on which Wire is Wound 2 THE MANUFACTURING PROCESS In steel cord manufacturing incoming raw material, the “steel rod wire”, is thinned into “fila- ment”s which are used in successive bunching operations to construct the “steel cord” final products (Figure 2). Between every bunching operation, the intermediate wire products are wound onto spools of varying capacities (in the scale of thousands of meters). Steel rod wire enters the steel cord plant with a radius of ~2.5mm and passes through dry drawing and wet drawing, accompanied with other operations (including chemical processes such as copper and zinc plating) to produce filaments with a radius of ~0.2mm. Filaments coming out of wet- drawing are wound on spools and are referred to as “payoff”. Payoff becomes the raw material for bunching and spiralling operations. At each bunching operation, bunched wires enter as “core” to be bunched with a new layer of payoff (filaments) to form “take-up”. The “take-up” in turn becomes the “core” for the following bunching operation (Figure 3).
  • 4. Türkseven and Ertek Dry drawing I & II Annealing Cold air bath Cold water bath Acidic solution Basic solution Spiralling Bunching Wet drawing Copper plating Zinc plating Packaging to Copper plating Steel wire rod Filament Steel cord Begin Production End production RESEARCHFOCUSRESEARCHFOCUSFigure 2. Production Processes in Steel Cord Manufacturing 8 Steel wire rod (raw material) Filament (payoff) Final product (construction) 3+8+12x0.2+1+1 3+8x0.2 Bunched steel wire 3x0.2 Bunched steel wire 1 2 8 7 10 11 5 4 6 39 12 5 4 1 2 36 7 2 1 3 SpiralSpiral filamentfilament Bunching 2 Bunching 3 & Spiralling Bunching1Drawing Operation Core Figure 3. Cross-section of 3+8+12x0.2+1 Construction at Successive Bunching Operations
  • 5. Türkseven and Ertek In each bunching operation the take-up consumes a pay-off longer than its own length, ac- cording to a “usage factor”. For example, in a bunching operation with a usage ratio of 0.9, 100000 meters of payoff bunches with 90000 meters of core to produce 90000 meters of take- up. As the product advances along the production line, its thickness increases and thus it takes a longer payoff to cover the take-up; i.e. the usage ratio decreases. Input ratios are discussed with other input parameters in Section 5. The final steel cord product is obtained by spiralling a single filament after the final bunch- ing operation, and is referred to as “construction”. Figure 3 illustrates the cross-section of the wire semi-products at various bunching stages in manufacturing of construction “3+8+12x0.2+1”. The naming convention for labeling constructions (and semi-product bunched wires) uses a “+” sign to denote each additonal bunching operation. The construction “3+8+12x0.2+1” is obtained by bunching 3 filaments of length 0.2mm in the first bunching op- eration, then 8 filaments, and then 12 filaments at 0.2mm, followed by a single spiralled fila- ment. Despite product variety (possibly in the scale of hundreds), we focus in our research on production of a particular construction and analyze quality and productivity issues for that sin- gle final product. Our approach can be validly applied in analysis and improvement of steel cord plants where a particular construction constitutes a major share of the production load or is of primary importance for another reason. As the spool of core and spools of payoff are used in a bunching operation, any of the spools may run out first. The time it takes for this run-out is a function of the spool lengths and pro- duction rates of the machines, besides other factors, some of which are discussed below. As run-out takes place, the bunching machine gradually slows down and finally stops. A setup is performed by a skilled operator to feed the next spool with the same kind of wire (core or pay- off) into the machine. Payoff or core spool is tied at the wire location where the machine had stopped, and production in that machine restarts. Since the stopping takes place gradually, a certain amount of wire is typically wasted at every “change-over”. This tying of changed spools results in a knot, which is an undesired situation. When the take-up spool (the spool on which the semi-product wire out of a bunching operation is wound) is completely full, a change of take-up is performed. Besides knots due to spool changes, “wire fractures”, seemingly random
  • 6. Türkseven and Ertek breaks of the wire due to structural properties, may also result in considerable number of addi- tional knots. By tagging an information card on each spool the locations of knots can be rec- orded. If the sources of knots (whether they are due to changeovers or fractures) are not rec- orded, the resulting data would not be perfectly valid from a statistical point of view. After the spiralling operation the steel cord is cut into specified lengths and wound onto fi- nal spools, which are eventually packaged for customers. Tire manufacturers prefer that the spools with the final cuts of steel cords contain no knots at all. Final spools that contain knots, namely “rejected spools”, are classified as second quality and are sold at a very low price. Therefore, it is an important management objective to decrease the number of knots and the number of rejected spools. The motivation of our research has been to identify improved operating policies, specifically “optimal” spool lengths for each bunching operation, such that quality and productivity are improved. Both of these two performance measures can be improved if the number of rejected spools (spools containing knots) is reduced. 3 MODELING APPROACHES In this section we discuss under what conditions simulation is a suitable modeling approach for steel cord manufacturing and discuss various modeling issues. Typically the steel cord final product is obtained after more than one bunching operation. For example, the construction 3+8+12x0.2+1 goes through 3 successive bunching operations and a final spiralling operation (Figure 3). If machines of all bunching operations had the same cycle times connected serially, and/or if random fractures were negligible, modeling the steel cord manufacturing process would be a fairly simple task. For now, we assume that fracture knots constitute a minor por- tion of the knots and can be ignored. In Section 4 we provide a detailed discussion of wire frac- tures and describe approaches to validate data collected on them. We consider three cases that correspond to various manufacturing settings, as illustrated in Figure 4. In Case 1, we assume that each successive bunching operation is connected serially, and the take-up (output wire) of a bunching operation is directly fed into the next one as core (input wire) without any work-in-process spool inventory. The quality and productivity of this system
  • 7. Türkseven and Ertek would be very high, as production takes place continously except the final cuts. The quality output of this hypothetical system is 100% and constitutes an upper bound on quality perfor- mance of a real-world plant. In Case 2, we assume that in-process inventories are stored on spools, and the serial nature of Case 1 is kept. In this type of a system, knots do occur due to spool changes, yet knot loca- tions at the end of bunching processes can be computed easily as multiples of spool lengths. From these locations, the number of spools containing knots can be computed (Figure 5). We can apply search algorithms to find spool lengths that minimize the number of rejected final spools. Case 3 is much more representitive of how steel cord manufacturing takes place in the real world. Since machine production rates vary for different bunching operations, the numbers of machines at each bunching operation are typically different. Work-in-process wires are stored on spools, which are queued before the next set of bunching machines. For operational sim- plicity, operators use a FIFO (First In First Out) queueing discipline in selecting the next spool to enter bunching operations. It is extremely difficult to identify mathematically the order in which spools are queued. Operator times, number of knots, knot locations, heuristic operating policies (described in Section 6), the current state of the spools in the system, machine speeds and other factors all affect the time it takes to complete a take-up spool. A linear programming based model that takes these factors as parameters can be questioned with respect to validity, as the constraints to reflect fairly complex nature of operations would require definition of a large number of variables, many of them integer. Therefore, we believe that simulation model- ing is the best way to analyze the described system. The existence of wire fractures only strengthens this conclusion.
  • 8. Türkseven and Ertek Bunching 1 Bunching 2 Bunching 3 Bunching 1 Bunching 2 Bunching 3 Bunching 1 Bunching 2 Bunching 3 Bunching 1 Bunching 2 Bunching 2 Bunching 3 Bunching 3 Bunching 3 CASE 3CASE 3 CASE 2CASE 2 CASE 1CASE 1 Figure 4. Various Manufacturing Scenarios which Require Different Modeling Approaches 4 MODELING WIRE FRACTURES Wire fractures may constitute a significant percentage of all the knots, depending on the quali- ty of incoming steel rod wire, heterogeneity caused by dry drawing processes, the plant envi- ronment, machine characteristics, and other factors. As opposed to knots from change-overs, which may be controlled –at least to some degree- through scheduling, wire fractures are un- controllable. Since the frequency and locations of knots have great impact on quality and productivity, one would ask the essential question of whether any patterns exist in wire frac- ture locations. As part of our study, we collected this data from bunching machines in a par- ticular steel cord plant and carried out basic statistical analysis. The data collected gives the lo- cations of wire fractures in spools entering the final bunching operation.
  • 9. Türkseven and Ertek xx x x xx x xx x xx x xx xxx x x x xx xxx Spool length for Bunching 1 Spool length for Bunching 2 Spool length for Bunching 3 Steel cord construction Figure 5. Locations of Knots in Case 2. The x Signs Denote the Knots Due to Change-overs. The Intervals Shown in Brackets Correspond to Lengths of Work-in-Process Spools, and Are Decision Variables in the Simulation Model. Fracture locations have been thought to be related to the location of previous fractures, the lo- cations of previous knots, core and payoff lengths. Production specialists suggested that these issues do not affect the fractures. It was tested if fracture locations and frequency followed any distribution. However, statistical analysis of the data did not suggest any patterns. Fracture lo- cations have been assumed random (uniform distribution) in the simulation model. Thus, in- ter-fracture distances are assumed to follow exponential distribution and the number of frac- tures on unit length of wire is assumed to follow poisson distribution. In addition to a known historical average value for the percentage of fractures, an estimate can also be obtained from a sample collected during a particular time interval. One important question is whether the col- lected data agrees with the patterns observed historically. This can be formulated as a statisti- cal null-hypothesis and tested using statistical techniques.
  • 10. Türkseven and Ertek 5 SIMULATION MODEL 5.1Description In the simulation, the number of rejected spools (a measure of both quality and productivity) is computed given a set of spool lengths. Through grid-search on spool lengths, the optimal spool lengths can be determined. The optimal spool lengths are constrained to be within a certain percentage of the current spool lengths. This constraint is imposed by plant managers as a result of the strategy of mak- ing gradual changes over time, as opposed to rushing in radical changes in short time periods. One other reason for such constraints is the impact on other operational measures. For exam- ple, selecting the spool lengths that are too short would lead to prohibitively frequent payoff or core changes, and increased operator costs. Some production issues are almost unique to this particular type of manufacturing: An ex- ample is that the locations of knots are reversed at every spool change. When a wound spool of length h with knot locations (k1, k2, ..., kn) is fed into the bunching operation, the unwinding re- sults in knot locations (h-kn, ..., h-k2, h-k1). 5.2 Implementation The simulation was programmed in C++ language, and takes ~1 minute running time to com- pute performance measures for a 10 ton production schedule (10 simulation experiments are performed). We preferred programming with a general-purpose language, as there are com- plexities (ex: reversing of knot locations at bunching operations) that would be next to impos- sible to reflect using spreadsheets and would have to be custom-programmed if a simulation language or modeling software were used.
  • 11. Türkseven and Ertek 5.3 Model Inputs, Decision Variables and Outputs Input Parameters:  Usage ratios: Ratio of take-up length to incoming payoff length at bunching and sprial- ling operations. As the diameter of the wire increases, usage ratios decrease.  Wire densities: Linear density of wires on spools. These density values are used to con- vert meter based calculations to tones, as calculations in the plant are carried out on a weight basis.  Fracture ratios: Expected number of fractures per ton at each bunching operation.  Machine characteristics and quantities: Primarily the production rates, the rate at which bunching machines bunch payoff filament on core to produce take-up.  Knotting time: The time it takes to restart the bunching process following a changeover or fracture. This time is very dependent on the source of the knot and is in the scale of 1- 20 minutes.  Final spool length: The length of final cuts that are wound on spools to be packaged and sent to tire manufacturers. These final cuts should be free of any knots. Decision variables:  Spool lengths: The length of wires on the take up and payoff spools. Outputs:  Number of accepted spools: The number of final spools that contain no knots.  Number of rejected spools: The number of final spools that contain knots.  Rejected wire length: The length of total rejected wire between knots, with a length smaller than final cut length.
  • 12. Türkseven and Ertek  Throughput time: Total time required to convert a given tonnage of payoff to steel cord. 6 RESULTS The simulation program provides an accurate estimation of the system performance measures given a particular setting. The results were validated with historical data from an existing steel cord plant and the simulation model was observed to be valid. The program was used to de- termine optimal spool lengths within a constrained search space. The accuracy of the simula- tion can be increased through increasing simulation run lengths and number of simulations and applying experimental design and output analysis techniques. If there is inaccuracy in implementing any type of policy, the simulation can be used only as a strategic testing tool to evaluate operating policies. Conclusions/suggestions obtained through the simulation analysis of the analyzed manufacturing plant are as follows:  Some of the current operational rules used by operators are proven to be useful. One such heuristic rule is performing a take-up change-over if only a few hundred meters have remained on the bunching operation. This is a reasonable approach: If the final spool length is greater than the remaining distance, winding the take-up completely would result in a rejected final spool further down the production line. The simulation model suggested that this indeed is a very helpful rule and should be implemented by all the operators.  Feasibility of implementing dynamic control policies can be investigated. For example, current FIFO rule for selecting among queued spools for bunching can be replaced by a more sophisticated approach. The simulation model can be used to evaluate such changes in operational policies. However, this would also require that measurements be very accurate and that computers be placed at the plant floor.
  • 13. Türkseven and Ertek 7 FUTURE RESEARCH Even though the developed simulation model accurately reflects the characteristics of the ana- lyzed plant, the model can be extended to include new features (such as compensating for ma- chine break-downs) and operational rules (such as dynamic spool selection). Meanwhile, it can also be used to test the economic feasibility of investing in new manufacturing technology, in- cluding better machines. A long term project could be developing the current tool into a gener- ic modeling environment to analyze systems with similar manufacturing characteristics. ACKNOWLEDGMENTS We would like to thank Mr. Turgut Uzer for allowing us to share our experiences with academ- ia. We would like to thank the anonymous referee and the proceeding editors for their valuable corrections and remarks. REFERENCES Thomas, J., J. Todi, and A. Paranjpe. Optimization of operations in a steel wire manufacturing company. In Proceedings of 2002 Winter Simulation Conference, ed. E. Yucesan, C. H. Chen, J. L. Snowdon, and J. M. Charnes, 1151-1156. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers. Mercankaya, B. 2003. Sales forecasting and production planning of BEKSA in the context of supply chain management. Sabanci University, Istanbul, Turkey. AUTHOR BIOGRAPHIES CAN H. TÜRKSEVEN is a graduate student at Purdue University. He received his B.S. from Manufacturing Systems Engineering Program from Sabancı University, Istanbul, Turkey, in 2003.
  • 14. Türkseven and Ertek GÜRDAL ERTEK is an assistant professor at Sabancı University. He received his B.S. from Industrial Engineering Department of Boğaziçi University, Istanbul, Turkey in 1994 and his Ph.D. from School of Industrial and Systems Engineering at Georgia Institute of Technology, Atlanta, GA, in 2001. His research areas include supply chain planning, material handling, production planning and simulation analysis.