SPM Vibration
Data Integration to CMMS
SPM Condmaster
Lube Master – for bearing
September 2014 | P1
SPM Ruby/ Nova
SPM Condmaster software
Vibration – ISO2372
Spectrum for
Symptom of vibration
Pro:
- very easy to use for experienced technician
- Main information of vibration condition is available and ready to use, such as:
- Bearing condition (lubemaster)
- Vibration condition (ISO 2372)
- Symptom of vibration (unbalance, misalignment, looseness)
Cons:
– The vibration information is managed at standalone computer for each site, and having difficulties to integrate
between site and head office
– Not integrate to CMMS / ERP system
– Difficulties to develop overall vibration condition across site
Vibration Analysis Workflow
PMWO
Generated
Vibration
DataTaking
Upload Data to
Condmaster (Notebook)
Close WO with OverallVib
asTextAttachment and
Site Reporting
Send vibration
database in USB
to JKT Engineer
Review
Data &Analysis
recommendation
to site
Generate
CM WO
1. Overall Vib in Text Attachment rarely
utilize or reviewed
2. GB develop internal vibration report
for their own documentation
Vibration database contain
complete Condmaster data
Every 1-2
months
Site 1: 49 tags ; 3-5 days
Site 2 : 110 tags : 10-14 days
Site 3: 99 tags; 8-10 days
Export Excel Data to
CMMS
Required 2
Weeks ave.
Quick Analysis on:
1. Schedule compliance
2. Bearing condition A/B/C (lube master)
3. Vibration Condition (ISO 2374), complete
with prioritization for yellow condition
4. Spectrum analysis (unbalance,
misalignment, looseness)
5. Control follow up recommendation
Reccomendation might OUT of
DATE, considered the long lead
time (2-3 months) between
measurement, and analysis
Head office
Offshore
Same day
result
Vibration Monitoring Data Facilities in CMMS - 1
By exporting condmaster excel data to CMMS
Measurement dates:
• Schedule attainment (backlog, overdue)
• Schedule compliance (interval between
measurement
Bearing Condition :
• Automatic result as per Condmaster
calculation
ISO 2372 vibration
Tag Number
Transfer Data fromCondMaster to CMMS/ERP
Extract
.xls file
Upload to CMMS
In-Use Example (based on CoMo Report)
Code “D” Indication
for 2 months in a row.
Need to take
immediate action.
Also point number 2
shifts from A to B,
indicate dryness in
bearing
Overall LR & HR
increased from
Feb toApr,
showing
bearing on its
way to more
damage
1. Overall vibration also
shown on this detail
page, consist of
Horizontal,Vibration,
andAxial.
2.To find out why it
shown such value,
Engineers still need to
go through the
Condmaster software
and analyze the
vibration spectrum.
Vibration Analysis KPI - 1
Schedule Compliance
Field-3
not yet complete
take vibration for
all equipment
(new initiativeApr
‘15)
Legend:
In-schedule : within interval frequency (30 days) compared to cut off date
Due : Currently on schedule to take measurement ( interval frequency + 30 days)
Overdue : Not yet measured after 60 days compare to cut off date
In-schedule
<30d, 25
Due 30d -
60d, 18
Overdue
2015, 23
Overdue
2014, 22
Never
Measured,
16
Field-2
(104 tags - as per 10 May)
In-
schedule
<30d, 24
Due 30d -
60d, 4
Overdue
2015, 1 Field-1
(29 tags - as per 10 Apr)
Vibration Analysis KPI - 2
Vibration Result (2015 measurement only)
Legend:
Green : good condition
Yellow-1 : Indicate vibration 1% - 50% from upper limit, still considered as good condition
Yellow-2 : Indicate vibration 51%-75% from upper limit, need close monitor
Yellow-3 : Indicate vibration 75%-99% from upper limit, action might required
Red : high vibration
GREEN,
15
YELLOW-1,
28
YELLOW-2, 6
YELLOW-3, 2
RED, 12
N/A, 2
Field-2
(65 tags)
GREEN, 10
YELLOW-1,
9
YELLOW-2,
2
YELLOW-3,
2
RED, 2
N/A, 4
Field-1
(29 tags)
GREEN, 7
YELLOW-
1, 8
YELLOW-2, 2
YELLOW-3, 2
RED, 8
Field-3
(27 tags)
Author
September 2014 | P7
Dedy Darmawan (dedydar@yahoo.com)
Maintenance System Engineer
Fari Aditya Gatam (fari.aditya@gmail.com)
Reliability Engineer
Ahmad Shovi
Application Developer

More Related Content

DOCX
latest CV
PDF
Sa presentatie
ODP
Sa presentatie
PPTX
Welcome to SimScale
PDF
meteodyn WT 5.0 new features
PDF
SimScale: Unparalleled CFD Speeds with Parallel Computing
PDF
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
PPTX
Pressure Coefficients on Building Facades for Building Simulation
latest CV
Sa presentatie
Sa presentatie
Welcome to SimScale
meteodyn WT 5.0 new features
SimScale: Unparalleled CFD Speeds with Parallel Computing
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Pressure Coefficients on Building Facades for Building Simulation

What's hot (20)

DOC
Caddata warehousing
PPTX
Design Buildings Faster by Harnessing the Power of the Cloud
PDF
Thermal Comfort Assessment: Comply with EN 15251 and EPBD
PDF
Thermal Resistance Modelling with SimScale
PPTX
Construction Management
PPTX
Fast & Easy Electronics Thermal Management
PPT
Control Systems Design- PID Tuning
PPTX
Simulation for Passively Cooled LED Design
PDF
An Introduction to Electronics Cooling
PDF
Lattice-Boltzmann Solver Validation for Pedestrian Wind Comfort
PDF
Pedestrian Wind Comfort Assessment for Master Planning
PPTX
One year on: Results of Time Based Separation at LHR
PDF
UrbaWind, a Computational Fluid Dynamics tool to predict wind resource in urb...
PDF
Serial Switching in Interval Meters
PPTX
Pid controller
PDF
Wind Analysis: Boston Seaport District
PPTX
Transformer Loading, Driving Enterprise Decisions with ArcGIS Online
PDF
HFC network optimization and PNM in the field - Proactive Service
PDF
SO2 Data Requirements Rule Modeling Strategies
PDF
Caddata warehousing
Design Buildings Faster by Harnessing the Power of the Cloud
Thermal Comfort Assessment: Comply with EN 15251 and EPBD
Thermal Resistance Modelling with SimScale
Construction Management
Fast & Easy Electronics Thermal Management
Control Systems Design- PID Tuning
Simulation for Passively Cooled LED Design
An Introduction to Electronics Cooling
Lattice-Boltzmann Solver Validation for Pedestrian Wind Comfort
Pedestrian Wind Comfort Assessment for Master Planning
One year on: Results of Time Based Separation at LHR
UrbaWind, a Computational Fluid Dynamics tool to predict wind resource in urb...
Serial Switching in Interval Meters
Pid controller
Wind Analysis: Boston Seaport District
Transformer Loading, Driving Enterprise Decisions with ArcGIS Online
HFC network optimization and PNM in the field - Proactive Service
SO2 Data Requirements Rule Modeling Strategies
Ad

Similar to Spm vibration data integration to cmms (20)

PDF
Khubaib Khan_CV Instrument
PPTX
MTEMC’s State 0 Changes with 1700+ Versions Intact
PPTX
State Zero: Middle Tennessee Electric Membership Corporation
PDF
Gi oss offering top cell_partnership (1)
PDF
Ac2017 6. output based contracting
PPTX
Best Business Practice @ Nov 22.pptx
PDF
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
DOC
Rajiv Kumar
PPTX
Performance Testing
PDF
IRJET- Multi Tasking Software for Manufacturing Industry
PDF
70-246 Exam-Private Cloud Monitoring and Operations with System Center 2012
DOC
08 gsm bss network kpi (immediate assignment success rate) optimization manual
PPTX
Embedded system design concepts-Characteristics quality attributes
PDF
ICE Overview : SAP - ERP Journey
PPT
MRM (July-2021 to December- 2021).ppt
PDF
70 246-q&amp;a-demo-self examengine
PDF
IRJET- Development of Generalize Software to Estimate Cooling Load for Air Co...
PPTX
Measurement validation peak load reduction
PDF
IRJET- Analysis of File Conversion Program Used for CNC Machine
PDF
Optimisation process guide
Khubaib Khan_CV Instrument
MTEMC’s State 0 Changes with 1700+ Versions Intact
State Zero: Middle Tennessee Electric Membership Corporation
Gi oss offering top cell_partnership (1)
Ac2017 6. output based contracting
Best Business Practice @ Nov 22.pptx
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
Rajiv Kumar
Performance Testing
IRJET- Multi Tasking Software for Manufacturing Industry
70-246 Exam-Private Cloud Monitoring and Operations with System Center 2012
08 gsm bss network kpi (immediate assignment success rate) optimization manual
Embedded system design concepts-Characteristics quality attributes
ICE Overview : SAP - ERP Journey
MRM (July-2021 to December- 2021).ppt
70 246-q&amp;a-demo-self examengine
IRJET- Development of Generalize Software to Estimate Cooling Load for Air Co...
Measurement validation peak load reduction
IRJET- Analysis of File Conversion Program Used for CNC Machine
Optimisation process guide
Ad

Recently uploaded (20)

PPTX
Geodesy 1.pptx...............................................
PPTX
UNIT 4 Total Quality Management .pptx
PDF
PPT on Performance Review to get promotions
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPT
Mechanical Engineering MATERIALS Selection
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Sustainable Sites - Green Building Construction
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPT
Project quality management in manufacturing
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
Geodesy 1.pptx...............................................
UNIT 4 Total Quality Management .pptx
PPT on Performance Review to get promotions
bas. eng. economics group 4 presentation 1.pptx
Mechanical Engineering MATERIALS Selection
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
additive manufacturing of ss316l using mig welding
Sustainable Sites - Green Building Construction
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Internet of Things (IOT) - A guide to understanding
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
Project quality management in manufacturing
OOP with Java - Java Introduction (Basics)
Embodied AI: Ushering in the Next Era of Intelligent Systems
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
R24 SURVEYING LAB MANUAL for civil enggi
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS

Spm vibration data integration to cmms

  • 2. SPM Condmaster Lube Master – for bearing September 2014 | P1 SPM Ruby/ Nova SPM Condmaster software Vibration – ISO2372 Spectrum for Symptom of vibration Pro: - very easy to use for experienced technician - Main information of vibration condition is available and ready to use, such as: - Bearing condition (lubemaster) - Vibration condition (ISO 2372) - Symptom of vibration (unbalance, misalignment, looseness) Cons: – The vibration information is managed at standalone computer for each site, and having difficulties to integrate between site and head office – Not integrate to CMMS / ERP system – Difficulties to develop overall vibration condition across site
  • 3. Vibration Analysis Workflow PMWO Generated Vibration DataTaking Upload Data to Condmaster (Notebook) Close WO with OverallVib asTextAttachment and Site Reporting Send vibration database in USB to JKT Engineer Review Data &Analysis recommendation to site Generate CM WO 1. Overall Vib in Text Attachment rarely utilize or reviewed 2. GB develop internal vibration report for their own documentation Vibration database contain complete Condmaster data Every 1-2 months Site 1: 49 tags ; 3-5 days Site 2 : 110 tags : 10-14 days Site 3: 99 tags; 8-10 days Export Excel Data to CMMS Required 2 Weeks ave. Quick Analysis on: 1. Schedule compliance 2. Bearing condition A/B/C (lube master) 3. Vibration Condition (ISO 2374), complete with prioritization for yellow condition 4. Spectrum analysis (unbalance, misalignment, looseness) 5. Control follow up recommendation Reccomendation might OUT of DATE, considered the long lead time (2-3 months) between measurement, and analysis Head office Offshore Same day result
  • 4. Vibration Monitoring Data Facilities in CMMS - 1 By exporting condmaster excel data to CMMS Measurement dates: • Schedule attainment (backlog, overdue) • Schedule compliance (interval between measurement Bearing Condition : • Automatic result as per Condmaster calculation ISO 2372 vibration Tag Number Transfer Data fromCondMaster to CMMS/ERP Extract .xls file Upload to CMMS
  • 5. In-Use Example (based on CoMo Report) Code “D” Indication for 2 months in a row. Need to take immediate action. Also point number 2 shifts from A to B, indicate dryness in bearing Overall LR & HR increased from Feb toApr, showing bearing on its way to more damage 1. Overall vibration also shown on this detail page, consist of Horizontal,Vibration, andAxial. 2.To find out why it shown such value, Engineers still need to go through the Condmaster software and analyze the vibration spectrum.
  • 6. Vibration Analysis KPI - 1 Schedule Compliance Field-3 not yet complete take vibration for all equipment (new initiativeApr ‘15) Legend: In-schedule : within interval frequency (30 days) compared to cut off date Due : Currently on schedule to take measurement ( interval frequency + 30 days) Overdue : Not yet measured after 60 days compare to cut off date In-schedule <30d, 25 Due 30d - 60d, 18 Overdue 2015, 23 Overdue 2014, 22 Never Measured, 16 Field-2 (104 tags - as per 10 May) In- schedule <30d, 24 Due 30d - 60d, 4 Overdue 2015, 1 Field-1 (29 tags - as per 10 Apr)
  • 7. Vibration Analysis KPI - 2 Vibration Result (2015 measurement only) Legend: Green : good condition Yellow-1 : Indicate vibration 1% - 50% from upper limit, still considered as good condition Yellow-2 : Indicate vibration 51%-75% from upper limit, need close monitor Yellow-3 : Indicate vibration 75%-99% from upper limit, action might required Red : high vibration GREEN, 15 YELLOW-1, 28 YELLOW-2, 6 YELLOW-3, 2 RED, 12 N/A, 2 Field-2 (65 tags) GREEN, 10 YELLOW-1, 9 YELLOW-2, 2 YELLOW-3, 2 RED, 2 N/A, 4 Field-1 (29 tags) GREEN, 7 YELLOW- 1, 8 YELLOW-2, 2 YELLOW-3, 2 RED, 8 Field-3 (27 tags)
  • 8. Author September 2014 | P7 Dedy Darmawan (dedydar@yahoo.com) Maintenance System Engineer Fari Aditya Gatam (fari.aditya@gmail.com) Reliability Engineer Ahmad Shovi Application Developer