Stakeholder involvement for local Action Plans
definition: approach, methods and techniques
1
Sabrina Franceschini
Co-Evolve4BG Associated Partner
CO-EVOLVE WP4 Leader
19th September 2019 – Gammarth (Tunisia)
Definition
A participatory process is a way to involve citizens, stakeholders, and communities in
defining plans and taking decisions that affect them, making it easier to implement
since they are defined together.
• The process must always "be linked" to a well-identified need
• Participation works have to represents the answer to a real need / problem
• there is no pre-established or 'pre-packaged' solution to resolve the issue
there should be a genuine willingness to open up to dialogue
on the object identified.
3
Why
• To achieve more information and elements about the decision from the
actors involved
• To make more viable the implementation of decision because the point
was discussed before
• To prevent or deal with conflicts in advance
• To get the collaboration of community for the co-produced policies
• To make more informed and responsible the citizens and stakeholders
4
When
A) When the contribution of other subjects is required:
• In the case of co-produced Policy: it is necessary that the recipients of a
specific policy, in addition to putting their different points of view and
interests on the table, are actually involved in the implementation of the
process; also contributing effectively to the solution of the problems.
• In the absence of cognitive elements: in cases where you do not have
certain cognitive resources, or you only have partial information and to
proceed, it is necessary to involve other (technical) subjects able to
integrate them with their contribution.
5
B) In the presence of conflict:
Conflicts related to the theme (to the object, or to the context) concerning
the participatory process can be managed according to two distinct models.
1. To avoid interferences that could compromise the work, which is thus
carried out with discretion. However, this choice often ends up by
exacerbating the conflict
2. On the contrary, provoke in advance the reactions of the stakeholders
and potential opponents through an early communication, which
arouses interest around the project can induce them to think about the
problem, and not only on a specific solution, and then push them to
engage in the formulation of new and innovative ideas and proposals.
6
Benefit
A participatory process can:
• improve the quality of public policies, closer to the real needs of all
those involved, thanks to their ideas and suggestions;
• empowering and motivating citizens, and local actors/stakeholders, in
implementing the choices taken collectively;
• activate processes of active citizenship able to strengthen social cohesion
and a sense of belonging;
• managing and reducing conflicts, increasing trust in institutions and
countering the lack of legitimacy and consensus;
• increase the level of transparency and openness of the work of the
administration that promotes it.
7
Phase of the policy and participation’s level
At the start of a participatory process it is necessary that the Administration establishes
explicitly the objectives and conditions within which the process takes place, make a real
"Participatory Deal" with the subjects involved: in order to avoid misunderstandings and
disappointments from them.
A process of participation must fit properly within the institutional process envisaged by
the public policy of reference.
Level Description
INFORMATION The promoter of the process provides information on a project (or a policy)
implemented or which it intends to carry out. All decisions have already been
made.
CONSULTATION The promoter of the process asks for feedback from the participants on a
project (or a policy) that it intends to carry out. In this way they have the
limited opportunity to influence certain aspects of the decision.
PARTICIPATED
DESIGN
The process promoter analyzes problems, defines strategies and designs
solutions together with the participants. Decisions are made on the basis of the
skills, resources and responsibilities of both the promoter and participant
bodies, or in partnership.
EMPOWERMENT The participants are able to autonomously manage proposals and projects on
which they are looking for a confrontation with the public body: they are an
active part of the decision-making process.
8
Phase of the policy and participation’s level
In Co-Evolve WP4, the participation level for the
definition of local action plans, tools and
measures for sustainable tourism development in
the pilot areas, was to be as “participated design”
(or even “empowerment”). The
“basis/preliminary document”, as defined, mainly
represents -and should be clearly presented as- a
first input to stimulate reactions, ideas and
proposals by the participants.
LEVEL OF INVOLVEMENT
EMPOWERMENT
CONSULTATION
INFORMATION
PARTICIPATED DESIGN
9
Six Methodology Steps
1. Context analysis
2. Stakeholder involvement and partnership building
3. Plan of activities
4. Set up of tools
5. Plan implementation and monitoring
6. Evaluation
1. Context analysis
The aims is to reach information about the social context for better design
the process and involved the target.
The analysis could include:
• socio-demographic, cultural and economic profile of the community
which highlights the resources present, with the aim of identifying
suitable ways to involve citizens and stakeholders
• preview similar experience in the same field (participation) or policy also
by other subjects
• description of strength and weakness present in the community or in the
organization in which the process takes place (both in terms of qualified
personnel, and in regulatory and legislative terms).
11
2. Stakeholder involvement and
partnership building
Potentially all people could give useful contribution to our process ☺
But we have some formal methods for selected them:
• The “door open”: in this case we promote the workshops and the
people choose if the events are of their interest or not. This method
is also called “auto-selection”.
• The “stakeholder map”: as says the name, we decide who to invite
beside the selection work. The map must include all the actors who
will be have potential effect by the decision discussed during the
process.
• The “random sample”: this procedure is represented by the random
selection of a sample of the reference population, which can be non-
stratified or stratified on the grounds of specific social and
demographic characteristics
12
Working group
When several stakeholders, even belonging to different organizations, are
involved in the process management, it could be useful to set up and
formalize a working group whose main objective is to share the definition of
strategies and organizational / management methods of the participatory
process.
The Working Group (or control room) includes all parties operationally
involved in the management of the various phases of the participatory
process, such as the person in charge of the process manager, one or more
coordinators and officials and technicians belonging to the various entities
involved .
The presence of different points of view enriches and helps to create
synergies but the responsibilities must be clearly defined : "who does
what."
13
3. Plan of activities
The participation process is like a project, so for the plan we
propose the classical project management scheme.
Description Indicators Verification's
sources
Aims
Expected
resultes
Activities to
achieve
14
Defining objectives and activities of the participatory process
Defining the objectives to be achieved, or the purposes to be pursued by the
participatory process, is a complex and never dull operation.
To facilitate this task, it may be worthwhile to refer to the "SMART
objective" concept developed as part of project management.
Each objective identified for the process must be:
Specific: it should be formulated in a clear and well detailed manner
Measurable: It must be possible to identify an appropriate criterion for
measuring
Accessible: the goal must be actually feasible
Relevant: it must be consistent with the mission
Temporally defined: the time within which the target must be reached must
be clearly established.
15
To carry out this activity for each identified objective, it is necessary to
establish:
expected results (i.e. tangible and intangible changes and / or
improvements, consistent with the objectives, expected both in the short
and long term from the participatory process);
activities to be carried (i.e. the main actions to be undertaken to achieve the
expected results).
Measurement indicators are defined respectively for the targets, the
expected results and the activities, as well as the related sources of
verification used for gathering data and information for measurement
purposes.
16
4. Set up of tools
Based on the specificity of the process, you must decide how to articulate
the steps online and offline, what tools and techniques to be used, the
number of meetings, work methods, the time required and whether or not
to use external or internal moderators / facilitators, if available.
In general:
• It’s always recommended to use an integrated approach in term of
channels: traditional and new media have to be use both.
• The external support, in particular for workshops facilitation, it is
important for professional aspect but also for role of moderator and
guarantee.
• The internal team have to be prepared trough specific training.
17
5. Plan implementation and monitoring
This phase is the core of the process. We have to implement the action plan
and to tackle the possible deviation.
In general the points of attention are:
• Check the list of stakeholders to invite;
• To activate in time the internal and/or external resources;
• To organize the (eventual) workshops locations and pay attention to the
logistic aspect;
• Use all channels, traditional and digitals, to promote the process;
• Collect the data expected for monitoring the process indicators.
18
Monitoring the participatory process
Monitoring consists of a systematic activity of collecting data and
information on the progress made in the process. More specifically,
using the verification indicators and the sources identified above the
following items can be analyzed:
• the achievement of expected (short-term or partial) results
• any criticality and unexpected elements
• opportunities, both external or internal ones in the process
All information collected at this stage, once processed by the working
group and translated into appropriate corrective actions to be
implemented, will be functional to any strategic and operational
adaptations.
19
6. Evaluation
Two reasons for evaluate:
• To measure the real impact of the process in relation to the aims
in the context.
• To measure in term of benchmarking in relation to another similar
project.
Two dimensions for evaluation:
• The process (some indicators: inclusion, transparency, structure
and methods, resources);
• The results/outcomes (some indicators: output, impacts,
consequence for the participants).
20
Indicators
For the process, the verification parameters are those listed below:
• Inclusion of all the points of view on the object under discussion.
• Transparent communication
• Use of methodological techniques and tools tailored
.
As regards, finally, the resources to draw on for the process, it is necessary to take
into account the total cost / number of participants; and of the total cost of the
process / n ° ideas or proposals emerged.
For the outcomes:
Output: formalization in a document of ideas and heterogeneous contributions
collected during the comparison with the participants.
Effects on participants: satisfaction with personal experience; satisfaction with the
process and the outcome;
Impact: what impact the participatory path has had on the decision / policy.
21
Challenges and solutions
Challenge Solution
New orchestration capability needs to be
developed
Team building and Action Planning
Feedback mechanisms and participation
are essential ingredients to developed
effective policies
Stakeholder engagement with innovative
mechanisms
Discuss about technical problems and
themes with citizens and local
communities (non expert stakeholders)
New language approach and new
perspective
Institutions and Local Authorities go face
to face with public: communication and
participation is a risk? Public
participation in decision making
Clarify public role and competences in a
transparent and smart modality.
22
Tips to share
Taking the time to process
design and internal sharing tips
Tip 4
Do not be afraid
to do things
they have never
done innovation
goes from there!
Tip 3
Participation is a hard
task for citizens but
can be extremely
interesting: dedicate
your time in these
initiatives!!
Tip 1
Tip 2
Do not be
discouraged by the
(normal) difficulty:
every problem is a
challenge to
overcome
THANKS YOU FOR YOUR ATTENTION!
☺
23
Name: Sabrina Franceschini
Email: sabrina.franceschini@regione.emilia-romagna.it
Web site of the partner: www.regione.emilia-romagna.it/
E-part platform: http://partecipazione.regione.emilia-romagna.it/iopartecipo
Twitter: @iopartecipoplus
Facebook: @IoPartecipo

More Related Content

PDF
Presentation co evolve_trainingcourse_bologna7032018
PDF
Stakeholder engagement a toolkit
PPTX
Community devt presentation
PPTX
Creating an Experience-Driven Strategy: full 2011 UPA presentation
PPTX
Overall presentation integrated policies and policy coherence for sd gs.
PDF
TESTING NEW SOCIAL INNOVATION POLICIES ON LOCAL AND REGIONAL LEVEL
PPTX
unit 7:participatory project management concept and case of Nepal
PDF
To p brochure_8-4-09
Presentation co evolve_trainingcourse_bologna7032018
Stakeholder engagement a toolkit
Community devt presentation
Creating an Experience-Driven Strategy: full 2011 UPA presentation
Overall presentation integrated policies and policy coherence for sd gs.
TESTING NEW SOCIAL INNOVATION POLICIES ON LOCAL AND REGIONAL LEVEL
unit 7:participatory project management concept and case of Nepal
To p brochure_8-4-09

What's hot (14)

PPT
B08 B4pc 144 Diapo Tullia E
PPTX
Participatory planning
PDF
ASIS Guideline #4 2021 - Testing new social innovation policies on local and ...
PDF
ASIS project - Guidelines #4 - TESTING NEW SOCIAL INNOVATION POLICIES ON LOCA...
PDF
04_DURCAN_AL_IT_FINAL
PPT
May Pathfinder Listening and Learning event breakout session: Consortia auth...
PDF
Policy process presn-12feb13- rebecca hanlin [compatibility mode]
PPT
Concepts in Participatory Monitoring and Evaluation
PPTX
Stakeholder Engagement in the Context of Conflict Analysis and Intervention
PDF
An overview of participatory m&e
PDF
Environmental Engagement Roadmap
PDF
Systematization and Reinforcement Guidelines Sudan Training WS
PPTX
Repositioning Agriculture Research for Development (AR4D) to deliver the SDGs
PDF
Extension Programs Planning
B08 B4pc 144 Diapo Tullia E
Participatory planning
ASIS Guideline #4 2021 - Testing new social innovation policies on local and ...
ASIS project - Guidelines #4 - TESTING NEW SOCIAL INNOVATION POLICIES ON LOCA...
04_DURCAN_AL_IT_FINAL
May Pathfinder Listening and Learning event breakout session: Consortia auth...
Policy process presn-12feb13- rebecca hanlin [compatibility mode]
Concepts in Participatory Monitoring and Evaluation
Stakeholder Engagement in the Context of Conflict Analysis and Intervention
An overview of participatory m&e
Environmental Engagement Roadmap
Systematization and Reinforcement Guidelines Sudan Training WS
Repositioning Agriculture Research for Development (AR4D) to deliver the SDGs
Extension Programs Planning
Ad

Similar to Stakeholder involvement for local Action Plans definition: approach, methods and techniques (20)

PPT
ACES Participatory Methods Training 2011
PPTX
Dr. Mark Reed What is participation
PPTX
Dr. Mark Reed What is participation
PPT
Application of tools. stakeholder and public participation dana thalmeinerova
PPTX
Хіль Хінсберг. Системне впровадження практики залучення та публічних консульт...
PPTX
DCD CONTENT ONE.pptxfgdghgfdfghfghgfdfdsdfg
PPT
Promoting and Institutionalising Participation for Integrated Watershed Manag...
PPTX
Lecture fsw 2013 short version stakeholders and participation
PPTX
Brainstorming By Allah Dad Khan
DOCX
Discussion 1 Need response According to Janssen, Wimmer & Del.docx
PPTX
Conflict & Working Together - Alison Crowther, MadeToLast – the Resilience Or...
PDF
A Guide To A Good Deliberative Event
PPTX
Public & patient engagement session 1
PPTX
Designing more effective participatory decision-making processes
PDF
Facilitating workshops
PDF
Public Participation
PPT
Participatory Monitoring- WG6.ppt
PPT
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
PPTX
What makes stakeholder and public participation work?
PPTX
Basic_Understandings_of_Participation.pptx
ACES Participatory Methods Training 2011
Dr. Mark Reed What is participation
Dr. Mark Reed What is participation
Application of tools. stakeholder and public participation dana thalmeinerova
Хіль Хінсберг. Системне впровадження практики залучення та публічних консульт...
DCD CONTENT ONE.pptxfgdghgfdfghfghgfdfdsdfg
Promoting and Institutionalising Participation for Integrated Watershed Manag...
Lecture fsw 2013 short version stakeholders and participation
Brainstorming By Allah Dad Khan
Discussion 1 Need response According to Janssen, Wimmer & Del.docx
Conflict & Working Together - Alison Crowther, MadeToLast – the Resilience Or...
A Guide To A Good Deliberative Event
Public & patient engagement session 1
Designing more effective participatory decision-making processes
Facilitating workshops
Public Participation
Participatory Monitoring- WG6.ppt
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
What makes stakeholder and public participation work?
Basic_Understandings_of_Participation.pptx
Ad

More from Sabrina Franceschini (20)

PDF
OGPweek2022 presentazione_franceschini.pdf
PPTX
La “Citizen Participation”, costruire il futuro dei cittadini insieme ai citt...
PDF
I progetti di e-democracy della Regione Emilia-Romagna
PDF
la PARTECIPAZIONE DELLA REGIONE EMILIA-ROMAGNA: LEGGE,PROGETTI, ATTIVITA’
PDF
La Partecipazione della Regione Emilia-Romagna. Leggi, progetti, attività
PDF
ioPartecipo+ case-history-1003207webinarformez
PDF
Case Study: ioPartecipo+ Participatory policymaking platform in the region ...
PDF
CASE HISTORY SEINONDA THE PARTICIPATION PROCESS FOR FLOOD RISK MANAGEMENT PLA...
PPTX
Workshop SEINONDA: new perspective and ideas from european young people INSTA...
PPTX
Slide presentazione Guida metodologica per la gestione di processi di parteci...
PPTX
Progetto "Seinonda": la partecipazione per costruire il Piano di Gestione del...
PPT
Ideamocracy: presentazione del concorso
PPTX
Come coinvolgere cittadini e stakeholder: strumenti ed esperienze della Regio...
PDF
Come coinvolgere cittadini e stakeholder: strumenti ed esperienze della Regio...
PPTX
Regione Emilia-Romagna: il progetto ioPartecipo+
PDF
Coinvolgere i cittadini nel processo decisionale Convegno 13ott2014
PPTX
ioPartecipo+ Le piazze della partecipazione Un progetto di edemocracy della R...
PPT
Verso il Piano di gestione del rischio di alluvioni:il processo di partecipaz...
PPTX
The eparticipation activities in the ePolicy project from Emilia-Romagna Region
PPTX
Epolicy slides smartcity
OGPweek2022 presentazione_franceschini.pdf
La “Citizen Participation”, costruire il futuro dei cittadini insieme ai citt...
I progetti di e-democracy della Regione Emilia-Romagna
la PARTECIPAZIONE DELLA REGIONE EMILIA-ROMAGNA: LEGGE,PROGETTI, ATTIVITA’
La Partecipazione della Regione Emilia-Romagna. Leggi, progetti, attività
ioPartecipo+ case-history-1003207webinarformez
Case Study: ioPartecipo+ Participatory policymaking platform in the region ...
CASE HISTORY SEINONDA THE PARTICIPATION PROCESS FOR FLOOD RISK MANAGEMENT PLA...
Workshop SEINONDA: new perspective and ideas from european young people INSTA...
Slide presentazione Guida metodologica per la gestione di processi di parteci...
Progetto "Seinonda": la partecipazione per costruire il Piano di Gestione del...
Ideamocracy: presentazione del concorso
Come coinvolgere cittadini e stakeholder: strumenti ed esperienze della Regio...
Come coinvolgere cittadini e stakeholder: strumenti ed esperienze della Regio...
Regione Emilia-Romagna: il progetto ioPartecipo+
Coinvolgere i cittadini nel processo decisionale Convegno 13ott2014
ioPartecipo+ Le piazze della partecipazione Un progetto di edemocracy della R...
Verso il Piano di gestione del rischio di alluvioni:il processo di partecipaz...
The eparticipation activities in the ePolicy project from Emilia-Romagna Region
Epolicy slides smartcity

Recently uploaded (20)

PPTX
AcademyNaturalLanguageProcessing-EN-ILT-M02-Introduction.pptx
PPTX
Self management and self evaluation presentation
DOC
学位双硕士UTAS毕业证,墨尔本理工学院毕业证留学硕士毕业证
PPTX
INTERNATIONAL LABOUR ORAGNISATION PPT ON SOCIAL SCIENCE
PPTX
Impressionism_PostImpressionism_Presentation.pptx
PPTX
The Effect of Human Resource Management Practice on Organizational Performanc...
PDF
Yusen Logistics Group Sustainability Report 2024.pdf
PPTX
Sustainable Forest Management ..SFM.pptx
PPTX
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
PDF
Microsoft-365-Administrator-s-Guide_.pdf
PPTX
Research Process - Research Methods course
PPTX
Hydrogel Based delivery Cancer Treatment
PDF
Instagram's Product Secrets Unveiled with this PPT
PPTX
Intro to ISO 9001 2015.pptx wareness raising
PPTX
Tablets And Capsule Preformulation Of Paracetamol
PDF
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
PPTX
ART-APP-REPORT-FINctrwxsg f fuy L-na.pptx
PDF
COLEAD A2F approach and Theory of Change
DOCX
"Project Management: Ultimate Guide to Tools, Techniques, and Strategies (2025)"
PPTX
Presentation for DGJV QMS (PQP)_12.03.2025.pptx
AcademyNaturalLanguageProcessing-EN-ILT-M02-Introduction.pptx
Self management and self evaluation presentation
学位双硕士UTAS毕业证,墨尔本理工学院毕业证留学硕士毕业证
INTERNATIONAL LABOUR ORAGNISATION PPT ON SOCIAL SCIENCE
Impressionism_PostImpressionism_Presentation.pptx
The Effect of Human Resource Management Practice on Organizational Performanc...
Yusen Logistics Group Sustainability Report 2024.pdf
Sustainable Forest Management ..SFM.pptx
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
Microsoft-365-Administrator-s-Guide_.pdf
Research Process - Research Methods course
Hydrogel Based delivery Cancer Treatment
Instagram's Product Secrets Unveiled with this PPT
Intro to ISO 9001 2015.pptx wareness raising
Tablets And Capsule Preformulation Of Paracetamol
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
ART-APP-REPORT-FINctrwxsg f fuy L-na.pptx
COLEAD A2F approach and Theory of Change
"Project Management: Ultimate Guide to Tools, Techniques, and Strategies (2025)"
Presentation for DGJV QMS (PQP)_12.03.2025.pptx

Stakeholder involvement for local Action Plans definition: approach, methods and techniques

  • 1. CO-EVOLVE4BG kick-off Meeting Co-evolution of coastal human activities & Med natural systems for sustainable tourism & Blue Growth in the Mediterranean Stakeholder involvement for local Action Plans definition: approach, methods and techniques 1 Sabrina Franceschini Co-Evolve4BG Associated Partner CO-EVOLVE WP4 Leader 19th September 2019 – Gammarth (Tunisia)
  • 2. Definition A participatory process is a way to involve citizens, stakeholders, and communities in defining plans and taking decisions that affect them, making it easier to implement since they are defined together. • The process must always "be linked" to a well-identified need • Participation works have to represents the answer to a real need / problem • there is no pre-established or 'pre-packaged' solution to resolve the issue there should be a genuine willingness to open up to dialogue on the object identified.
  • 3. 3 Why • To achieve more information and elements about the decision from the actors involved • To make more viable the implementation of decision because the point was discussed before • To prevent or deal with conflicts in advance • To get the collaboration of community for the co-produced policies • To make more informed and responsible the citizens and stakeholders
  • 4. 4 When A) When the contribution of other subjects is required: • In the case of co-produced Policy: it is necessary that the recipients of a specific policy, in addition to putting their different points of view and interests on the table, are actually involved in the implementation of the process; also contributing effectively to the solution of the problems. • In the absence of cognitive elements: in cases where you do not have certain cognitive resources, or you only have partial information and to proceed, it is necessary to involve other (technical) subjects able to integrate them with their contribution.
  • 5. 5 B) In the presence of conflict: Conflicts related to the theme (to the object, or to the context) concerning the participatory process can be managed according to two distinct models. 1. To avoid interferences that could compromise the work, which is thus carried out with discretion. However, this choice often ends up by exacerbating the conflict 2. On the contrary, provoke in advance the reactions of the stakeholders and potential opponents through an early communication, which arouses interest around the project can induce them to think about the problem, and not only on a specific solution, and then push them to engage in the formulation of new and innovative ideas and proposals.
  • 6. 6 Benefit A participatory process can: • improve the quality of public policies, closer to the real needs of all those involved, thanks to their ideas and suggestions; • empowering and motivating citizens, and local actors/stakeholders, in implementing the choices taken collectively; • activate processes of active citizenship able to strengthen social cohesion and a sense of belonging; • managing and reducing conflicts, increasing trust in institutions and countering the lack of legitimacy and consensus; • increase the level of transparency and openness of the work of the administration that promotes it.
  • 7. 7 Phase of the policy and participation’s level At the start of a participatory process it is necessary that the Administration establishes explicitly the objectives and conditions within which the process takes place, make a real "Participatory Deal" with the subjects involved: in order to avoid misunderstandings and disappointments from them. A process of participation must fit properly within the institutional process envisaged by the public policy of reference. Level Description INFORMATION The promoter of the process provides information on a project (or a policy) implemented or which it intends to carry out. All decisions have already been made. CONSULTATION The promoter of the process asks for feedback from the participants on a project (or a policy) that it intends to carry out. In this way they have the limited opportunity to influence certain aspects of the decision. PARTICIPATED DESIGN The process promoter analyzes problems, defines strategies and designs solutions together with the participants. Decisions are made on the basis of the skills, resources and responsibilities of both the promoter and participant bodies, or in partnership. EMPOWERMENT The participants are able to autonomously manage proposals and projects on which they are looking for a confrontation with the public body: they are an active part of the decision-making process.
  • 8. 8 Phase of the policy and participation’s level In Co-Evolve WP4, the participation level for the definition of local action plans, tools and measures for sustainable tourism development in the pilot areas, was to be as “participated design” (or even “empowerment”). The “basis/preliminary document”, as defined, mainly represents -and should be clearly presented as- a first input to stimulate reactions, ideas and proposals by the participants. LEVEL OF INVOLVEMENT EMPOWERMENT CONSULTATION INFORMATION PARTICIPATED DESIGN
  • 9. 9 Six Methodology Steps 1. Context analysis 2. Stakeholder involvement and partnership building 3. Plan of activities 4. Set up of tools 5. Plan implementation and monitoring 6. Evaluation
  • 10. 1. Context analysis The aims is to reach information about the social context for better design the process and involved the target. The analysis could include: • socio-demographic, cultural and economic profile of the community which highlights the resources present, with the aim of identifying suitable ways to involve citizens and stakeholders • preview similar experience in the same field (participation) or policy also by other subjects • description of strength and weakness present in the community or in the organization in which the process takes place (both in terms of qualified personnel, and in regulatory and legislative terms).
  • 11. 11 2. Stakeholder involvement and partnership building Potentially all people could give useful contribution to our process ☺ But we have some formal methods for selected them: • The “door open”: in this case we promote the workshops and the people choose if the events are of their interest or not. This method is also called “auto-selection”. • The “stakeholder map”: as says the name, we decide who to invite beside the selection work. The map must include all the actors who will be have potential effect by the decision discussed during the process. • The “random sample”: this procedure is represented by the random selection of a sample of the reference population, which can be non- stratified or stratified on the grounds of specific social and demographic characteristics
  • 12. 12 Working group When several stakeholders, even belonging to different organizations, are involved in the process management, it could be useful to set up and formalize a working group whose main objective is to share the definition of strategies and organizational / management methods of the participatory process. The Working Group (or control room) includes all parties operationally involved in the management of the various phases of the participatory process, such as the person in charge of the process manager, one or more coordinators and officials and technicians belonging to the various entities involved . The presence of different points of view enriches and helps to create synergies but the responsibilities must be clearly defined : "who does what."
  • 13. 13 3. Plan of activities The participation process is like a project, so for the plan we propose the classical project management scheme. Description Indicators Verification's sources Aims Expected resultes Activities to achieve
  • 14. 14 Defining objectives and activities of the participatory process Defining the objectives to be achieved, or the purposes to be pursued by the participatory process, is a complex and never dull operation. To facilitate this task, it may be worthwhile to refer to the "SMART objective" concept developed as part of project management. Each objective identified for the process must be: Specific: it should be formulated in a clear and well detailed manner Measurable: It must be possible to identify an appropriate criterion for measuring Accessible: the goal must be actually feasible Relevant: it must be consistent with the mission Temporally defined: the time within which the target must be reached must be clearly established.
  • 15. 15 To carry out this activity for each identified objective, it is necessary to establish: expected results (i.e. tangible and intangible changes and / or improvements, consistent with the objectives, expected both in the short and long term from the participatory process); activities to be carried (i.e. the main actions to be undertaken to achieve the expected results). Measurement indicators are defined respectively for the targets, the expected results and the activities, as well as the related sources of verification used for gathering data and information for measurement purposes.
  • 16. 16 4. Set up of tools Based on the specificity of the process, you must decide how to articulate the steps online and offline, what tools and techniques to be used, the number of meetings, work methods, the time required and whether or not to use external or internal moderators / facilitators, if available. In general: • It’s always recommended to use an integrated approach in term of channels: traditional and new media have to be use both. • The external support, in particular for workshops facilitation, it is important for professional aspect but also for role of moderator and guarantee. • The internal team have to be prepared trough specific training.
  • 17. 17 5. Plan implementation and monitoring This phase is the core of the process. We have to implement the action plan and to tackle the possible deviation. In general the points of attention are: • Check the list of stakeholders to invite; • To activate in time the internal and/or external resources; • To organize the (eventual) workshops locations and pay attention to the logistic aspect; • Use all channels, traditional and digitals, to promote the process; • Collect the data expected for monitoring the process indicators.
  • 18. 18 Monitoring the participatory process Monitoring consists of a systematic activity of collecting data and information on the progress made in the process. More specifically, using the verification indicators and the sources identified above the following items can be analyzed: • the achievement of expected (short-term or partial) results • any criticality and unexpected elements • opportunities, both external or internal ones in the process All information collected at this stage, once processed by the working group and translated into appropriate corrective actions to be implemented, will be functional to any strategic and operational adaptations.
  • 19. 19 6. Evaluation Two reasons for evaluate: • To measure the real impact of the process in relation to the aims in the context. • To measure in term of benchmarking in relation to another similar project. Two dimensions for evaluation: • The process (some indicators: inclusion, transparency, structure and methods, resources); • The results/outcomes (some indicators: output, impacts, consequence for the participants).
  • 20. 20 Indicators For the process, the verification parameters are those listed below: • Inclusion of all the points of view on the object under discussion. • Transparent communication • Use of methodological techniques and tools tailored . As regards, finally, the resources to draw on for the process, it is necessary to take into account the total cost / number of participants; and of the total cost of the process / n ° ideas or proposals emerged. For the outcomes: Output: formalization in a document of ideas and heterogeneous contributions collected during the comparison with the participants. Effects on participants: satisfaction with personal experience; satisfaction with the process and the outcome; Impact: what impact the participatory path has had on the decision / policy.
  • 21. 21 Challenges and solutions Challenge Solution New orchestration capability needs to be developed Team building and Action Planning Feedback mechanisms and participation are essential ingredients to developed effective policies Stakeholder engagement with innovative mechanisms Discuss about technical problems and themes with citizens and local communities (non expert stakeholders) New language approach and new perspective Institutions and Local Authorities go face to face with public: communication and participation is a risk? Public participation in decision making Clarify public role and competences in a transparent and smart modality.
  • 22. 22 Tips to share Taking the time to process design and internal sharing tips Tip 4 Do not be afraid to do things they have never done innovation goes from there! Tip 3 Participation is a hard task for citizens but can be extremely interesting: dedicate your time in these initiatives!! Tip 1 Tip 2 Do not be discouraged by the (normal) difficulty: every problem is a challenge to overcome
  • 23. THANKS YOU FOR YOUR ATTENTION! ☺ 23 Name: Sabrina Franceschini Email: sabrina.franceschini@regione.emilia-romagna.it Web site of the partner: www.regione.emilia-romagna.it/ E-part platform: http://partecipazione.regione.emilia-romagna.it/iopartecipo Twitter: @iopartecipoplus Facebook: @IoPartecipo