This document provides the design basis for a class project to develop the optimum tie-back option for a third well drilled in the Red Hawk field within block GB 877. Three potential tie-back options are considered: 1) Tie back to the existing manifolds of the first two wells, 2) An independent flowline through a hazard mass directly to the riser, 3) Independent flowlines directly to the risers via the same route as the existing flowlines. Key parameters of the existing design basis for the first two wells and the third well location are presented. Deliverables for the project include an updated design basis, evaluation of options, recommended option details, diagrams and an equipment list.