NTPC
  India’s Largest
Power Company….
          Presented By;
          ISHU CHAUHAN
          E.C.E- 4th year
          0728531017        2
TABLE OF CONTENTS:-

   1.INTRODUCTION.
   2.PERFORMANCE STATISTICS.
   3.FEATURES.
   4.OVERVIEW OF PLANT’s WORKING.
   5.C&I DEPT.
   6.THERMAL PLANT.
   7.MAIN COMPONENT OF PLANT.
   8.CONCLUSION.



                                     3
INTRODUCTION
              1975- NTPC was set up in 1975 with
               100% ownership by government of
               INDIA . In the last 30 year NTPC Grown
               into the largest power utility in India



    1997- in 1997 govt. of India granted NTPC
     status of NAVRATNA being on of the nine
     jewels of India, enhancing the power of the
     board of director .
                 2004- NTPC become a listed COMPANY
                 with majority govt. ownership of 89.5%
                 NTPC become 3rd largest           by market
                 capitalization of listed company.


     2008- NTPC is largest power generation
     company in India. Forbes global    2000   for
     2008 ranked it 411 in the world.                     4
PERFORMANCE
  STATISTICS




               5
    TABLE SHOWS THAT WHILE THE INSTALLED CAPACITY
HAS INCREASED BY 62.15% IN THE LAST TWELVE YEARS THE
        GENERATION HAS INCREASED BY 99.84% .




          DESCRIPTION UNIT 1998-99 2009-10 % OF INCREASE


           Installed
                        MW    17,786    28,840        62.15
           Capacity


                              1,09,50   2,18,84
           Generation   MUs                           99.84
                                    5         0




                                                           6
FEATURES :World top ten power company,
               *Main focus on sustainable
                        developement
               *Golden Peacock Awards for
               Excellence in Corporate
               Governance in2003
               *Installed capacityof 28,644 MW
               through 31 power station
               *Operates 18 coal based, 8 gas
               based and 5 joint venture power
               station
               *17000MW under construction on
               at 17 location
                                                 7
NTPC DADRI

 It is country’s only 3-in-1 project-coal
  based, gas based and converter based
 A new stage i.e; STAGE-II is now in
  running position with a capacity of 980MW
  (2*490)
 To lighten up the CWG-2010 and for
  benefit of Delhi and UP
 It generates 840 MW power from coal
  based station and 817 MW power from gas
  based station                               8
PLANT’S WORKING




                  9
COAL TO ELECTRICITY

   COAL TAKEN.

COAL TRANSPORTATION.

CRUSHED COAL TO FURNACE.

SENDING TO PRE-HEATERS & MILL.
WATER PASSES TO BOILER DRUM.
DRUM TO BOTTOM RING HEADER.


                                  10
WATER RISES UP TO WALL TUBES.

MIXTURE TAKEN TO THE BOILER DRUM.

STEAM SENT TO SUPER HEATERS AND
 GOES TO TURBINE.

ASH PARTICALS ARE EXTRACTED.

STEAM ENTERS HIGH PRESSURE
 CYLINDER OF TURBINES.


                                   11
CONTROL &
INSTRUMENTATION………
             “BRAIN OF THE
                 PLANT”….




                             12
This division calibrates
various instruments and take
  care of any faults occur in
 the auxiliaries in the plant.




                                 13
14
MANOMETRY LAB

 PROTECTION & INTERLOCK LAB

      AUTOMATION LAB

 PYROMETRY LAB

   FSSS LAB.

    ELECTRONICS TEST LAB      15
MANOMETRY LAB




It is basically used for the measurement
of the gases and liquids..with the help of
following equipments:-
1.TRANSMITTERS.
2.MANOMETER.
3.BOURDEN PRESSURE GAUGE.


                                             16
PROTECTION AND INTERLOCK
          LAB
 It is basically interconnecting two or more
 equipments so that if one equipment fails other one
 can perform the tasks with the help of following etc..
 1.RELAY.
 2.FUSES.
 3.MINIATURE CIRCUIT BREAKER.




                                                  17
AUTOMATION LAB.
   This lab deals in automating the existing
    equipments and feeding routes.



   1.Liquid in glass thermometre.
   2.Ultra violet sensors.
   3.Thermocouples.
   4.RTD’s



                                                18
Furnance Safety and Supervisory
System Lab.
(FSSS)

   This lab has the responsibility of
    starting fire in the furnance to
    enable the burning of coal.

   For firing the furnance a 10KV
    spark plugis operated for ten
    seconds.
                                     19
ELECTRONICS LAB.


   THIS LAB UNDERTAKES THE
    CALIBERATIONS AND TESTING OF
    VARIOUS CARDS.




                                   20
“THERMAL PLANT”




                  21
 A THERMAL POWER STATION
   COMPRISES OF ALL THE EQUIPMENT
   AND A SUBSYSTEM REQUIRED TO
   PRODUCE ELECTRICITY BY USING A
   STEAM GENERATING BOILER.


 SUCH POWER STATIONS ARE MOST
 USUALLY CONSTRUCTED ON A VERY
 LARGE SCALE AND DESIGNED FOR
 CONTINUOUS OPERATION.



                                    22
 SOME OF THE MAIN
COMPONENTS OF THE PLANT
        ARE :-


     COOLING TOWERS.

     THREE PHASE
      TRANSMISSION LINE.
                           23
 ELECTRICAL GENERATOR.
 BOILER FEED WATER PUMP.

 STEAM POWERED PUMPS.

     CONTRL VALVES.

      DEAERATOR.


                            24
 FEED WATER HEATER.

 PULVERIZER.

 BOILER STEAM DRUM.

 SUPER HEATER.

 ECONOMIZERS.
                       25
   AIR PREHEATER.

   PRECIPITATOR.

   FUEL GAS STACK.




                      26
27
28
Thank You

            29
30

More Related Content

PPTX
NTPC Barh ppt by Shivank
PDF
NTPC summer training report
PPTX
Summer training in NTPC ppt
DOCX
VOCATIONAL TRAINING REPORT ON NTPC KORBA
PPTX
ntpc khalgaon
PPTX
Ntpc badarpur summer training
NTPC Barh ppt by Shivank
NTPC summer training report
Summer training in NTPC ppt
VOCATIONAL TRAINING REPORT ON NTPC KORBA
ntpc khalgaon
Ntpc badarpur summer training

What's hot (20)

DOC
ntpc unchahar
DOCX
Ntpc KAHALGAON REPORT FILE
DOCX
ntpc unchahar
DOC
Ntpc vocational training project report sipat
DOCX
Gas turbine Power Station Internship Report
PDF
Internship saad
PPTX
A presentation on summer training at NTPC corporate office noida
PPTX
Ntpc unchahar summer or vocational training ppt
PPTX
ppt by amit 5 from iet lko
PPTX
Summer training at NTPC Badarpur ppt
DOC
Ntpc kahalgaon training report
PDF
Ntpc Report
PPT
NTPC faridabad nd badarpur
PPTX
thermal power plant NTPC singrauli
PDF
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
PDF
summer training report ntpc anta
PDF
Muhammad Arshad (KAPCO) Report
DOC
project -2
PPTX
Training NTPC
PPTX
NTPC Auraiya Industrial Training
ntpc unchahar
Ntpc KAHALGAON REPORT FILE
ntpc unchahar
Ntpc vocational training project report sipat
Gas turbine Power Station Internship Report
Internship saad
A presentation on summer training at NTPC corporate office noida
Ntpc unchahar summer or vocational training ppt
ppt by amit 5 from iet lko
Summer training at NTPC Badarpur ppt
Ntpc kahalgaon training report
Ntpc Report
NTPC faridabad nd badarpur
thermal power plant NTPC singrauli
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
summer training report ntpc anta
Muhammad Arshad (KAPCO) Report
project -2
Training NTPC
NTPC Auraiya Industrial Training
Ad

Similar to sumit kumar (20)

PPT
Ishuchauhan 120924002216-phpapp02
PDF
NTPC Training Report
PDF
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
PDF
Training Report
DOCX
Sagar mehta summer training thermal power station full report
PDF
training reportON Thermal power plantt (nashik tps)pdf
PDF
training report on thermal power plant & thermal power generation by sagar me...
PPTX
Rajghat power house ppt
PPTX
NTPC BARH, BIHAR
PDF
Ntpc dadri
DOCX
Tarun Project Report On NTPC Kanti
DOCX
Report ntpc
PPTX
NTPC Barh Training Report .pptx
PPT
IPGCL/PPCL Training presentation
PDF
Ntpc 131113070238-phpapp02
DOCX
PPTX
Shivesh ntpc ppt
PPTX
MTPS Bappa main
PDF
rajghat-power-house-new-delhi-training-report
Ishuchauhan 120924002216-phpapp02
NTPC Training Report
Shivam Dubey trainees mechanical engineering NTPC ltd.Vindhyachal .pdf
Training Report
Sagar mehta summer training thermal power station full report
training reportON Thermal power plantt (nashik tps)pdf
training report on thermal power plant & thermal power generation by sagar me...
Rajghat power house ppt
NTPC BARH, BIHAR
Ntpc dadri
Tarun Project Report On NTPC Kanti
Report ntpc
NTPC Barh Training Report .pptx
IPGCL/PPCL Training presentation
Ntpc 131113070238-phpapp02
Shivesh ntpc ppt
MTPS Bappa main
rajghat-power-house-new-delhi-training-report
Ad

Recently uploaded (20)

PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
STKI Israel Market Study 2025 version august
PDF
A comparative study of natural language inference in Swahili using monolingua...
PPTX
Modernising the Digital Integration Hub
PDF
Architecture types and enterprise applications.pdf
PPTX
The various Industrial Revolutions .pptx
PPTX
Chapter 5: Probability Theory and Statistics
PPTX
OMC Textile Division Presentation 2021.pptx
PDF
Getting Started with Data Integration: FME Form 101
PDF
project resource management chapter-09.pdf
PPTX
cloud_computing_Infrastucture_as_cloud_p
PDF
DP Operators-handbook-extract for the Mautical Institute
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
PDF
Getting started with AI Agents and Multi-Agent Systems
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PPTX
1. Introduction to Computer Programming.pptx
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Final SEM Unit 1 for mit wpu at pune .pptx
WOOl fibre morphology and structure.pdf for textiles
STKI Israel Market Study 2025 version august
A comparative study of natural language inference in Swahili using monolingua...
Modernising the Digital Integration Hub
Architecture types and enterprise applications.pdf
The various Industrial Revolutions .pptx
Chapter 5: Probability Theory and Statistics
OMC Textile Division Presentation 2021.pptx
Getting Started with Data Integration: FME Form 101
project resource management chapter-09.pdf
cloud_computing_Infrastucture_as_cloud_p
DP Operators-handbook-extract for the Mautical Institute
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
Getting started with AI Agents and Multi-Agent Systems
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
1. Introduction to Computer Programming.pptx

sumit kumar

  • 1. INSTITUTE OF TECHNOLOGY AND MANAGEMENT 1 DATE:-25 October 2010
  • 2. NTPC India’s Largest Power Company…. Presented By; ISHU CHAUHAN E.C.E- 4th year 0728531017 2
  • 3. TABLE OF CONTENTS:-  1.INTRODUCTION.  2.PERFORMANCE STATISTICS.  3.FEATURES.  4.OVERVIEW OF PLANT’s WORKING.  5.C&I DEPT.  6.THERMAL PLANT.  7.MAIN COMPONENT OF PLANT.  8.CONCLUSION. 3
  • 4. INTRODUCTION  1975- NTPC was set up in 1975 with 100% ownership by government of INDIA . In the last 30 year NTPC Grown into the largest power utility in India  1997- in 1997 govt. of India granted NTPC status of NAVRATNA being on of the nine jewels of India, enhancing the power of the board of director . 2004- NTPC become a listed COMPANY with majority govt. ownership of 89.5% NTPC become 3rd largest by market capitalization of listed company. 2008- NTPC is largest power generation company in India. Forbes global 2000 for 2008 ranked it 411 in the world. 4
  • 6. TABLE SHOWS THAT WHILE THE INSTALLED CAPACITY HAS INCREASED BY 62.15% IN THE LAST TWELVE YEARS THE GENERATION HAS INCREASED BY 99.84% . DESCRIPTION UNIT 1998-99 2009-10 % OF INCREASE Installed MW 17,786 28,840 62.15 Capacity 1,09,50 2,18,84 Generation MUs 99.84 5 0 6
  • 7. FEATURES :World top ten power company, *Main focus on sustainable developement *Golden Peacock Awards for Excellence in Corporate Governance in2003 *Installed capacityof 28,644 MW through 31 power station *Operates 18 coal based, 8 gas based and 5 joint venture power station *17000MW under construction on at 17 location 7
  • 8. NTPC DADRI  It is country’s only 3-in-1 project-coal based, gas based and converter based  A new stage i.e; STAGE-II is now in running position with a capacity of 980MW (2*490)  To lighten up the CWG-2010 and for benefit of Delhi and UP  It generates 840 MW power from coal based station and 817 MW power from gas based station 8
  • 10. COAL TO ELECTRICITY  COAL TAKEN. COAL TRANSPORTATION. CRUSHED COAL TO FURNACE. SENDING TO PRE-HEATERS & MILL. WATER PASSES TO BOILER DRUM. DRUM TO BOTTOM RING HEADER. 10
  • 11. WATER RISES UP TO WALL TUBES. MIXTURE TAKEN TO THE BOILER DRUM. STEAM SENT TO SUPER HEATERS AND GOES TO TURBINE. ASH PARTICALS ARE EXTRACTED. STEAM ENTERS HIGH PRESSURE CYLINDER OF TURBINES. 11
  • 12. CONTROL & INSTRUMENTATION……… “BRAIN OF THE PLANT”…. 12
  • 13. This division calibrates various instruments and take care of any faults occur in the auxiliaries in the plant. 13
  • 14. 14
  • 15. MANOMETRY LAB  PROTECTION & INTERLOCK LAB  AUTOMATION LAB  PYROMETRY LAB FSSS LAB.  ELECTRONICS TEST LAB 15
  • 16. MANOMETRY LAB It is basically used for the measurement of the gases and liquids..with the help of following equipments:- 1.TRANSMITTERS. 2.MANOMETER. 3.BOURDEN PRESSURE GAUGE. 16
  • 17. PROTECTION AND INTERLOCK LAB It is basically interconnecting two or more equipments so that if one equipment fails other one can perform the tasks with the help of following etc.. 1.RELAY. 2.FUSES. 3.MINIATURE CIRCUIT BREAKER. 17
  • 18. AUTOMATION LAB.  This lab deals in automating the existing equipments and feeding routes.  1.Liquid in glass thermometre.  2.Ultra violet sensors.  3.Thermocouples.  4.RTD’s 18
  • 19. Furnance Safety and Supervisory System Lab. (FSSS)  This lab has the responsibility of starting fire in the furnance to enable the burning of coal.  For firing the furnance a 10KV spark plugis operated for ten seconds. 19
  • 20. ELECTRONICS LAB.  THIS LAB UNDERTAKES THE CALIBERATIONS AND TESTING OF VARIOUS CARDS. 20
  • 22.  A THERMAL POWER STATION COMPRISES OF ALL THE EQUIPMENT AND A SUBSYSTEM REQUIRED TO PRODUCE ELECTRICITY BY USING A STEAM GENERATING BOILER.  SUCH POWER STATIONS ARE MOST USUALLY CONSTRUCTED ON A VERY LARGE SCALE AND DESIGNED FOR CONTINUOUS OPERATION. 22
  • 23.  SOME OF THE MAIN COMPONENTS OF THE PLANT ARE :- COOLING TOWERS. THREE PHASE TRANSMISSION LINE. 23
  • 24.  ELECTRICAL GENERATOR.  BOILER FEED WATER PUMP.  STEAM POWERED PUMPS.  CONTRL VALVES.  DEAERATOR. 24
  • 25.  FEED WATER HEATER.  PULVERIZER.  BOILER STEAM DRUM.  SUPER HEATER.  ECONOMIZERS. 25
  • 26. AIR PREHEATER.  PRECIPITATOR.  FUEL GAS STACK. 26
  • 27. 27
  • 28. 28
  • 29. Thank You 29
  • 30. 30