Just-In-Time (JIT) JIT : an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, finished goods & work in process.
Just-In-Time (JIT) (Cont.) Management philosophy…Nothing produce until needed. Encompasses the successful execution of all production activities required from design to delivery of products. Common sense based/simple techniques
Just-In-Time (JIT) (Cont.) Minimize waste of time, energy, material & errors Minimize waste…in both factories:  Manufacturing product & “Hidden” Attack/eliminate waste Value added to the final product philosophy … from  customer ’s point of view
Just-In-Time (JIT) (Cont.) Expose problems Continuous improvement/ change Enforced problem solving approach
Goals Zero defects …reducing defects Zero inventory …Stockless production Zero setup time …  SMED ---Single Minute Exchange of Dies Zero handling Zero break down
Goals (Cont.) Zero lead time Zero Transactions …reduced paperwork Zero disturbances …routine execution of schedules
Elements addressing  Elimination of Waste Focused Factory …specialized Group Technology …Eliminate movement & queue time between operations Jidoka …Quality at the source stop line if necessary Total quality: an approach that encompasses all phases of a manufacturing organization.
Elements addressing  Elimination of Waste (Cont.) Quality …Meeting a specific set of customer  expectations Fitness for use, reliability, consistency, etc. Customer…external & internal
JIT Manufacturing JIT Manufacturing :  Executing linear production : Production of necessary units in the necessary time with the objective of    0 Variance W.R.T. the schedule.
JIT Manufacturing (Cont.) No Inventories, No queues Minimum schedule variation Uniform plant loading Uninterrupted flow of materials Flow paced by market demands Flexibility,  Visual Control  (make problems visible to everyone),  Reliability  (of materials, people & equipment)
JIT Manufacturing (Cont.) Inventory hides problems such as poor quality, break downs, late deliveries, workers absence & tardiness, etc. Tightening the production system : Reducing the amount of inventory in the system “One less at a time”…(reducing the lot size) expose eliminate constraints
Pull System Produce only when material is needed downstream…(cue from the user  not  the planning source) Pull materials sequentially through the factory. Orders placed at end item level. Idle material is waste. Need discipline…(Good practices reinforced through training)
Push System Production authorized in  anticipation  of needs downstream…(cue is a work order from the planning system) Orders launched to meet due dates. Keep machines & people busy. NOTE : Planning is necessary under JIT to ensure the    right amount of productive resources are   scheduled/available to satisfy MPS/FAS
Kanban Production Control Systems Simple, paperless procedures Signals/visual systems Posted schedules Containers Standard size , small Factors: Material Handling consideration proximity of work centers
Kanban Production Control Systems  (Cont.) Kanban…Cards Production Card---”P” Card: Part #, Quantity to be produced, Supply work center #, etc. Conveyance (Move) Card---”C” Card : Part #, Container Capacity, Source, Destination, etc. 1-card system : Move card and an empty space 2-card system
Setup Reduction Setup reduction is the process of reducing the time required to convert from production of the last good piece of unit  A  to the first good piece of unit  B . use methods engineering/common sense. Ideal lot size = 1.
Setup Reduction (Cont.) Setup activities: External:  Operations performed while the machine is running. Internal:  Operations performed after the machine is stopped. Setup…responsibility of the operator.

More Related Content

PPTX
Just in time manufacturing ppt
PPTX
JIT- JUST IN TIME PPT
PPTX
Jit in mc donald's
PPT
Just In Time(JIT)
PPTX
Just In Time Production (JIT)
PPT
Jit systems
PPTX
Just In Time & Kanban
PDF
ITFT--JIT
Just in time manufacturing ppt
JIT- JUST IN TIME PPT
Jit in mc donald's
Just In Time(JIT)
Just In Time Production (JIT)
Jit systems
Just In Time & Kanban
ITFT--JIT

What's hot (20)

PPTX
Just In Time (jit) inventory management
PPTX
santosh kumar just in time presentation
PPTX
JIT and Lean Manufacturing
PDF
Just In Time Technique
PPTX
PPTX
Just in time
DOC
just in time management
PPT
Just In Time Management
PPTX
Just in time
PPTX
Just in time Manufacturing
PPTX
Toyota automobile
PPTX
Presentation on Just in Time
PPTX
just in time manufacturing
PPT
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
PPT
Ch9 Jit
PPTX
Just in Time and Lean Manufacturing
PPT
What is Just In Time (JIT) Manufacturing?
PPTX
Just in time (JIT).
PPT
Just In Time
PPTX
Just in time technology (JIT)
Just In Time (jit) inventory management
santosh kumar just in time presentation
JIT and Lean Manufacturing
Just In Time Technique
Just in time
just in time management
Just In Time Management
Just in time
Just in time Manufacturing
Toyota automobile
Presentation on Just in Time
just in time manufacturing
Just in time - Accounting Theory (ACT - 412) Presentation Sonia ma'am
Ch9 Jit
Just in Time and Lean Manufacturing
What is Just In Time (JIT) Manufacturing?
Just in time (JIT).
Just In Time
Just in time technology (JIT)
Ad

Similar to Supply Chain Mgmt Jit (20)

PPT
Slide Show Week #9 Chapter 11 Jit
PPT
Jit In Toyota
PPTX
Toyota way
PPT
Just In Time
PPT
Lean_Manufacturing___Just-in-Time.ppt
PPTX
13. lean production system pgp
PPTX
JUST IN TIME AND KABAN CARD BY kalpana.pptx
PDF
JUST IN TIME PRODUCTION SYSTEM
PPT
Just in Time and Lean operation management
PPTX
Lean production System - TPS
PPTX
Operation management II
PPTX
tpsandleanmanufacturing-130709101251-phpapp01.pptx
PPT
PPT
Chapter.1 just in time
PPTX
JUST IN TIME
PPT
PPT
Just in time & Lean production
PPTX
10. Lean Manufacturing and Just In Time.pptx
PPT
Tps and lean manufacturing
Slide Show Week #9 Chapter 11 Jit
Jit In Toyota
Toyota way
Just In Time
Lean_Manufacturing___Just-in-Time.ppt
13. lean production system pgp
JUST IN TIME AND KABAN CARD BY kalpana.pptx
JUST IN TIME PRODUCTION SYSTEM
Just in Time and Lean operation management
Lean production System - TPS
Operation management II
tpsandleanmanufacturing-130709101251-phpapp01.pptx
Chapter.1 just in time
JUST IN TIME
Just in time & Lean production
10. Lean Manufacturing and Just In Time.pptx
Tps and lean manufacturing
Ad

More from ajithsrc (20)

PPT
Business Plan On Retail Mall
DOC
Ethics
DOC
Ethics
DOC
Ethics
DOC
New Ethics 5
DOC
New Ethics 4
PPT
Valuation Of S Ecurities
PPT
Transport
PPT
Inflation
PPT
Auto
DOC
Ajith Resume
PPT
Ksrtc
PPT
Operations Research
PPT
Evolution Of Operations Management
PPT
Tqm Tool2
PPT
Tqm Tool1
PPT
Textile Industry
PPT
Syndicate 1 Tqm
PPT
Stevenson9e Ch04
PPT
Statistical Process Control & Operations Management
Business Plan On Retail Mall
Ethics
Ethics
Ethics
New Ethics 5
New Ethics 4
Valuation Of S Ecurities
Transport
Inflation
Auto
Ajith Resume
Ksrtc
Operations Research
Evolution Of Operations Management
Tqm Tool2
Tqm Tool1
Textile Industry
Syndicate 1 Tqm
Stevenson9e Ch04
Statistical Process Control & Operations Management

Supply Chain Mgmt Jit

  • 1. Just-In-Time (JIT) JIT : an integrated set of activities designed to achieve high-volume production using minimal inventories of raw materials, finished goods & work in process.
  • 2. Just-In-Time (JIT) (Cont.) Management philosophy…Nothing produce until needed. Encompasses the successful execution of all production activities required from design to delivery of products. Common sense based/simple techniques
  • 3. Just-In-Time (JIT) (Cont.) Minimize waste of time, energy, material & errors Minimize waste…in both factories: Manufacturing product & “Hidden” Attack/eliminate waste Value added to the final product philosophy … from customer ’s point of view
  • 4. Just-In-Time (JIT) (Cont.) Expose problems Continuous improvement/ change Enforced problem solving approach
  • 5. Goals Zero defects …reducing defects Zero inventory …Stockless production Zero setup time … SMED ---Single Minute Exchange of Dies Zero handling Zero break down
  • 6. Goals (Cont.) Zero lead time Zero Transactions …reduced paperwork Zero disturbances …routine execution of schedules
  • 7. Elements addressing Elimination of Waste Focused Factory …specialized Group Technology …Eliminate movement & queue time between operations Jidoka …Quality at the source stop line if necessary Total quality: an approach that encompasses all phases of a manufacturing organization.
  • 8. Elements addressing Elimination of Waste (Cont.) Quality …Meeting a specific set of customer expectations Fitness for use, reliability, consistency, etc. Customer…external & internal
  • 9. JIT Manufacturing JIT Manufacturing : Executing linear production : Production of necessary units in the necessary time with the objective of  0 Variance W.R.T. the schedule.
  • 10. JIT Manufacturing (Cont.) No Inventories, No queues Minimum schedule variation Uniform plant loading Uninterrupted flow of materials Flow paced by market demands Flexibility, Visual Control (make problems visible to everyone), Reliability (of materials, people & equipment)
  • 11. JIT Manufacturing (Cont.) Inventory hides problems such as poor quality, break downs, late deliveries, workers absence & tardiness, etc. Tightening the production system : Reducing the amount of inventory in the system “One less at a time”…(reducing the lot size) expose eliminate constraints
  • 12. Pull System Produce only when material is needed downstream…(cue from the user not the planning source) Pull materials sequentially through the factory. Orders placed at end item level. Idle material is waste. Need discipline…(Good practices reinforced through training)
  • 13. Push System Production authorized in anticipation of needs downstream…(cue is a work order from the planning system) Orders launched to meet due dates. Keep machines & people busy. NOTE : Planning is necessary under JIT to ensure the right amount of productive resources are scheduled/available to satisfy MPS/FAS
  • 14. Kanban Production Control Systems Simple, paperless procedures Signals/visual systems Posted schedules Containers Standard size , small Factors: Material Handling consideration proximity of work centers
  • 15. Kanban Production Control Systems (Cont.) Kanban…Cards Production Card---”P” Card: Part #, Quantity to be produced, Supply work center #, etc. Conveyance (Move) Card---”C” Card : Part #, Container Capacity, Source, Destination, etc. 1-card system : Move card and an empty space 2-card system
  • 16. Setup Reduction Setup reduction is the process of reducing the time required to convert from production of the last good piece of unit A to the first good piece of unit B . use methods engineering/common sense. Ideal lot size = 1.
  • 17. Setup Reduction (Cont.) Setup activities: External: Operations performed while the machine is running. Internal: Operations performed after the machine is stopped. Setup…responsibility of the operator.