04/15/2011 15:00 UTC Unit  1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ  In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation  – Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant status Pressure of RPV Increasing Stable Stable CV Pressure Drywell Increasing Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Fresh water injection by concrete pump truck
04/14/2011 11:00 UTC Unit  5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building  Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

More Related Content

PPT
Table summary of reactor unit status at 18-april 2011
PPT
Summaryreactorunitstatus120411 110412123744-phpapp02
PPT
Summary of reactor unit status at of 24 March-0600 UTC
PPT
Summary of reactor unit status at 20-march-13-00 utc
PPT
Summary of reactor unit status at 18 March - Graham Andrew
PPT
Paper presentation1
PPTX
Dsr
PPTX
Bera Syul Hydro power project Presentation
Table summary of reactor unit status at 18-april 2011
Summaryreactorunitstatus120411 110412123744-phpapp02
Summary of reactor unit status at of 24 March-0600 UTC
Summary of reactor unit status at 20-march-13-00 utc
Summary of reactor unit status at 18 March - Graham Andrew
Paper presentation1
Dsr
Bera Syul Hydro power project Presentation

What's hot (20)

PPTX
Week 12 13 14 pe 3231
PPTX
Critical Power: Generators and Generator System Design
PPTX
ADITEC04
PDF
Hot water flow controller function description
PDF
Paralleling Switchgear
PPTX
Fluke1748 - power quality measurements on overhead lines
PDF
NTPC Ramagundam Station Blackout and Action Plan
DOCX
LETTER OF AUTHORIZATION
DOCX
Low cost automatic water level control for domestic or industrial applicat...
PDF
Westward Ounalashka Final Report R1
PPTX
Wireless Power Transmission
PPTX
Rankine Cycle
PPTX
Rankine cycle
PPTX
Automatic transfer switch (ats)
PDF
wathiq alanbaki
PDF
05 ropp sandia-epri_workshop_lrov_spod_05092016
PPTX
Vapour power cycles
PDF
GenSync - User Guide
PPTX
PPTX
Synchronous generator
Week 12 13 14 pe 3231
Critical Power: Generators and Generator System Design
ADITEC04
Hot water flow controller function description
Paralleling Switchgear
Fluke1748 - power quality measurements on overhead lines
NTPC Ramagundam Station Blackout and Action Plan
LETTER OF AUTHORIZATION
Low cost automatic water level control for domestic or industrial applicat...
Westward Ounalashka Final Report R1
Wireless Power Transmission
Rankine Cycle
Rankine cycle
Automatic transfer switch (ats)
wathiq alanbaki
05 ropp sandia-epri_workshop_lrov_spod_05092016
Vapour power cycles
GenSync - User Guide
Synchronous generator
Ad

Similar to Table summary of reactor unit status at 15-april-1200 utc (15)

PPT
Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
PDF
Table: Summary of reactor unit status at 4-may-0700 utc
PPTX
Fukushima Daiichi Byu Presentation
PDF
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
PPTX
pwr-intro.pptx
PDF
Fukushima Daiichi Nuclear Power Station Accident April19 2011
PPT
Accident Analysis
PDF
Technical Briefing on Radiological Situation in Japan - 21 March 2011
PPT
PDF
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
PDF
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
PPTX
Sergio Final
PDF
F12np gaiyou e
PDF
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
PDF
En20110404 3-2
Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
Table: Summary of reactor unit status at 4-may-0700 utc
Fukushima Daiichi Byu Presentation
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
pwr-intro.pptx
Fukushima Daiichi Nuclear Power Station Accident April19 2011
Accident Analysis
Technical Briefing on Radiological Situation in Japan - 21 March 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Sergio Final
F12np gaiyou e
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
En20110404 3-2
Ad

More from International Atomic Energy Agency (20)

PDF
IAEA Bulletin September 2011
PPT
The IAEA Legal Framework for Nuclear Safety
PDF
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
PDF
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
PDF
Summary of Reactor Status (2 June 2011)
PDF
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
PDF
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
PDF
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
PPTX
Fukushima Marine Environment Monitoring - 5 May 2011
PPTX
Radiological Monitoring and Consequences - 5 May 2011
PPTX
Summary of reactor unit status - 5 May 2011
PPTX
Table summary of reactor unit status at 27-april-0700 utc
PPTX
Table summary of reactor unit status at 26-april-0700 utc
PPTX
Summary of reactor unit status - 19 April 2011
PPTX
Fukushima Marine Environment Monitoring - 19 April 2011
PPTX
Radiological Monitoring and Consequences - 19 April 2011
PPT
Tc Programme - Delivering Results for Peace and Development (Russian)
PPT
Tc programme presentation UN audience
PPT
TC Programme Presentation Russian
PPT
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
IAEA Bulletin September 2011
The IAEA Legal Framework for Nuclear Safety
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Summary of Reactor Status (2 June 2011)
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
Summary of reactor unit status - 5 May 2011
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
Summary of reactor unit status - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc programme presentation UN audience
TC Programme Presentation Russian
Technical Cooperation Programme - Delivering Results for Peace and Developmen...

Table summary of reactor unit status at 15-april-1200 utc

  • 1. 04/15/2011 15:00 UTC Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant status Pressure of RPV Increasing Stable Stable CV Pressure Drywell Increasing Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Fresh water injection by concrete pump truck
  • 2. 04/14/2011 11:00 UTC Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Editor's Notes

  • #2: 04/15/11 14:54
  • #3: 04/15/11 14:54