Reengineering the Acquisition/Procurement Process:  Requirements Collection Methodologyand                  Thomas Vanek    Booz Allen HamiltonNASA PM Challenge 2011    February 9–10, 2011 Randall L. Taylor    Project ManagerAcquisition Reengineering Project    Jet Propulsion Laboratory    California Institute of TechnologyCopyright © 2010. All rights reserved.
AgendaProject MethodologyRequirements CollectionCustomer SessionsCustomer VotingStakeholder and Process Performer SessionsPreliminary BenchmarkingPreliminary RequirementsQuick Hits Where are we Now?
Project ApproachUtilize Lean Six Sigma and Reengineering methodologies and techniquesFocus on the Customer, and how we can do a better job.In line with the Acquisition Division Mission & VisionThe Project is “Exploratory”.Explore solutions that make life better for Subcontract Managers & Contract Technical ManagersThe Project is conducted like a flight project, using various tools & techniques
Project MethodologyMajor improvement can come about through a single paradigm change, or by a combination of smaller but important changes.FY09FY10
Methodology: Project PlanEach phase has required products and independent reviews
Phase A: Concept Studies/Development
Validate Customers, Stakeholders, and Process Performers
Requirements; Concept; Prelim. Concept of Operations; Prelim. Project Plan
Concept Review
Phase B: Preliminary Design
Requirements (baseline); Prelim. Design; Concept of Operations; Project Plan; Integrated Baseline (tech-sched-cost)
Pre-PDR peer reviews; PDR; Confirmation Review
Phase C: Final Design & Build
Phase D: System Assembly, I&T, and Launch
Phase E: Operations & SustainmentPhase BPhase CPhase DPhase EPhase A
Acquisition Reengineering Activity 1:Gather Customer RequirementsActivity 1 - Requirements GenerationObjective: to capture customer requirements as the basis for proposing a concept (and subsequent design) that meets the requirements in a verifiable mannerRequirements are solicited from:Customers – primary customers are Project Managers and Proposal ManagersStakeholders – we have a long list (e.g., Legal, Property, Invoice Management, Engineering and SMA management…)Process Performers – buyers, negotiators, Contract Technical Managers (primary), othersEmploy a modified version of the JPL Resource Management System technique Products include preliminary requirements set & recommended “quick hits” (Lean Six Sigma Kaizen events and Just-Do-Its) for implementationEstablish JPL acquisition process definitionPhase APhase BPhase CPhase DPhase E
Requirements collection & analysis toolsCustomer/stakeholder/process performer groups identifiedCollection sessions technique(s) mapped outSession pre-work conducted prior to each sessionCustomer Requirements Collection MethodIllustrativeSampling of requirement fieldsSource Name
Source Type, e.g., Project Manager
Requirement statement
Requirement rationale
Requirement impact

More Related Content

PDF
Osterkamp jeff
PPTX
Sharyl butler
PPT
Esker.linda
PDF
Sandra smalley
PDF
Zimmerman
PPTX
Dean.david
PPTX
Symons
PDF
Rhodes.donna
Osterkamp jeff
Sharyl butler
Esker.linda
Sandra smalley
Zimmerman
Dean.david
Symons
Rhodes.donna

What's hot (20)

PPT
Cole ready aim fire impact!- status impact analysis - nasa
PPTX
Simon.dekker.vance kotrla
PPT
Gonzales.matthew
PDF
Richard.laws
PPT
Backup jim cassidy
PDF
Thomas.coonce
PPTX
Backup darren elliott
PPTX
Mahmood porter
PPTX
Amer.tahani
PPTX
Ed mangopanelpm challengefinal
PDF
Eggert.joe
PPTX
Borchardt.heidemarie
PPT
Brian muirhead v1-27-12
PPT
Mc nally
PDF
K.pagel.beene
PDF
Gary.humphreys
PDF
Law.richard
PDF
Murphy.dar jean.jean
PDF
Design & Development Of A Schedule Management Plan Presentation
PPTX
Newman.steve
Cole ready aim fire impact!- status impact analysis - nasa
Simon.dekker.vance kotrla
Gonzales.matthew
Richard.laws
Backup jim cassidy
Thomas.coonce
Backup darren elliott
Mahmood porter
Amer.tahani
Ed mangopanelpm challengefinal
Eggert.joe
Borchardt.heidemarie
Brian muirhead v1-27-12
Mc nally
K.pagel.beene
Gary.humphreys
Law.richard
Murphy.dar jean.jean
Design & Development Of A Schedule Management Plan Presentation
Newman.steve
Ad

Viewers also liked (13)

PPT
An overview of the Ghana national M&E system
PPT
Zieger.alfred
PDF
Alfred mecum
PDF
Leonard.matthew
PDF
Rovinsky final
PPTX
J marinaro jmay
PDF
Maturo.a.midgett.j
PPT
Baniszewski.john
PPTX
QIP-SCM
PDF
Accra2009 action plan
PPT
Swedish County Council: Sustainable Procurement for Sustainable Development
PPTX
Strategic Management Case Study - Toyota
An overview of the Ghana national M&E system
Zieger.alfred
Alfred mecum
Leonard.matthew
Rovinsky final
J marinaro jmay
Maturo.a.midgett.j
Baniszewski.john
QIP-SCM
Accra2009 action plan
Swedish County Council: Sustainable Procurement for Sustainable Development
Strategic Management Case Study - Toyota
Ad

Similar to Taylor.randall (20)

PPTX
Project Reviews 20100414 1 0
PPTX
Supply Chain Strategy Assessment
PPT
Chap002
PPTX
Optimize Project Intake Approval and Prioritization
PPTX
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
PPTX
Case Study: Product Development Redesign for Life Science client
PDF
Approach for transformation kickoff
PPT
Poor business analysis The Culprit of IT project Failure
PDF
Six Sigma DMAIC Case Study
PPTX
Importance of early project requirements definition
PPTX
Process Redesign or Improvement Approach Options
PPTX
M1 Refresher Training Master Final Version non client linkedin
PPTX
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
PPT
PGP New Product Generation Project 2003
PPTX
Feasibilty .pptx
PPT
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
PDF
2.requirements management
DOCX
Chapter16For all types of project and in their different sizes, .docx
PPTX
PMP Training - 04 project integration management
PDF
build-for-speed-brochure
Project Reviews 20100414 1 0
Supply Chain Strategy Assessment
Chap002
Optimize Project Intake Approval and Prioritization
IIBA Basel Event March 2016 - Case Study Agile Waterfall.pptx
Case Study: Product Development Redesign for Life Science client
Approach for transformation kickoff
Poor business analysis The Culprit of IT project Failure
Six Sigma DMAIC Case Study
Importance of early project requirements definition
Process Redesign or Improvement Approach Options
M1 Refresher Training Master Final Version non client linkedin
Practitioner’s Guide Building and Sustaining an Effective IT Demand Managemen...
PGP New Product Generation Project 2003
Feasibilty .pptx
Sanitized Knowledge Transfer Deliverable:Rapid Process Change Tutorial
2.requirements management
Chapter16For all types of project and in their different sizes, .docx
PMP Training - 04 project integration management
build-for-speed-brochure

More from NASAPMC (20)

PDF
Bejmuk bo
PDF
Baniszewski john
PDF
Yew manson
PDF
Wood frank
PDF
Wood frank
PDF
Wessen randi (cd)
PDF
Vellinga joe
PDF
Trahan stuart
PDF
Stock gahm
PDF
Snow lee
PDF
Smalley sandra
PDF
Seftas krage
PDF
Sampietro marco
PDF
Rudolphi mike
PDF
Roberts karlene
PDF
Rackley mike
PDF
Paradis william
PDF
O'keefe william
PDF
Muller ralf
PDF
Mulenburg jerry
Bejmuk bo
Baniszewski john
Yew manson
Wood frank
Wood frank
Wessen randi (cd)
Vellinga joe
Trahan stuart
Stock gahm
Snow lee
Smalley sandra
Seftas krage
Sampietro marco
Rudolphi mike
Roberts karlene
Rackley mike
Paradis william
O'keefe william
Muller ralf
Mulenburg jerry

Recently uploaded (20)

PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
Business Ethics - An introduction and its overview.pptx
PDF
WRN_Investor_Presentation_August 2025.pdf
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
PDF
IFRS Notes in your pocket for study all the time
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPT
Chapter four Project-Preparation material
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Business model innovation report 2022.pdf
Belch_12e_PPT_Ch18_Accessible_university.pptx
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Business Ethics - An introduction and its overview.pptx
WRN_Investor_Presentation_August 2025.pdf
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
IFRS Notes in your pocket for study all the time
Euro SEO Services 1st 3 General Updates.docx
Chapter four Project-Preparation material
Lecture (1)-Introduction.pptx business communication
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
COST SHEET- Tender and Quotation unit 2.pdf
Laughter Yoga Basic Learning Workshop Manual
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
unit 1 COST ACCOUNTING AND COST SHEET
Unit 1 Cost Accounting - Cost sheet
Business model innovation report 2022.pdf

Taylor.randall

  • 1. Reengineering the Acquisition/Procurement Process: Requirements Collection Methodologyand Thomas Vanek Booz Allen HamiltonNASA PM Challenge 2011 February 9–10, 2011 Randall L. Taylor Project ManagerAcquisition Reengineering Project Jet Propulsion Laboratory California Institute of TechnologyCopyright © 2010. All rights reserved.
  • 2. AgendaProject MethodologyRequirements CollectionCustomer SessionsCustomer VotingStakeholder and Process Performer SessionsPreliminary BenchmarkingPreliminary RequirementsQuick Hits Where are we Now?
  • 3. Project ApproachUtilize Lean Six Sigma and Reengineering methodologies and techniquesFocus on the Customer, and how we can do a better job.In line with the Acquisition Division Mission & VisionThe Project is “Exploratory”.Explore solutions that make life better for Subcontract Managers & Contract Technical ManagersThe Project is conducted like a flight project, using various tools & techniques
  • 4. Project MethodologyMajor improvement can come about through a single paradigm change, or by a combination of smaller but important changes.FY09FY10
  • 5. Methodology: Project PlanEach phase has required products and independent reviews
  • 6. Phase A: Concept Studies/Development
  • 7. Validate Customers, Stakeholders, and Process Performers
  • 8. Requirements; Concept; Prelim. Concept of Operations; Prelim. Project Plan
  • 11. Requirements (baseline); Prelim. Design; Concept of Operations; Project Plan; Integrated Baseline (tech-sched-cost)
  • 12. Pre-PDR peer reviews; PDR; Confirmation Review
  • 13. Phase C: Final Design & Build
  • 14. Phase D: System Assembly, I&T, and Launch
  • 15. Phase E: Operations & SustainmentPhase BPhase CPhase DPhase EPhase A
  • 16. Acquisition Reengineering Activity 1:Gather Customer RequirementsActivity 1 - Requirements GenerationObjective: to capture customer requirements as the basis for proposing a concept (and subsequent design) that meets the requirements in a verifiable mannerRequirements are solicited from:Customers – primary customers are Project Managers and Proposal ManagersStakeholders – we have a long list (e.g., Legal, Property, Invoice Management, Engineering and SMA management…)Process Performers – buyers, negotiators, Contract Technical Managers (primary), othersEmploy a modified version of the JPL Resource Management System technique Products include preliminary requirements set & recommended “quick hits” (Lean Six Sigma Kaizen events and Just-Do-Its) for implementationEstablish JPL acquisition process definitionPhase APhase BPhase CPhase DPhase E
  • 17. Requirements collection & analysis toolsCustomer/stakeholder/process performer groups identifiedCollection sessions technique(s) mapped outSession pre-work conducted prior to each sessionCustomer Requirements Collection MethodIllustrativeSampling of requirement fieldsSource Name
  • 18. Source Type, e.g., Project Manager
  • 35. Customer VotingSummaryFollowing the Customer sessions, performed preliminary data analysis, identified the most commonly voiced/most impactful ideas, and prepared an electronic ballot for Customer voting.51% of customers who attended the Customer Sessions responded.Customers were asked to (1) make choices from a list of 40 items based on importance (Not Important at all, Fairly Important, Very Important) and (2) respond with the Top 5 items from the list by typing the number of his/her selections in an input box.GeneralEmail with link to ballot was sent to customers on the morning of Monday, May 17Eligible voters: 224How many have voted: 115Voting complete: May 25Sample
  • 36. Ballot AnalysisCustomer voting is one data point — but a very important one. The customer voting process proved to be an excellent communication/feedback mechanism for the customers: they felt they were heard. It also proved to be a useful educational vehicle for the Acquisition Division process performers who attended the sessions.Voting analysis focused on five “cuts” at the data:1. Those items receiving the largest number of “5” ratings Ten items received 35 or more votes in this range, which means that at least 30% of those who voted rated them the most important (despite some voters finding the item not applicable to them).2. Those items receiving the largest number of combined “4” and “5” ratings.Thirteen items received 50 or more votes in this range, which means at least 44% of those who voted rated them high (despite some voters finding the item not applicable).3. Those items receiving the largest number of “Top Five” designations.4. Those items specific to Commodities receiving high ratings.5. Those items specific to Subcontracts/Bypass receiving high ratings.
  • 37. Customer Ballot email sent 5/17/10
  • 38. Customer Voting: Part 1(115 responses)The following are the items rated a 5 on the scale ranging from 1: Not important at all to 5: Very important.The following are the items rated either 4 or 5 on the scale ranging from 1: Not important at all to 5: Very important.
  • 41. Objective: To identify key acquisition/procurement major process improvement areas that might not surface from the requirements collection sessions, but have been previously done by other Acquisition initiatives.MethodologyLiterature search, by Booz Allen Hamilton and by JPL, plus review of relevant Acquisition Div. activities.Reviewed the following Division activitiesDivision Strategic Plan — BAH compared project Preliminary Requirements to the Strategic PlanIdea Summits — BAH compared project Preliminary Requirements to the collected ideasR2C — JPL reviewed scope of potential Oracle Advanced Purchasing Suite implementation against the Project PlanKPIs — BAH compared project Preliminary Requirements to the proposed Key Performance IndicatorsBenchmarking resulted in some changes to the Preliminary Requirements (and ideas for Quick Hits and Phase A2/3 study)Preliminary (Coarse) Benchmarking
  • 42. Booz Allen Benchmarking Materials – JPL Analysis – P1* See Backup slides for references: “Appendix: Booz Allen Benchmarking References”
  • 43. Preliminary RequirementsObjective of preliminary requirements: to serve as the basis for conducting Phase A2/3 conceptual design and targeted benchmarking; also provides a resource to identify Quick Hits for management.MethodologyReviewed brainstorming ideas from customers, stakeholders, and process performersReviewed ballot resultsReviewed BAH & JPL benchmarking materialsTurned the most popular and/or most promising ideas into preliminary requirementsAdded a small number of constraints that the new process must comply withBAH tested the draft preliminary requirements set against the Division Strategic Plan (goals and actions) and against the Idea Summits brainstorming ideasResults were very good (not identical) alignment.
  • 44. Acquisition ReengineeringPreliminary Requirements P1Requirement 1. Programs, Projects, Tasks, and Proposals shall contact Acquisition at the beginning of their life cycle to formulate acquisition strategy and negotiate support commitments.Requirement 2. Acquisition transactions shall be planned to support project/task and one-year-money need dates. Planning shall include end user and supporting discipline rec-dels.Requirement 3. The process shall identify multiple acquisition strategy options for support effort subcontracts.Requirement 4. The process shall identify multiple acquisition strategy options for system contract subcontracts.Requirement 5. The process shall track purchase requisition entry through purchase order award and purchase order award through purchase order closure, while publishing the cycle time metrics for customers.Requirement 6. Purchase Requisition required steps and responsible parties shall be published for end users (requestors) and preparers.Requirement 7. Special Provisioners shall be established to acquire designated products and services for the end users in lieu of a Purchase Requisition transaction.Requirement 8. Procurement Control Points shall be established only where necessary and approved and shall process requests within a goal of 1 work day.Requirement 9. The process shall establish a method for identifying significant repetitive-buy commodities and options for quickly acquiring them.Requirement 10.iProcurement shall be enhanced by expansion of included commodities and improved user search capabilities.
  • 45. Quick Hits“Quick Hits” are process improvement ideas that meet the following criteria:They have clear value to customers (primarily), stakeholders, and process performersThey are properly sized to be implemented within 6 months or less (Kaizen-sized or smaller)They do not require any programming by Institutional ITThe necessary resources are available and fit within the Acquisition Division budget (or possible small augmentation)Their implementation is not expected to introduce impediments to the broader process reengineering effortAn improvement opportunity that requires more study, or otherwise does not meet the above criteria, would be included in the Phase A/B reengineering activity.Quick Hits may be implemented in several ways, e.g.:Just Do ItFacilitated focus groupAcquisition mini-teamKaizen eventThe list of recommended Quick Hits is a menu for management to choose from.  They can be implemented in any order.  Apart from Just Do it items, prudence dictates embarking on a maximum of 3 Quick Hits per quarter (to ensure adequate oversight and synergistic coordination with other activities as well as to put less strain on the budget).  
  • 46. Where Are We Now?Completed purchase requisition sub-process reengineering (11 “enablers” all operational)Completed Standard Subcontract Data Requirements (SDRL/DRDs) (official in command media)Received ATP for two Quick Hits Control points sub-process Communication normsInitiated planning for Advanced (Targeted) Benchmarking activity
  • 47. SummaryCompleted 44 requirements collection sessions with 391 persons, representing customers, stakeholders, and process performersConducted customer voting with a 51% response ratePerformed preliminary benchmarkingGenerated process Preliminary Requirements to guide new process conceptual designProvided recommended Quick Hits for management considerationRefined the plan for conceptual design phase— Additional information is available in IEEE paper, “Reengineering the Acquisition/Procurement Process: A Methodology for Requirements Collection” (available from the authors)