TECHNICAL INSTALLATION
TECHNICALINSTALLATION
Location
Chachoengsao, Th.
Duration
3 Days
Dimensions (m)
EvaporatorL23.6xW2.6xH2.8
DistillationL16xW1.4xH2.4
SeparatorL9.5xW2.6xH2.9
Pillar Fan L4.3xW3xH3.2
Weight
Evaporator 28 T
Distillation 4 T
Separator 6.5 T
Pillar Fan 8.5 T
Total Tonnage 47 T




SCOPE
CEA Project Logistics completed a potentially
difficult and technical installation for a well-known
drinks manufacturer in Chachoengsao, Thailand.
CEA provided Transportation, Lifting and the
Installation of several parts of distillation columns,
evaporators, separators and fans.
All parts were discharged through the night at Laem Chabang
Port and loaded on to several trailers. Due to its size and weight
the Evaporator Chamber was loaded on to a multi-axle hydraulic
trailer. The parts were transported and unloaded at the factory’s
lay down area. After a site inspection two mobile cranes were
moved into their positions.
The Evaporator Chamber was lifted by both cranes until the
chamber was vertical then the smaller crane was unhooked while
the larger 500 T crane continued the lift into the facility. CEA teams
ensured the safe lowering of the evaporator through the facility.
CASE STUDY		 CS016
Technical Installation 1/2
EVAPORATOR CHAMBER TRANSPORTATION DISTILLATION CHAMBER TRANSPORTATION
TECHNICALINSTALLATION
CEA PROJECT LOGISTICS
41/13 M1 AO-UDOM ROAD
TUNGSUNGKHLA
SRI RACHA
CHONBURI 20230
THAILAND
+66 38 354 019
www.ceaprojects.com
The 16 metre distillation chamber was installed using the same lift
technique as the Evaporator, CEA teams once again were located
on several floors ensuring a safe installation and aligning it to the
previously installed Evaporator. Smaller parts were unloaded and
assembled at the installation site and lifted into the facility. All
aspects of the project were completed in a timely and efficient
manner and within budget.
CASE STUDY		 CS016
Technical Installation 2/2
SEPARATOR LOWERED INTO POSITION
CHAMBER LOWERED THROUGH EACH FLOOR
SEPARATOR BEING READIED FOR LIFT
ALIGNING THE CHAMBER TO ITS BASE
THE W100 28 TONNE EVAPORATOR CHAMBER IS CAREFULLY LOWERED INTO THE FACILITY
CEA ON-SITE TOOLBOX TALK TWO CRANES LIFT THE EVAPORATOR
SMALLER PARTS LOWERED INTO POSITION BOTH MAIN CHAMBERS ALIGNED INSIDE

More Related Content

PDF
Basic cpp presentation(1)
PPTX
SLB Well Integrity final
PDF
Conveying_Systems
PDF
Alfred-Coronel (1) (1)
PDF
Ship unloading systems: Mechanical Vs Pneumatic?
PDF
Reverse Engineering for Pumps for Lift Irrigation
DOCX
4481 4485.output
PPTX
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Basic cpp presentation(1)
SLB Well Integrity final
Conveying_Systems
Alfred-Coronel (1) (1)
Ship unloading systems: Mechanical Vs Pneumatic?
Reverse Engineering for Pumps for Lift Irrigation
4481 4485.output
Various Mechanical Units Involved in The Bottling Of LPG cylinders

What's hot (20)

PPTX
drain pit(1)
PDF
Reverse rotaion of co2 compressor
PDF
Vacumme pump-rotary
PPTX
Safe bunkering practices
PPT
Power Plant Boiler feed pump
PPT
Pre commissioning steam turbines load trial
PDF
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
PDF
Fresh water generator maintenance
PPTX
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
PDF
KNPC Shuaiba Refinery Kuwait - Canada (2)
PPTX
Lpg Bottling Plant
DOCX
internship report by usama
PPTX
DOCX
Renovation
DOC
internship report final.DOC
PDF
Bayliss Capabilities
PPTX
Weiler E1250A Remixing Transfer Vehicle
PPT
Ig system & equipment oil tankers
PDF
Synchronising the 210MW unit to the 220KV grid
PPTX
Project Final
drain pit(1)
Reverse rotaion of co2 compressor
Vacumme pump-rotary
Safe bunkering practices
Power Plant Boiler feed pump
Pre commissioning steam turbines load trial
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Fresh water generator maintenance
HIGH PRESUURE LEACH PLANT PRESENTATION - W KAUZI
KNPC Shuaiba Refinery Kuwait - Canada (2)
Lpg Bottling Plant
internship report by usama
Renovation
internship report final.DOC
Bayliss Capabilities
Weiler E1250A Remixing Transfer Vehicle
Ig system & equipment oil tankers
Synchronising the 210MW unit to the 220KV grid
Project Final
Ad

Viewers also liked (14)

PDF
CEA SURELIFT Brochure 2015
PDF
The Dynamic Workspace: An Emaar story
PDF
Fleet & Equipment
PDF
Fuso Trucks - Fv54 prime mover_tsh55_a
PDF
ایمنی ریگری و علامت ده جرثقیل
PDF
Operating Conditions for Prime Mover & Trailers
PPT
02 3 prime-movers
PPT
Container Handling Equipments
PDF
India :Ports Sector Report_August 2013
PPT
Lifting Sling Safety
PDF
Wrs rigging practice
PPTX
Operating practices
PPTX
Port operations & management slideshow
PDF
Hacking the Creative Brain - Web Directions 2015
CEA SURELIFT Brochure 2015
The Dynamic Workspace: An Emaar story
Fleet & Equipment
Fuso Trucks - Fv54 prime mover_tsh55_a
ایمنی ریگری و علامت ده جرثقیل
Operating Conditions for Prime Mover & Trailers
02 3 prime-movers
Container Handling Equipments
India :Ports Sector Report_August 2013
Lifting Sling Safety
Wrs rigging practice
Operating practices
Port operations & management slideshow
Hacking the Creative Brain - Web Directions 2015
Ad

More from CEA Project Logistics (20)

PDF
Catamaran Transport & Export
PDF
Injection Mould Demob & Export
PDF
CEA & Fagioli Italy
PDF
Power Plant Demobilisation
PDF
Drill Rig Transportation
PDF
Bottle Blower Installation
PDF
CEA Project Logistics Brochure 2016
PDF
CEA Myanmar - Bottle Washer Relocation
PDF
Bottle Manufacturing Plant, Assembly & Installation
PDF
Drill Pipe Storage & Transportation
PDF
CEA Ao-Udom Facility
PDF
Steel Handling & Consolidation
PDF
CEA Project Logistics News Articles
PDF
Technical Lifting
PDF
Warehousing & Storage
PDF
Specialized Lifting
PDF
Break Bulk Consolidation
PDF
DAFF/AQIS Quarantine Project
PDF
CEA Project Logistics Myanmar
PDF
VpCI Cortec Preservation
Catamaran Transport & Export
Injection Mould Demob & Export
CEA & Fagioli Italy
Power Plant Demobilisation
Drill Rig Transportation
Bottle Blower Installation
CEA Project Logistics Brochure 2016
CEA Myanmar - Bottle Washer Relocation
Bottle Manufacturing Plant, Assembly & Installation
Drill Pipe Storage & Transportation
CEA Ao-Udom Facility
Steel Handling & Consolidation
CEA Project Logistics News Articles
Technical Lifting
Warehousing & Storage
Specialized Lifting
Break Bulk Consolidation
DAFF/AQIS Quarantine Project
CEA Project Logistics Myanmar
VpCI Cortec Preservation

Recently uploaded (20)

PDF
Introduction to Power System StabilityPS
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
Petroleum Refining & Petrochemicals.pptx
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
DOC
T Pandian CV Madurai pandi kokkaf illaya
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
Amdahl’s law is explained in the above power point presentations
PPTX
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
PDF
Java Basics-Introduction and program control
PDF
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PPTX
Feature types and data preprocessing steps
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
Principal presentation for NAAC (1).pptx
PDF
Applications of Equal_Area_Criterion.pdf
PDF
Soil Improvement Techniques Note - Rabbi
Introduction to Power System StabilityPS
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Petroleum Refining & Petrochemicals.pptx
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
T Pandian CV Madurai pandi kokkaf illaya
Exploratory_Data_Analysis_Fundamentals.pdf
Management Information system : MIS-e-Business Systems.pptx
Amdahl’s law is explained in the above power point presentations
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
Java Basics-Introduction and program control
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Feature types and data preprocessing steps
"Array and Linked List in Data Structures with Types, Operations, Implementat...
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
Principal presentation for NAAC (1).pptx
Applications of Equal_Area_Criterion.pdf
Soil Improvement Techniques Note - Rabbi

Technical Installation

  • 1. TECHNICAL INSTALLATION TECHNICALINSTALLATION Location Chachoengsao, Th. Duration 3 Days Dimensions (m) EvaporatorL23.6xW2.6xH2.8 DistillationL16xW1.4xH2.4 SeparatorL9.5xW2.6xH2.9 Pillar Fan L4.3xW3xH3.2 Weight Evaporator 28 T Distillation 4 T Separator 6.5 T Pillar Fan 8.5 T Total Tonnage 47 T SCOPE CEA Project Logistics completed a potentially difficult and technical installation for a well-known drinks manufacturer in Chachoengsao, Thailand. CEA provided Transportation, Lifting and the Installation of several parts of distillation columns, evaporators, separators and fans. All parts were discharged through the night at Laem Chabang Port and loaded on to several trailers. Due to its size and weight the Evaporator Chamber was loaded on to a multi-axle hydraulic trailer. The parts were transported and unloaded at the factory’s lay down area. After a site inspection two mobile cranes were moved into their positions. The Evaporator Chamber was lifted by both cranes until the chamber was vertical then the smaller crane was unhooked while the larger 500 T crane continued the lift into the facility. CEA teams ensured the safe lowering of the evaporator through the facility. CASE STUDY CS016 Technical Installation 1/2 EVAPORATOR CHAMBER TRANSPORTATION DISTILLATION CHAMBER TRANSPORTATION
  • 2. TECHNICALINSTALLATION CEA PROJECT LOGISTICS 41/13 M1 AO-UDOM ROAD TUNGSUNGKHLA SRI RACHA CHONBURI 20230 THAILAND +66 38 354 019 www.ceaprojects.com The 16 metre distillation chamber was installed using the same lift technique as the Evaporator, CEA teams once again were located on several floors ensuring a safe installation and aligning it to the previously installed Evaporator. Smaller parts were unloaded and assembled at the installation site and lifted into the facility. All aspects of the project were completed in a timely and efficient manner and within budget. CASE STUDY CS016 Technical Installation 2/2 SEPARATOR LOWERED INTO POSITION CHAMBER LOWERED THROUGH EACH FLOOR SEPARATOR BEING READIED FOR LIFT ALIGNING THE CHAMBER TO ITS BASE THE W100 28 TONNE EVAPORATOR CHAMBER IS CAREFULLY LOWERED INTO THE FACILITY CEA ON-SITE TOOLBOX TALK TWO CRANES LIFT THE EVAPORATOR SMALLER PARTS LOWERED INTO POSITION BOTH MAIN CHAMBERS ALIGNED INSIDE