Project Name
Steering Committee Meeting
Project Manager: Project Manager Name
Program Manager: Program Manager Name
Project Sponsor: Project Sponsor Name
General Guidelines:
•Keep words to a minimum - more detail
can be added verbally
•Highlight changes from the last
presentation where appropriate.
•Stick to recommended format where
possible.
•Delete red instruction boxes when
complete.
•More detailed instructions are in the
Speaker Notes. Click on View / Notes Page
to view. You can print the ‘Notes View’ by
selecting File/Print, then select ‘Notes
Page’ in the ‘Print What’ drop down.
(To view template instructions – Save this
template to project files, reopen and then
select View, Notes Page. Delete this note prior
to publishing)
Executive Summary
Description
Schedule
Cost
Risks
Total Project Budget
Actual Cost to Date
Est. at Completion
Variance at Completion
Est. at Completion is the Actual Cost to
date plus the estimated remaining cost for
the work scheduled.
Cost Variance is the ‘Project Budget’
minus the ‘Estimate at completion’
Current Phase: Requirements
Project Status: Green
Project End Date: mm/dd/ccyy
Accomplishments



Business
Risk 1
Risk 2
Technology
Risk 1
Risk 2
High level business objective
List the major risks to the project.
High level accomplishments so far
To change status colors, highlight box and select
Format/Borders.
For ‘Current Phase’ update, please
use standard PM phases (Opp
Assessment, Initiating, Planning,
Executing & Controlling, Closing)
or Lifecycle Phases (e.g Software
Development Lifecycle)
Business Need
Project Background
Proposed Solution
Business Benefits
• Benefit 1.
• Benefit 2.
(Example)
Project Costs
Cost
Labor $xxx,xxx
Hardware $xxx,xxx
Software $xxx,xxx
Outside Services $xxx,xxx
Total $xxx,xxx
(Example)
Project ROI
Project Organization
Steering
Committee
Sponsor
Program Manager Project Manager
Business Team
IT Mgmt
CIS
Warehouse Infrastructure
Financial Purchasing
TSS CSS
Data Mgmt
Documentation
Other
Other
Database Apps
Please keep same general format.
Adjust boxes as necessary. Delete
unneeded boxes.
Project Schedule & Approach
ID
1
2
3
4
5
6
8
9
1
0
1
1
Task Name
Concept
Requirements
Design
Development
Testing
Documentation & Training
Deployment
Task 9
Task 10
Task 11
Start Date
0
1
/
0
1
/
2
0
0
1
0
2
/
1
5
/
2
0
0
1
0
2
/
1
5
/
2
0
0
1
0
5
/
0
1
/
2
0
0
1
0
6
/
0
1
/
2
0
0
1
0
6
/
1
5
/
2
0
0
1
1
1
/
0
6
/
2
0
0
1
0
1
/
0
1
/
2
0
0
1
0
1
/
0
1
/
2
0
0
1
0
1
/
0
1
/
2
0
0
1
End Date
0
3
/
0
2
/
2
0
0
1
0
4
/
3
0
/
2
0
0
1
0
4
/
3
0
/
2
0
0
1
0
6
/
2
9
/
2
0
0
1
0
8
/
3
0
/
2
0
0
1
1
0
/
3
0
/
2
0
0
1
0
1
/
2
2
/
2
0
0
2
0
3
/
0
1
/
2
0
0
1
0
3
/
0
1
/
2
0
0
1
0
3
/
0
1
/
2
0
0
1
4
5
d
5
3
d
5
3
d
4
4
d
6
5
d
9
8
d
5
6
d
4
4
d
4
4
d
4
4
d
Qtr 1 Qtr 2 Qtr 3 Qtr 4
2001
Duration
Status
R
e
d
Y
e
l
l
o
w
G
r
e
e
n
7
Post Deployment
1
0
/
3
1
/
2
0
0
1
1
1
/
1
5
/
2
0
0
1
1
2
d
Double click the Visio Gantt chart to
make changes. Please try to keep
standard phases. List special milestones
or variations as appropriate per project.
Example - Other phases may be used depending on project
Communications Management Plan
Monthly
Aug. Sept. Oct. Nov. Dec. Jan. ‘02 Feb. April May
March June
SVP Update: 1:1
Exec. Staff Mtgs Monthly
Every 6 weeks
Extended Staff Mtgs
Progress Updates
All-Hands Qtrly Qtrly Qtrly
Learning
Formal training for roll-outs
Mentoring as needed
All
All
As Needed
Sr. Mgmt Staff Mtgs
Information Sharing
Qtrly
Open House Sessions Qtrly Qtrly
“Hot Sheets” Bi-Mthly Bi-Mthly Bi-Mthly Bi-Mthly Bi-Mthly
E-mails As Needed
Website Update As Needed
Posters As Needed
(Example)
Key Risks and Issues
Risk
(Example)
Too much change to
department at one time
Confusion due to
multiple initiatives
Competition for
resources with other
projects
Change readiness assessment
and structured
communication plan
Mitigation
Structured communication
plan across program
Centralized management,
dedicated resources, realistic
timeframes
Other (Example)
Cost to Utilize Consultant for Project Management
4 consultants, 6 months => $XXX,000
Benefit
Project will be done in 6 months instead of 12 months
Steering Committee Members
• Name
• Name
• Name
• Name
• Name
• Name
• Name
(Example)
Expectations of Steering Committee
• Participate in all Steering Committee meetings
• Take ownership of issues and resolve by assigned date
• Commit resources in department as needed
• Commit 2 - 4 hour per month
• Assign one owner department to handle all changes
(Example)
Key Decisions to Be Made (Example)
Decision Owner Due Date Impact
Third party
package or custom
implementation
Joe Smith October, 2001 Overall project
schedule will be
impacted if not
decided by end of
October
# of Sales
personnel that will
need to be trained
Jane Smith December 12,
2001
Overall project
schedule will be
impacted if not
finalized by 12/12
# of PC upgrades
needed to support
software
Joe Smith October, 2001 Overall budget
will be impacted if
number exceeds 20
PCs
Next Steps
• Revise budget based on decisions
• Finalize make vs. buy decision
• Create detailed change enablement plan
(Example)

More Related Content

DOCX
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
PPTX
Project management (A Basic Approach)
DOCX
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PPSX
Information Technology Project Management
PPTX
Project Management Framework
PPT
Project Preparation and Management
PPT
PMO Proposal For Global Sales Operations
PPT
Introduction To Project Management
BSBPMG522A Undertake project workProject Planning TemplatesBSBP.docx
Project management (A Basic Approach)
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
Information Technology Project Management
Project Management Framework
Project Preparation and Management
PMO Proposal For Global Sales Operations
Introduction To Project Management

Similar to temp_steeringcommitte meeting template as reference (20)

DOCX
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
PDF
Post mortem report
PDF
CSRA Havranek Hostetter Palisade 2012
PPTX
Project Management Toolkit - Presentation
PDF
The simplified project management process it-toolkits
DOCX
Manage a successfull business project assignment
PPT
IntroductiontoProjectManagement.ppt
PPT
Backup jim cassidy
PPTX
Business scorecard multiple workstreams - Travis Barker, MPA GCPM (2018)
PDF
Project plan preparation guidelines
PPT
The Effective Management of Time
PDF
Project Deliverables PowerPoint Presentation Slides
PDF
Project Gain PowerPoint Presentation Slides
DOCX
ITP-6 - Consolidated Project Management Plan(PMBOK 2, 3.5-3.7, 9).docx
PPT
Cassidy.jim
PDF
Scope Management Powerpoint Presentation Slides
DOCX
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
PDF
Project management part 3
PPT
Mmi entrepreneurship 6
PPTX
Project Mangement
PLANNING THE INTERNATIONAL PROJECT IN TERMS OF TIME, COS.docx
Post mortem report
CSRA Havranek Hostetter Palisade 2012
Project Management Toolkit - Presentation
The simplified project management process it-toolkits
Manage a successfull business project assignment
IntroductiontoProjectManagement.ppt
Backup jim cassidy
Business scorecard multiple workstreams - Travis Barker, MPA GCPM (2018)
Project plan preparation guidelines
The Effective Management of Time
Project Deliverables PowerPoint Presentation Slides
Project Gain PowerPoint Presentation Slides
ITP-6 - Consolidated Project Management Plan(PMBOK 2, 3.5-3.7, 9).docx
Cassidy.jim
Scope Management Powerpoint Presentation Slides
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Project management part 3
Mmi entrepreneurship 6
Project Mangement
Ad

More from Sandeep720217 (20)

PPTX
645216350-IC-Project-Closure-Presentation-11064-PowerPoint-pptx.pptx
PPTX
355150291-WM-PPT_overview of SAP WM Process.pptx
PPT
Philosophical understanding on ryan buddism.ppt
PPT
IT Project Scoping Workshop Kickoff Template.ppt
PPTX
72698-Roadmap PowerPoint Template for projects
PPT
392127341-Steering-Committee-Presentation-Template-PPT.ppt
PPTX
reporting-project-status-to-regents.pptx
PPTX
ERP Projects fit gap analysis report- important
PPTX
412533622-1-Client-Workshops-for-SAP-Projects.pptx
PPTX
IC-Weekly-Project-Status-Report-Slideshow-11416_PowerPoint.pptx
PPTX
Summary-Report-on-a-page-template for better reporting
PPTX
IC-Project-Management-Status-Report-Powerpoint-11839_Powerpoint.pptx
PDF
295245101-SAP-CRM-Overview-Presentation.pdf
PPT
draft-esb-networks-sap-upgrade-presentation-v1-0.ppt
PPT
PMO-Presentation-Color-Final for education purpose
PPT
275286547-Handling-Unit-Managment-SAP.ppt
PPT
The Value of Project Management - Februaury
PPT
Create An Effective Resume PowerPoint.ppt
PPT
04 project schedules on how to manage schedule
PPT
Lecture 12 - Agile Processes-Scrum 2024.ppt
645216350-IC-Project-Closure-Presentation-11064-PowerPoint-pptx.pptx
355150291-WM-PPT_overview of SAP WM Process.pptx
Philosophical understanding on ryan buddism.ppt
IT Project Scoping Workshop Kickoff Template.ppt
72698-Roadmap PowerPoint Template for projects
392127341-Steering-Committee-Presentation-Template-PPT.ppt
reporting-project-status-to-regents.pptx
ERP Projects fit gap analysis report- important
412533622-1-Client-Workshops-for-SAP-Projects.pptx
IC-Weekly-Project-Status-Report-Slideshow-11416_PowerPoint.pptx
Summary-Report-on-a-page-template for better reporting
IC-Project-Management-Status-Report-Powerpoint-11839_Powerpoint.pptx
295245101-SAP-CRM-Overview-Presentation.pdf
draft-esb-networks-sap-upgrade-presentation-v1-0.ppt
PMO-Presentation-Color-Final for education purpose
275286547-Handling-Unit-Managment-SAP.ppt
The Value of Project Management - Februaury
Create An Effective Resume PowerPoint.ppt
04 project schedules on how to manage schedule
Lecture 12 - Agile Processes-Scrum 2024.ppt
Ad

Recently uploaded (20)

PDF
Insiders guide to clinical Medicine.pdf
PDF
O7-L3 Supply Chain Operations - ICLT Program
PPTX
Week 4 Term 3 Study Techniques revisited.pptx
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
01-Introduction-to-Information-Management.pdf
PPTX
Cell Types and Its function , kingdom of life
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
Business Ethics Teaching Materials for college
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
master seminar digital applications in india
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
Classroom Observation Tools for Teachers
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PPTX
Cell Structure & Organelles in detailed.
PDF
VCE English Exam - Section C Student Revision Booklet
Insiders guide to clinical Medicine.pdf
O7-L3 Supply Chain Operations - ICLT Program
Week 4 Term 3 Study Techniques revisited.pptx
102 student loan defaulters named and shamed – Is someone you know on the list?
01-Introduction-to-Information-Management.pdf
Cell Types and Its function , kingdom of life
STATICS OF THE RIGID BODIES Hibbelers.pdf
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Business Ethics Teaching Materials for college
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Anesthesia in Laparoscopic Surgery in India
master seminar digital applications in india
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Classroom Observation Tools for Teachers
PPH.pptx obstetrics and gynecology in nursing
2.FourierTransform-ShortQuestionswithAnswers.pdf
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Cell Structure & Organelles in detailed.
VCE English Exam - Section C Student Revision Booklet

temp_steeringcommitte meeting template as reference

  • 1. Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name General Guidelines: •Keep words to a minimum - more detail can be added verbally •Highlight changes from the last presentation where appropriate. •Stick to recommended format where possible. •Delete red instruction boxes when complete. •More detailed instructions are in the Speaker Notes. Click on View / Notes Page to view. You can print the ‘Notes View’ by selecting File/Print, then select ‘Notes Page’ in the ‘Print What’ drop down. (To view template instructions – Save this template to project files, reopen and then select View, Notes Page. Delete this note prior to publishing)
  • 2. Executive Summary Description Schedule Cost Risks Total Project Budget Actual Cost to Date Est. at Completion Variance at Completion Est. at Completion is the Actual Cost to date plus the estimated remaining cost for the work scheduled. Cost Variance is the ‘Project Budget’ minus the ‘Estimate at completion’ Current Phase: Requirements Project Status: Green Project End Date: mm/dd/ccyy Accomplishments    Business Risk 1 Risk 2 Technology Risk 1 Risk 2 High level business objective List the major risks to the project. High level accomplishments so far To change status colors, highlight box and select Format/Borders. For ‘Current Phase’ update, please use standard PM phases (Opp Assessment, Initiating, Planning, Executing & Controlling, Closing) or Lifecycle Phases (e.g Software Development Lifecycle)
  • 6. Business Benefits • Benefit 1. • Benefit 2. (Example)
  • 7. Project Costs Cost Labor $xxx,xxx Hardware $xxx,xxx Software $xxx,xxx Outside Services $xxx,xxx Total $xxx,xxx (Example)
  • 9. Project Organization Steering Committee Sponsor Program Manager Project Manager Business Team IT Mgmt CIS Warehouse Infrastructure Financial Purchasing TSS CSS Data Mgmt Documentation Other Other Database Apps Please keep same general format. Adjust boxes as necessary. Delete unneeded boxes.
  • 10. Project Schedule & Approach ID 1 2 3 4 5 6 8 9 1 0 1 1 Task Name Concept Requirements Design Development Testing Documentation & Training Deployment Task 9 Task 10 Task 11 Start Date 0 1 / 0 1 / 2 0 0 1 0 2 / 1 5 / 2 0 0 1 0 2 / 1 5 / 2 0 0 1 0 5 / 0 1 / 2 0 0 1 0 6 / 0 1 / 2 0 0 1 0 6 / 1 5 / 2 0 0 1 1 1 / 0 6 / 2 0 0 1 0 1 / 0 1 / 2 0 0 1 0 1 / 0 1 / 2 0 0 1 0 1 / 0 1 / 2 0 0 1 End Date 0 3 / 0 2 / 2 0 0 1 0 4 / 3 0 / 2 0 0 1 0 4 / 3 0 / 2 0 0 1 0 6 / 2 9 / 2 0 0 1 0 8 / 3 0 / 2 0 0 1 1 0 / 3 0 / 2 0 0 1 0 1 / 2 2 / 2 0 0 2 0 3 / 0 1 / 2 0 0 1 0 3 / 0 1 / 2 0 0 1 0 3 / 0 1 / 2 0 0 1 4 5 d 5 3 d 5 3 d 4 4 d 6 5 d 9 8 d 5 6 d 4 4 d 4 4 d 4 4 d Qtr 1 Qtr 2 Qtr 3 Qtr 4 2001 Duration Status R e d Y e l l o w G r e e n 7 Post Deployment 1 0 / 3 1 / 2 0 0 1 1 1 / 1 5 / 2 0 0 1 1 2 d Double click the Visio Gantt chart to make changes. Please try to keep standard phases. List special milestones or variations as appropriate per project. Example - Other phases may be used depending on project
  • 11. Communications Management Plan Monthly Aug. Sept. Oct. Nov. Dec. Jan. ‘02 Feb. April May March June SVP Update: 1:1 Exec. Staff Mtgs Monthly Every 6 weeks Extended Staff Mtgs Progress Updates All-Hands Qtrly Qtrly Qtrly Learning Formal training for roll-outs Mentoring as needed All All As Needed Sr. Mgmt Staff Mtgs Information Sharing Qtrly Open House Sessions Qtrly Qtrly “Hot Sheets” Bi-Mthly Bi-Mthly Bi-Mthly Bi-Mthly Bi-Mthly E-mails As Needed Website Update As Needed Posters As Needed (Example)
  • 12. Key Risks and Issues Risk (Example) Too much change to department at one time Confusion due to multiple initiatives Competition for resources with other projects Change readiness assessment and structured communication plan Mitigation Structured communication plan across program Centralized management, dedicated resources, realistic timeframes
  • 13. Other (Example) Cost to Utilize Consultant for Project Management 4 consultants, 6 months => $XXX,000 Benefit Project will be done in 6 months instead of 12 months
  • 14. Steering Committee Members • Name • Name • Name • Name • Name • Name • Name (Example)
  • 15. Expectations of Steering Committee • Participate in all Steering Committee meetings • Take ownership of issues and resolve by assigned date • Commit resources in department as needed • Commit 2 - 4 hour per month • Assign one owner department to handle all changes (Example)
  • 16. Key Decisions to Be Made (Example) Decision Owner Due Date Impact Third party package or custom implementation Joe Smith October, 2001 Overall project schedule will be impacted if not decided by end of October # of Sales personnel that will need to be trained Jane Smith December 12, 2001 Overall project schedule will be impacted if not finalized by 12/12 # of PC upgrades needed to support software Joe Smith October, 2001 Overall budget will be impacted if number exceeds 20 PCs
  • 17. Next Steps • Revise budget based on decisions • Finalize make vs. buy decision • Create detailed change enablement plan (Example)

Editor's Notes

  • #1: General Guidelines: General Guidelines: Keep words to a minimum - more detail can be added verbally Highlight changes from the last presentation where appropriate. Stick to recommended format where possible. Delete red instruction boxes when complete. Instructions are also in the Speaker Notes. Click on View / Notes Page to view. You can print the ‘Notes View’ by selecting File/Print, then select ‘Notes Page’ in the ‘Print What’ drop down. Highlight changes from the last presentation where appropriate. Stick to recommended format where possible.
  • #2:  This slide is meant to be a high level summary.  Use Font size 16 or greater.  For current phase, either use the standard project management phases (Opportunity Assessment, Initiating, Planning, Executing & Controlling, Closing) or use specific project lifecycle (e.g. Software Development Lifecycle).  Est. at Completion is the ‘Actual Cost to date’ plus the ‘estimated remaining cost for the work scheduled.’.  Cost Variance is the ‘Project Budget’ minus the ‘Estimate at Completion’  List the high level accomplishments to date.  List the major risks to the project that are labeled High or Medium. Focus on new or significant ongoing risks.
  • #3: Should reflect information that is documented in the Request Summary section of the Project Initiation Document
  • #4: Should reflect information documented in the Project Charter
  • #5: Should reflect information documented in the Project Charter
  • #6: Should summarize information documented in the Business Case documents If the Business Case is not yet complete, use the High Level Benefits documented in the Project Request section of the Project Initiative Document
  • #7: Should summarize information documented in the Business Case or the Project Budget, as appropriate Show funding sources, as appropriate Show break down of costs as appropriate - e.g. hardware, software, outside services, internal labor, travel, etc. Should reflect costs known at this point in project. If total project funding has not yet been approved, should show funding for next phase and/or order of magnitude of cost, if known
  • #8: This should summarize the Business Benefits slide and the Project Cost slide and show the net return on investment. This number should match what is shown in the Business Case. If the benefits and costs are fairly straightforward, the Benefits, Cost and ROI slide can be combined into one slide. If the ROI has not yet been determined at this point in the project, omit this slide. Be sure to include it in a later Steering Committee meeting.
  • #9: Please attempt to keep the same general format as above to ensure consistency across presentations. If there are boxes listed above which do not fit your specific project, delete the box. If there are boxes which are not listed, please add to this diagram. If the structure of your project is not represented with this diagram, you may change accordingly.
  • #10: As a general rule, use Standard Schedule with the standard approach. While the current standard schedule template shows the approach within it, if there is a significant deviation from the approach that is deemed necessary, you may want to have an additional slide which outlines that approach.
  • #11: Summarize the information in the Communications Matrix in display similar to the one shown above.
  • #12: List only significant risks and issues that will likely impact the overall budget, schedule or quality of the product. As a general rule, show the top 3 - 5. If a resolutions or mitigation plan exists, show that.
  • #13: Rename this slide to the appropriate topic. This slide(s) should include any other information which is pertinent to the project. Examples are: Consultant involvement Third party software Phase approach to project Outside events driving dates
  • #14: List the Steering Committee members
  • #15: List expectations of steering committee. This could include: Level of involvement on decision making Number of hours per week or month Resource expectations from their areas Amount of ownership for all involved parties
  • #16: This slide could be combined with the Key Risks and Issues slide if appropriate. This slide should clearly list the decision to be made, who needs to make the decision, the impact to the project and the date the decision is required.
  • #17: List next steps until the next Steering Committee meeting.