The hidden costs of
      Visio, Word & Excel
-better requirements at a lower cost



           Ben Clohesy

      Future State Consulting
Agenda
       • Requirements definition is still difficult

       • The traditional approach

       • The model-driven approach

       • Beyond use cases - the strategic BA




Holocentric
                                                      2
July 2010
REQUIREMENTS
              DEFINITION

Holocentric
                             3
July 2010
System delivery success
                                             % Project failure
                     100

                     90

                     80

                     70

                     60                                                      Robins-Gioia 2001

                     50                                                      Meta Group 2001

                     40
                                                                             Deborah Weiss - Meta
                     30                                                      Group 2003
                                                                             Standish 2010
                     20

                     10

                       0
                           Robins-Gioia Meta Group  Deborah       Standish
                              2001         2001    Weiss - Meta     2010
                                                   Group 2003

      •       Implementation costs were found to average 25% over budget, 40% of the
              projects failed to achieve their business case within one year of going live
              (Conference Board Survey 2001)
Holocentric
                                                                                                    4
July 2010
Specs to save CIO necks
                                 Karen Dearne
                                 NOVEMBER 14, 2006


       “With two out of every three projects failing to
       produce any discernible benefits whatsoever, it's
       only a matter of time before boards are forced to be
       more accountable for their inability to apply
       strategies and the massive waste, estimated at up
       to one-third of total capital expenditure.

       “Based on overseas estimates, the cost of
       terminated projects in Australia in 2002-03 was
       $1.4 billion, while another $3.2 billion was spend on
       projects that delivered no benefits.“

      I.T. Matters – at least until everyone can get this right!


Holocentric
                                                                   5
July 2010
Why do projects fail so often?
     • Poor communication among customers, developers, and users
     • Unrealistic or unarticulated project goals
                   95% of the time it's a project management
     • Badly defined system requirements projects set
                   issue. The managers of these
                                       Not engineering
     • Inaccurate out the requirements at the beginning of a
                    estimates of needed resources
                   project and Not requirements (IDC, 2004)
                               they get it wrong management
     • Poor project and risk management
                   …the market places It‟s all about
                                         a disproportionate
     • Stakeholder politics definition and co-ordination!
                   emphasis on tools for requirements
     • Commercial pressures The real opportunity lies in
                   management.
                   requirements definition… (Forrester, 2006)
     • Use of immature technology
     • Sloppy development practices
     • Inability to handle the project's complexity

                                          IEEE Spectrum, September, 2005
Holocentric
                                                                           6
July 2010
THE TRADITIONAL
              APPROACH

Holocentric
                                7
July 2010
All the usual suspects...


                           Visio Process   Process
       Business Case         Diagrams      Metrics         Requirements




      Vendor Information     Policy and    User Training   Requirements
       e.g. Use Cases        Procedures     Materials            &
                                                           Specifications



Holocentric
                                                                            8
July 2010
THE MODEL-DRIVEN
              APPROACH

Holocentric
                                 9
July 2010
Process Modeling is the key
       • Roles emphasise a „People view‟ of
         process.

       • Personal level of responsibility for
         work unit output

       • Key link in chain of requirements
         responsibility




Holocentric
                                                10
July 2010
The difference ...

       • Engage business representatives – better quality
         requirements

       • Greater functionality to verify the integrity of your
         requirements

       • Model as single repository used to derive all the
         information you need – no more documentation
         nightmares

       • Impact analysis to manage change


Holocentric
                                                             11
July 2010
Project Model


                                                                                               Project
                                                                                                Model




              Business Outcomes       Capabilities       Business Constraints        Risks               Assumptions          Metrics        Measures           External Document
                                                                                                                                                                   References




              Business Process Model


                                                                                        Business Process
                                                                                              Model




                                                                   Business Process Diagrams                     Process Roles                  Process Steps
                           Business Process Area Diagrams




              System Requirements Model

                                                                                       System Requirements
                                                                                              Model

                                  Build


                                     Buy



                                          System Features        Functional Requirements                         Non Functional         Rules Register
                                                                                                                 Requirements




                                            System Use                 Information                               User Interface         System Process
                                            Case Model                    Model                                     Model                  Diagrams


Holocentric
                                                                                                                                                                                    12
July 2010
Holocentric
              13
July 2010
Case Study

       • Traditional vs. model-based approach

       • The consulting firm:
              • Cost: $2.5 million

              • 6000 requirements in excel, word

       • Model-based team:
              • Cost: $0.55M

              • Of the 6000, 1500 were invalid, unnecessary or
                duplicated

              • 450 were missing
Holocentric
                                                                 14
July 2010
*
                                                           Accelerator Item                                                  Linkable
                                                              {abstract}             Subject Of                             {abstract}
                                                                                 *




                                                                               «Project Model»                            «Project Model»           «Project Model»
                                                                                 Assumption                                     Risk          External Document Reference




              Business Case Inputs
                                                                                                                       «Project Model»
                                                                                                                      Business Outcome


                                                                                                                                         *

                                                           Constrainable                                                     Gaugable
                                                            {abstract}                                                      {abstract}
                                                                                                                                                      Requires
                                                              *                                                               *
                                                         Constrained By                                                    Gauged By                                         *
                                                                   *                                                               *

                                                          «Project Model»                                                 «Project Model»         *                          «Project Model»
                                                                                                                                                      Refined By
                                                        Business Constraint                                                   Metric                                            Capability

                                                                                                                              *               *                                  *
                                                                                                                          Operates On                                                      *
                                                                                                                                   *
                           «Project Model»
                        Project Scope Diagram                                                                             «Project Model»                              Utilizes                Comprises
                                                                                                                             Measure


                                                                                                                              *                                                                                *
                                                                                                                                                                         *
              Business Requirements Modeling
                                                                                                                                                          Capability Utilizer                        Capability Element
                                                                                                                          Measured By                        {abstract}                                 {abstract}

                      «Business Process Model»
                    Business Process Area Diagram
                                                                                                                                   *
                                                              «Business Process Model»                                                                                               Competency
                                                                    Process Role                      «Business Process Model»                                                        {abstract}
                                                                                                            Process Step

                     «Business Process Model»                                                 *                               *
                                                                                                      *
                     Business Process Diagram                                                                               Requires
                                                                                                                                   *
                                                                                                                                                                                                                    Capacity
                                                                                                                                                                   *                                               {abstract}
                                                                                                              «System Requirement»                                           «System Requirement»
                                                                                                                                                          Enabled By
                                                                                                              Functional Requirement                                            System Feature
                                                                                                                                                          *

                                                                                                                              *                       *
                                                                                                                                                              Characterized By
                                                                                                                                                                                       *
                                                           Elaborated By             Realizes
                                                                                                                                                                                                     «System Requirement»
                         «Project Model»                                                                                                                                                           Non Functional Requirement
                     Capability Usage Diagram                                                                              Implements




              System Requirements Modeling                                                                                         *
                                                                  «System Model»                                      *
                                                    *
                                                                   System Actor
                          «System Model»                                                                              «System Model»                                   Rule Subject
                     System Use Case Diagram                                                      *                   System Use Case                                   {abstract}
                                                                                                                                                                                                   Governed By
                                                         Elaborated By                                                                                                                         *           *
                       Supplementary
                      System Diagram          *                                                                                                                                                                     «Rule»
                                                                           Screen Flow Node                   *
                         {abstract}                                                                                        Proceeds To                                                                             Rule Set
                                                                              {abstract}

                                                                                                          *                                                                                                        1..*
                                                                                                                                                  Information
                         «System Model»                                                                                                            {abstract}                                                      Groups
                                                                                                                                                                                                                          *
                     System Process Diagram
                                                         «User Interface Model»
                                                            Dialog Message                                                                                                                                         «Rule»
                                                                                                                                                                                                                    Rule
                     «User Interface Model»
                      Screen Flow Diagram                                   «User Interface Model»
                                                                                    Screen                                             «Information Model»
                                                                                                                                         Information Field




                                                                                                                                                                                                                                15
                           «Information Model»                                                                                                                           «Information Model»
                      Information Structure Diagram                                                                                                                         Information Set

Holocentric
July 2010
DEMONSTRATION


Holocentric
                              16
July 2010
RACI Matrix




Holocentric
                     17
July 2010
Impact Analysis - Requirements




Holocentric
                                        18
July 2010
Impact Analysis - Measures




Holocentric
                                    19
July 2010
Drawing versus Modeling




       •      Isolated „flat‟ drawings – difficult to maintain model integrity

       •      Difficult to analyze across the full spectrum of a business

       •      Little re-usable content

       •
Holocentric   Challenging to maintain on an ongoing basis                        20
July 2010
Holocentric
July 2010
Joining the dots
          Policy                                                               System
         Positions                                                           Requirements
                                            Business Processes

        The ‘Why’                                                              The ‘How’



                                                          Business processes also provide
                                                           a meaningful context to define
                                                           accurate system requirements

                 Business Processes
              implement the policy intent


                                                                                  Functional
                                                                                 Specification
                                    The ‘Who’, ‘When’ and ‘Where’                           22
Holocentric
July 2010
BEYOND USE CASES
              - A MORE STRATEGIC ROLE FOR BA’S

Holocentric
                                                 23
July 2010
From process mapping




              Generally used to “map” the “AS-IS” and/or “TO-BE” process in a
Holocentric
                                                                                   24
July 2010     more visual way. Thought be easier to communicate to the workforce
To modelling
                            What is the process to be followed?
                           Model the Process
                            - Using Role Based Notation
                                              How will it impact my role?
                            - Identify Enabling and Supporting Systems
                            - Highlight manual Tasks
                                            What manual tasks and
                                            other systems will we need
                                            to use?

                                          - Link it do what we need it to
                                            Will to Business
                                          Requirements
                                            do?
              -Does everyone have
                Create and Link                  - Link to External Documents
                                                   What official documentation
              System Roles
               the same access?                    do I need to know about?
- Will it still ensure we
  Create and Link                              - Create and Link the system?
                                                 How do we use Use Cases
Regulations regulations?
  adhere to the

              -What happens when the
                Rate the process for        - How doTraining Material
                                              Create we train users on
               system doesn’t work?
              Business Continuity           within thesystem?
                                              the new Model
Holocentric
                                                                                 25
July 2010
To training




Holocentric
                     26
July 2010
To regulations
                                  Process

                            Policies & Procedures

              Regulations   Business Requirements

                                 Use Cases




Holocentric
                                               27
July 2010
Tangible Benefits
       •      Requirements refinement and validation
               •   At very little cost

       •      Creation of framework to generate Material for Training
               •   At very little cost

       •      Creation of framework to generate Material for Change Programs
               •   At very little cost

       •      Processes and Documents reflect Regulations
               •   At very little cost and with high integrity

       •      Creation and capture of Use Cases
               •   Applications Vendor provide “software steps”

               •   Manage Applications functionality

       •      Synchronisation of all key Project work

       Furthermore, model-based information is maintainable
Holocentric
                                                                               28
July 2010
*
                                                                Accelerator Item                                                  Linkable
                                                                   {abstract}             Subject Of                             {abstract}
                                                                                      *




    A meta model                                                                    «Project Model»
                                                                                      Assumption
                                                                                                                               «Project Model»
                                                                                                                                     Risk
                                                                                                                                                         «Project Model»
                                                                                                                                                   External Document Reference




                   Business Case Inputs
                                                                                                                            «Project Model»
                                                                                                                           Business Outcome


                                                                                                                                              *

                                                                Constrainable                                                     Gaugable
                                                                 {abstract}                                                      {abstract}
                                                                                                                                                           Requires
                                                                   *                                                               *
                                                              Constrained By                                                    Gauged By                                         *
                                                                        *                                                               *

                                                               «Project Model»                                                 «Project Model»         *                          «Project Model»
                                                                                                                                                           Refined By
                                                             Business Constraint                                                   Metric                                            Capability

                                                                                                                                   *               *                                  *
                                                                                                                               Operates On                                                      *
                                                                                                                                        *
                                «Project Model»
                             Project Scope Diagram                                                                             «Project Model»                              Utilizes                Comprises
                                                                                                                                  Measure


                                                                                                                                   *                                                                                *
                                                                                                                                                                              *
                   Business Requirements Modeling
                                                                                                                                                               Capability Utilizer                        Capability Element
                                                                                                                               Measured By                        {abstract}                                 {abstract}

                           «Business Process Model»
                         Business Process Area Diagram
                                                                                                                                        *
                                                                   «Business Process Model»                                                                                               Competency
                                                                         Process Role                      «Business Process Model»                                                        {abstract}
                                                                                                                 Process Step

                          «Business Process Model»                                                 *                               *
                                                                                                           *
                          Business Process Diagram                                                                               Requires
                                                                                                                                        *
                                                                                                                                                                                                                         Capacity
                                                                                                                                                                        *                                               {abstract}
                                                                                                                   «System Requirement»                                           «System Requirement»
                                                                                                                                                               Enabled By
                                                                                                                   Functional Requirement                                            System Feature
                                                                                                                                                               *

                                                                                                                                   *                       *
                                                                                                                                                                   Characterized By
                                                                                                                                                                                            *
                                                                Elaborated By             Realizes
                                                                                                                                                                                                          «System Requirement»
                              «Project Model»                                                                                                                                                           Non Functional Requirement
                          Capability Usage Diagram                                                                              Implements




                   System Requirements Modeling                                                                                         *
                                                                       «System Model»                                      *
                                                         *
                                                                        System Actor
                               «System Model»                                                                              «System Model»                                   Rule Subject
                          System Use Case Diagram                                                      *                   System Use Case                                   {abstract}
                                                                                                                                                                                                        Governed By
                                                              Elaborated By

                                                                                                                                                                                                                                     ...everyone
                                                                                                                                                                                                    *           *
                            Supplementary
                           System Diagram          *                                                                                                                                                                     «Rule»
                                                                                Screen Flow Node                   *
                              {abstract}                                                                                        Proceeds To                                                                             Rule Set
                                                                                   {abstract}

                                                                                                               *
                                                                                                                                                       Information
                                                                                                                                                                                                                        1..*
                                                                                                                                                                                                                                     should
                                                                                                                                                        {abstract}                                                      Groups
                              «System Model»
                          System Process Diagram
                                                              «User Interface Model»
                                                                 Dialog Message
                                                                                                                                                                                                                               *
                                                                                                                                                                                                                                     have one
                                                                                                                                                                                                                        «Rule»
                                                                                                                                                                                                                         Rule
                          «User Interface Model»
                           Screen Flow Diagram                                   «User Interface Model»
                                                                                         Screen                                             «Information Model»
                                                                                                                                              Information Field




                                                                                                                                                                                                                                               29
                                «Information Model»                                                                                                                           «Information Model»
                           Information Structure Diagram                                                                                                                         Information Set

Holocentric
July 2010
Summary
       • A model driven approach can help drive business
         outcomes quicker and more accurately than
         disconnected documents.

       • As BA’s our job is not to write documents – it’s to
         help ensure that the business outcomes are
         achieved.




Holocentric
                                                           30
July 2010

More Related Content

PDF
Researching Standards - What? Why? How? And?
PPT
Business architecture for business specialists and IT professionals wanting I...
PDF
Modeling in the Large Keynote
PDF
Why Zachman Certification
PDF
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
PDF
Case study development of share point service business architecture 2010 08-0...
PDF
Case study development of share point service business architecture 2010 08-0...
PDF
Business Process Management
Researching Standards - What? Why? How? And?
Business architecture for business specialists and IT professionals wanting I...
Modeling in the Large Keynote
Why Zachman Certification
Performance driven dashboards & role based portals d hill bmick arc orlando 2008
Case study development of share point service business architecture 2010 08-0...
Case study development of share point service business architecture 2010 08-0...
Business Process Management

What's hot (10)

PPTX
Missouri Issues in Workers’ Compensation General Session
PDF
Business architecture in perspective v2.1
PDF
Introduction to the Decision Model - Larry Goldberg
PPT
Systems Engineering - a smarter way
PPSX
Stages Brochure 3.14
PDF
Chris Madrid Master Data Management
PDF
Introduction to Business Process Management
PDF
Eight deadly defects in systems engineering and how to fix them
PDF
Enterprise Architecture: Making it Real
PPT
Model Runway Part 2 Design Best Practices at Blue Cross BlueShield
Missouri Issues in Workers’ Compensation General Session
Business architecture in perspective v2.1
Introduction to the Decision Model - Larry Goldberg
Systems Engineering - a smarter way
Stages Brochure 3.14
Chris Madrid Master Data Management
Introduction to Business Process Management
Eight deadly defects in systems engineering and how to fix them
Enterprise Architecture: Making it Real
Model Runway Part 2 Design Best Practices at Blue Cross BlueShield
Ad

Viewers also liked (17)

PPT
Osw Pricing For Success Mark Burton
PPS
Stunning Photos - see http://www.slideshare.net/Thilini/stunning-photos-prese...
PPTX
Vvvv Framework
PPT
Socsig Frye Clohesy Presentation
PPT
Pricex 2008
PDF
Investor - New Concept Design for Real Estate Publishing - Strategy for New B...
PPT
Pps Spring 2007
PDF
Pps Taking Art Out Of Bto B Pricing Final Sb 32906
PPTX
Search2012 ibm vf
PDF
Winning Services Strategies
DOC
Greener Pastures
PPT
The Flight of the Baby Boomers
PPTX
8th Annual CUNY IT Presentation "to Build a 21st Century Website for Tod...
PDF
Poznań, Jeżyce, Dąbrowskiego - Prezentacja nieruchomości/ Real Estate Present...
PPT
Krispy Kreme Doughnuts
PPT
Food Risk Ppt
Osw Pricing For Success Mark Burton
Stunning Photos - see http://www.slideshare.net/Thilini/stunning-photos-prese...
Vvvv Framework
Socsig Frye Clohesy Presentation
Pricex 2008
Investor - New Concept Design for Real Estate Publishing - Strategy for New B...
Pps Spring 2007
Pps Taking Art Out Of Bto B Pricing Final Sb 32906
Search2012 ibm vf
Winning Services Strategies
Greener Pastures
The Flight of the Baby Boomers
8th Annual CUNY IT Presentation "to Build a 21st Century Website for Tod...
Poznań, Jeżyce, Dąbrowskiego - Prezentacja nieruchomości/ Real Estate Present...
Krispy Kreme Doughnuts
Food Risk Ppt
Ad

Similar to The Hidden Costs Ba World V2 1 (20)

PDF
Req Pro - Andreas gschwind
PPTX
Agile marries itil
PDF
The BA role in Agile software development
PDF
The Business Analysts Role in Agile Software Development
PDF
Lean Thinking on Business Analysis
PDF
The BA role in Agile Development
PDF
Incose: People, process, tools webinar - visure solutions - systems engineering
PPTX
Webinar - Maximizing Requirements Value Throughout the Product Lifecycle
PPTX
Building Results Oriented Websites: The Method That Ends the Madness
PDF
Outside In Process - Chicago V3
PDF
What is Collaborative Productivity?
PDF
Aras Innovator PLM Deployment Methodology
PDF
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
PPTX
Jpunch 02-16-2012
PDF
1 rdm keynote-robin_bater
 
PDF
RDM Keynote Robin Bater
PDF
ESEconf2011 - Kaiser Traian: "How to measure productivity in software develop...
PDF
What is in your Business Analysis Toolkit?
PDF
SADT & IDEF0 for Augmenting UML, Algile & Usability Engineering
PPT
Business processes improvement
Req Pro - Andreas gschwind
Agile marries itil
The BA role in Agile software development
The Business Analysts Role in Agile Software Development
Lean Thinking on Business Analysis
The BA role in Agile Development
Incose: People, process, tools webinar - visure solutions - systems engineering
Webinar - Maximizing Requirements Value Throughout the Product Lifecycle
Building Results Oriented Websites: The Method That Ends the Madness
Outside In Process - Chicago V3
What is Collaborative Productivity?
Aras Innovator PLM Deployment Methodology
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Jpunch 02-16-2012
1 rdm keynote-robin_bater
 
RDM Keynote Robin Bater
ESEconf2011 - Kaiser Traian: "How to measure productivity in software develop...
What is in your Business Analysis Toolkit?
SADT & IDEF0 for Augmenting UML, Algile & Usability Engineering
Business processes improvement

The Hidden Costs Ba World V2 1

  • 1. The hidden costs of Visio, Word & Excel -better requirements at a lower cost Ben Clohesy Future State Consulting
  • 2. Agenda • Requirements definition is still difficult • The traditional approach • The model-driven approach • Beyond use cases - the strategic BA Holocentric 2 July 2010
  • 3. REQUIREMENTS DEFINITION Holocentric 3 July 2010
  • 4. System delivery success % Project failure 100 90 80 70 60 Robins-Gioia 2001 50 Meta Group 2001 40 Deborah Weiss - Meta 30 Group 2003 Standish 2010 20 10 0 Robins-Gioia Meta Group Deborah Standish 2001 2001 Weiss - Meta 2010 Group 2003 • Implementation costs were found to average 25% over budget, 40% of the projects failed to achieve their business case within one year of going live (Conference Board Survey 2001) Holocentric 4 July 2010
  • 5. Specs to save CIO necks Karen Dearne NOVEMBER 14, 2006 “With two out of every three projects failing to produce any discernible benefits whatsoever, it's only a matter of time before boards are forced to be more accountable for their inability to apply strategies and the massive waste, estimated at up to one-third of total capital expenditure. “Based on overseas estimates, the cost of terminated projects in Australia in 2002-03 was $1.4 billion, while another $3.2 billion was spend on projects that delivered no benefits.“ I.T. Matters – at least until everyone can get this right! Holocentric 5 July 2010
  • 6. Why do projects fail so often? • Poor communication among customers, developers, and users • Unrealistic or unarticulated project goals 95% of the time it's a project management • Badly defined system requirements projects set issue. The managers of these Not engineering • Inaccurate out the requirements at the beginning of a estimates of needed resources project and Not requirements (IDC, 2004) they get it wrong management • Poor project and risk management …the market places It‟s all about a disproportionate • Stakeholder politics definition and co-ordination! emphasis on tools for requirements • Commercial pressures The real opportunity lies in management. requirements definition… (Forrester, 2006) • Use of immature technology • Sloppy development practices • Inability to handle the project's complexity IEEE Spectrum, September, 2005 Holocentric 6 July 2010
  • 7. THE TRADITIONAL APPROACH Holocentric 7 July 2010
  • 8. All the usual suspects... Visio Process Process Business Case Diagrams Metrics Requirements Vendor Information Policy and User Training Requirements e.g. Use Cases Procedures Materials & Specifications Holocentric 8 July 2010
  • 9. THE MODEL-DRIVEN APPROACH Holocentric 9 July 2010
  • 10. Process Modeling is the key • Roles emphasise a „People view‟ of process. • Personal level of responsibility for work unit output • Key link in chain of requirements responsibility Holocentric 10 July 2010
  • 11. The difference ... • Engage business representatives – better quality requirements • Greater functionality to verify the integrity of your requirements • Model as single repository used to derive all the information you need – no more documentation nightmares • Impact analysis to manage change Holocentric 11 July 2010
  • 12. Project Model Project Model Business Outcomes Capabilities Business Constraints Risks Assumptions Metrics Measures External Document References Business Process Model Business Process Model Business Process Diagrams Process Roles Process Steps Business Process Area Diagrams System Requirements Model System Requirements Model Build Buy System Features Functional Requirements Non Functional Rules Register Requirements System Use Information User Interface System Process Case Model Model Model Diagrams Holocentric 12 July 2010
  • 13. Holocentric 13 July 2010
  • 14. Case Study • Traditional vs. model-based approach • The consulting firm: • Cost: $2.5 million • 6000 requirements in excel, word • Model-based team: • Cost: $0.55M • Of the 6000, 1500 were invalid, unnecessary or duplicated • 450 were missing Holocentric 14 July 2010
  • 15. * Accelerator Item Linkable {abstract} Subject Of {abstract} * «Project Model» «Project Model» «Project Model» Assumption Risk External Document Reference Business Case Inputs «Project Model» Business Outcome * Constrainable Gaugable {abstract} {abstract} Requires * * Constrained By Gauged By * * * «Project Model» «Project Model» * «Project Model» Refined By Business Constraint Metric Capability * * * Operates On * * «Project Model» Project Scope Diagram «Project Model» Utilizes Comprises Measure * * * Business Requirements Modeling Capability Utilizer Capability Element Measured By {abstract} {abstract} «Business Process Model» Business Process Area Diagram * «Business Process Model» Competency Process Role «Business Process Model» {abstract} Process Step «Business Process Model» * * * Business Process Diagram Requires * Capacity * {abstract} «System Requirement» «System Requirement» Enabled By Functional Requirement System Feature * * * Characterized By * Elaborated By Realizes «System Requirement» «Project Model» Non Functional Requirement Capability Usage Diagram Implements System Requirements Modeling * «System Model» * * System Actor «System Model» «System Model» Rule Subject System Use Case Diagram * System Use Case {abstract} Governed By Elaborated By * * Supplementary System Diagram * «Rule» Screen Flow Node * {abstract} Proceeds To Rule Set {abstract} * 1..* Information «System Model» {abstract} Groups * System Process Diagram «User Interface Model» Dialog Message «Rule» Rule «User Interface Model» Screen Flow Diagram «User Interface Model» Screen «Information Model» Information Field 15 «Information Model» «Information Model» Information Structure Diagram Information Set Holocentric July 2010
  • 17. RACI Matrix Holocentric 17 July 2010
  • 18. Impact Analysis - Requirements Holocentric 18 July 2010
  • 19. Impact Analysis - Measures Holocentric 19 July 2010
  • 20. Drawing versus Modeling • Isolated „flat‟ drawings – difficult to maintain model integrity • Difficult to analyze across the full spectrum of a business • Little re-usable content • Holocentric Challenging to maintain on an ongoing basis 20 July 2010
  • 22. Joining the dots Policy System Positions Requirements Business Processes The ‘Why’ The ‘How’ Business processes also provide a meaningful context to define accurate system requirements Business Processes implement the policy intent Functional Specification The ‘Who’, ‘When’ and ‘Where’ 22 Holocentric July 2010
  • 23. BEYOND USE CASES - A MORE STRATEGIC ROLE FOR BA’S Holocentric 23 July 2010
  • 24. From process mapping Generally used to “map” the “AS-IS” and/or “TO-BE” process in a Holocentric 24 July 2010 more visual way. Thought be easier to communicate to the workforce
  • 25. To modelling What is the process to be followed? Model the Process - Using Role Based Notation How will it impact my role? - Identify Enabling and Supporting Systems - Highlight manual Tasks What manual tasks and other systems will we need to use? - Link it do what we need it to Will to Business Requirements do? -Does everyone have Create and Link - Link to External Documents What official documentation System Roles the same access? do I need to know about? - Will it still ensure we Create and Link - Create and Link the system? How do we use Use Cases Regulations regulations? adhere to the -What happens when the Rate the process for - How doTraining Material Create we train users on system doesn’t work? Business Continuity within thesystem? the new Model Holocentric 25 July 2010
  • 26. To training Holocentric 26 July 2010
  • 27. To regulations Process Policies & Procedures Regulations Business Requirements Use Cases Holocentric 27 July 2010
  • 28. Tangible Benefits • Requirements refinement and validation • At very little cost • Creation of framework to generate Material for Training • At very little cost • Creation of framework to generate Material for Change Programs • At very little cost • Processes and Documents reflect Regulations • At very little cost and with high integrity • Creation and capture of Use Cases • Applications Vendor provide “software steps” • Manage Applications functionality • Synchronisation of all key Project work Furthermore, model-based information is maintainable Holocentric 28 July 2010
  • 29. * Accelerator Item Linkable {abstract} Subject Of {abstract} * A meta model «Project Model» Assumption «Project Model» Risk «Project Model» External Document Reference Business Case Inputs «Project Model» Business Outcome * Constrainable Gaugable {abstract} {abstract} Requires * * Constrained By Gauged By * * * «Project Model» «Project Model» * «Project Model» Refined By Business Constraint Metric Capability * * * Operates On * * «Project Model» Project Scope Diagram «Project Model» Utilizes Comprises Measure * * * Business Requirements Modeling Capability Utilizer Capability Element Measured By {abstract} {abstract} «Business Process Model» Business Process Area Diagram * «Business Process Model» Competency Process Role «Business Process Model» {abstract} Process Step «Business Process Model» * * * Business Process Diagram Requires * Capacity * {abstract} «System Requirement» «System Requirement» Enabled By Functional Requirement System Feature * * * Characterized By * Elaborated By Realizes «System Requirement» «Project Model» Non Functional Requirement Capability Usage Diagram Implements System Requirements Modeling * «System Model» * * System Actor «System Model» «System Model» Rule Subject System Use Case Diagram * System Use Case {abstract} Governed By Elaborated By ...everyone * * Supplementary System Diagram * «Rule» Screen Flow Node * {abstract} Proceeds To Rule Set {abstract} * Information 1..* should {abstract} Groups «System Model» System Process Diagram «User Interface Model» Dialog Message * have one «Rule» Rule «User Interface Model» Screen Flow Diagram «User Interface Model» Screen «Information Model» Information Field 29 «Information Model» «Information Model» Information Structure Diagram Information Set Holocentric July 2010
  • 30. Summary • A model driven approach can help drive business outcomes quicker and more accurately than disconnected documents. • As BA’s our job is not to write documents – it’s to help ensure that the business outcomes are achieved. Holocentric 30 July 2010