1. Here’s a project requirements document outline tailored for a Transport Information
System Management (TISM):
---
# Project Requirements Document: Transport Information System Management
(TISM)
## **1. Introduction**
- **Project Objective**: Develop a robust transport information management
system to streamline operations, improve efficiency, and enhance user experience
for public and private transport systems.
- **Scope**: The system will cover real-time vehicle tracking, route optimization,
scheduling, fleet management, and customer information dissemination.
---
## **2. Functional Requirements**
### **User Management**
- Admin, driver, and passenger roles with distinct permissions.
- Secure login and user authentication system.
### **Vehicle Tracking**
- Integration with GPS to track vehicles in real-time.
- Geofencing and alerts for deviations or delays.
### **Scheduling & Routing**
- Automatic route optimization based on traffic and road conditions.
- Display real-time schedules for passengers.
### **Fleet Management**
- Maintenance alerts for vehicles.
- Performance tracking for drivers and vehicles.
### **Customer Information**
- Display estimated arrival times (ETAs) for passengers.
- Notifications for delays, cancellations, and route changes.
### **Data Analytics**
- Generate reports on transport efficiency and performance.
- Predictive analytics for demand forecasting.
---
## **3. Non-Functional Requirements**
### **Performance**
- Handle concurrent requests from multiple users without lag.
2. ### **Scalability**
- Accommodate a growing number of vehicles, users, and routes.
### **Reliability**
- High uptime and quick recovery in case of system failures.
### **Security**
- End-to-end encryption of sensitive data (e.g., user details and location).
- Compliance with data protection regulations.
---
## **4. Technical Requirements**
- **Platform**: Cloud-based with mobile and web interfaces.
- **Database**: Use of relational databases like MySQL or PostgreSQL.
- **Integration**: API integration for GPS and third-party route optimization tools.
- **Development Framework**: React for the front-end and Node.js for the back-
end.
---
## **5. Stakeholders**
- **Primary Users**: Transport operators, administrators, drivers, and passengers.
- **Secondary Users**: Maintenance teams and analytics teams.
- **Sponsors**: Local government authorities, private transport companies.
---
## **6. Project Deliverables**
- Fully functional transport management system.
- Training materials and user manuals.
- Maintenance and support plan.
---
This is a starting point and can be adjusted based on the specific goals and
requirements of your project. Let me know if you'd like more detail on any particular
section or a different focus!
Certainly! Let's expand on the requirements document:
---
3. ## **7. Project Milestones**
- **Phase 1: Research & Planning**
- Identify stakeholders and gather initial requirements.
- Conduct feasibility studies and finalize project scope.
- **Phase 2: System Design**
- Create wireframes and mockups for user interface.
- Design the database schema and architecture of the system.
- **Phase 3: Development**
- Develop modules for user management, vehicle tracking, and fleet management.
- Integrate APIs for GPS and analytics.
- **Phase 4: Testing**
- Perform unit, integration, and system testing.
- Conduct user acceptance testing (UAT) with stakeholders.
- **Phase 5: Deployment**
- Roll out the system to a pilot group.
- Gather feedback and optimize for full-scale deployment.
- **Phase 6: Maintenance**
- Monitor system performance and reliability.
- Provide ongoing support and updates.
---
## **8. Risks and Challenges**
- **Technical Risks**: Issues like integration challenges, cybersecurity vulnerabilities,
or insufficient performance scalability.
- **Budget Risks**: Overruns due to unexpected costs in development or
infrastructure.
- **Stakeholder Risks**: Difficulty aligning the diverse needs of different
stakeholders.
- **Operational Risks**: Adoption issues from end-users or logistical challenges
during deployment.
---
## **9. Success Metrics**
- Reduction in transport delays and inefficiencies.
- Improvement in user satisfaction measured via surveys.
- Increase in fleet utilization rates and operational transparency.
- Cost savings achieved through route optimization and efficient scheduling.
---
## **10. Budget Estimation**
- **Development Costs**: Salaries of developers, software licenses, and API
subscriptions.
- **Infrastructure Costs**: Servers, databases, and cloud services.
4. - **Maintenance Costs**: Technical support, regular updates, and data storage.
---
## **11. Conclusion**
The Transport Information System Management project aims to revolutionize
transport operations with advanced technological solutions. By addressing functional
and non-functional requirements comprehensively, this project seeks to benefit
operators, passengers, and the broader transport ecosystem.
---
Feel free to share specific aspects you'd like me to elaborate on further, such as a
more detailed budget or timeline breakdown. What do you think?