The TPM  Total Productive Maintenance BY SHAILENDRA DAF
OUTLINE OF THE PRESENTATION Introduction of TPM TPM principle Structure(pillars) of TPM TPM implementation step Implementation  strategy TPM benefit Case study
1. TPM definition  A company-wide team-based effort to build quality into equipment and to improve overall equipment effectiveness Total all employees are involved it aims to eliminate all accidents, defects and breakdowns Productive actions are performed while production goes on troubles for production are minimized Maintenance keep in good condition repair, clean, lubricate
1. TPM definition  TPM combines the traditionally American practice of  preventive maintenance with Total Quality Control and Total Employee Involvement , to create a culture where operators develop ownership of their equipment, and become full partners with Maintenance, Engineering and Management to assure equipment operates properly everyday.
3. TPM principles Increase Overall Equipment Effectiveness (OEE) Improve existing planned maintenance systems The operator is the best condition monitor Provide training to upgrade operations and maintenance skills Involve everyone and utilize cross-functional teamwork
4. Eight major pillars of TPM Education and training Safety and environmental management Autonomous Maintenance Planned Maintenance Equipment and process improvement Early management of new equipment Process quality management TPM in the office
4. Eight major pillars of TPM 4.1.  Autonomous Maintenance  (1) Train the operators  to close the gap between them and the maintenance staff, making it easier for both to work as one team Change the equipment so the operator can identify any abnormal conditions and measure deterioration before it affects the process or leads to a failure
4. Eight major pillars of TPM 4.2.  Equipment and process improvement Objective : maximize efficiency by eliminating waste and manufacturing losses Manufacturing losses are categorized into 13 big losses: Equipment losses (6) Manpower losses (4) Material losses (3)
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.1. Equipment losses Downtime  loss Speed loss Quality loss Equipment failure / breakdowns Set-up / adjustments Minor stopping / idling Reduced speed Process errors Rework / scrap
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.2. Manpower and material losses Manpower losses Material  losses Cleaning and checking Waiting instructions Waiting quality confirmation Material yield Energy losses Waiting materials Consumable material losses
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) OEE  are determined by combining the availability and performance of your equipment with the quality of parts made OEE measures the efficiency of the machine during its planned loading time .
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability Downtime loss Speed loss Performance Quality Yield Quality loss
4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability =  time available for production - downtime time available for production Performance =  ideal cycle time x number of parts produced   operating time Quality Yield =  total number of parts produced - defect number  total number of parts produced
4. Eight major pillars of TPM 4.3.  Planned maintenance Objective : establish Preventative and Predictive Maintenance systems for equipment and tooling Natural life cycle of individual machine elements must be achieved Correct operation Correct set-up Cleaning Lubrication Retightening Feedback and repair of minor defects Quality spare parts
4. Eight major pillars of TPM 4.4.  Early Management of new equipment Objective:  establish systems to shorten  new product or equipment development start-up, commissioning and stabilization time for quality and efficiency New equipment needs  to be: easy to operate easy to clean easy to maintain and reliable have quick set-up times operate at the lowest life cycle cost
4. Eight major pillars of TPM 4.5.  Process Quality Management Definition:  a process for controlling the condition of equipment components that affect variability in product quality Objective :  to set and maintain conditions to accomplish zero defects Quality rate  has a direct correlation with material conditions equipment precision production methods process parameters
4. Eight major pillars of TPM 4.6.  TPM in administrative and support departments Administrative and support departments can be seen as process plants whose principal  tasks  are to collect, process, and distribute information Process analysis should be applied to streamline information flow
4. Eight major pillars of TPM 4.7.  Education and training TPM  is a continuous learning process. 2 major components soft skills  training: how to work as teams, diversity training and  communication skills technical  training: upgrading problem-solving and equipment- related skills
4. Eight major pillars of TPM 4.8.  Safety and environmental management Assuring safety and preventing adverse environmental impacts are important priorities in any TPM effort
5. TPM Implementation 12 steps Preparation Kick-off Implementation Announcement to introduce TPM Introductory education campaign for the workforce TPM Promotion (special committees) Establish basic TPM policies and goals Preparation and Formulation of a master plan Develop an equipment management program Develop a planned maintenance program Develop an autonomous maintenance program Increase skills of production and maintenance personnel Perfect TPM implementation and raise TPM levels Stabilization Develop early equipment management program Invite customers, affiliated companies and subcontractors
IMPLEMENTATION STRATEGY  PROCESS ORIENTED STRATEGY HUMAN ORIENTED STRATEGY
HUMAN ORIENTED STRATEGY Human-oriented strategy is, generally, strategies that actively involve human administrative application of management methods in achieving high extent of TPM.  Three important aspects  (1) Top management commitment and leadership  (2) Total Employee Involvement, and (3) Training and Education.
Increasing motivation: changing peoples attitudes Increasing competency and peoples skills Improving the work environment, so that it supports the establishment of a program for implementing TPM
PROCESS ORIENTED STRATEGY The primary goal of TPM is to achieve the ultimate target of  Zero Loss and Zero Breakdown The sequential step-wise procedure of Process-oriented Strategy begins with: I )  IDENTIFYING FAILURES OR LOSSES AND ANALYZE CAUSES II) SETTING IMPROVEMENTS TO ELIMINATE FAILURES AND LOSSES; III) CONFIRMING AND CONSOLIDATING RESULTS.
6. TPM Benefits Increased equipment productivity Reduced equipment downtime Increased plant capacity Lower maintenance and production costs Approaching zero equipment-caused defects Enhanced job satisfaction Increased Return On Investment
CASE STUDY IMPLEMENTING TOTAL PRODUCTIVE MAINTENANCE (TPM) IN MANUFACTURING ORGANISATION
WHY FAILURE OF TPM
PROBLEM  Introducing TPM in a developing country, such as INDIA, is still considered a major challenge due to several non-conducive environments in the adoption and implementation process.  Lack of commitment and leadership from top management  & resistance from the employee involved in the TPM program is also regarded as another major reason that explains why TPM fails in many local organizations.  Employees refused to endure extra maintenance responsibilities without any rewards, recognition or compensation.
HYPOTHESIS H1 : Extent of Human-oriented strategy will be  positively related to Extent of TPM implementation. H2 : Extent of Process-oriented strategy will be positively related to Extent of TPM implementation. H3 : Human-oriented strategy has greater impact on Extent of TPM level then Process-oriented strategy.
Regression result for Operational Strategy and Extent of TPM Implementation General Training  Top Executive Commitment  Maintenance Training  Supportive TPM environment  Workplace Improvement 0.205 0.040 0.271 0.071 0.197 R2 Adj. R2 F Value 0.32 0.28 8.47**
Two stage regression analyses with Human-oriented strategy entered first in the model Model 1: Supportive TPM environment, General Training, Maintenance Training, Top Executive Commitment Model 2: Supportive TPM environment, General Training, Maintenance Training, Top Executive Commitment, Workplace Improvement Dependent variable:  Extent of TPM. R  R2  Adjusted R2  Δ R2  F Model 1: Model 2: 0.54  0.29  0.26  0.29  9.40 0.57  0.32  0.28  0.03  3.66
Two stage regression analyses with Process-oriented strategy entered first in the model Model 1  : Workplace Improvement Model 2:  Workplace Improvement, Supportive TPM environment, General Training, Maintenance Training, Top Executive Commitment, Dependent variable: Extent of TPM. R  R2  Adjusted R2  Δ R2  F Model 1: Model 2: 0.41  0.17  0.16  0.17  18.64 0.57  0.32  0.28  0.15  5.12
CONCLUSION It can be concluded that the extent of  both the human and process oriented strategies would lead to higher TPM implementation  in the organization.  Thus the management has to balance both these strategies in order to achieve the maximal effect of implementation.
REFERENCES Nakajima, S. (1988).  Introduction to TPM. Cambridge: Productivity Press. sang, A. H. C. & Chan, P. K. (2000). TPM Implementation in China: A Case Study,  International Journal of Quality & Reliability Management, 17(2), 144-157. Scontrino, M. P. (1995). TPM in Process Industry,  Personnel Psychology, 48(2), 456-458. Shim bun, N. K. (1995). TPM Case Studies, Portland OR: Productivity Press. Suzuki, T. (1994).  TPM in Process Industry, Portland OR: Productivity Press. Thiagarajan, T. & Zaire, M. (1997). A Review Of Total Quality Management In Practice: Understanding The Fundamentals Through Examples Of Best Practice Applications – Part 1,  The TQM Magazine, 9(4), 270-286. Tsang, A. H. C. & Chan, P. K. (2000). TPM Implementation in China: A Case Study, International Journal of Quality & Reliability Management, 17(2), 144-157. Weeks, B. et al., (1995), Are We Ready for TQM? A Case Study,  Production and Inventory Management Journal, 36(4), 27-32. Yamashina, H. (2000). Challenge to World Class Manufacturing,  International Journal of Quality & Reliability Management, 17(2), 132-143.
Questions ?

More Related Content

PPT
010 bmw tpm management training
PPTX
PDF
Implementation Of TPM with Case study
PDF
Maintenance Strategy, Types of Maintenance
PDF
Best Practices in Maintenance and Reliability
PPT
My machine camp
PPTX
Lean manufacturing ppt
PPT
Tpm total productive maintenance
010 bmw tpm management training
Implementation Of TPM with Case study
Maintenance Strategy, Types of Maintenance
Best Practices in Maintenance and Reliability
My machine camp
Lean manufacturing ppt
Tpm total productive maintenance

What's hot (20)

PPT
Presentation on Total Productive Maintenance
PPTX
Jishu hozen
PPTX
tpm (total productive maintenance)
PPT
Maintenance Management
PPT
16 major losses tng
PPTX
TPM the effective maintenance with Autonomous Maintenance
PPTX
What is total productive maintenance?
PPT
Lean manufacturing overview
PDF
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT
PPTX
Basic Maintenance
PPT
Tpm basic
PPT
Tpm Sample
PDF
Total Productive Maintenance (TPM)
PPT
PPTX
TPM Activity
PDF
Lean Quick Changeover (SMED) Training Module
PPTX
TPM - Total Productive Maintenance
PPT
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Presentation on Total Productive Maintenance
Jishu hozen
tpm (total productive maintenance)
Maintenance Management
16 major losses tng
TPM the effective maintenance with Autonomous Maintenance
What is total productive maintenance?
Lean manufacturing overview
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
Basic Maintenance
Tpm basic
Tpm Sample
Total Productive Maintenance (TPM)
TPM Activity
Lean Quick Changeover (SMED) Training Module
TPM - Total Productive Maintenance
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Ad

Similar to Tpm final (20)

PPT
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
PPT
# TPM.ppt for manufacturing industry CNC and VMC
PPT
TPM implementation throughout company.ppt
PDF
A Review on Implementation of TPM in Manufacturing Industry
PPT
PDF
A Review on Implementation of TPM in Manufacturing Industry
PDF
Total Productive Maintenance (TPM).pdf
PPTX
TPM.pptx
PPTX
Introduction To TPM by Ashish Trivedi.pptx
PPTX
Ranveer yadav 2013 14
PPTX
Total productive maintenance (tpm)
PPT
PPT
PPT
TPM.ppt
PPT
Tpm basic
PPT
Tpm basic
PPT
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
PPTX
TPM-PPT-4.pptx
PPT
Tpm guide
PPTX
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
# TPM.ppt for manufacturing industry CNC and VMC
TPM implementation throughout company.ppt
A Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing Industry
Total Productive Maintenance (TPM).pdf
TPM.pptx
Introduction To TPM by Ashish Trivedi.pptx
Ranveer yadav 2013 14
Total productive maintenance (tpm)
TPM.ppt
Tpm basic
Tpm basic
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TPM-PPT-4.pptx
Tpm guide
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Ad

Recently uploaded (20)

PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Approach and Philosophy of On baking technology
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Encapsulation theory and applications.pdf
PDF
NewMind AI Monthly Chronicles - July 2025
PPTX
MYSQL Presentation for SQL database connectivity
PPT
Teaching material agriculture food technology
PPTX
A Presentation on Artificial Intelligence
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
Reach Out and Touch Someone: Haptics and Empathic Computing
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
“AI and Expert System Decision Support & Business Intelligence Systems”
NewMind AI Weekly Chronicles - August'25 Week I
Understanding_Digital_Forensics_Presentation.pptx
Building Integrated photovoltaic BIPV_UPV.pdf
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Unlocking AI with Model Context Protocol (MCP)
Per capita expenditure prediction using model stacking based on satellite ima...
Approach and Philosophy of On baking technology
Dropbox Q2 2025 Financial Results & Investor Presentation
Shreyas Phanse Resume: Experienced Backend Engineer | Java • Spring Boot • Ka...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Encapsulation theory and applications.pdf
NewMind AI Monthly Chronicles - July 2025
MYSQL Presentation for SQL database connectivity
Teaching material agriculture food technology
A Presentation on Artificial Intelligence
Chapter 3 Spatial Domain Image Processing.pdf
Mobile App Security Testing_ A Comprehensive Guide.pdf

Tpm final

  • 1. The TPM Total Productive Maintenance BY SHAILENDRA DAF
  • 2. OUTLINE OF THE PRESENTATION Introduction of TPM TPM principle Structure(pillars) of TPM TPM implementation step Implementation strategy TPM benefit Case study
  • 3. 1. TPM definition A company-wide team-based effort to build quality into equipment and to improve overall equipment effectiveness Total all employees are involved it aims to eliminate all accidents, defects and breakdowns Productive actions are performed while production goes on troubles for production are minimized Maintenance keep in good condition repair, clean, lubricate
  • 4. 1. TPM definition TPM combines the traditionally American practice of preventive maintenance with Total Quality Control and Total Employee Involvement , to create a culture where operators develop ownership of their equipment, and become full partners with Maintenance, Engineering and Management to assure equipment operates properly everyday.
  • 5. 3. TPM principles Increase Overall Equipment Effectiveness (OEE) Improve existing planned maintenance systems The operator is the best condition monitor Provide training to upgrade operations and maintenance skills Involve everyone and utilize cross-functional teamwork
  • 6. 4. Eight major pillars of TPM Education and training Safety and environmental management Autonomous Maintenance Planned Maintenance Equipment and process improvement Early management of new equipment Process quality management TPM in the office
  • 7. 4. Eight major pillars of TPM 4.1. Autonomous Maintenance (1) Train the operators to close the gap between them and the maintenance staff, making it easier for both to work as one team Change the equipment so the operator can identify any abnormal conditions and measure deterioration before it affects the process or leads to a failure
  • 8. 4. Eight major pillars of TPM 4.2. Equipment and process improvement Objective : maximize efficiency by eliminating waste and manufacturing losses Manufacturing losses are categorized into 13 big losses: Equipment losses (6) Manpower losses (4) Material losses (3)
  • 9. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.1. Equipment losses Downtime loss Speed loss Quality loss Equipment failure / breakdowns Set-up / adjustments Minor stopping / idling Reduced speed Process errors Rework / scrap
  • 10. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.2. Manpower and material losses Manpower losses Material losses Cleaning and checking Waiting instructions Waiting quality confirmation Material yield Energy losses Waiting materials Consumable material losses
  • 11. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) OEE are determined by combining the availability and performance of your equipment with the quality of parts made OEE measures the efficiency of the machine during its planned loading time .
  • 12. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability Downtime loss Speed loss Performance Quality Yield Quality loss
  • 13. 4. Eight major pillars of TPM 4.2. Equipment and process improvement 4.2.3 Overall Equipment Effectiveness (OEE) Overall Equipment Effectiveness = Availability x Performance x Quality Yield Availability = time available for production - downtime time available for production Performance = ideal cycle time x number of parts produced operating time Quality Yield = total number of parts produced - defect number total number of parts produced
  • 14. 4. Eight major pillars of TPM 4.3. Planned maintenance Objective : establish Preventative and Predictive Maintenance systems for equipment and tooling Natural life cycle of individual machine elements must be achieved Correct operation Correct set-up Cleaning Lubrication Retightening Feedback and repair of minor defects Quality spare parts
  • 15. 4. Eight major pillars of TPM 4.4. Early Management of new equipment Objective: establish systems to shorten new product or equipment development start-up, commissioning and stabilization time for quality and efficiency New equipment needs to be: easy to operate easy to clean easy to maintain and reliable have quick set-up times operate at the lowest life cycle cost
  • 16. 4. Eight major pillars of TPM 4.5. Process Quality Management Definition: a process for controlling the condition of equipment components that affect variability in product quality Objective : to set and maintain conditions to accomplish zero defects Quality rate has a direct correlation with material conditions equipment precision production methods process parameters
  • 17. 4. Eight major pillars of TPM 4.6. TPM in administrative and support departments Administrative and support departments can be seen as process plants whose principal tasks are to collect, process, and distribute information Process analysis should be applied to streamline information flow
  • 18. 4. Eight major pillars of TPM 4.7. Education and training TPM is a continuous learning process. 2 major components soft skills training: how to work as teams, diversity training and communication skills technical training: upgrading problem-solving and equipment- related skills
  • 19. 4. Eight major pillars of TPM 4.8. Safety and environmental management Assuring safety and preventing adverse environmental impacts are important priorities in any TPM effort
  • 20. 5. TPM Implementation 12 steps Preparation Kick-off Implementation Announcement to introduce TPM Introductory education campaign for the workforce TPM Promotion (special committees) Establish basic TPM policies and goals Preparation and Formulation of a master plan Develop an equipment management program Develop a planned maintenance program Develop an autonomous maintenance program Increase skills of production and maintenance personnel Perfect TPM implementation and raise TPM levels Stabilization Develop early equipment management program Invite customers, affiliated companies and subcontractors
  • 21. IMPLEMENTATION STRATEGY PROCESS ORIENTED STRATEGY HUMAN ORIENTED STRATEGY
  • 22. HUMAN ORIENTED STRATEGY Human-oriented strategy is, generally, strategies that actively involve human administrative application of management methods in achieving high extent of TPM. Three important aspects (1) Top management commitment and leadership (2) Total Employee Involvement, and (3) Training and Education.
  • 23. Increasing motivation: changing peoples attitudes Increasing competency and peoples skills Improving the work environment, so that it supports the establishment of a program for implementing TPM
  • 24. PROCESS ORIENTED STRATEGY The primary goal of TPM is to achieve the ultimate target of Zero Loss and Zero Breakdown The sequential step-wise procedure of Process-oriented Strategy begins with: I ) IDENTIFYING FAILURES OR LOSSES AND ANALYZE CAUSES II) SETTING IMPROVEMENTS TO ELIMINATE FAILURES AND LOSSES; III) CONFIRMING AND CONSOLIDATING RESULTS.
  • 25. 6. TPM Benefits Increased equipment productivity Reduced equipment downtime Increased plant capacity Lower maintenance and production costs Approaching zero equipment-caused defects Enhanced job satisfaction Increased Return On Investment
  • 26. CASE STUDY IMPLEMENTING TOTAL PRODUCTIVE MAINTENANCE (TPM) IN MANUFACTURING ORGANISATION
  • 28. PROBLEM Introducing TPM in a developing country, such as INDIA, is still considered a major challenge due to several non-conducive environments in the adoption and implementation process. Lack of commitment and leadership from top management & resistance from the employee involved in the TPM program is also regarded as another major reason that explains why TPM fails in many local organizations. Employees refused to endure extra maintenance responsibilities without any rewards, recognition or compensation.
  • 29. HYPOTHESIS H1 : Extent of Human-oriented strategy will be positively related to Extent of TPM implementation. H2 : Extent of Process-oriented strategy will be positively related to Extent of TPM implementation. H3 : Human-oriented strategy has greater impact on Extent of TPM level then Process-oriented strategy.
  • 30. Regression result for Operational Strategy and Extent of TPM Implementation General Training Top Executive Commitment Maintenance Training Supportive TPM environment Workplace Improvement 0.205 0.040 0.271 0.071 0.197 R2 Adj. R2 F Value 0.32 0.28 8.47**
  • 31. Two stage regression analyses with Human-oriented strategy entered first in the model Model 1: Supportive TPM environment, General Training, Maintenance Training, Top Executive Commitment Model 2: Supportive TPM environment, General Training, Maintenance Training, Top Executive Commitment, Workplace Improvement Dependent variable: Extent of TPM. R R2 Adjusted R2 Δ R2 F Model 1: Model 2: 0.54 0.29 0.26 0.29 9.40 0.57 0.32 0.28 0.03 3.66
  • 32. Two stage regression analyses with Process-oriented strategy entered first in the model Model 1 : Workplace Improvement Model 2: Workplace Improvement, Supportive TPM environment, General Training, Maintenance Training, Top Executive Commitment, Dependent variable: Extent of TPM. R R2 Adjusted R2 Δ R2 F Model 1: Model 2: 0.41 0.17 0.16 0.17 18.64 0.57 0.32 0.28 0.15 5.12
  • 33. CONCLUSION It can be concluded that the extent of both the human and process oriented strategies would lead to higher TPM implementation in the organization. Thus the management has to balance both these strategies in order to achieve the maximal effect of implementation.
  • 34. REFERENCES Nakajima, S. (1988). Introduction to TPM. Cambridge: Productivity Press. sang, A. H. C. & Chan, P. K. (2000). TPM Implementation in China: A Case Study, International Journal of Quality & Reliability Management, 17(2), 144-157. Scontrino, M. P. (1995). TPM in Process Industry, Personnel Psychology, 48(2), 456-458. Shim bun, N. K. (1995). TPM Case Studies, Portland OR: Productivity Press. Suzuki, T. (1994). TPM in Process Industry, Portland OR: Productivity Press. Thiagarajan, T. & Zaire, M. (1997). A Review Of Total Quality Management In Practice: Understanding The Fundamentals Through Examples Of Best Practice Applications – Part 1, The TQM Magazine, 9(4), 270-286. Tsang, A. H. C. & Chan, P. K. (2000). TPM Implementation in China: A Case Study, International Journal of Quality & Reliability Management, 17(2), 144-157. Weeks, B. et al., (1995), Are We Ready for TQM? A Case Study, Production and Inventory Management Journal, 36(4), 27-32. Yamashina, H. (2000). Challenge to World Class Manufacturing, International Journal of Quality & Reliability Management, 17(2), 132-143.