SlideShare a Scribd company logo
Technical Seminar on
Presentation by
AKSHAY P B
CONTENTS
 INTRODUCTION
 NEXT GENERATION TRANSIT SYSTEM
 FEATURES OF TEB
 COMPARISON WITH CURRENT TRANSIT SYSTEMS
 KEY STEPS FOR IMPLEMENTATION
 POWER SUPPLY TO BUS
 WHY IN INDIA ?
 CONCLUSION
 REFERENCE
 Traffic jams
 Pollution
 Fuel cost
INTRODUCTION
The concept of Transit Elevated Bus(TEB) was introduced in China in 2010,
which is the world’s largest polluter. Currently, four types of public transport
systems are used in China.
That are,
 Subway
 Light rail train
 BRT(Bus rapid Transit)
 General bus
INTRODUCTION
5
 High initial cost
 Long time to build
 High maintenance
SUBWAY
6
 Reconstruction of roads
 Chances of accidents
 Comparatively slow
LIGHT RAIL TRAIN
7
BUS RAPID TRANSIT(BRT)
 Takes more road space
 Pollution
 Noise
8
GENERAL BUS
 Noise
 Pollution
 Less capacity
 Parking space
9
NEXT GENERATION TRANSIT SYSTEM
The model looks like a
subway or a light-rail
train bestriding the road
on both sides.
Powered by electricity or
solar energy.
Reduces the traffic jams
by 20%-30%.
10
TRANSIT ELEVATED BUS [TEB]
 Huge elevated public bus.
 Straddles on two road lines.
 Can Carry 1200 passengers.
 Allows smaller vehicles to
pass under it.
 Takes no road space.
 Reduces traffic jam by 30%.
 Powered by electricity or
solar power.
 Can reach speeds up to 37
mph(60 kph).
11
Costs about 5.36 billion
rupees to build the bus and
a 40KM long path for it,
approximately 7% cost
of metro system.
Its 4 - 4.5 M( nearly 15
feet) high with a passenger
deck and 7 M in width
while other vehicles lower
than 2 M( nearly 7 feet) can
move under it.
FEATURES OF TEB
12
FEATURES OF TEB
 Warning alarms are provided
underneath to warn cars from getting
too close to the bus (radar scanning).
 Cameras are fitted at the bottom which
can be used to monitor from the driver
cabin.
 Large windows are provided to avoid
backward illusion for the vehicles
passing below it.
13
 Big cities can be modernise their
traffic signalling system to
prioritize public buses.
 Emergency braking system is
provided incase of accidents or
emergency situations.
FEATURES OF TEB
14
 Escaping doors (similar to inflated
ladder in planes) are in-built.
 Built-in slides engage when necessary
during any emergency situations.
FEATURES OF TEB
15
 Ultrasonic waves are put forth from
the end of the bus, that is to keep high
cars or trucks away from entering
under the bus.
 Indicates light when any obstacles are
in the path of the vehicle.
FEATURES OF TEB
16
 Metro costs a lot and takes
a long time to build.
 BRTs takes up road spaces
and produces noise and
pollution.
 General buses have less
capacity.
 Large parking spaces are
required.
16
 It is cheaper and construction
takes less time.
 It saves road spaces, efficient and
high in capacity.
 Traveling with these buses will
consume less time so its more
sophisticated and time efficient.
 Large parking spaces are not
required and can be parked on
roads without affecting other
vehicles.
Present Transit Systems Straddle Bus System
17
 Re - modelling of the road:
 Laying Rails - The rails will be
laid on both sides of the road and
the bus can run on the rails and
saving 30% energy due to less
wheel rolling resistance.

KEY STEPS INVOLVED IN IMPLEMENTATION
Paint White Lines - The white lines
are painted on both sides of the road
and buses will have auto pilots
which will follow these lines and run
stable while moving.
18
 There are also two ways in dealing
with station platform.
 load/unload through the side
platforms.
 Using the built-in ladder at stations,
so that passengers can go up and to
the overpass through the ceiling
door.
BUILDING STATIONS
19
 MUNICIPAL ELECTRICITY
 The setting is called relay direct current
electrification.
 Bus itself is electrical conductor.
 Two rails built on top.
 Allow charging post to run along the rails
of the bus.
 PARTLY SOLAR POWER
 Use super capacitor.
 It can charge, discharge and store
electricity quickly.
 Charging is done when bus stops on
station.
 Achieving zero toxic gas on the process
 Solar panels provided on the stations
POWER SUPPLY TO BUS
2020
Metro rail transit system Straddle Bus system
 It requires huge
infrastructure, which incurs
more initial investment
 It requires more land to
build. elevated structures.
 It runs only on electricity.
 It can carry 1000 passengers
at a time.
 It does not require elevated
structure
 It does not require more
land, as rails will be laid on
the road itself.
 It runs on electricity as well
as solar energy.
 it can carry up to 1200
passengers at a time.
 Eco-friendly
21
 India is second largest in population.
 Because of High population density, India's major cities are
facing traffic jams. 30% of traffic jams can be avoid by using
straddle bus.
 As a developing nation India facing air pollution. Straddle bus
can prevent 2640 tons of carbon emissions that 40 buses emit
annually.
 Fuel cost in India is high comparing with other nations. 860
tons of fuel can be save by using straddle bus.
 Shortest construction life cycle of nearly 1 year to build for a
40kms path.
 Can be implemented in most of the Metropolitan cities.
WHY IN INDIA ?
22
 It runs above cars and other road vehicles, saves road
space.
 It uses electric or solar power and thus reduces the air
pollution.
 It reduces up to 20-30 % of traffic jams.
 It is safe, efficient and has high capacity.
 It is eco- friendly
CONCLUSION
23
 The Straddling bus was first exhibited on the 13th
Beijing international high-tech expo in 2010.
 The basic idea was proposed by Shenzhen Hashi Future
Parking Equipment Company.
 First trial run was done in Beijing's Mentougou district
by late 2016.
 The city of Manaus, Brazil is planning to install this bus
on their streets.
APPENDIX
24
 http://www.nytimes.com
 http://www.techeblog.com/index.php/tech-gadget/3d-
express-coach-straddling-bus-will-drive-over-cars
 http://www.chinahush.com/
 http://www.hsfuture.com/ehbus.html
 http://www.trafficsolutions.com/
REFERENCE

THANK YOU
25

More Related Content

PPTX
Recycling of the pavements
PPTX
Hyper loop train
PDF
tally software detailed presentation .pdf
PPTX
tally ppt.pptx
PPTX
Hyperloop
PPTX
Hyperloop
PPTX
Hyperloop ppt
PPTX
Self driving cars.pptx
Recycling of the pavements
Hyper loop train
tally software detailed presentation .pdf
tally ppt.pptx
Hyperloop
Hyperloop
Hyperloop ppt
Self driving cars.pptx

What's hot (20)

PDF
Regenerative Braking System Report
PPTX
Hyperloop
PPTX
hyperloop transportation
PPTX
compressed air vehicle
PPTX
PPT on MONORAIL TECHNOLOGY
PPTX
The hyperloop by rishabh mishra
PPT
Traffic congestion
PPT
Compressed Air car ppt
PPTX
Hyperloop ppt
PPT
air powered car presentation
PPTX
Hyperloop (A new mode of transportation)
PPTX
Presentation on maglev
PPTX
Hyperloop
PPTX
AIR POWERED CAR
PDF
Future Of Transpotation
PPTX
HYPERLOOP TRAIN
PPTX
Hyperloop
PPTX
.Chennai metro rail-2
PDF
traffic problems in bangalore
PDF
Li-Fi Project Report
Regenerative Braking System Report
Hyperloop
hyperloop transportation
compressed air vehicle
PPT on MONORAIL TECHNOLOGY
The hyperloop by rishabh mishra
Traffic congestion
Compressed Air car ppt
Hyperloop ppt
air powered car presentation
Hyperloop (A new mode of transportation)
Presentation on maglev
Hyperloop
AIR POWERED CAR
Future Of Transpotation
HYPERLOOP TRAIN
Hyperloop
.Chennai metro rail-2
traffic problems in bangalore
Li-Fi Project Report
Ad

Similar to TRANSIT ELEVATED BUS (straddle bus) (20)

PPTX
Intelligent Transportation System
PPTX
Straddlingbusbyrk 150515005107-lva1-app6892
PPTX
Straddling bus presented by RK
PPTX
Sky bus an emerging technology
PPT
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
PPTX
Driverless metro
 
PPT
SEM 1 PRESENTATION
PPTX
ELECTRO KINETIC ROAD RAMP.pptx for engineering
PPT
Super Capacitor Buses in Shanghai
PPTX
Bus inovation for the future
PPTX
Kolkata underwater metro project VISHAL PPT.pptx
PPTX
Metro train prototype
PPTX
sky bus
DOCX
Subway
PDF
Pp connected autonomous and electric vehicles
PPTX
Personal Rapid Transit System
PPTX
Tram seminar ppt
PPT
sustainable transport
PPTX
Solar roads seminar
PDF
A Review on
Intelligent Transportation System
Straddlingbusbyrk 150515005107-lva1-app6892
Straddling bus presented by RK
Sky bus an emerging technology
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
Driverless metro
 
SEM 1 PRESENTATION
ELECTRO KINETIC ROAD RAMP.pptx for engineering
Super Capacitor Buses in Shanghai
Bus inovation for the future
Kolkata underwater metro project VISHAL PPT.pptx
Metro train prototype
sky bus
Subway
Pp connected autonomous and electric vehicles
Personal Rapid Transit System
Tram seminar ppt
sustainable transport
Solar roads seminar
A Review on
Ad

Recently uploaded (20)

PDF
Volvo ecr88 excavator specs Manual Download
PPTX
Type of Sentence & SaaaaaaaaaadddVA.pptx
PDF
Volvo ecr88 battery location Service Repair Manual.pdf
DOCX
lp of food hygiene.docxvvvvvvvvvvvvvvvvvvvvvvv
PDF
Caterpillar CAT 311B EXCAVATOR (8GR00001-UP) Operation and Maintenance Manual...
PPTX
Paediatric History & Clinical Examination.pptx
PPT
Kaizen for Beginners and how to implement Kaizen
PPTX
capstoneoooooooooooooooooooooooooooooooooo
PDF
Volvo ecr88 lifting capacity Service Repair Manual.pdf
PDF
Caterpillar Cat 315C Excavator (Prefix CJC) Service Repair Manual Instant Dow...
PPTX
1. introduction-to-bvcjdhjdfffffffffffffffffffffffffffffffffffmicroprocessors...
PDF
Volvo ecr58 problems Repair Manual Pdf Download
PDF
Volvo ecr145cl specs Service Manual Download
PDF
What are dimensions of the Volvo ECR235cl.pdf
PDF
Diagnose and Repair Transmission Sound Issues in Volkswagen Vehicles
PDF
How much does a e145 excavator weight.pdf
PDF
Honda Dealership SNS Evaluation pdf/ppts
PDF
EC300D LR EC300DLR - Volvo Service Repair Manual.pdf
PDF
Caterpillar Cat 329D LN Excavator (Prefix EBM) Service Repair Manual Instant ...
PPTX
IMMUNITY TYPES PPT.pptx very good , sufficient
Volvo ecr88 excavator specs Manual Download
Type of Sentence & SaaaaaaaaaadddVA.pptx
Volvo ecr88 battery location Service Repair Manual.pdf
lp of food hygiene.docxvvvvvvvvvvvvvvvvvvvvvvv
Caterpillar CAT 311B EXCAVATOR (8GR00001-UP) Operation and Maintenance Manual...
Paediatric History & Clinical Examination.pptx
Kaizen for Beginners and how to implement Kaizen
capstoneoooooooooooooooooooooooooooooooooo
Volvo ecr88 lifting capacity Service Repair Manual.pdf
Caterpillar Cat 315C Excavator (Prefix CJC) Service Repair Manual Instant Dow...
1. introduction-to-bvcjdhjdfffffffffffffffffffffffffffffffffffmicroprocessors...
Volvo ecr58 problems Repair Manual Pdf Download
Volvo ecr145cl specs Service Manual Download
What are dimensions of the Volvo ECR235cl.pdf
Diagnose and Repair Transmission Sound Issues in Volkswagen Vehicles
How much does a e145 excavator weight.pdf
Honda Dealership SNS Evaluation pdf/ppts
EC300D LR EC300DLR - Volvo Service Repair Manual.pdf
Caterpillar Cat 329D LN Excavator (Prefix EBM) Service Repair Manual Instant ...
IMMUNITY TYPES PPT.pptx very good , sufficient

TRANSIT ELEVATED BUS (straddle bus)

  • 2. CONTENTS  INTRODUCTION  NEXT GENERATION TRANSIT SYSTEM  FEATURES OF TEB  COMPARISON WITH CURRENT TRANSIT SYSTEMS  KEY STEPS FOR IMPLEMENTATION  POWER SUPPLY TO BUS  WHY IN INDIA ?  CONCLUSION  REFERENCE
  • 3.  Traffic jams  Pollution  Fuel cost INTRODUCTION
  • 4. The concept of Transit Elevated Bus(TEB) was introduced in China in 2010, which is the world’s largest polluter. Currently, four types of public transport systems are used in China. That are,  Subway  Light rail train  BRT(Bus rapid Transit)  General bus INTRODUCTION
  • 5. 5  High initial cost  Long time to build  High maintenance SUBWAY
  • 6. 6  Reconstruction of roads  Chances of accidents  Comparatively slow LIGHT RAIL TRAIN
  • 7. 7 BUS RAPID TRANSIT(BRT)  Takes more road space  Pollution  Noise
  • 8. 8 GENERAL BUS  Noise  Pollution  Less capacity  Parking space
  • 9. 9 NEXT GENERATION TRANSIT SYSTEM The model looks like a subway or a light-rail train bestriding the road on both sides. Powered by electricity or solar energy. Reduces the traffic jams by 20%-30%.
  • 10. 10 TRANSIT ELEVATED BUS [TEB]  Huge elevated public bus.  Straddles on two road lines.  Can Carry 1200 passengers.  Allows smaller vehicles to pass under it.  Takes no road space.  Reduces traffic jam by 30%.  Powered by electricity or solar power.  Can reach speeds up to 37 mph(60 kph).
  • 11. 11 Costs about 5.36 billion rupees to build the bus and a 40KM long path for it, approximately 7% cost of metro system. Its 4 - 4.5 M( nearly 15 feet) high with a passenger deck and 7 M in width while other vehicles lower than 2 M( nearly 7 feet) can move under it. FEATURES OF TEB
  • 12. 12 FEATURES OF TEB  Warning alarms are provided underneath to warn cars from getting too close to the bus (radar scanning).  Cameras are fitted at the bottom which can be used to monitor from the driver cabin.  Large windows are provided to avoid backward illusion for the vehicles passing below it.
  • 13. 13  Big cities can be modernise their traffic signalling system to prioritize public buses.  Emergency braking system is provided incase of accidents or emergency situations. FEATURES OF TEB
  • 14. 14  Escaping doors (similar to inflated ladder in planes) are in-built.  Built-in slides engage when necessary during any emergency situations. FEATURES OF TEB
  • 15. 15  Ultrasonic waves are put forth from the end of the bus, that is to keep high cars or trucks away from entering under the bus.  Indicates light when any obstacles are in the path of the vehicle. FEATURES OF TEB
  • 16. 16  Metro costs a lot and takes a long time to build.  BRTs takes up road spaces and produces noise and pollution.  General buses have less capacity.  Large parking spaces are required. 16  It is cheaper and construction takes less time.  It saves road spaces, efficient and high in capacity.  Traveling with these buses will consume less time so its more sophisticated and time efficient.  Large parking spaces are not required and can be parked on roads without affecting other vehicles. Present Transit Systems Straddle Bus System
  • 17. 17  Re - modelling of the road:  Laying Rails - The rails will be laid on both sides of the road and the bus can run on the rails and saving 30% energy due to less wheel rolling resistance.  KEY STEPS INVOLVED IN IMPLEMENTATION Paint White Lines - The white lines are painted on both sides of the road and buses will have auto pilots which will follow these lines and run stable while moving.
  • 18. 18  There are also two ways in dealing with station platform.  load/unload through the side platforms.  Using the built-in ladder at stations, so that passengers can go up and to the overpass through the ceiling door. BUILDING STATIONS
  • 19. 19  MUNICIPAL ELECTRICITY  The setting is called relay direct current electrification.  Bus itself is electrical conductor.  Two rails built on top.  Allow charging post to run along the rails of the bus.  PARTLY SOLAR POWER  Use super capacitor.  It can charge, discharge and store electricity quickly.  Charging is done when bus stops on station.  Achieving zero toxic gas on the process  Solar panels provided on the stations POWER SUPPLY TO BUS
  • 20. 2020 Metro rail transit system Straddle Bus system  It requires huge infrastructure, which incurs more initial investment  It requires more land to build. elevated structures.  It runs only on electricity.  It can carry 1000 passengers at a time.  It does not require elevated structure  It does not require more land, as rails will be laid on the road itself.  It runs on electricity as well as solar energy.  it can carry up to 1200 passengers at a time.  Eco-friendly
  • 21. 21  India is second largest in population.  Because of High population density, India's major cities are facing traffic jams. 30% of traffic jams can be avoid by using straddle bus.  As a developing nation India facing air pollution. Straddle bus can prevent 2640 tons of carbon emissions that 40 buses emit annually.  Fuel cost in India is high comparing with other nations. 860 tons of fuel can be save by using straddle bus.  Shortest construction life cycle of nearly 1 year to build for a 40kms path.  Can be implemented in most of the Metropolitan cities. WHY IN INDIA ?
  • 22. 22  It runs above cars and other road vehicles, saves road space.  It uses electric or solar power and thus reduces the air pollution.  It reduces up to 20-30 % of traffic jams.  It is safe, efficient and has high capacity.  It is eco- friendly CONCLUSION
  • 23. 23  The Straddling bus was first exhibited on the 13th Beijing international high-tech expo in 2010.  The basic idea was proposed by Shenzhen Hashi Future Parking Equipment Company.  First trial run was done in Beijing's Mentougou district by late 2016.  The city of Manaus, Brazil is planning to install this bus on their streets. APPENDIX
  • 24. 24  http://www.nytimes.com  http://www.techeblog.com/index.php/tech-gadget/3d- express-coach-straddling-bus-will-drive-over-cars  http://www.chinahush.com/  http://www.hsfuture.com/ehbus.html  http://www.trafficsolutions.com/ REFERENCE