Troubleshoot fiber network
FIBER OPTIC ACADEMY
IN CONJUCTION
WITH
IMT COMPUTERS NIGERIA LTD
PRESENTS
http://fiberopticacademy.com.ng/
5 STEPS TO
TROUBLESHOOT
FIBER OPTICS
NETWORK
JUST 5 THINGS TO DO
 Assess the situation
 Search for the problem
 Test the system
 Correct the problem
 Document the result
Become
COMPUTER &
NETWORKING ENGINEER
(DCE)
www.imtcomputer.net
STEP 1 : ASSESS THE SITUATION
At this stage we determine the:
 The priority of the condition
 The available resource for rectification
 The priority of the restoration (the critical level L1, L2 L3)
 Available equipment for restoration
 Available manpower (maintenance team
 Method and procedure of restoration
STEP 2: SEARCH FOR THE PROBLEM
 The Method and procedure of restoration adopted will
determine whether to start at the beginning of a link, and
work towards the other end (which only happen where
there is only one link, or a relatively short link) OR
 To start in the middle of the link, and determine in which
direction the problem exists
Certain test equipment expertise will be required at this
stage.
.
STEP 3 :TEST THE SYSTEM
TESTING EQUIPMENT
VISUAL FAULT LOCATOR
OLTS
OTDR
The visual fault locator injects light into the
core of the fiber. The light can be seen at the
other end if the circuit is good.
VISUAL FAULT LOCATOR
Troubleshoot fiber network
POWER METER AND A LIGHT SOURCE
OLTS
OLTS provide the loss value of the fiber to which
they are connected. However, they are limited to
use over short distances.
OTDR reports fiber losses over a long run. It can also
give the exact location of a break, or fault.
OTDR
STEP 4: CORRECT THE PROBLEM
The essence and goal of locating and isolating the problem is to
FIX IT which can be
 cleaning the connector
 replacing a jumper
 Re-splicing
 Re-testing to ensure the restoration of the system to its original
working condition.
Become
COMPUTER &
NETWORKING ENGINEER
(DCE)
www.imtcomputer.net
STEP 5: DOCUMENT THE RESULT
While correcting the problem, record the troubleshooting process
The AS-Built drawing and some other project documents will be affected. More importantly the
record should provide the following information:
 The date
 The reason for troubleshooting
 The method of troubleshooting
 Testing data (if any)
 The location of the problem
 The problem solution
 The testing data after the problem is corrected
For more articles
on IT & TELECOM
CLICK
HERE
For Fiber Training
& Certifications
CLICK
HERE
THANK YOU
from
INTRA-METROPOLITAN
TECHNOLOGIES
(IMT)

More Related Content

PPTX
Network architecture - part-I
PPTX
Chapter 3.pptx
PPTX
Qos Quality of services
PPTX
Tcp IP Model
PPTX
Network design
PPT
Chapter 12(cpm pert)
PPTX
Feasibility study
PPTX
Mobile Ad hoc Networks
Network architecture - part-I
Chapter 3.pptx
Qos Quality of services
Tcp IP Model
Network design
Chapter 12(cpm pert)
Feasibility study
Mobile Ad hoc Networks

What's hot (20)

PPTX
Visualizing Progress.pptx
PDF
FTTH Planning using GIS
PPT
Chapter03
PPT
Network Essentials
PPT
Switching systems lecture1
PPTX
Project communications management
PPT
PPSX
Requirement Elicitation Techniques
PPT
Network architecture
PPT
TCP Model
PDF
Software project management
PPTX
Fiber Network Deployment
PPT
Capability maturity model cmm lecture 8
PPT
Ieee 802.11 wireless lan
PPTX
Lan and Its Components
PPTX
Session Layer
PPT
Quality of service
PPS
GIS Role in FTTx
PPTX
Project communications management
PPTX
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
Visualizing Progress.pptx
FTTH Planning using GIS
Chapter03
Network Essentials
Switching systems lecture1
Project communications management
Requirement Elicitation Techniques
Network architecture
TCP Model
Software project management
Fiber Network Deployment
Capability maturity model cmm lecture 8
Ieee 802.11 wireless lan
Lan and Its Components
Session Layer
Quality of service
GIS Role in FTTx
Project communications management
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
Ad

Similar to Troubleshoot fiber network (20)

PPTX
Fiber optics
PPTX
PACE-IT: Troubleshooting Fiber Cable Networks
PDF
Bicsi news best-practices
PDF
Visual Fault Locator Everything You Need to Know
PDF
Pruebas y Solucion de problemas empresariales en redes de Fibra Optica
PDF
Troubleshooting_Fiber-7002378.pdf
PDF
Realise the Value in modern Data Center Infrastructure
PDF
Troubleshoot faults in fiber optic cables
PPT
Testing and Troubleshooting Fiber Optic Cables
PPTX
Ofc day 3
PPTX
Optical_Fiber_Technology
PPTX
Losses in optical wires
PDF
AFL Fiber Optics Demystified - OTDR Fundamentals - Slide Deck.pdf
PDF
Best Practices Fiber and SFP Inspection
PDF
SPC_EXFOSession1.pdf
PPTX
Sticklers Fiber Cleaning Technical Presentation - BICSI Mexico City
PDF
Flexible Fabric Innerduct
PPTX
Connector Inspection & Cleaning Best Practices
DOCX
Fibre cable repair. can fibre optic cable be joined
PPTX
Sources of End Face Contamination on Fiber Optic Interconnects and Recommende...
Fiber optics
PACE-IT: Troubleshooting Fiber Cable Networks
Bicsi news best-practices
Visual Fault Locator Everything You Need to Know
Pruebas y Solucion de problemas empresariales en redes de Fibra Optica
Troubleshooting_Fiber-7002378.pdf
Realise the Value in modern Data Center Infrastructure
Troubleshoot faults in fiber optic cables
Testing and Troubleshooting Fiber Optic Cables
Ofc day 3
Optical_Fiber_Technology
Losses in optical wires
AFL Fiber Optics Demystified - OTDR Fundamentals - Slide Deck.pdf
Best Practices Fiber and SFP Inspection
SPC_EXFOSession1.pdf
Sticklers Fiber Cleaning Technical Presentation - BICSI Mexico City
Flexible Fabric Innerduct
Connector Inspection & Cleaning Best Practices
Fibre cable repair. can fibre optic cable be joined
Sources of End Face Contamination on Fiber Optic Interconnects and Recommende...
Ad

More from JOHNSON ADEJOLA ( Msc, CCNA,CFOT, CFOS/D/H/I/O/L (17)

PDF
5 major milestones in fiber osp project
PDF
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
PDF
How to calculate the loss budget for a plant fiber optic cable plant
PDF
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
PDF
Operations of singlemode fiber cable
PDF
FIBER OPTIC PROJECT AS-BUILT DRAWING (ABD)
PDF
10 stages of fiber project implemetation
PDF
The technology of fiber optic in telcommunication
PDF
Fiber Optic project implemetation procedure
PDF
5 major milestones in fiber osp project
PDF
9 steps to calculate loss budget
PDF
loss budget calculation in fiber optic link
5 major milestones in fiber osp project
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
How to calculate the loss budget for a plant fiber optic cable plant
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
Operations of singlemode fiber cable
FIBER OPTIC PROJECT AS-BUILT DRAWING (ABD)
10 stages of fiber project implemetation
The technology of fiber optic in telcommunication
Fiber Optic project implemetation procedure
5 major milestones in fiber osp project
9 steps to calculate loss budget
loss budget calculation in fiber optic link

Recently uploaded (20)

PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PPTX
Tartificialntelligence_presentation.pptx
PPTX
The various Industrial Revolutions .pptx
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
A comparative study of natural language inference in Swahili using monolingua...
PPT
Geologic Time for studying geology for geologist
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
Five Habits of High-Impact Board Members
PDF
Hindi spoken digit analysis for native and non-native speakers
PPT
Module 1.ppt Iot fundamentals and Architecture
PPTX
Chapter 5: Probability Theory and Statistics
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PDF
STKI Israel Market Study 2025 version august
PDF
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PDF
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Developing a website for English-speaking practice to English as a foreign la...
A contest of sentiment analysis: k-nearest neighbor versus neural network
Tartificialntelligence_presentation.pptx
The various Industrial Revolutions .pptx
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
A comparative study of natural language inference in Swahili using monolingua...
Geologic Time for studying geology for geologist
Assigned Numbers - 2025 - Bluetooth® Document
Five Habits of High-Impact Board Members
Hindi spoken digit analysis for native and non-native speakers
Module 1.ppt Iot fundamentals and Architecture
Chapter 5: Probability Theory and Statistics
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
STKI Israel Market Study 2025 version august
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
Final SEM Unit 1 for mit wpu at pune .pptx
1 - Historical Antecedents, Social Consideration.pdf
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Developing a website for English-speaking practice to English as a foreign la...

Troubleshoot fiber network

  • 2. FIBER OPTIC ACADEMY IN CONJUCTION WITH IMT COMPUTERS NIGERIA LTD PRESENTS http://fiberopticacademy.com.ng/
  • 4. JUST 5 THINGS TO DO  Assess the situation  Search for the problem  Test the system  Correct the problem  Document the result Become COMPUTER & NETWORKING ENGINEER (DCE) www.imtcomputer.net
  • 5. STEP 1 : ASSESS THE SITUATION At this stage we determine the:  The priority of the condition  The available resource for rectification  The priority of the restoration (the critical level L1, L2 L3)  Available equipment for restoration  Available manpower (maintenance team  Method and procedure of restoration
  • 6. STEP 2: SEARCH FOR THE PROBLEM  The Method and procedure of restoration adopted will determine whether to start at the beginning of a link, and work towards the other end (which only happen where there is only one link, or a relatively short link) OR  To start in the middle of the link, and determine in which direction the problem exists Certain test equipment expertise will be required at this stage. .
  • 7. STEP 3 :TEST THE SYSTEM TESTING EQUIPMENT VISUAL FAULT LOCATOR OLTS OTDR
  • 8. The visual fault locator injects light into the core of the fiber. The light can be seen at the other end if the circuit is good. VISUAL FAULT LOCATOR
  • 10. POWER METER AND A LIGHT SOURCE OLTS OLTS provide the loss value of the fiber to which they are connected. However, they are limited to use over short distances.
  • 11. OTDR reports fiber losses over a long run. It can also give the exact location of a break, or fault. OTDR
  • 12. STEP 4: CORRECT THE PROBLEM The essence and goal of locating and isolating the problem is to FIX IT which can be  cleaning the connector  replacing a jumper  Re-splicing  Re-testing to ensure the restoration of the system to its original working condition. Become COMPUTER & NETWORKING ENGINEER (DCE) www.imtcomputer.net
  • 13. STEP 5: DOCUMENT THE RESULT While correcting the problem, record the troubleshooting process The AS-Built drawing and some other project documents will be affected. More importantly the record should provide the following information:  The date  The reason for troubleshooting  The method of troubleshooting  Testing data (if any)  The location of the problem  The problem solution  The testing data after the problem is corrected
  • 14. For more articles on IT & TELECOM CLICK HERE For Fiber Training & Certifications CLICK HERE