Solar Powered Systemwith TS1000 ControllerTrench & FillInstallationCity of Vallejo, CA 12/09
The BasicsFxtures must be installed flush with the pavement and aimed in the right direction.Before installation check for crowning in the road, adjustto compensate for crowning.Base cans require a drainage system. Before installation check soil for drainage issues.DC System color coding for cabling is different: Whiteconnects to RedBlack connects to BlackSolar panels must face true south and require full sunlight from 9am to 3pm. Check for shadows that might interferewith exposure during those hours.Quickdry cement can be used to set base cans quickly and prevent sinking.Follow these basics for a great installation.
Pre-installation Phase
In-Pavement Installation PhaseSystem Delivery and Site Inspection
In-Pavement Installation PhaseSystem Delivery and Site Inspection
Trenching Phase
Trenching Phase
Infrastructure Phase
Drainage System
Drainage System.
Electrical System
Electrical System
Base Can System
Pole Assembly and Electrical
Pole Assembly and Electrical
Solar Panel Assembly
Solar Panel Assembly.
Signs and Activation
Activation and Cabling.
Cabling the System
Filling Trenches
Fixture Layout
Completed System and Site Photos.
Activation
Finished Site.
Finished Site..
Finished Site..
Tsc 2
Traffic Safety Corp. 1-888-446-9255 Copyright © 2010 Traffic Safety Corp. All rights reserved.

More Related Content

KEY
Social media aypa
PPT
Lider
PPT
Glosario
PDF
Kisi kisisoaluambnskimaagm
PPTX
high school
PPTX
Why Sales and Marketing are like PB&J
PPT
Glosario
PPTX
Powerpoint 1
Social media aypa
Lider
Glosario
Kisi kisisoaluambnskimaagm
high school
Why Sales and Marketing are like PB&J
Glosario
Powerpoint 1

Viewers also liked (6)

PPT
Chapter 1 v n.2
PPTX
Presentatie Passie Voor Haiti
PPT
Natasja
PPT
การดูแลสุขภาพฉัน (ฉันในอดีต ปัจจุบัน และอนาคต)
PPTX
Sato Markkinoinnin KPI mittariston rakentaminen
PDF
The Role of Integrated Marketing Communications
Chapter 1 v n.2
Presentatie Passie Voor Haiti
Natasja
การดูแลสุขภาพฉัน (ฉันในอดีต ปัจจุบัน และอนาคต)
Sato Markkinoinnin KPI mittariston rakentaminen
The Role of Integrated Marketing Communications
Ad

Similar to Tsc 2 (14)

PDF
Installation, Operations, and Maintenance.pdf
PDF
Solarsmart Solar Signage General
PPTX
Lobel solar project ppt
PPTX
Presentation for Final Year Students about Solar.pptx
PDF
0112-2016 JMS Solar Network & Associates
PDF
Srs installation guide
PPTX
Unit 2 Sustainable within Construction industry
PPTX
Solar_Photo _Voltaic_System_designs.pptx
PPT
Solar Tracking Controller Atributes
PDF
Optimus Energy Solar Power Information Pack - Australia
PPT
Solar Training 20100208
PDF
Technical guide-smart-technology-and-solar-street-lights
PDF
How to install solar led street lights
PPSX
Efficient Solar Panel Installation System
Installation, Operations, and Maintenance.pdf
Solarsmart Solar Signage General
Lobel solar project ppt
Presentation for Final Year Students about Solar.pptx
0112-2016 JMS Solar Network & Associates
Srs installation guide
Unit 2 Sustainable within Construction industry
Solar_Photo _Voltaic_System_designs.pptx
Solar Tracking Controller Atributes
Optimus Energy Solar Power Information Pack - Australia
Solar Training 20100208
Technical guide-smart-technology-and-solar-street-lights
How to install solar led street lights
Efficient Solar Panel Installation System
Ad

Tsc 2