TYPES
OF
CONTRACTS
Types of construction contracts pro and cons
Types of construction contracts pro and cons
• Lump-sum Contract
• Cost Plus Fixed Fee Contract
• Cost Plus Bid Fee Contract
• Guaranteed Maximum Contract
• Negotiated Contract
• Unit-price Contract
• Design Build
• Turn Key Contracts
Lump-sum
Contract
• Traditional method of Contract.
• The contractor offers to do the whole work for a total
stipulated sum of money as given in drawings and
described by specification.
• It is more suitable for works which contractor have
prior construction experience.
• This is considered when tender process will tend to be
slower and preparing a tender may be more expensive
for the contractor.
Advantages
• Owner is aware of the cost of the project before the
project construction starts.
• Project scope and limits are defined prior to the
start
of construction.
• Contractual relation between all parties, owner and
Engineer are clearly defined.
• Best price for work obtained through competitive
process with cost of work established and agreed
upon.
Disadvantages
• The lack of time flexibility in this method may result in
delayed project implementation.
• Highly skilled Architect or Engineer is needed.
• Difficult to implement revisions or change in the work
on the later stage of the work.
Cost Plus fixed fee Contract
•All Cost for the work according to the specification is
reimbursed by the owner to the contractor.
•Contractor is paid a fixed sum which represents the
profit
•The variation on the lump-sum fee is percentage fee
wherein fees is established by percentage of total cost
incurred by the contractor.
•Usually it is fixed as a sum.
Cost Plus Bid fee Contract
•Owner invites proposal from qualified contractor
in terms of past experience, performance , etc.
•All Cost for the work according to the
specification is reimbursed by the owner to the
contractor.
•The bid fee is calculated on the basis of project
scope.
Guaranteed Maximum Contract
•The contractor agrees to perform work within
a price ceiling. This is the maximum
guaranteed price.
•If the ceiling is exceeded, without change in scope then the
excess cost is borne by the contractor. If the work is
accomplished under the ceiling then the owner pays no
more than the actual cost and the profit is
shared between the contractor and the owner.
This method gives greater flexibility for the owner
Negotiated Contract
The preselected contractors are invited upon on the basis
of Capability of the past experience in the specific area
Availability of the personnel to accomplish
the work in the specified time frame Bid (Estimate) Price
Proposed method for compensation including
amount of fee.
•The owner is then negotiating with the contract
including method of payment for the work, Bid,
etc.
•On the basis of circumstances it can be
competitive or non-competitive.
Unit Price Contract
•Based on the estimated quantities of the items
involved in the work.
•The cost per unit item is given by the contractor
and the estimated quantities of items are given by
the owner.
•The total cost of work can only be calculated only
measurement is made
after the completion of the work because
on the basis of work
actually done.
•The contractor is obliged to perform the work
actually required in the field at his quoted price
only.
•If the estimated quantity is exceeds, then there
should be increase in unit price , therefore it is
difficult to forecast the project cost.
Design Build
•It is a method to deliver a project in which the design and
construction services are contracted by a single entity
known as the design–builder or design–build contractor
•design–build relies on a single point of responsibility
contract and is used to minimize risks for the project
owner and to reduce the delivery schedule by
overlapping the design phase and construction phase of a
project.
•Contractor will be responsible for all of the work on the
project, regardless of the nature of the fault
Turn-key
contracts
•A type of project that is constructed so that it could be
sold to any buyer as a completed product.
•This is
contrasted
with build to
order,wherethe constructor builds an item
to the buyer's exact
specifications, or when an incomplete product is
sold with the assumption that the buyer would complete
it.
Earnest Money Deposit (EMD)
Security Deposit (SD)
Defects Liability Period (DLP)
Retention Money/retention amount

More Related Content

PPTX
types-170309142854.pptx
PPTX
Types of Contract in Construction Management
PPTX
Contracts
PDF
Measure And Pay Contract
PDF
Key Components of Cost Estimation in construction
PPTX
Unit V - Contracts.pptx
PPTX
Lecture 3.pptx
PPTX
Contract Management - Contracts Types and Payment Structure
types-170309142854.pptx
Types of Contract in Construction Management
Contracts
Measure And Pay Contract
Key Components of Cost Estimation in construction
Unit V - Contracts.pptx
Lecture 3.pptx
Contract Management - Contracts Types and Payment Structure

Similar to Types of construction contracts pro and cons (20)

PDF
TOPIC2.pdf
PPTX
1. Contracts and Tender.pptx jkbjhvjhcvhgcfgxftxtrjxgjfchchgchgkchgkchkgchgkch
PPTX
Types of contracts
PPTX
Professional practice-1-presentation
PPTX
Negotiated contracts
PPTX
Construction contract
PPTX
Classification of contracts
PDF
3. Contract Pricing.pdf
PPTX
Lecture 4 - selection of contract forms
PPT
BLdg mtc 7c -Execution of maintenance work load - 25.ppt
PPT
BLdg mtc 7c -Execution of maintenance work load - 25.ppt
PPTX
Types and forms of contracts
PPT
TENDERS and Contracts basic syllabus for engineering
PPTX
Preparation of boq
PPTX
Contracts Management
PDF
Muckle LLP - Which contract should I be using?
PPT
Contract costing
PPTX
Topic No 3 New (2) chh gi ugihob ivihoog
PPT
contract procedure
PPTX
6.1.1.-REVENUE-RECOGNITION-CONSTRUCTION-CONTRACTS.pptx
TOPIC2.pdf
1. Contracts and Tender.pptx jkbjhvjhcvhgcfgxftxtrjxgjfchchgchgkchgkchkgchgkch
Types of contracts
Professional practice-1-presentation
Negotiated contracts
Construction contract
Classification of contracts
3. Contract Pricing.pdf
Lecture 4 - selection of contract forms
BLdg mtc 7c -Execution of maintenance work load - 25.ppt
BLdg mtc 7c -Execution of maintenance work load - 25.ppt
Types and forms of contracts
TENDERS and Contracts basic syllabus for engineering
Preparation of boq
Contracts Management
Muckle LLP - Which contract should I be using?
Contract costing
Topic No 3 New (2) chh gi ugihob ivihoog
contract procedure
6.1.1.-REVENUE-RECOGNITION-CONSTRUCTION-CONTRACTS.pptx
Ad

More from Suchith Reddy Arukala (8)

PDF
CDT 1 Mineral Properties discussion of minerals
PDF
UNIT 1 chapter 2 Petrology part2 study on rocks
PDF
Lab 1 - Physical Propertie of minerals.pdf
PPTX
Weathering of rocks and its useful ness in civil engineering
PPTX
Valuation of building infrastructure and construction
PPTX
Sustainable Principles, Materials and Technologies
PPTX
lamis theorem.pptx
PPTX
MCDM PPT.pptx
CDT 1 Mineral Properties discussion of minerals
UNIT 1 chapter 2 Petrology part2 study on rocks
Lab 1 - Physical Propertie of minerals.pdf
Weathering of rocks and its useful ness in civil engineering
Valuation of building infrastructure and construction
Sustainable Principles, Materials and Technologies
lamis theorem.pptx
MCDM PPT.pptx
Ad

Recently uploaded (20)

PPTX
Information Storage and Retrieval Techniques Unit III
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
Module 8- Technological and Communication Skills.pptx
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
introduction to high performance computing
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPTX
communication and presentation skills 01
PDF
Design Guidelines and solutions for Plastics parts
PPT
Occupational Health and Safety Management System
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
Software Engineering and software moduleing
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Information Storage and Retrieval Techniques Unit III
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Module 8- Technological and Communication Skills.pptx
Exploratory_Data_Analysis_Fundamentals.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
introduction to high performance computing
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
communication and presentation skills 01
Design Guidelines and solutions for Plastics parts
Occupational Health and Safety Management System
"Array and Linked List in Data Structures with Types, Operations, Implementat...
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Software Engineering and software moduleing
Nature of X-rays, X- Ray Equipment, Fluoroscopy
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx

Types of construction contracts pro and cons

  • 4. • Lump-sum Contract • Cost Plus Fixed Fee Contract • Cost Plus Bid Fee Contract • Guaranteed Maximum Contract • Negotiated Contract • Unit-price Contract • Design Build • Turn Key Contracts
  • 5. Lump-sum Contract • Traditional method of Contract. • The contractor offers to do the whole work for a total stipulated sum of money as given in drawings and described by specification. • It is more suitable for works which contractor have prior construction experience. • This is considered when tender process will tend to be slower and preparing a tender may be more expensive for the contractor.
  • 6. Advantages • Owner is aware of the cost of the project before the project construction starts. • Project scope and limits are defined prior to the start of construction. • Contractual relation between all parties, owner and Engineer are clearly defined. • Best price for work obtained through competitive process with cost of work established and agreed upon.
  • 7. Disadvantages • The lack of time flexibility in this method may result in delayed project implementation. • Highly skilled Architect or Engineer is needed. • Difficult to implement revisions or change in the work on the later stage of the work.
  • 8. Cost Plus fixed fee Contract •All Cost for the work according to the specification is reimbursed by the owner to the contractor. •Contractor is paid a fixed sum which represents the profit •The variation on the lump-sum fee is percentage fee wherein fees is established by percentage of total cost incurred by the contractor. •Usually it is fixed as a sum.
  • 9. Cost Plus Bid fee Contract •Owner invites proposal from qualified contractor in terms of past experience, performance , etc. •All Cost for the work according to the specification is reimbursed by the owner to the contractor. •The bid fee is calculated on the basis of project scope.
  • 10. Guaranteed Maximum Contract •The contractor agrees to perform work within a price ceiling. This is the maximum guaranteed price. •If the ceiling is exceeded, without change in scope then the excess cost is borne by the contractor. If the work is accomplished under the ceiling then the owner pays no more than the actual cost and the profit is shared between the contractor and the owner. This method gives greater flexibility for the owner
  • 11. Negotiated Contract The preselected contractors are invited upon on the basis of Capability of the past experience in the specific area Availability of the personnel to accomplish the work in the specified time frame Bid (Estimate) Price Proposed method for compensation including amount of fee.
  • 12. •The owner is then negotiating with the contract including method of payment for the work, Bid, etc. •On the basis of circumstances it can be competitive or non-competitive.
  • 13. Unit Price Contract •Based on the estimated quantities of the items involved in the work. •The cost per unit item is given by the contractor and the estimated quantities of items are given by the owner. •The total cost of work can only be calculated only measurement is made after the completion of the work because on the basis of work actually done.
  • 14. •The contractor is obliged to perform the work actually required in the field at his quoted price only. •If the estimated quantity is exceeds, then there should be increase in unit price , therefore it is difficult to forecast the project cost.
  • 15. Design Build •It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor •design–build relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project. •Contractor will be responsible for all of the work on the project, regardless of the nature of the fault
  • 16. Turn-key contracts •A type of project that is constructed so that it could be sold to any buyer as a completed product. •This is contrasted with build to order,wherethe constructor builds an item to the buyer's exact specifications, or when an incomplete product is sold with the assumption that the buyer would complete it. Earnest Money Deposit (EMD) Security Deposit (SD) Defects Liability Period (DLP) Retention Money/retention amount