Aim
Introduce learners to waste management.
Objectives
• List two ways of reducing waste in construction.
• Identify two materials that may be recycled during the construction
process.
• Explain two methods of managing waste disposal on site.
© 2013 City and Guilds of London Institute. All rights reserved. 3 of 11
City & Guilds Construction
What is waste?
Waste is:
• any substance which constitutes a scrap material or effluent or
otherwise any unwanted surplus arising from the application of any
process
• any substance or
article which requires to
be disposed of as being
broken, worn out,
contaminated or
otherwise spoiled.
© 2013 City and Guilds of London Institute. All rights reserved. 4 of 11
City & Guilds Construction
Types of waste
Controlled waste
Building and demolition waste and household industrial and
commercial waste.
It may be divided into three types:
• inert waste: waste that will not decompose, eg rubble, concrete,
metal, rubber, etc
• putrescible waste: waste which will rot and decompose, eg timber,
food, paper
• special waste: waste which is dangerous to keep or dispose of.
Liquids with a flashpoint below 210°C are special waste, eg gun
wash, thinners, Evo-Stik remover.
© 2013 City and Guilds of London Institute. All rights reserved. 5 of 11
City & Guilds Construction
Task
In groups, discuss how to reduce waste in construction.
Then create a mind map on reducing waste.
© 2013 City and Guilds of London Institute. All rights reserved. 6 of 11
City & Guilds Construction
Waste management
A licence is required if you deposit, recover or dispose of controlled
waste.
A building contractor who carries waste, eg a joiner, even if they carry
their own waste, must have a proper transfer note which is required to
be given to the site receiving the waste.
It must contain an honest description of the waste.
© 2013 City and Guilds of London Institute. All rights reserved. 7 of 11
City & Guilds Construction
Waste management continued
A description such as ‘general building waste’ will suffice, however,
‘waste timber’ would be better.
Loads should be segregated to dispose of them correctly. This may
mean several skips, eg:
• brick, rubble, cement, plaster and plasterboard
• empty paint tins, adhesive tins or drums
• wood, cardboard, paper, carpet
• scrap metal, pipe, wire
• various chemicals, oil, grease
• PVC window mouldings, gutters and down pipes.
© 2013 City and Guilds of London Institute. All rights reserved. 8 of 11
City & Guilds Construction
Task
Identify recyclable materials and their uses.
© 2013 City and Guilds of London Institute. All rights reserved. 9 of 11
City & Guilds Construction
Waste disposal: skips
• Set up where lorries can reach them.
• Keep access to skips clear.
• Do not overload skips. The carrier can refuse to remove it/tell you to
unload it.
• Do not load above the height of the sides.
• Do not light fires in skips. Fire weakens the structure of the skip and
can cause it to collapse on lifting.
• Never ride or climb into a skip.
• If on a highway, skips must be lit at night and be guarded by a row of
cones at 45 degrees, ie 2.5m in front of the skip and along the outer
edge.
• Skips must not cover manholes or drains.
© 2013 City and Guilds of London Institute. All rights reserved. 10 of 11
City & Guilds Construction
Enforcement
The Environment Agency under the Environmental Protection Act 1990
has the duty of policing environmental pollution. They have similar
powers to the Health and Safety Executive.
Fires should not be used as a method of disposal without permission
and must be controlled by trained staff to ensure unacceptable
materials are not burnt.
Discharge to the atmosphere will attract the attention of officers if black
smoke from insulation is produced.
© 2013 City and Guilds of London Institute. All rights reserved. 11 of 11
City & Guilds Construction
Any questions?

More Related Content

PPTX
101 Level 1 Principles of building construction, information and communication
PPTX
Unit 101: Principles of building construction, information and communication
PPTX
Foundations 3
PPTX
101 Level 1 Principles of building construction, information and communication
PPTX
101 Level 1 Principles of building construction, information and communication
PPTX
Unit 101, ppt 4, Principles of building, construction, information and commu...
PPTX
Unit 113: Maintain and use carpentry and joinery hand tools
PPTX
6706 l2u214 powerpoint_3
101 Level 1 Principles of building construction, information and communication
Unit 101: Principles of building construction, information and communication
Foundations 3
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
Unit 101, ppt 4, Principles of building, construction, information and commu...
Unit 113: Maintain and use carpentry and joinery hand tools
6706 l2u214 powerpoint_3

What's hot (20)

PPTX
Floor boarding and calculations 4
PPTX
Unit 201: Health safety and welfare in construction
PPTX
Unit 101, ppt 3, Principles of building, construction, information and commu...
PPTX
Unit 113: Maintain and use carpentry and joinery hand tools
PPTX
L2 bench joinery unit 211 power point presentation 4
PPTX
Communication on site 5
PPTX
Sustainable insulation materials 1
PPTX
unit 207 carry out first fix flooring and roofing
PPTX
Unit 201: Health safety and welfare in construction
PPT
Set Out and Build Masonry Structures
PPT
Cavity Walling Activities - Session 1
PPTX
202 principles of construction
PPTX
unit 207 carry out first fix flooring and roofing
PPTX
unit 207 carry out first fix flooring and roofing
PPTX
Unit 201 Health, safety and welfare in construction
PPTX
L2 bench joinery unit 211 power point presentation 3
PPTX
L2 bench joinery unit 211 power point presentation 2
PPTX
L2 bench joinery unit 211 power point presentation 5
PPTX
6706 unit 209 ppt 2
PPTX
unit 207 carry out first fix flooring and roofing
Floor boarding and calculations 4
Unit 201: Health safety and welfare in construction
Unit 101, ppt 3, Principles of building, construction, information and commu...
Unit 113: Maintain and use carpentry and joinery hand tools
L2 bench joinery unit 211 power point presentation 4
Communication on site 5
Sustainable insulation materials 1
unit 207 carry out first fix flooring and roofing
Unit 201: Health safety and welfare in construction
Set Out and Build Masonry Structures
Cavity Walling Activities - Session 1
202 principles of construction
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
Unit 201 Health, safety and welfare in construction
L2 bench joinery unit 211 power point presentation 3
L2 bench joinery unit 211 power point presentation 2
L2 bench joinery unit 211 power point presentation 5
6706 unit 209 ppt 2
unit 207 carry out first fix flooring and roofing
Ad

Similar to Unit 101 Level 1 Principles of building construction, information and communication (20)

PPTX
Waste management 2
PDF
6710 127 l1_powerpoint_3
PDF
Disposal
PPTX
C&D waste management and onsite Dust Mitigation .pptx
PPTX
C&D waste management and onsite Dust Mitigation .pptx
PPTX
ENVIRONMENTAL IMPLICATIONS OF BUILDINGS.pptx
PPTX
recycle and reuse
PPTX
09 - Construction and Demolition Waste.pptx
PDF
Gruff's Recycling Report
PDF
Consolidated Program_LEED_0805_color
PPT
reuse of c&d waste
PDF
RICS FLASH Presentation
PPTX
Construction and Demolition Waste Recycling
PPT
Waste management
PPT
130 waste management
PPTX
Recycle and reuse of solid waste
PPTX
Developments in waste regulation 2014
PPTX
Construction and demolition waste in India
PPTX
Construction and demolition waste
Waste management 2
6710 127 l1_powerpoint_3
Disposal
C&D waste management and onsite Dust Mitigation .pptx
C&D waste management and onsite Dust Mitigation .pptx
ENVIRONMENTAL IMPLICATIONS OF BUILDINGS.pptx
recycle and reuse
09 - Construction and Demolition Waste.pptx
Gruff's Recycling Report
Consolidated Program_LEED_0805_color
reuse of c&d waste
RICS FLASH Presentation
Construction and Demolition Waste Recycling
Waste management
130 waste management
Recycle and reuse of solid waste
Developments in waste regulation 2014
Construction and demolition waste in India
Construction and demolition waste
Ad

More from gsr101 (20)

PPTX
L2 bench joinery unit 211 power point presentation 1
PPTX
6706 l2u214 powerpoint_5
PPTX
6706 l2u214 powerpoint_4
PPTX
6706 l2u214 powerpoint_2
PPTX
6706 l2u214 powerpoint_1
PPTX
L2 bench joinery unit 212 power point presentation 5
PPTX
L2 bench joinery unit 212 power point presentation 3
PPTX
L2 bench joinery unit 212 power point presentation 1
PPTX
L2 bench joinery unit 213 power point presentation 5
PDF
L2 bench joinery unit 213 power point presentation 4
PPTX
L2 bench joinery unit 213 power point presentation 3
PPTX
L2 bench joinery unit 213 power point presentation 2
PPTX
unit 213 power point presentation 1
PPTX
Foundations
PPTX
Unit 113: Maintain and use carpentry and joinery hand tools
PPTX
Unit 113: Maintain and use carpentry and joinery hand tools
PPTX
Unit 113: Maintain and use carpentry and joinery hand tools
PPTX
Unit 113: Maintain and use carpentry and joinery hand tools
PPT
Unit 115: Produce woodworking joints
PPT
Unit 115: Produce woodworking joints
L2 bench joinery unit 211 power point presentation 1
6706 l2u214 powerpoint_5
6706 l2u214 powerpoint_4
6706 l2u214 powerpoint_2
6706 l2u214 powerpoint_1
L2 bench joinery unit 212 power point presentation 5
L2 bench joinery unit 212 power point presentation 3
L2 bench joinery unit 212 power point presentation 1
L2 bench joinery unit 213 power point presentation 5
L2 bench joinery unit 213 power point presentation 4
L2 bench joinery unit 213 power point presentation 3
L2 bench joinery unit 213 power point presentation 2
unit 213 power point presentation 1
Foundations
Unit 113: Maintain and use carpentry and joinery hand tools
Unit 113: Maintain and use carpentry and joinery hand tools
Unit 113: Maintain and use carpentry and joinery hand tools
Unit 113: Maintain and use carpentry and joinery hand tools
Unit 115: Produce woodworking joints
Unit 115: Produce woodworking joints

Recently uploaded (20)

PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
IGGE1 Understanding the Self1234567891011
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PPTX
20th Century Theater, Methods, History.pptx
PDF
Empowerment Technology for Senior High School Guide
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
Introduction to pro and eukaryotes and differences.pptx
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
IGGE1 Understanding the Self1234567891011
B.Sc. DS Unit 2 Software Engineering.pptx
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
AI-driven educational solutions for real-life interventions in the Philippine...
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Cambridge-Practice-Tests-for-IELTS-12.docx
Unit 4 Computer Architecture Multicore Processor.pptx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
LDMMIA Reiki Yoga Finals Review Spring Summer
FORM 1 BIOLOGY MIND MAPS and their schemes
20th Century Theater, Methods, History.pptx
Empowerment Technology for Senior High School Guide
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
History, Philosophy and sociology of education (1).pptx
Introduction to pro and eukaryotes and differences.pptx

Unit 101 Level 1 Principles of building construction, information and communication

  • 1. © 2013 City and Guilds of London Institute. All rights reserved. 1 of 11 City & Guilds Construction PowerPointpresentation Presentation 2: Waste management Unit 101: Principles of building construction, information and communication
  • 2. © 2013 City and Guilds of London Institute. All rights reserved. 2 of 11 City & Guilds Construction Aim Introduce learners to waste management. Objectives • List two ways of reducing waste in construction. • Identify two materials that may be recycled during the construction process. • Explain two methods of managing waste disposal on site.
  • 3. © 2013 City and Guilds of London Institute. All rights reserved. 3 of 11 City & Guilds Construction What is waste? Waste is: • any substance which constitutes a scrap material or effluent or otherwise any unwanted surplus arising from the application of any process • any substance or article which requires to be disposed of as being broken, worn out, contaminated or otherwise spoiled.
  • 4. © 2013 City and Guilds of London Institute. All rights reserved. 4 of 11 City & Guilds Construction Types of waste Controlled waste Building and demolition waste and household industrial and commercial waste. It may be divided into three types: • inert waste: waste that will not decompose, eg rubble, concrete, metal, rubber, etc • putrescible waste: waste which will rot and decompose, eg timber, food, paper • special waste: waste which is dangerous to keep or dispose of. Liquids with a flashpoint below 210°C are special waste, eg gun wash, thinners, Evo-Stik remover.
  • 5. © 2013 City and Guilds of London Institute. All rights reserved. 5 of 11 City & Guilds Construction Task In groups, discuss how to reduce waste in construction. Then create a mind map on reducing waste.
  • 6. © 2013 City and Guilds of London Institute. All rights reserved. 6 of 11 City & Guilds Construction Waste management A licence is required if you deposit, recover or dispose of controlled waste. A building contractor who carries waste, eg a joiner, even if they carry their own waste, must have a proper transfer note which is required to be given to the site receiving the waste. It must contain an honest description of the waste.
  • 7. © 2013 City and Guilds of London Institute. All rights reserved. 7 of 11 City & Guilds Construction Waste management continued A description such as ‘general building waste’ will suffice, however, ‘waste timber’ would be better. Loads should be segregated to dispose of them correctly. This may mean several skips, eg: • brick, rubble, cement, plaster and plasterboard • empty paint tins, adhesive tins or drums • wood, cardboard, paper, carpet • scrap metal, pipe, wire • various chemicals, oil, grease • PVC window mouldings, gutters and down pipes.
  • 8. © 2013 City and Guilds of London Institute. All rights reserved. 8 of 11 City & Guilds Construction Task Identify recyclable materials and their uses.
  • 9. © 2013 City and Guilds of London Institute. All rights reserved. 9 of 11 City & Guilds Construction Waste disposal: skips • Set up where lorries can reach them. • Keep access to skips clear. • Do not overload skips. The carrier can refuse to remove it/tell you to unload it. • Do not load above the height of the sides. • Do not light fires in skips. Fire weakens the structure of the skip and can cause it to collapse on lifting. • Never ride or climb into a skip. • If on a highway, skips must be lit at night and be guarded by a row of cones at 45 degrees, ie 2.5m in front of the skip and along the outer edge. • Skips must not cover manholes or drains.
  • 10. © 2013 City and Guilds of London Institute. All rights reserved. 10 of 11 City & Guilds Construction Enforcement The Environment Agency under the Environmental Protection Act 1990 has the duty of policing environmental pollution. They have similar powers to the Health and Safety Executive. Fires should not be used as a method of disposal without permission and must be controlled by trained staff to ensure unacceptable materials are not burnt. Discharge to the atmosphere will attract the attention of officers if black smoke from insulation is produced.
  • 11. © 2013 City and Guilds of London Institute. All rights reserved. 11 of 11 City & Guilds Construction Any questions?