This document provides information about the start-up process for a 660 MW power generating unit at Adani Power Limited in Tiroda, India. It discusses the key steps in preparing boiler and turbine systems, warming up and rolling the turbine, synchronizing with the grid, and gradually loading the unit to full power. The start-up involves flushing the boiler, lighting the furnace, warming casings, rolling the turbine to operating speed, switching over steam flows, and cutting in coal mills in stages to ramp up load. Critical parameters are monitored at each stage to ensure safe and efficient start-up of the unit.