SlideShare a Scribd company logo
VISIBLE   INVISIBLE
VISIBLE INVISIBLE                                 The Concept
For every “visible” intervention…
          And its SUSTAINABILITY




                                                  Include an “invisible” counterpart




                    To contribute to a comprehensive development…
VISIBLE INVISIBLE

           •   Connectivity
           •   Density                                      • History
Context    •   Activities / Services
           •   Mobility

                                   •   Current conditions
Problem                            •   Strengths
Analysis                           •   Weaknesses
                                   •   Opportunities

           • Levels of action
               • Neighborhood
                                                            •   Participation
               • District
  The                                                       •   Perception
               • City
Proposal                                                    •   Self-esteem
           • Areas of intervention
                                                            •   Ownership
               • Urban Development
                                                            •   Pride
               • Public Space
               • Governance

                       Structure of the Presentation
CONTEXT ANALYSIS
NEW DOOR
Context   Context Analysis
Context   Context Analysis
Context   Context Analysis
Context   Context Analysis density
Context   Context Analysis
Context   Sections
Context   Previous Attempts
                                         PRINCIPLES
          1960   Land Use Plan       Respectful of the
                                     typology


          1969   Torre Baró-
                 Vallbona-Trinitat                                Expropriation

          1976   Metropolitan Plan

                                                            Improve accessibility: small   To conceive facilities
                                     Gradual and flexible
          1984   Special Plan PERI   intervention
                                                            operations
                                                            Improve pedestrian
                                                            network
                                                            Upgrade existing buildings
                                                            Provision of public spaces
          1987   Modifications PGM
          1993

                                                            Improve infrastructure         Assume and warrant
                                     Improve urban
          2004   Modifications PGM   connectivity
                                                            Social housing for             public initiative
                                                            relocation                     processes


          2005   Modifications PGM   Expropriation



                                     Increase density
          2006   Modifications PGM   Camí de Ronda (Sant         Expropriation
                                     Feliú)
PROBLEM ANALYSIS
LOW QUALITY OF
                                                         LIFE
                Relative low                             Weak areas
                                                                                                         Weak
                   urban                                 and urban
                                                                                                       Governan
                development                                space
                                                                             Poor           Rigid laws and
                    Poorly           Scarce and       Lack of public   connections to     standards for the
Low density    constructed self-      deficient        spaces and       the rest of the      provision of
                 built housing     infrastructure        services             city             services
                                                      A Torre Baró
                                                disassociated from the
Problem Tree




                                                   city of Barcelona
                 Spontaneaus                          Lack of urban                                  (Illegal) Lan
                 settlements                            planning                                      Occupatio
                                                     MISMANAGED
                                                    URBANIZATION OF
                                                    THE POPULATION


                                              Problem
                                              Analysis
HIGH QUALITY OF
                                                       LIFE
                  High urban                       Strong Urban                                      Strong
                 development                           Space                                       Governan
                                                                                      Flexible laws and
                                                                         Strong
                  Improved         Efficient       Public spaces     connections to
                                                                                         standards,
higher density                                                                        adequate to the
                   housing      infrastructure      and services        the city           context
Objective Tree




                                                   A Torre Baró
                                                 integrated to the
                                                 city of Barcelona
                   Controlled                     Comprehensive                                  Regular lan
                  settlements                     urban planning                                  occupatio
                                                  WELL MANAGED
                                                 URBANIZATION OF
                                                 THE POPULATION


                                           Problem
                                           Analysis
Conceptual Analysis



Problem
Analysis
Conceptual Analysis



Problem
Analysis
SWOT Analysis
             Unique identity                   • Not very well connected
             •Geographic                         to the rest of the city.
             •Typological                      • Layout of the
             Availability of land                neighborhood as a
                                                 disadvantage
                                                 (infrastructure and
Problem                                          services provision)
Analysis

                                           •    Sudden introduction of an
             • The Gate of Collserola           external megaproject
             • Room to grow wisely         •    Mismanaged increase of
               (strategic densification)        density, speculation,
             • Interesting disposition          gentrification
               of space to play with.      •    Introduction of new typology
             • The Tower and the                forces rearrangement of space
                                                -> loss of uniqueness
               Observatory of the city
                                           •    Missing the opportunity of
                                                catching the Tower /
                                                Observatory’s visitors
Context   Stakeholder Analysis
THE PROPOSAL
“Developed in a balanced way in order to
  vision                                       accomodate all people and all interests”
                                                              Inner city regeneration Charter (2007)




                                                                         y
                                                                     ilit
                                                                  xib
                                                            Fle


               Partic
                        ipatio
                              n




                ty                                                           Con
            ili                                                                  tex
          ab                                                                        t
        nt
  c   ou
Ac



                                          The Calder Principles
                     For a viable and implementable urban regeneration strategy
Structure
           From our analysis…


                      High urban              Strong Urban                  Strong
                     development                  Space                   Governance




                   Urban                      Spatial
                                                                       Governance
                Development                  Approach

            Features land use,
            planning, zoning,           Addresses the
                                        continuum in which       It relates to decisions that
            density, environmental      objects and              define expectations,
            and transportation
            planning.                   events occur and         grant power, or verify
            Incorporates economics,
                                        have relative position   performance.
                                        and direction.           Consistent
            design, ecology,            The systematic           management,
            sociology, geography,       framework that           cohesive policies,
            laws and politics.          humans use to            guidance, processes and
                                        structure all            decision-rights.
            Connection to the
  The
            surrounding neighborhoods
                                        experiences. (I.Kant)
Proposal
            and the rest of the city
Levels of Action
           Urban Development




  The
Proposal
Level 3
           Urban Development

                                        9




                            1                       8
                        2

                                    6       7


                                                5



                                            4
  The                           3
Proposal
Level 2
              Urban Development
 Land use

  zonning

  density

  design

geography

connections

environment




   The
 Proposal
Level 2
              Urban Development
 Land use

  zonning

  density

  design

 geography

connections

environment




   The
 Proposal
Level 2
              Urban Development
 Land use

  zonning

  density

  design

 geography

connections

environment




   The
 Proposal
Identity
              Spatial Approach
  objects

 Relative
 position

  events

 direction

framework

continuum

experiences




   The
 Proposal
Identity
              Spatial Approach
  objects

 Relative
 position

  events

 direction

framework

continuum

experiences




   The
 Proposal
Expression
              Spatial Approach
  objects

 Relative
 position

  events

 direction

framework

continuum

experiences




   The
 Proposal
Snakes and Ladders
              Spatial Approach
  objects

 Relative
 position

  events

 direction

framework

continuum

experiences




   The
 Proposal
Snakes and Ladders Spatial
              Approach
  objects

 Relative
 position

  events

 direction

framework

continuum

experiences




   The
 Proposal
Management
Expectations
               Governance
grant power
                • Flexibility in the standards of services provision. Bear with
                  the expenses until higher density evens expenditure in
performance
                  Torre Baró and the rest of BCN
Management
                • Forest areas (sector 3) and other strategic spots: Right of
                  pre-emption. Avoidance of speculation
 Cohesive       • Law to estimulate productive use of the land. Empty plots
  Policies
                  and houses should not remain as such for a period longer
                  than 5 years* or has to be sold to the municipality.
 processes      • Local experts. Managers of the specific areas of the
                  community: Improvement of community-government
 decision-
                  communication Favela Barrio Case Study
  rights.



   The
 Proposal
               *suggestion. It should respond to further analysis on the matter
Participation
Expectations   Governance
grant power

performance

Management

 Cohesive
  Policies

 processes

 decision-
  rights.



   The
 Proposal
Phases                                                                 Estimated period of time
           Design, Planning                                                  year 1 year 2 year 3 year 4 year 5…
               Meetings, consultations,…                                                                  
               Adjust the legal framework (right of pre-emption,           
               revised building standard, land use,…)                                                     
               Presenting the idea of the “Snakes and Laders
               approach” to the Neighbors’ Association and local 
               leaders to define the community contribution and 
               participation.                                                                             
           Implementation                                                                                 
               Plots clearance                                                                            
               Build new staircases connecting streets in different    
               levels                                                                                     
               Introduce common spaces, playgrounds,…                                                     
               Introduce elements of the ““Snakes and Laders
               approach”                                                                                  
               Open streets in order to establish a road circuit                                          
               Construction of new blocks in the current
               residential areas                                                                          
               Introduction of  the “balloon”                                                             
               Introduce informative elements of possible routes 
               (Colserolla Park, Tower, Baloon, Bars,…)                                                   
               Construction of new blocks in the hill, connecting 
               Torre Baro and Ciudat Meridiana                                                            
Timeline




               Introduce a mini bus route                                                                 
               Intervention in the valley and aqueduct connected 
               to a green network                                                                         
               Introduce a new program in Torre Baro and/or in 
               Valbona (FabLab)                                                                           
               Spontaneous new interventions from the 
               residents                                                                                  
           Maintenance                                                                                    
               Residents maintain areas near their plots  and 
               common areas                                                                               
               Government keep providing regular services and
               maintenance                                                                                
               Through Neighborhood's Association, select a local
               manager to support the District’s Council                                                  
               Regulate and stimulate  the establishment of
               workshops (carpentry, mechanics, welding,…)                                                

  The          Through the participation of existent associations and 
               clubs in the improvements of the neighborhood, 

Proposal    
               promote empowerment and share responsibilities
               with government                                                                            
               The new program introduced (FabLab,…) supports
               and finance activities                                                                     
Risk Mitigation
            • Sudden introduction of      •   Strengthen the 
                                              neighborhood before 
              an external 
                                              introducing “The Gates 
              megaproject                     of Collserola” Internal
            • Mismanaged increase             development
              of density, speculation,    •   Controlled and strategic
              gentrification                  increase of density. Right 
            • Introduction of new             of pre-emption
              typology forces             •   Enforcement of the 
              rearrangement of                original public space and 
              space -> loss of                typology. Growth adapts
              uniqueness                      to it.
                                          •   Torre Baró is attractive 
            • Missing the opportunity 
                                              enough to catch their 
              of catching the Tower /         own visitors (and the 
  The         Observatory’s visitors          Tower’s)
Proposal
Evaluation
           Indicators

                  Indicators          Unit of Measurement        Expected Result
            Mixed used land index     Amount of uses/plot       Higher

            Amount of people         Total amount + analysis    Higher
            walking around the      (Demographic technology-
            neighborhood                    sensor-)
            Occupation Index          Built area/Total area     Higher
            Demographic density           People/Km2            Higher
            Cost of service                    €                Lower than before,
            provision compared to                               equalized to
            that of Barcelona                                   Barcenlona’s
            Community               Spontaneous interventions   Higher
            involvement                 and maintenance

  The
Proposal
The future of Torre Baró




  The
Proposal
The future of Torre Baró




  The
Proposal
Let’s play!




                                                                 Thank you
     By Ana Livi. Michela Guglielmi. Silvia Aldana. Wan-Ting Chiang. Tomasso Sacconi

More Related Content

PDF
Location Context Awareness
PPTX
Demographic and lifestyle data product
PDF
Mimosa workshop smart measures berlin
PPTX
Building a Community of Social Entrepreneurs
PDF
LBS Application Wars
PDF
6th Wave member Brie'Nov
PDF
2013 novus villa and land sub divisions management capabilities
PPT
Torre de collserola
Location Context Awareness
Demographic and lifestyle data product
Mimosa workshop smart measures berlin
Building a Community of Social Entrepreneurs
LBS Application Wars
6th Wave member Brie'Nov
2013 novus villa and land sub divisions management capabilities
Torre de collserola

Recently uploaded (20)

PPT
robotS AND ROBOTICSOF HUMANS AND MACHINES
PDF
Govind singh Corporate office interior Portfolio
PPTX
22CDH01-V3-UNIT III-UX-UI for Immersive Design
PDF
SOUND-NOTE-ARCHITECT-MOHIUDDIN AKHAND SMUCT
PPTX
a group casestudy on architectural aesthetic and beauty
PDF
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
PPT
EthicsNotesSTUDENTCOPYfghhnmncssssx sjsjsj
PDF
2025CategoryRanking of technology university
PPTX
2. Competency Based Interviewing - September'16.pptx
PPTX
Acoustics new for. Sound insulation and absorber
PPTX
UNIT III - GRAPHICS AND AUDIO FOR MOBILE
PPTX
Necrosgwjskdnbsjdmdndmkdndndnmdndndkdmdndkdkndmdmis.pptx
PPTX
Presentation.pptx anemia in pregnancy in
PDF
Social Media USAGE .............................................................
PDF
How Animation is Used by Sports Teams and Leagues
PPTX
UI UX Elective Course S1 Sistem Informasi RPS.pptx
PPTX
Bitcoin predictor project presentation
PPTX
Introduction to Building Information Modeling
PDF
analisis snsistem etnga ahrfahfffffffffffffffffffff
PPTX
Final Presentation of Reportttttttttttttttt
robotS AND ROBOTICSOF HUMANS AND MACHINES
Govind singh Corporate office interior Portfolio
22CDH01-V3-UNIT III-UX-UI for Immersive Design
SOUND-NOTE-ARCHITECT-MOHIUDDIN AKHAND SMUCT
a group casestudy on architectural aesthetic and beauty
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
EthicsNotesSTUDENTCOPYfghhnmncssssx sjsjsj
2025CategoryRanking of technology university
2. Competency Based Interviewing - September'16.pptx
Acoustics new for. Sound insulation and absorber
UNIT III - GRAPHICS AND AUDIO FOR MOBILE
Necrosgwjskdnbsjdmdndmkdndndnmdndndkdmdndkdkndmdmis.pptx
Presentation.pptx anemia in pregnancy in
Social Media USAGE .............................................................
How Animation is Used by Sports Teams and Leagues
UI UX Elective Course S1 Sistem Informasi RPS.pptx
Bitcoin predictor project presentation
Introduction to Building Information Modeling
analisis snsistem etnga ahrfahfffffffffffffffffffff
Final Presentation of Reportttttttttttttttt
Ad
Ad

Visible invisible2

  • 1. VISIBLE INVISIBLE
  • 2. VISIBLE INVISIBLE The Concept For every “visible” intervention… And its SUSTAINABILITY Include an “invisible” counterpart To contribute to a comprehensive development…
  • 3. VISIBLE INVISIBLE • Connectivity • Density • History Context • Activities / Services • Mobility • Current conditions Problem • Strengths Analysis • Weaknesses • Opportunities • Levels of action • Neighborhood • Participation • District The • Perception • City Proposal • Self-esteem • Areas of intervention • Ownership • Urban Development • Pride • Public Space • Governance Structure of the Presentation
  • 6. Context Context Analysis
  • 7. Context Context Analysis
  • 8. Context Context Analysis
  • 9. Context Context Analysis density
  • 10. Context Context Analysis
  • 11. Context Sections
  • 12. Context Previous Attempts PRINCIPLES 1960 Land Use Plan Respectful of the typology 1969 Torre Baró- Vallbona-Trinitat Expropriation 1976 Metropolitan Plan Improve accessibility: small To conceive facilities Gradual and flexible 1984 Special Plan PERI intervention operations Improve pedestrian network Upgrade existing buildings Provision of public spaces 1987 Modifications PGM 1993 Improve infrastructure Assume and warrant Improve urban 2004 Modifications PGM connectivity Social housing for public initiative relocation processes 2005 Modifications PGM Expropriation Increase density 2006 Modifications PGM Camí de Ronda (Sant Expropriation Feliú)
  • 14. LOW QUALITY OF LIFE Relative low Weak areas Weak urban and urban Governan development space Poor Rigid laws and Poorly Scarce and Lack of public connections to standards for the Low density constructed self- deficient spaces and the rest of the provision of built housing infrastructure services city services A Torre Baró disassociated from the Problem Tree city of Barcelona Spontaneaus Lack of urban (Illegal) Lan settlements planning Occupatio MISMANAGED URBANIZATION OF THE POPULATION Problem Analysis
  • 15. HIGH QUALITY OF LIFE High urban Strong Urban Strong development Space Governan Flexible laws and Strong Improved Efficient Public spaces connections to standards, higher density adequate to the housing infrastructure and services the city context Objective Tree A Torre Baró integrated to the city of Barcelona Controlled Comprehensive Regular lan settlements urban planning occupatio WELL MANAGED URBANIZATION OF THE POPULATION Problem Analysis
  • 18. SWOT Analysis Unique identity • Not very well connected •Geographic to the rest of the city. •Typological • Layout of the Availability of land neighborhood as a disadvantage (infrastructure and Problem services provision) Analysis • Sudden introduction of an • The Gate of Collserola external megaproject • Room to grow wisely • Mismanaged increase of (strategic densification) density, speculation, • Interesting disposition gentrification of space to play with. • Introduction of new typology • The Tower and the forces rearrangement of space -> loss of uniqueness Observatory of the city • Missing the opportunity of catching the Tower / Observatory’s visitors
  • 19. Context Stakeholder Analysis
  • 21. “Developed in a balanced way in order to vision accomodate all people and all interests” Inner city regeneration Charter (2007) y ilit xib Fle Partic ipatio n ty Con ili tex ab t nt c ou Ac The Calder Principles For a viable and implementable urban regeneration strategy
  • 22. Structure From our analysis… High urban Strong Urban Strong development Space Governance Urban Spatial Governance Development Approach Features land use, planning, zoning, Addresses the continuum in which It relates to decisions that density, environmental objects and define expectations, and transportation planning. events occur and grant power, or verify Incorporates economics, have relative position performance. and direction. Consistent design, ecology, The systematic management, sociology, geography, framework that cohesive policies, laws and politics. humans use to guidance, processes and structure all decision-rights. Connection to the The surrounding neighborhoods experiences. (I.Kant) Proposal and the rest of the city
  • 23. Levels of Action Urban Development The Proposal
  • 24. Level 3 Urban Development 9 1 8 2 6 7 5 4 The 3 Proposal
  • 25. Level 2 Urban Development Land use zonning density design geography connections environment The Proposal
  • 26. Level 2 Urban Development Land use zonning density design geography connections environment The Proposal
  • 27. Level 2 Urban Development Land use zonning density design geography connections environment The Proposal
  • 28. Identity Spatial Approach objects Relative position events direction framework continuum experiences The Proposal
  • 29. Identity Spatial Approach objects Relative position events direction framework continuum experiences The Proposal
  • 30. Expression Spatial Approach objects Relative position events direction framework continuum experiences The Proposal
  • 31. Snakes and Ladders Spatial Approach objects Relative position events direction framework continuum experiences The Proposal
  • 32. Snakes and Ladders Spatial Approach objects Relative position events direction framework continuum experiences The Proposal
  • 33. Management Expectations Governance grant power • Flexibility in the standards of services provision. Bear with the expenses until higher density evens expenditure in performance Torre Baró and the rest of BCN Management • Forest areas (sector 3) and other strategic spots: Right of pre-emption. Avoidance of speculation Cohesive • Law to estimulate productive use of the land. Empty plots Policies and houses should not remain as such for a period longer than 5 years* or has to be sold to the municipality. processes • Local experts. Managers of the specific areas of the community: Improvement of community-government decision- communication Favela Barrio Case Study rights. The Proposal *suggestion. It should respond to further analysis on the matter
  • 34. Participation Expectations Governance grant power performance Management Cohesive Policies processes decision- rights. The Proposal
  • 35. Phases Estimated period of time Design, Planning year 1 year 2 year 3 year 4 year 5…   Meetings, consultations,…         Adjust the legal framework (right of pre-emption,       revised building standard, land use,…)         Presenting the idea of the “Snakes and Laders approach” to the Neighbors’ Association and local  leaders to define the community contribution and    participation.           Implementation             Plots clearance         Build new staircases connecting streets in different       levels           Introduce common spaces, playgrounds,…           Introduce elements of the ““Snakes and Laders   approach”             Open streets in order to establish a road circuit           Construction of new blocks in the current   residential areas             Introduction of  the “balloon”           Introduce informative elements of possible routes    (Colserolla Park, Tower, Baloon, Bars,…)           Construction of new blocks in the hill, connecting    Torre Baro and Ciudat Meridiana           Timeline   Introduce a mini bus route            Intervention in the valley and aqueduct connected    to a green network           Introduce a new program in Torre Baro and/or in    Valbona (FabLab)           Spontaneous new interventions from the    residents           Maintenance           Residents maintain areas near their plots  and    common areas           Government keep providing regular services and   maintenance           Through Neighborhood's Association, select a local   manager to support the District’s Council            Regulate and stimulate  the establishment of   workshops (carpentry, mechanics, welding,…)            The Through the participation of existent associations and  clubs in the improvements of the neighborhood,  Proposal   promote empowerment and share responsibilities with government           The new program introduced (FabLab,…) supports   and finance activities          
  • 36. Risk Mitigation • Sudden introduction of  • Strengthen the  neighborhood before  an external  introducing “The Gates  megaproject of Collserola” Internal • Mismanaged increase  development of density, speculation,  • Controlled and strategic gentrification increase of density. Right  • Introduction of new  of pre-emption typology forces  • Enforcement of the  rearrangement of  original public space and  space -> loss of  typology. Growth adapts uniqueness to it. • Torre Baró is attractive  • Missing the opportunity  enough to catch their  of catching the Tower /  own visitors (and the  The  Observatory’s visitors Tower’s) Proposal
  • 37. Evaluation Indicators Indicators Unit of Measurement Expected Result Mixed used land index Amount of uses/plot Higher Amount of people Total amount + analysis Higher walking around the (Demographic technology- neighborhood sensor-) Occupation Index Built area/Total area Higher Demographic density People/Km2 Higher Cost of service € Lower than before, provision compared to equalized to that of Barcelona Barcenlona’s Community Spontaneous interventions Higher involvement and maintenance The Proposal
  • 38. The future of Torre Baró The Proposal
  • 39. The future of Torre Baró The Proposal
  • 40. Let’s play! Thank you By Ana Livi. Michela Guglielmi. Silvia Aldana. Wan-Ting Chiang. Tomasso Sacconi