What is Post Tensioning?
• Post-tensioning is a method of producing prestressed concrete, masonry and other
structural elements.
• When the steel is tensioned after concrete placement the process is called
posttensioning.
• When a concrete or masonry element is prestressed, it means that the steel is being
tensioned and the concrete or masonry is being compressed. Compression is a force
that squeezes or crushes and tension is a force that pulls something apart.
• Post-tensioning is a form of prestressing. Prestressing simply means that the steel is
stressed (pulled or tensioned) before the concrete has to support the service loads.
What is post tensioning
What is post tensioning
Freyssinet System
• Freyssinet system was
introduced by the French
Engineer Freyssinet and it was
the first method to be
introduced.
• High strength steel wires of
5mm or 7mm diameter,
numbering 8 or 12 or 16 or 24
are grouped into a cable with a
helical spring inside.
• Spring keeps proper spacing
for the wire. Cable is inserted in
the duct.
• Anchorage device consists of a
concrete cylinder with a
concentric conical hole and
corrugations on its surface, and
a conical plug carrying grooves
on its surface.
Magnel Blaton system
• In Freyssinet system several
wires are stretched at a time. In
Magnel Blaton system, two
wires are stretched at a time
• In this system, the anchorage
device consists of sandwich
plate having grooves to hold
the wires and wedges which
are also grooved.
• Each plate carries eight wires.
Between the two ends the
spacing of the wires is
maintained by spacers.
• Wires of 5mm or 7mm are
adopted. Cables consists of
wires in multiples of 8 wires.
Gifford Udall System
• This system originated in Great
Britain, is widely used in India.
• This is a single wire system.
Each wire is stressed
independently using a double
acting jack.
• Any number of wires can be
grouped together to form a
cable in this system. There are
two types of anchorage device
in this system.
a) Tube anchorages
b) Plate anchorages
Lee McCall System:
• This method is used to
prestress steel bars.
• The diameter of the bar is
between 12 and 28mm. bars
provided with threads at the
ends are inserted in the
performed ducts.
• After stretching the bars to the
required length, they are
tightened using nuts against
bearing plates provided at the
end sections of the member.
• This system has the advantage
over others that stressing can
be done by stages as it is
possible to tighten the nut at
any stage.

More Related Content

PPTX
Post Tension
PPTX
Prestressing Concept, Materials and Prestressing System - Section B, Group 1
PPT
Introduction to prestressed concrete
PPTX
Reactive powder-concrete
PPT
Post-Tension Concrete - Info session for Contractors
PPTX
prestressed concrete
PPT
PRE STRESSED CONCRETE
PPTX
Self compacting concrete (scc)
Post Tension
Prestressing Concept, Materials and Prestressing System - Section B, Group 1
Introduction to prestressed concrete
Reactive powder-concrete
Post-Tension Concrete - Info session for Contractors
prestressed concrete
PRE STRESSED CONCRETE
Self compacting concrete (scc)

What's hot (20)

PPT
Prestressed concrete
PPTX
Prestressed Concrete
PPTX
Jacketing
PPT
Pre-stressed Concrete
PPTX
Doubly R C Beam
PPTX
Connections in steel structures
PPTX
Shoring and underpinning
PPSX
Design of steel structures Introduction
PPTX
Prefabrication​ structure ppt
PPTX
Industrial building
PPT
Introduction to prestressed concrete structures
PPTX
Formwork
PPTX
Prefabricated structures
PDF
Precast concrete construction
PPTX
Precast concrete construction
PPTX
Compression member
PDF
Combined footing 1-1-18
PPTX
suspension bridge ppt
PPTX
Balanced section,under reinforced,over reinforced section
PPTX
Limit state, working stress, ultimate load method - Detailed Concept
Prestressed concrete
Prestressed Concrete
Jacketing
Pre-stressed Concrete
Doubly R C Beam
Connections in steel structures
Shoring and underpinning
Design of steel structures Introduction
Prefabrication​ structure ppt
Industrial building
Introduction to prestressed concrete structures
Formwork
Prefabricated structures
Precast concrete construction
Precast concrete construction
Compression member
Combined footing 1-1-18
suspension bridge ppt
Balanced section,under reinforced,over reinforced section
Limit state, working stress, ultimate load method - Detailed Concept
Ad

Similar to What is post tensioning (20)

PPTX
Types of post tensioning methods (2).pptx
PPTX
Pre stressed concrete
PPTX
Presentation1
PPTX
post tension slabs in residential building
PPTX
Pre stressed concrete construction
PPT
Prestressed Concrete Basics
PPTX
PPTX
Unit 1 anchorage systems
PPT
Wiring_Con.ppt
PDF
PSC Lecture PPT.pdf
PDF
Pre-stressed concrete
PPTX
Design considerations of electrical installations
PPTX
Pre-stressing Concrete Concepts and Advantages
PPTX
Openwinding system in mine machinery.pptx
PPTX
Prestressed Concrete
PPT
Chimney one go
PPTX
Spine Instrumentation.pptx
PPTX
Unit I Introduction theory and behaviour
PDF
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
Types of post tensioning methods (2).pptx
Pre stressed concrete
Presentation1
post tension slabs in residential building
Pre stressed concrete construction
Prestressed Concrete Basics
Unit 1 anchorage systems
Wiring_Con.ppt
PSC Lecture PPT.pdf
Pre-stressed concrete
Design considerations of electrical installations
Pre-stressing Concrete Concepts and Advantages
Openwinding system in mine machinery.pptx
Prestressed Concrete
Chimney one go
Spine Instrumentation.pptx
Unit I Introduction theory and behaviour
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
Ad

Recently uploaded (20)

PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
Construction Project Organization Group 2.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
composite construction of structures.pdf
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
Well-logging-methods_new................
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
Sustainable Sites - Green Building Construction
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
UNIT 4 Total Quality Management .pptx
Strings in CPP - Strings in C++ are sequences of characters used to store and...
CYBER-CRIMES AND SECURITY A guide to understanding
Lecture Notes Electrical Wiring System Components
Construction Project Organization Group 2.pptx
CH1 Production IntroductoryConcepts.pptx
composite construction of structures.pdf
additive manufacturing of ss316l using mig welding
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Well-logging-methods_new................
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Operating System & Kernel Study Guide-1 - converted.pdf
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Sustainable Sites - Green Building Construction
UNIT-1 - COAL BASED THERMAL POWER PLANTS
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx

What is post tensioning

  • 1. Charlie Gupta B.Arch VIII Sem Methods of Post Tensioning
  • 2. What is Post Tensioning? • Post-tensioning is a method of producing prestressed concrete, masonry and other structural elements. • When the steel is tensioned after concrete placement the process is called posttensioning. • When a concrete or masonry element is prestressed, it means that the steel is being tensioned and the concrete or masonry is being compressed. Compression is a force that squeezes or crushes and tension is a force that pulls something apart. • Post-tensioning is a form of prestressing. Prestressing simply means that the steel is stressed (pulled or tensioned) before the concrete has to support the service loads.
  • 5. Freyssinet System • Freyssinet system was introduced by the French Engineer Freyssinet and it was the first method to be introduced. • High strength steel wires of 5mm or 7mm diameter, numbering 8 or 12 or 16 or 24 are grouped into a cable with a helical spring inside. • Spring keeps proper spacing for the wire. Cable is inserted in the duct. • Anchorage device consists of a concrete cylinder with a concentric conical hole and corrugations on its surface, and a conical plug carrying grooves on its surface.
  • 6. Magnel Blaton system • In Freyssinet system several wires are stretched at a time. In Magnel Blaton system, two wires are stretched at a time • In this system, the anchorage device consists of sandwich plate having grooves to hold the wires and wedges which are also grooved. • Each plate carries eight wires. Between the two ends the spacing of the wires is maintained by spacers. • Wires of 5mm or 7mm are adopted. Cables consists of wires in multiples of 8 wires.
  • 7. Gifford Udall System • This system originated in Great Britain, is widely used in India. • This is a single wire system. Each wire is stressed independently using a double acting jack. • Any number of wires can be grouped together to form a cable in this system. There are two types of anchorage device in this system. a) Tube anchorages b) Plate anchorages
  • 8. Lee McCall System: • This method is used to prestress steel bars. • The diameter of the bar is between 12 and 28mm. bars provided with threads at the ends are inserted in the performed ducts. • After stretching the bars to the required length, they are tightened using nuts against bearing plates provided at the end sections of the member. • This system has the advantage over others that stressing can be done by stages as it is possible to tighten the nut at any stage.