MICRO ETL FOUNDATION - Ideas and solutions for the Data Warehouse and Business Intelligence projects in Oracle environment - MASSIMO CENCI
What you know
about ETL process is
MICRO ETL FOUNDATION
The ETL process
• The title you have just read, is deliberately provocative. Of course not everything is false. My intention is to
try to see the things from another point of view. Don't take anything for granted, and try to read some
axioms, typical of the world of the Data Warehouse, in a critical way.
• I will try to provide a different view of reality, questioning the individual letters of the ETL paradigm. It is
therefore necessary to investigate in more detail the meaning of the ETL process.
• We can find many definitions of the ETL process. In general, it is an expression that refers to the process of
Extraction, Transformation and Load of input data into a Synthesis System (Data Warehouse, Data Mart ...)
used by the end users.
• This is a very general definition, which does not helps us to understand the work that we face. A simple
design can help you to understand the process.
MICRO ETL FOUNDATION
The ETL process
• The data that are in the structures of the Operational Systems(OLTP), are extracted, transformed and
loaded into the the Data Warehouse structures.
• In recent years, it has also sets another definition of the loading process. Its difference is the inversion of
the "L" with the "T", that is, the implementation of the transformation phase AFTER the extraction phase.
• This trend is related to the need to charge increasingly large amounts of data, and to the ability to treat
this data, using the ETL tools. Many data transformations, maybe performed "on the fly", ie in memory, or
with the help of temporary tables, can be problematic.
• You have less problems to load the data file as it is, in a staging table, and then apply on it, this
transformations.
MICRO ETL FOUNDATION
The ambiguity of the ETL and ELT processes
• As part of my considerations on the Micro ETL Foundation, the ELT approach is more in line with his
philosophy. There must be a close relationship between the input data file and the Staging table. This
ratio must be 1:1 and the flow must be as complete as possible.
• Despite the ELT approach is better, this does not mean that it is the correct one. Of course, on the
Internet you can find various articles and comments relating to the pros and cons of the two approaches.
• In my view, however, the reality is different. The problem is not to decide whether to make the changes
before or after loading. The problem is that both processes need to be revised. This is because, if we look
carefully :
1. The extraction step doesn't exists.
2. It lacks the configuration and acquisition step.
3. It is not convenient the transformation phase
4. It is not clear how to do the loading, and where to do it.
• Thus, although we can continue to speak generically of ETL (or ELT) because it is basically an acronym
universally known for years, we must be aware that the name is misleading in case you want to set a
baseline with the three phases into a project Gantt, with the estimates associated.
• Let us then to justify the 4 previous points.
MICRO ETL FOUNDATION
1 - The extraction step doesn't exists
• Is there a very real extraction activity in charge of the development team of the DWH? I think not. In most
cases, the feeding systems are external systems that reside on mainframe, perhaps with different operating
systems, and different database programming languages.
• The extraction phase of the data, the "E" of the Extract word, is always in charge to the feeding system,
which knows how to produce the flow. The Data Warehouse team must instead deal with two activities.
1. The activity of Acquisition or Transfer, namely the placement and storage of the input data files into
well-defined folders in the DWH server. All this, with a pre-established naming convention.
2. The analysis of the contents of the data file, that is what the feeding system must produce. This, if
we're lucky. Otherwise, because generate new data files costs money, you will have to reuse or
integrate already existing data files.
• The relationship with the external systems, using the transfer of data files, is used by most of the Data
Warehouse projects. The CDC (Change Data Capture) situations are not so frequent, however, and do not
cover the whole loading phase.
• There are also rare cases, in which the DWH team builds the extraction statements and runs them directly,
using a database link.
• This should not be done for safety reasons, for performance reasons (who knows the indexing structure
into the external systems ?) and for reasons of liability (if the data are not loaded, where is the problem?).
• And also for scalability reasons. In times of budget cuts, it is increasingly common for the "IT people" to
change the transactional systems or part of the source systems.
• Having a source configuration which remains stable to which the external systems must adapt it, is
definitely a choice that maintains the stability.
MICRO ETL FOUNDATION
2 - It lacks the configuration and the acquisition step
• The first step to be taken into account (and it is not simple) is the definition phase of the data files and
their configuration in the metadata tables. It will be the feeding system to provide us the definitions using
word documents, excel, pdf or other.
• We must also give a unique identification of the data file, not numeric, valid for all feeding systems. It
'important that the name will be unique.
• If we have a data file of financial operations, let's call it,for example, TMOV. If we have multiple data files,
such as daily, monthly, quarterly, etc, let's call them DTMOV, MTMOV, QTMOV. If we have two systems
that provide the daily financial operations, let's call them XDTMOV, YDTMOV to distinguish them, but we
must have always a unique name as a reference. On it we will build a primary key.
• In this phase, we will have to configure all of the characteristics of the data files, not only their columnar
structure.
MICRO ETL FOUNDATION
3 - It is not convenient the transformation phase
• We now analyze the letter “T”, that is the "Transform" component of the process. My opinion is that we
should not talk about transformation, but of enrichment of the data.
• To transform the data, means make them different from the original one: this has, as a consequence, a
difficulty in the control of the data.
• We must always be able to demonstrate that the data that we have received in input is identical to what
we have loaded into the Data Warehouse. Immediately after the deploy into production, certainly we will
have to answer to several check requests.
• If the original data has been transformed, we will have to spend much time to restore the original data
files (maybe already stored on tapes) and redo the tests. If we preserve the original data and enrich them
with the result of the transformation, we will be able to respond more efficiently and faster. So my
suggestion is:
1. Keep the original data into the Staging Area tables (and, if possible, even after).
2. Do not make changes to the existing data, but add the columns that contain the transformation
result.
3. Enrichment is the right word. I execute the enrichment by transforming or aggregating different
data as consequence of the requirements.
4. Implement the enrichment step not as a staging phase, but as a phase of post-staging, ie only at the
end of the whole loading of the Staging Area. This is because, often, the enrichment involves the use
of data from other staging tables. To avoid implementing any precedence rules or supervision of
arrivals, it is certainly preferable to wait for the completion of the entire staging process.
MICRO ETL FOUNDATION
4 – How and where to load
• The phase of the loading is very generic, since it does not say where to load the data. We should decide
where to load immediately, because this choice will determine which, of the two fundamental approaches
in the field of Data Warehouse, will be adopted.
• Many years have passed, but this choice will continue to divide the international community. Innmon
approach or Kimball approach?
• We want to have a comprehensive architecture of ODS (Operational Data Store) that retains more detail
data and a dimensional architecture for synthesis data, or we prefer to have a single dimensional structure
for both? Everyone can decide according to his own experience, your own timing and your own badget.
• However, regardless of the method used, surely the first structure to be loaded is the Staging Area, which
at first, will welcome the input data files. The Staging Area is a very vast topic. Just some suggestion.
• The loading of the staging tables should be as simple as possible. A single direct insertion, possibly filtered
by some logical structure, from the data file into the final table. Some small "syntactic" transformation can
be done, but it must be of formatting, and not of semantic.
• The loading must always be preceded by the cleaning of the staging table. Do not load into a staging table,
multiple data files (more days, for example) of the same type, that, for some reason, have not been loaded
and they have accumulated. If you can, always process them one at a time.
• If it is necessary, you can aggregate them, by hand or with an automatic mechanism, into a single data file.
Do not forget that we have to perform very accurate control of these flows.
• So, even a trivial control on the congruence between the number of rows loaded and those present in the
data file, it will be much more difficult if the staging table contains the rows of several input streams.
MICRO ETL FOUNDATION
Conclusion
• So in conclusion, keep in mind that, in practice, ETL hides a different acronym, which can be summarized
with: CALEL
1. Configuration
2. Acquisition
3. Load (Staging Area)
4. Enrichment
5. Load (Data Warehouse)
• But, as CALEL is just horrible, we can continue to call it, ETL process. All this we can represent graphically
in this way:
MICRO ETL FOUNDATION
Conclusion

More Related Content

PDF
Introduction to ETL and Data Integration
DOC
To Study E T L ( Extract, Transform, Load) Tools Specially S Q L Server I...
PDF
CloverETL Basic Training Excerpt
PDF
Etl overview training
PPT
ETL Fundamentals
DOCX
Data Warehousing Practical for T.Y.I.T.
PPTX
What is ETL?
PPTX
ELT Publishing Tool Overview V3_Jeff
Introduction to ETL and Data Integration
To Study E T L ( Extract, Transform, Load) Tools Specially S Q L Server I...
CloverETL Basic Training Excerpt
Etl overview training
ETL Fundamentals
Data Warehousing Practical for T.Y.I.T.
What is ETL?
ELT Publishing Tool Overview V3_Jeff

What's hot (20)

PPT
Hand Coding ETL Scenarios and Challenges
PDF
Day 1 Data Stage Administrator And Director 11.0
DOCX
Migration from 8.1 to 11.3
PDF
An Overview on Data Quality Issues at Data Staging ETL
DOC
Datastage parallell jobs vs datastage server jobs
PDF
Cts informatica interview question answers
PPTX
RDBMS to NoSQL. An overview.
PPTX
Datastage free tutorial
PPT
Datastage Introduction To Data Warehousing
DOCX
Function points and elements
PPT
Less18 moving data
PDF
Day 2 Data Stage Manager 11.0
PDF
Oracle Insert Statements for DBAs and Developers
PPT
Datastage Introduction To Data Warehousing
PDF
[Www.pkbulk.blogspot.com]dbms01
DOCX
Oracle dba interview questions with answer
PDF
Data warehousing labs maunal
DOC
Oracle Complete Interview Questions
DOCX
Informatica interview questions and answers|Informatica Faqs 2014
PPT
Transaction management and concurrency control
Hand Coding ETL Scenarios and Challenges
Day 1 Data Stage Administrator And Director 11.0
Migration from 8.1 to 11.3
An Overview on Data Quality Issues at Data Staging ETL
Datastage parallell jobs vs datastage server jobs
Cts informatica interview question answers
RDBMS to NoSQL. An overview.
Datastage free tutorial
Datastage Introduction To Data Warehousing
Function points and elements
Less18 moving data
Day 2 Data Stage Manager 11.0
Oracle Insert Statements for DBAs and Developers
Datastage Introduction To Data Warehousing
[Www.pkbulk.blogspot.com]dbms01
Oracle dba interview questions with answer
Data warehousing labs maunal
Oracle Complete Interview Questions
Informatica interview questions and answers|Informatica Faqs 2014
Transaction management and concurrency control
Ad

Similar to Data Warehouse - What you know about etl process is wrong (20)

DOCX
Etl techniques
PPT
definign etl process extract transform load.ppt
PPTX
Module 1_Data Warehousing Fundamentals.pptx
PDF
Why shift from ETL to ELT?
PPTX
Etl - Extract Transform Load
PPTX
Recipes 6 of Data Warehouse and Business Intelligence - Naming convention tec...
PDF
Data warehouse-testing
PPTX
ETL Technologies.pptx
PPTX
data warehousing need and characteristics. types of data w data warehouse arc...
PPTX
ETL_Methodology.pptx
PDF
4_etl_testing_tutorial_till_chapter3-merged-compressed.pdf
PDF
Data Ware House Testing
PPT
Recipe 14 - Build a Staging Area for an Oracle Data Warehouse (2)
PDF
REAL-TIME CHANGE DATA CAPTURE USING STAGING TABLES AND DELTA VIEW GENERATION...
PDF
Data warehousing change in a challenging environment
PDF
ETL Process & Data Warehouse Fundamentals
PPTX
Extract Transformation Load (3) (1).pptx
PPTX
Extract Transformation Loading1 (3).pptx
PDF
Data Warehousing concepts for Data Engineering
PPT
ETL Testing Training Presentation
Etl techniques
definign etl process extract transform load.ppt
Module 1_Data Warehousing Fundamentals.pptx
Why shift from ETL to ELT?
Etl - Extract Transform Load
Recipes 6 of Data Warehouse and Business Intelligence - Naming convention tec...
Data warehouse-testing
ETL Technologies.pptx
data warehousing need and characteristics. types of data w data warehouse arc...
ETL_Methodology.pptx
4_etl_testing_tutorial_till_chapter3-merged-compressed.pdf
Data Ware House Testing
Recipe 14 - Build a Staging Area for an Oracle Data Warehouse (2)
REAL-TIME CHANGE DATA CAPTURE USING STAGING TABLES AND DELTA VIEW GENERATION...
Data warehousing change in a challenging environment
ETL Process & Data Warehouse Fundamentals
Extract Transformation Load (3) (1).pptx
Extract Transformation Loading1 (3).pptx
Data Warehousing concepts for Data Engineering
ETL Testing Training Presentation
Ad

More from Massimo Cenci (20)

PPTX
Recipe 16 of Data Warehouse and Business Intelligence - The monitoring of the...
PPTX
Il controllo temporale dei data file in staging area
PPT
Recipe 14 of Data Warehouse and Business Intelligence - Build a Staging Area ...
PPTX
Tecniche di progettazione della staging area in un processo etl
PPTX
Note di Data Warehouse e Business Intelligence - Il giorno di riferimento dei...
PPTX
Recipe 12 of Data Warehouse and Business Intelligence - How to identify and c...
PPTX
Note di Data Warehouse e Business Intelligence - Pensare "Agile"
PPTX
Note di Data Warehouse e Business Intelligence - La gestione delle descrizioni
PPTX
Recipes 10 of Data Warehouse and Business Intelligence - The descriptions man...
PPTX
Note di Data Warehouse e Business Intelligence - Tecniche di Naming Conventio...
PPTX
Letter to a programmer
PPTX
Recipes 9 of Data Warehouse and Business Intelligence - Techniques to control...
PPTX
Note di Data Warehouse e Business Intelligence - Tecniche di Naming Conventio...
PPTX
Recipes 8 of Data Warehouse and Business Intelligence - Naming convention tec...
PPTX
ata Warehouse and Business Intelligence - Recipe 7 - A messaging system for O...
PPTX
Data Warehouse and Business Intelligence - Recipe 7 - A messaging system for ...
PPTX
Data Warehouse e Business Intelligence in ambiente Oracle - Il sistema di mes...
PPTX
Data Warehouse e Business Intelligence in ambiente Oracle - Il sistema di mes...
PPT
Oracle All-in-One - how to send mail with attach using oracle pl/sql
PPTX
Note di Data Warehouse e Business Intelligence - Le Dimensioni di analisi (pa...
Recipe 16 of Data Warehouse and Business Intelligence - The monitoring of the...
Il controllo temporale dei data file in staging area
Recipe 14 of Data Warehouse and Business Intelligence - Build a Staging Area ...
Tecniche di progettazione della staging area in un processo etl
Note di Data Warehouse e Business Intelligence - Il giorno di riferimento dei...
Recipe 12 of Data Warehouse and Business Intelligence - How to identify and c...
Note di Data Warehouse e Business Intelligence - Pensare "Agile"
Note di Data Warehouse e Business Intelligence - La gestione delle descrizioni
Recipes 10 of Data Warehouse and Business Intelligence - The descriptions man...
Note di Data Warehouse e Business Intelligence - Tecniche di Naming Conventio...
Letter to a programmer
Recipes 9 of Data Warehouse and Business Intelligence - Techniques to control...
Note di Data Warehouse e Business Intelligence - Tecniche di Naming Conventio...
Recipes 8 of Data Warehouse and Business Intelligence - Naming convention tec...
ata Warehouse and Business Intelligence - Recipe 7 - A messaging system for O...
Data Warehouse and Business Intelligence - Recipe 7 - A messaging system for ...
Data Warehouse e Business Intelligence in ambiente Oracle - Il sistema di mes...
Data Warehouse e Business Intelligence in ambiente Oracle - Il sistema di mes...
Oracle All-in-One - how to send mail with attach using oracle pl/sql
Note di Data Warehouse e Business Intelligence - Le Dimensioni di analisi (pa...

Recently uploaded (20)

PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PDF
Empathic Computing: Creating Shared Understanding
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PPTX
Big Data Technologies - Introduction.pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPT
Teaching material agriculture food technology
PDF
Approach and Philosophy of On baking technology
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Spectral efficient network and resource selection model in 5G networks
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
Mobile App Security Testing_ A Comprehensive Guide.pdf
Empathic Computing: Creating Shared Understanding
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Big Data Technologies - Introduction.pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Review of recent advances in non-invasive hemoglobin estimation
NewMind AI Weekly Chronicles - August'25 Week I
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
20250228 LYD VKU AI Blended-Learning.pptx
Teaching material agriculture food technology
Approach and Philosophy of On baking technology
“AI and Expert System Decision Support & Business Intelligence Systems”
Understanding_Digital_Forensics_Presentation.pptx
Spectral efficient network and resource selection model in 5G networks
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Dropbox Q2 2025 Financial Results & Investor Presentation
Encapsulation_ Review paper, used for researhc scholars
Advanced methodologies resolving dimensionality complications for autism neur...

Data Warehouse - What you know about etl process is wrong

  • 1. MICRO ETL FOUNDATION - Ideas and solutions for the Data Warehouse and Business Intelligence projects in Oracle environment - MASSIMO CENCI What you know about ETL process is
  • 2. MICRO ETL FOUNDATION The ETL process • The title you have just read, is deliberately provocative. Of course not everything is false. My intention is to try to see the things from another point of view. Don't take anything for granted, and try to read some axioms, typical of the world of the Data Warehouse, in a critical way. • I will try to provide a different view of reality, questioning the individual letters of the ETL paradigm. It is therefore necessary to investigate in more detail the meaning of the ETL process. • We can find many definitions of the ETL process. In general, it is an expression that refers to the process of Extraction, Transformation and Load of input data into a Synthesis System (Data Warehouse, Data Mart ...) used by the end users. • This is a very general definition, which does not helps us to understand the work that we face. A simple design can help you to understand the process.
  • 3. MICRO ETL FOUNDATION The ETL process • The data that are in the structures of the Operational Systems(OLTP), are extracted, transformed and loaded into the the Data Warehouse structures. • In recent years, it has also sets another definition of the loading process. Its difference is the inversion of the "L" with the "T", that is, the implementation of the transformation phase AFTER the extraction phase. • This trend is related to the need to charge increasingly large amounts of data, and to the ability to treat this data, using the ETL tools. Many data transformations, maybe performed "on the fly", ie in memory, or with the help of temporary tables, can be problematic. • You have less problems to load the data file as it is, in a staging table, and then apply on it, this transformations.
  • 4. MICRO ETL FOUNDATION The ambiguity of the ETL and ELT processes • As part of my considerations on the Micro ETL Foundation, the ELT approach is more in line with his philosophy. There must be a close relationship between the input data file and the Staging table. This ratio must be 1:1 and the flow must be as complete as possible. • Despite the ELT approach is better, this does not mean that it is the correct one. Of course, on the Internet you can find various articles and comments relating to the pros and cons of the two approaches. • In my view, however, the reality is different. The problem is not to decide whether to make the changes before or after loading. The problem is that both processes need to be revised. This is because, if we look carefully : 1. The extraction step doesn't exists. 2. It lacks the configuration and acquisition step. 3. It is not convenient the transformation phase 4. It is not clear how to do the loading, and where to do it. • Thus, although we can continue to speak generically of ETL (or ELT) because it is basically an acronym universally known for years, we must be aware that the name is misleading in case you want to set a baseline with the three phases into a project Gantt, with the estimates associated. • Let us then to justify the 4 previous points.
  • 5. MICRO ETL FOUNDATION 1 - The extraction step doesn't exists • Is there a very real extraction activity in charge of the development team of the DWH? I think not. In most cases, the feeding systems are external systems that reside on mainframe, perhaps with different operating systems, and different database programming languages. • The extraction phase of the data, the "E" of the Extract word, is always in charge to the feeding system, which knows how to produce the flow. The Data Warehouse team must instead deal with two activities. 1. The activity of Acquisition or Transfer, namely the placement and storage of the input data files into well-defined folders in the DWH server. All this, with a pre-established naming convention. 2. The analysis of the contents of the data file, that is what the feeding system must produce. This, if we're lucky. Otherwise, because generate new data files costs money, you will have to reuse or integrate already existing data files. • The relationship with the external systems, using the transfer of data files, is used by most of the Data Warehouse projects. The CDC (Change Data Capture) situations are not so frequent, however, and do not cover the whole loading phase. • There are also rare cases, in which the DWH team builds the extraction statements and runs them directly, using a database link. • This should not be done for safety reasons, for performance reasons (who knows the indexing structure into the external systems ?) and for reasons of liability (if the data are not loaded, where is the problem?). • And also for scalability reasons. In times of budget cuts, it is increasingly common for the "IT people" to change the transactional systems or part of the source systems. • Having a source configuration which remains stable to which the external systems must adapt it, is definitely a choice that maintains the stability.
  • 6. MICRO ETL FOUNDATION 2 - It lacks the configuration and the acquisition step • The first step to be taken into account (and it is not simple) is the definition phase of the data files and their configuration in the metadata tables. It will be the feeding system to provide us the definitions using word documents, excel, pdf or other. • We must also give a unique identification of the data file, not numeric, valid for all feeding systems. It 'important that the name will be unique. • If we have a data file of financial operations, let's call it,for example, TMOV. If we have multiple data files, such as daily, monthly, quarterly, etc, let's call them DTMOV, MTMOV, QTMOV. If we have two systems that provide the daily financial operations, let's call them XDTMOV, YDTMOV to distinguish them, but we must have always a unique name as a reference. On it we will build a primary key. • In this phase, we will have to configure all of the characteristics of the data files, not only their columnar structure.
  • 7. MICRO ETL FOUNDATION 3 - It is not convenient the transformation phase • We now analyze the letter “T”, that is the "Transform" component of the process. My opinion is that we should not talk about transformation, but of enrichment of the data. • To transform the data, means make them different from the original one: this has, as a consequence, a difficulty in the control of the data. • We must always be able to demonstrate that the data that we have received in input is identical to what we have loaded into the Data Warehouse. Immediately after the deploy into production, certainly we will have to answer to several check requests. • If the original data has been transformed, we will have to spend much time to restore the original data files (maybe already stored on tapes) and redo the tests. If we preserve the original data and enrich them with the result of the transformation, we will be able to respond more efficiently and faster. So my suggestion is: 1. Keep the original data into the Staging Area tables (and, if possible, even after). 2. Do not make changes to the existing data, but add the columns that contain the transformation result. 3. Enrichment is the right word. I execute the enrichment by transforming or aggregating different data as consequence of the requirements. 4. Implement the enrichment step not as a staging phase, but as a phase of post-staging, ie only at the end of the whole loading of the Staging Area. This is because, often, the enrichment involves the use of data from other staging tables. To avoid implementing any precedence rules or supervision of arrivals, it is certainly preferable to wait for the completion of the entire staging process.
  • 8. MICRO ETL FOUNDATION 4 – How and where to load • The phase of the loading is very generic, since it does not say where to load the data. We should decide where to load immediately, because this choice will determine which, of the two fundamental approaches in the field of Data Warehouse, will be adopted. • Many years have passed, but this choice will continue to divide the international community. Innmon approach or Kimball approach? • We want to have a comprehensive architecture of ODS (Operational Data Store) that retains more detail data and a dimensional architecture for synthesis data, or we prefer to have a single dimensional structure for both? Everyone can decide according to his own experience, your own timing and your own badget. • However, regardless of the method used, surely the first structure to be loaded is the Staging Area, which at first, will welcome the input data files. The Staging Area is a very vast topic. Just some suggestion. • The loading of the staging tables should be as simple as possible. A single direct insertion, possibly filtered by some logical structure, from the data file into the final table. Some small "syntactic" transformation can be done, but it must be of formatting, and not of semantic. • The loading must always be preceded by the cleaning of the staging table. Do not load into a staging table, multiple data files (more days, for example) of the same type, that, for some reason, have not been loaded and they have accumulated. If you can, always process them one at a time. • If it is necessary, you can aggregate them, by hand or with an automatic mechanism, into a single data file. Do not forget that we have to perform very accurate control of these flows. • So, even a trivial control on the congruence between the number of rows loaded and those present in the data file, it will be much more difficult if the staging table contains the rows of several input streams.
  • 9. MICRO ETL FOUNDATION Conclusion • So in conclusion, keep in mind that, in practice, ETL hides a different acronym, which can be summarized with: CALEL 1. Configuration 2. Acquisition 3. Load (Staging Area) 4. Enrichment 5. Load (Data Warehouse) • But, as CALEL is just horrible, we can continue to call it, ETL process. All this we can represent graphically in this way: