SlideShare a Scribd company logo
Speaker: Adam McMillen
Course Number: 40119201-29
March 15, 2018
www.IMEGCorp.com
Why the EUI in the RFP?
HIGHLY DESIRABLE - have influence on the recommended design; if not included, trade-offs should be
made clear
Photos courtesy of University of Chicago
PROJECT GOAL LIST: Project goals help design teams prioritize their focus on the MEP and building performance
design. Goals are categorized in three main sections:
• Maximum energy target of 65 KBTU/gsf annually; lower is preferred
• LEED NC Silver Certification
• Superior occupant comfort
• EnergyStar certified building
MISSION CRITICAL - these are deemed critical to project success
IF POSSIBLE - influence recommended design and are considered highly beneficial if included in the
solution
• Living Building full certification
• Net Zero Energy Design
• Maximum energy target of 55 kBtu/gsf annually; lower is preferred
• Passive design strategies (i.e. daylighting, passive solar heating, etc.)
• Ease of maintenance
• Visual displays of current energy efficiency
• Exceed LEED NC version 4, Silver Certification
RFP LANGUAGE
4
46 kBtu/ft2/yr
52 kBtu/ft2/yr
54 kBtu/ft2/yr
51 kBtu/ft2/yr
5
Accelerate Performance
This Changes Everything: a
Sustainability Revolution in New
Building Procurement
Define an energy requirement
Lack of clarity with unbounded
interpretation. Rating schemes
help resolve this, but do not
drive a certain metric.
Often this is a comparison
between simulated results.
There is very little opportunity to
verify actual savings.
This is a measurable target;
requires up-front research to
establish a realistic benchmark.
Sustainable building
30% savings over
energy code
An annual energy
use intensity (EUI)
of 45 kBtu/sq ft/year
A
B
C
Same
budget
Same
budget
Same
budget
Project energy goals
Variations of a measurable target
SHALL ACHIEVE AN EUI OF 80 KBTU/SF/YR
SHALL ACHIEVE AN ENERGYSTAR SCORE OF 90
NET ZERO
SHALL BE THE MOST EFFICIENT CLASSROOM BUILDING ON
CAMPUS
SHALL BE IN TOP 10% OF BUILDINGS IN CITY BENCHMARKING
ORDINANCE
TEAM SHALL SUBMIT THEIR PROPOSED EUI REQUIREMENT
MEANS OF ENFORCEMENT
So now what
Instead, focus on this
0
50
100
150
200
250
300
350
400
450
500
- 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000
Energyuseintensity(kBtu/sf/yr)
Building size
Project focus facilities OSU district 3 IMEG healthcare - midwestCampus XYZ
Energystar
Add context and clarity
Proposed project size
Approach
• Benchmark
• Yours, the owners, peers, industry targets
• Communicate financial implications of the owner’s energy goal
• Create 2-3 packages – not a list of one-offs
• Be aware of the most sensitive variables
• Avoid language around ‘guarantee’
No guarantee
Not an energy performance contract
• Need all three parts – design, construction, and operations
Achieving net zero
Actual path to zero
Credit:
Shanti Pless, National Renewable Energy Laboratory
WHY DID THEY PUT THAT EUI REQUIREMENT IN THE RFP
Course Number: 40119201-29
Adam McMillen, PE, LEED AP BD+C
312.852.1360
Adam.M.McMillen@imegcorp.com
This concludes the American Institute of Architects
Continuing Education Systems Course

More Related Content

PDF
Building the Case for Net Zero
PDF
How Upcoming Regulation Will Affect You
PDF
Preparing for Zero Net Energy Buildings
PDF
Presentation on Zero Carbon Buildings
PDF
Net Zero Energy Buildings
PDF
Regulatory Update: Introduction to Bill 135 and Environmental Policies Impact...
PPTX
Deep Retrofit: Supporting transition to low carbon buildings
PPTX
Deep Retrofit: Lessons from Superhomes
Building the Case for Net Zero
How Upcoming Regulation Will Affect You
Preparing for Zero Net Energy Buildings
Presentation on Zero Carbon Buildings
Net Zero Energy Buildings
Regulatory Update: Introduction to Bill 135 and Environmental Policies Impact...
Deep Retrofit: Supporting transition to low carbon buildings
Deep Retrofit: Lessons from Superhomes

What's hot (20)

PPTX
Deep Retrofit: IERC & Enabling collaborative and Industry Driven Energy Rese...
PPTX
Energy modeling 101 (public)
PDF
CIB TG66 North America Webinar 2010-10-12 5 Joshua Kneifel
PPTX
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
PPT
Deep Retrofit & the Irish Policy Perspective
PDF
Bemidji Guaranteed Energy Savings Program
PDF
Overview: MN Guaranteed Energy Savings Program
PDF
Towards Nearly Zero Energy Buildings
PDF
Energy Management at Unite Students: it is Up to uS…
PPTX
Deep Retrofit: Retrofit in the UK
PPTX
Deep Retrofit: Energy Cultures and the Importance of Energy Practices Within ...
PDF
IMPACT & Life Cycle Assessment
PDF
The role of delivered performance june2009
PDF
Carbon Neutral Apartment Retrofits
PPS
Sez presentation-6
PDF
Policy innovation in British Columbia
PPTX
Pre-Conference Workshop: Energy Conservation in Gambling Facilities
PDF
Sustainable Energy and Climate Action Planning to Enhance Low Carbon District...
PDF
Money and the Role of Building Physics Software in the Valuation Chain
PPT
Why should we invest in Energy Efficiency Innovation?
Deep Retrofit: IERC & Enabling collaborative and Industry Driven Energy Rese...
Energy modeling 101 (public)
CIB TG66 North America Webinar 2010-10-12 5 Joshua Kneifel
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit & the Irish Policy Perspective
Bemidji Guaranteed Energy Savings Program
Overview: MN Guaranteed Energy Savings Program
Towards Nearly Zero Energy Buildings
Energy Management at Unite Students: it is Up to uS…
Deep Retrofit: Retrofit in the UK
Deep Retrofit: Energy Cultures and the Importance of Energy Practices Within ...
IMPACT & Life Cycle Assessment
The role of delivered performance june2009
Carbon Neutral Apartment Retrofits
Sez presentation-6
Policy innovation in British Columbia
Pre-Conference Workshop: Energy Conservation in Gambling Facilities
Sustainable Energy and Climate Action Planning to Enhance Low Carbon District...
Money and the Role of Building Physics Software in the Valuation Chain
Why should we invest in Energy Efficiency Innovation?
Ad

Similar to Why the EUI in the RFP? (20)

PDF
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
PDF
Advanced energy design guides a blueprint for cutting your campus energy us...
PDF
Controlling capital costs using a performance based design build process
PPT
Intelligent building library study
PDF
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
PDF
Office-building-catalogue-India
PDF
Gordon Holness Handout
PPTX
High Performance Building Design Workshop
PDF
Overview of U.S. Building Energy Regulations
PDF
Sustainability
PDF
ISO 50001 Energy Management Standard
PDF
High Performance Building Design Strategies
PDF
Advanced energy design guides a blueprint for cutting your hospital buildin...
PPS
High Performance Green Design for High-Precision Manufacturing
PPTX
Building Energy Efficiency Metrics: From Title 24 to EUI
PPTX
Energy Efficiency
PPS
Ashrae Sustainability The Road To Net Zero Gcg
PPT
IOT HEMANT 1
PPT
Owning zero usgbc co rmg 2012
PDF
Get an Energy Analysis Report from cove.pdf
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Advanced energy design guides a blueprint for cutting your campus energy us...
Controlling capital costs using a performance based design build process
Intelligent building library study
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Office-building-catalogue-India
Gordon Holness Handout
High Performance Building Design Workshop
Overview of U.S. Building Energy Regulations
Sustainability
ISO 50001 Energy Management Standard
High Performance Building Design Strategies
Advanced energy design guides a blueprint for cutting your hospital buildin...
High Performance Green Design for High-Precision Manufacturing
Building Energy Efficiency Metrics: From Title 24 to EUI
Energy Efficiency
Ashrae Sustainability The Road To Net Zero Gcg
IOT HEMANT 1
Owning zero usgbc co rmg 2012
Get an Energy Analysis Report from cove.pdf
Ad

Recently uploaded (20)

PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
communication and presentation skills 01
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPTX
Amdahl’s law is explained in the above power point presentations
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
737-MAX_SRG.pdf student reference guides
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
Module 8- Technological and Communication Skills.pptx
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
Software Engineering and software moduleing
PPT
Total quality management ppt for engineering students
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
"Array and Linked List in Data Structures with Types, Operations, Implementat...
communication and presentation skills 01
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Amdahl’s law is explained in the above power point presentations
Information Storage and Retrieval Techniques Unit III
CyberSecurity Mobile and Wireless Devices
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
737-MAX_SRG.pdf student reference guides
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
Fundamentals of Mechanical Engineering.pptx
Module 8- Technological and Communication Skills.pptx
Soil Improvement Techniques Note - Rabbi
Fundamentals of safety and accident prevention -final (1).pptx
Software Engineering and software moduleing
Total quality management ppt for engineering students
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT

Why the EUI in the RFP?

  • 1. Speaker: Adam McMillen Course Number: 40119201-29 March 15, 2018 www.IMEGCorp.com
  • 3. HIGHLY DESIRABLE - have influence on the recommended design; if not included, trade-offs should be made clear Photos courtesy of University of Chicago PROJECT GOAL LIST: Project goals help design teams prioritize their focus on the MEP and building performance design. Goals are categorized in three main sections: • Maximum energy target of 65 KBTU/gsf annually; lower is preferred • LEED NC Silver Certification • Superior occupant comfort • EnergyStar certified building MISSION CRITICAL - these are deemed critical to project success IF POSSIBLE - influence recommended design and are considered highly beneficial if included in the solution • Living Building full certification • Net Zero Energy Design • Maximum energy target of 55 kBtu/gsf annually; lower is preferred • Passive design strategies (i.e. daylighting, passive solar heating, etc.) • Ease of maintenance • Visual displays of current energy efficiency • Exceed LEED NC version 4, Silver Certification RFP LANGUAGE
  • 4. 4
  • 5. 46 kBtu/ft2/yr 52 kBtu/ft2/yr 54 kBtu/ft2/yr 51 kBtu/ft2/yr 5
  • 6. Accelerate Performance This Changes Everything: a Sustainability Revolution in New Building Procurement
  • 7. Define an energy requirement Lack of clarity with unbounded interpretation. Rating schemes help resolve this, but do not drive a certain metric. Often this is a comparison between simulated results. There is very little opportunity to verify actual savings. This is a measurable target; requires up-front research to establish a realistic benchmark. Sustainable building 30% savings over energy code An annual energy use intensity (EUI) of 45 kBtu/sq ft/year A B C Same budget Same budget Same budget Project energy goals
  • 8. Variations of a measurable target SHALL ACHIEVE AN EUI OF 80 KBTU/SF/YR SHALL ACHIEVE AN ENERGYSTAR SCORE OF 90 NET ZERO SHALL BE THE MOST EFFICIENT CLASSROOM BUILDING ON CAMPUS SHALL BE IN TOP 10% OF BUILDINGS IN CITY BENCHMARKING ORDINANCE TEAM SHALL SUBMIT THEIR PROPOSED EUI REQUIREMENT
  • 11. Instead, focus on this 0 50 100 150 200 250 300 350 400 450 500 - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 Energyuseintensity(kBtu/sf/yr) Building size Project focus facilities OSU district 3 IMEG healthcare - midwestCampus XYZ Energystar
  • 12. Add context and clarity Proposed project size
  • 13. Approach • Benchmark • Yours, the owners, peers, industry targets • Communicate financial implications of the owner’s energy goal • Create 2-3 packages – not a list of one-offs • Be aware of the most sensitive variables • Avoid language around ‘guarantee’
  • 14. No guarantee Not an energy performance contract • Need all three parts – design, construction, and operations
  • 16. Actual path to zero Credit: Shanti Pless, National Renewable Energy Laboratory
  • 17. WHY DID THEY PUT THAT EUI REQUIREMENT IN THE RFP Course Number: 40119201-29 Adam McMillen, PE, LEED AP BD+C 312.852.1360 Adam.M.McMillen@imegcorp.com This concludes the American Institute of Architects Continuing Education Systems Course